DATA CENTER
Design and Implementation
Sinar Surya Teknologi
Data Center Lifecycle
Design is considered to
be the most important
phase as this is where we
are going to determine
fundamental criteria of
the Data Center;
Availability, Scalability,
Capability & Security
Business Requirement Based
Data Center
Integrated Approach
Data Center
Transformation Flow
TIA-942 Standard
• The purpose of Telecomunication Industry Association
(TIA-942) standard is to provide requirements and
guidelines for the Design and Installation of a data
center or computer room
Telecommunications
Electrical
Architectural
Mechanical
Availability Scalability Security
Standard for sub-components
• Electrical: UNE-EN 50160, UNE-EN 61000-3-2, UNE-EN
61000-3-3, UNE-EN 55011, IEC-61643, EN-60730-2-7, etc
• Earthing: MIE-REBT-039, EN-50310
• EMF: EN-61000-4-8, EN-55022, EN-55011
• Environmental: IEC-61340-5-1, ASHRAE
• Raised floor: BS/EN-12825, UK-PSA PF2
• Network: ISO-11810, EN-50173, TIA-568A
• Fire Protection: NFPA-75, NFPA-2001
Tier Level
Data Center Energy Efficiency Metric
Design Criteria
Architectural Design
• Server Room
– Interior
– Lighting
– Server Rack
– Cabling
– Piping
– Security devices
– Fire Protection Nozzle
• Staging Room
• Utility Room
• Entrance Room
• NOC Room
Electrical Design
• Single Line Diagram
• Fire Protection SLD
• Main Distribution Panel
• Access Door
• CCTV
• Generator
Mechanical Design
• Cooling Equipment Indoor & Outdoor unit
• Cooling Piping Route
Telecommunication Design
• Rack Connection
• Data & Power Tray
DC Components
Power Supply
• Power components in the data center:
– Utility power source(s) and main power panel(s),
– Back-up generator
Mechanical Systems
• Temperature – 20 to 25 degrees celcius
• Relative humidity – 45% to 50%
• Bottom-to-up airflow
• Use cold aisle/hot aisle rack configuration
• Avoid air leaks in raised floor
• Maintain vapor barrier in parimeter,
doorway and subfloor area
Raised Access Floor
• This type of floor consists of a gridded metal framework or substructure of
adjustable-height supports (called "pedestals") that provide support for removable
(lift-able) floor panels, which are usually 2×2 feet or 60×60 cm in size.
• The height of the legs/pedestals is dictated by the volume of cables and other
services provided beneath, but typically arranged for a clearance of at least six
inches or 15 cm.
Cabling
• Horizontal cabling zone
• Vertical cabling zone
Fire Suppression
• Follow NFPA 75 Standard
Firewalls
• Sprinkler systems — both
flooded and pre-action
• Chemical systems:
– Novec
– FM 200
– Inergen
– Halon 1301 (no longer
recommended or in
production)
• Manual systems
– Manual pull stations
– Portable fire
extinguishers
Security Systems
Monitoring System
• Environment Monitoring in computer rooms, data centers and
other facilities has become a critical part of 'Disaster
Prevention'
Implementation
Implementation Phase
Phase-1 Phase-2 Phase-3 Phase-4 Phase-5
 Pre Kick off
 Kick off
 Working permit
 *) Material
delivery
 Build DC Room
 DC Equipment
 Integrity Test
 H/W Mounting
 H/W Setup
 Inter Network
 Testing
 Monitoring
 Checking
 Documentation
 BAST
*) Exclude delivery time
Migration, Move and Relocation
Item Planning
Phase
Blueprint
Phase
Relocation
Phase
Create a team and assign responsibilities for all aspects of the move √
Make sure all areas of expertise are covered √
Make sure that you may have to look outside of IT for some areas √
Prepare documentation, policy, and procedures √
Design a layout for your new data center √
Develop a schedule √
Set up services √
Make business interruption plans √
Only personnel involved in the move should be present at this time √
Have contact numbers for all your vendors handy √
have representatives from the construction firm √
Make sure you have resources on "standby" in case √
Test your critical applications and hardware once everything is in place √
Document every task that have moved in new places √
 Upflow Cooling & Downflow Cooling
 Inrow Cooling
DC Technology
Thank You
@ssteknologi
sinarsurya.teknologi
PT. Sinar Surya Teknologi
Menara Global 5th Floor
Jl. Gatot Subroto Kav.27
Jakarta 12950
Indonesia
Phone : 62-21 529-22636
Facimile : 62-21 52922639
Email : info@ssteknologi.com
Website : http://www.ssteknologi.com

More Related Content

What's hot

Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
Ali Mirfallah
 
Tia 942 Data Center Standards
Tia 942 Data Center StandardsTia 942 Data Center Standards
Tia 942 Data Center Standards
Sri Chalasani
 
Data center presentation toi -28022013
Data center presentation   toi -28022013Data center presentation   toi -28022013
Data center presentation toi -28022013Sanjay Belulkar
 
Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ Build
Schneider Electric
 
Data center
Data centerData center
Data center
Jwala Chapagai
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Upsite Technologies
 
Data Center
Data CenterData Center
Data Center
dhana1663
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
Christopher Kelley
 
Data center hvac
Data center hvacData center hvac
Data center hvac
Sulma Mahardiani
 
Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
Internap
 
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Cloud Computing Wire
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
SP Home Run Inc.
 
