VALIDATION
 Definition:
 Validation is the documented act of proving that any
procedure, process, equipment, material, activity or
system showing the correct result or not.
Objective of validation:
It reduces the risk of regulatory non-compliance.
Reduction of time to the market for the new products.
It will increase productivity in lower cost.
Reduces the chances of product re- call from market.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 3
TYPES OF VALIDATION
• It is a process to validate the reproducibility and
consistency of the process.
Process
validation
• Procedure is used to check if a equipment is
properly calibrated ,maintained or not.
Equipment
validation
• Procedure used to ensure that the cleaning
process has eliminated the residues of drug
substance from equipment surface after
manufacturing.
Cleaning
validation
• It consist of documenting the quality of
analytical procedure.
Analytical
method
validation
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 4
INTRODUCTION
 It is a regulatory requirement for pharmaceutical
companies to perform instrument validation on all
new equipment.
 Equipment validation requires detailed knowledge of
the instrumentation system being validated and is
therefore performed by company supplying the
equipment.
 It gives the assurance that the equipment works
properly and giving accurate result.
4/25/2022 5
Equipment Validation Swati Swagatika
(RA2122254010006)
VALIDATION STUDY PHASE
• Pre-validation
Phase
• Other name:
Qualification
Phase
Phase-1
• Process Validation
• Other Name:
Process
Qualification
Phase
Phase-2 • Validation
Maintenance Phase
Phase-3
4/25/2022 6
Equipment Validation Swati Swagatika
(RA2122254010006)
PARTS OF EQUIPMENT
VALIDATION
Equipment
Validation
Installation
qualification(IQ)
Operational
qualification
(OQ)
Performance
qualification
(PQ)
Design
qualification
(DQ)
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 7
Principle of Equipment
Validation
Designed
Constructed
Adapted
Maintained
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 8
To perform the
operations which are
to be carried out.
Aim of Equipment Layout and
Design
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 9
To minimize
the risk of
errors
To permit
effective
cleaning and
maintenance
To avoid Cross
contamination
and dirt, dust
build up
To avoid any
adverse effect
on quality of
products
Design qualification
 It provides documented verification that the design of
new instrument or equipment will result in a system
that is suitable for the intended purpose.
4/25/2022 10
Equipment Validation Swati Swagatika
(RA2122254010006)
• Analytical Problem
• Use of Equipment
• Environment
• Function and
performance
What are to
be
Considered?
INSTALLATION
QUALIFICATION
 It tells whether the equipment is properly installed
and whether it is suitable for that environment.
4/25/2022 11
Equipment Validation Swati Swagatika
(RA2122254010006)
Support
Group
Equipment
Management
Group
Plant
Engineering
Group
Documented Records for
Installation
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 12
Installation
Qualification report
includes
The Supplier and the
manufacturer
System or Equipment
Name
Model and Serial Number
Date of Installation
Contd...
Installation Qualification Includes:
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 13
Inspection
Checklist
Installation
Checklist
Inspection Checklist
Instructions Explains how this section is physically executed
Table of Contents Lists the major components of an equipment
Specification Explains manufacturers specifications
Actual Things that are actually observed are listed here
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 14
Installation Checklist
 This section of protocol determines whether or not a
piece of the equipment or system as a whole meets the
manufacturer’s design specifications.
 It is recorded as “Yes” or “No”.
 If “No”s are then recorded as deviations or deficiencies.
 Environmental Requirements: Specifically
considers humidity, temperature of a particular piece
of the equipment.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 15
Operational Qualification
 It demonstrates that an instrument will function
according to its operational qualification in the
selected environment within the acceptance criteria.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 16
Start up of
Equipment
according to
the manual
Programm
able Logic
Controller
(PLC)
All
Functions
and features
are
Operational
SOP,
Maintenance
and
Calibration
Report
Generation
and Data
Analysis
Contd...
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 17
Application
SOPs
Utilization
List
Process
Description
Critical
Parameters
Test
Function
List
Test
Function
Summary
Test
Instrument
Details
Test
Instrument
Calibration
Contents
Contd...
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 18
List the necessary
test instruments
before starting the
test the instrument
is to be calibrated
and maintained till
the completion of
the test.
Alarm testing
Operation Testing
Test Equipment Test Procedure
Performance Qualification
 Performance Qualification : The final selection for
equipment qualification protocols.
 A process of demonstrating that an instrument or
piece of equipment consistently performs according to
a specification for it routine use.
 The factors like Loads, Volumes, Capacity and Power
related issues should not be problematic throughout
the specified range.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 19
Documentation System
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 20
Working
Documentation
System
Documentation
of Inspection
Documentation
of Internal
Audit
Documentation
For quick location of
document
In case of fault in
production
For reliability on
documentation
Contd...
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 21
List any test
instrument
necessary and must
be calibrated prior to
use and till the
process complete.
This is the final
phase of validation
process.
Test Equipment
Roles of FDA in Equipment
Validation
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 22
Validation Process
Regulated by
CFR : Code of Federal
Regulation (US Govt.)
for food and drugs
Guidelines and
regulations set forth by
the FDA
Validation Rules as per
21 CFR Part 210 and 211
Testing Procedure
 Table of Contents
 List of standardised sections
 Unique testing procedure