Data center
Data centerData center
Data center
Mohammad Danish
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
Tyrone Systems
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Upsite Technologies
 
Data Center Server Rack Strategies
Data Center Server Rack StrategiesData Center Server Rack Strategies
Data Center Server Rack Strategies
42U Data Center Solutions
 
Data center tier standards
Data center tier standardsData center tier standards
Data center tier standards
Colocation America
 
ASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five Questions
MarcHourican1
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
Ali Shoaee
 

What's hot (20)

Data center Building & General Specification
Data center Building & General Specification Data center Building & General Specification
Data center Building & General Specification
 
Tia 942 Data Center Standards
Tia 942 Data Center StandardsTia 942 Data Center Standards
Tia 942 Data Center Standards
 
Data center presentation toi -28022013
Data center presentation   toi -28022013Data center presentation   toi -28022013
Data center presentation toi -28022013
 
Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ Build
 
Data center
Data centerData center
Data center
 
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center CoolingCooling Optimization 101: A Beginner's Guide to Data Center Cooling
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
 
Data Center
Data CenterData Center
Data Center
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
 
Data center hvac
Data center hvacData center hvac
Data center hvac
 
Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
 
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
Data Center Tiers : Tier 1, Tier 2, Tier 3 and Tier 4 data center tiers expla...
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
 
Data center
Data centerData center
Data center
 
Importance of data centers
Importance of data centersImportance of data centers
Importance of data centers
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
 
Data Center Server Rack Strategies
Data Center Server Rack StrategiesData Center Server Rack Strategies
Data Center Server Rack Strategies
 
Data center tier standards
Data center tier standardsData center tier standards
Data center tier standards
 
ASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five QuestionsASHRAE 90.4 vs. 90.1 - Five Questions
ASHRAE 90.4 vs. 90.1 - Five Questions
 
Datacenter
DatacenterDatacenter
Datacenter
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
 

Similar to Datacenter best practices design and implementation

(Tm) 14 May Jwm Pro Intro Resume Cover
(Tm) 14 May Jwm Pro Intro Resume Cover(Tm) 14 May Jwm Pro Intro Resume Cover
(Tm) 14 May Jwm Pro Intro Resume Cover
JMONDAK
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
SmritiGarg21
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011Marc Sample
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedin
Nathaniel Weathers
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
surangagw
 
Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns GroupAkankha Ahmed
 
Eng.Walidmanaa CV
Eng.Walidmanaa  CVEng.Walidmanaa  CV
Eng.Walidmanaa CV
walidmanaa1
 
2015 02 antaira quarterly webinar optimizing a robust automation network
2015 02 antaira quarterly webinar optimizing a robust automation network2015 02 antaira quarterly webinar optimizing a robust automation network
2015 02 antaira quarterly webinar optimizing a robust automation network
Jose Juan Santiago Gomez
 
Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak
 
Wireless Water Monitoring System
Wireless Water Monitoring SystemWireless Water Monitoring System
Wireless Water Monitoring SystemPraveen Sharma
 
Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...
Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...
Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...David Sidhu
 
Updated-Resume-2015
Updated-Resume-2015Updated-Resume-2015
Updated-Resume-2015Jiliang Wang
 
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
IT Arena
 
Data Centre Design Guideline and Standards
Data Centre Design Guideline and StandardsData Centre Design Guideline and Standards
Data Centre Design Guideline and Standards
Bangladesh Network Operators Group
 
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...paul_mathews
 

Similar to Datacenter best practices design and implementation (20)

(Tm) 14 May Jwm Pro Intro Resume Cover
(Tm) 14 May Jwm Pro Intro Resume Cover(Tm) 14 May Jwm Pro Intro Resume Cover
(Tm) 14 May Jwm Pro Intro Resume Cover
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedin
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
 
Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns Group
 
overviewNOC
overviewNOCoverviewNOC
overviewNOC
 
overviewNOC
overviewNOCoverviewNOC
overviewNOC
 
Eng.Walidmanaa CV
Eng.Walidmanaa  CVEng.Walidmanaa  CV
Eng.Walidmanaa CV
 
2015 02 antaira quarterly webinar optimizing a robust automation network
2015 02 antaira quarterly webinar optimizing a robust automation network2015 02 antaira quarterly webinar optimizing a robust automation network
2015 02 antaira quarterly webinar optimizing a robust automation network
 
Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak Resume 2016
Andrew Kranak Resume 2016
 
Wireless Water Monitoring System
Wireless Water Monitoring SystemWireless Water Monitoring System
Wireless Water Monitoring System
 
Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...
Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...
Zones IoT Substation Protection and Security Solution NERC CIPv5-014 Overview...
 
UPDATE CV 2016
UPDATE  CV 2016UPDATE  CV 2016
UPDATE CV 2016
 
Updated-Resume-2015
Updated-Resume-2015Updated-Resume-2015
Updated-Resume-2015
 
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
 
Data Centre Design Guideline and Standards
Data Centre Design Guideline and StandardsData Centre Design Guideline and Standards
Data Centre Design Guideline and Standards
 
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
 
Dc
DcDc
Dc
 
Shahzaib
ShahzaibShahzaib
Shahzaib
 

Recently uploaded

Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 

Recently uploaded (20)

Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 

Datacenter best practices design and implementation

  • 1. DATA CENTER Design and Implementation Sinar Surya Teknologi
  • 2. Data Center Lifecycle Design is considered to be the most important phase as this is where we are going to determine fundamental criteria of the Data Center; Availability, Scalability, Capability & Security
  • 3. Business Requirement Based Data Center Integrated Approach Data Center Transformation Flow
  • 4. TIA-942 Standard • The purpose of Telecomunication Industry Association (TIA-942) standard is to provide requirements and guidelines for the Design and Installation of a data center or computer room Telecommunications Electrical Architectural Mechanical Availability Scalability Security
  • 5. Standard for sub-components • Electrical: UNE-EN 50160, UNE-EN 61000-3-2, UNE-EN 61000-3-3, UNE-EN 55011, IEC-61643, EN-60730-2-7, etc • Earthing: MIE-REBT-039, EN-50310 • EMF: EN-61000-4-8, EN-55022, EN-55011 • Environmental: IEC-61340-5-1, ASHRAE • Raised floor: BS/EN-12825, UK-PSA PF2 • Network: ISO-11810, EN-50173, TIA-568A • Fire Protection: NFPA-75, NFPA-2001
  • 7. Data Center Energy Efficiency Metric
  • 9. Architectural Design • Server Room – Interior – Lighting – Server Rack – Cabling – Piping – Security devices – Fire Protection Nozzle • Staging Room • Utility Room • Entrance Room • NOC Room
  • 10. Electrical Design • Single Line Diagram • Fire Protection SLD • Main Distribution Panel • Access Door • CCTV • Generator
  • 11. Mechanical Design • Cooling Equipment Indoor & Outdoor unit • Cooling Piping Route
  • 12. Telecommunication Design • Rack Connection • Data & Power Tray
  • 14. Power Supply • Power components in the data center: – Utility power source(s) and main power panel(s), – Back-up generator
  • 15. Mechanical Systems • Temperature – 20 to 25 degrees celcius • Relative humidity – 45% to 50% • Bottom-to-up airflow • Use cold aisle/hot aisle rack configuration • Avoid air leaks in raised floor • Maintain vapor barrier in parimeter, doorway and subfloor area
  • 16. Raised Access Floor • This type of floor consists of a gridded metal framework or substructure of adjustable-height supports (called "pedestals") that provide support for removable (lift-able) floor panels, which are usually 2×2 feet or 60×60 cm in size. • The height of the legs/pedestals is dictated by the volume of cables and other services provided beneath, but typically arranged for a clearance of at least six inches or 15 cm.
  • 17. Cabling • Horizontal cabling zone • Vertical cabling zone
  • 18. Fire Suppression • Follow NFPA 75 Standard Firewalls • Sprinkler systems — both flooded and pre-action • Chemical systems: – Novec – FM 200 – Inergen – Halon 1301 (no longer recommended or in production) • Manual systems – Manual pull stations – Portable fire extinguishers
  • 20. Monitoring System • Environment Monitoring in computer rooms, data centers and other facilities has become a critical part of 'Disaster Prevention'
  • 22. Implementation Phase Phase-1 Phase-2 Phase-3 Phase-4 Phase-5  Pre Kick off  Kick off  Working permit  *) Material delivery  Build DC Room  DC Equipment  Integrity Test  H/W Mounting  H/W Setup  Inter Network  Testing  Monitoring  Checking  Documentation  BAST *) Exclude delivery time
  • 23. Migration, Move and Relocation Item Planning Phase Blueprint Phase Relocation Phase Create a team and assign responsibilities for all aspects of the move √ Make sure all areas of expertise are covered √ Make sure that you may have to look outside of IT for some areas √ Prepare documentation, policy, and procedures √ Design a layout for your new data center √ Develop a schedule √ Set up services √ Make business interruption plans √ Only personnel involved in the move should be present at this time √ Have contact numbers for all your vendors handy √ have representatives from the construction firm √ Make sure you have resources on "standby" in case √ Test your critical applications and hardware once everything is in place √ Document every task that have moved in new places √
  • 24.  Upflow Cooling & Downflow Cooling  Inrow Cooling DC Technology
  • 25. Thank You @ssteknologi sinarsurya.teknologi PT. Sinar Surya Teknologi Menara Global 5th Floor Jl. Gatot Subroto Kav.27 Jakarta 12950 Indonesia Phone : 62-21 529-22636 Facimile : 62-21 52922639 Email : info@ssteknologi.com Website : http://www.ssteknologi.com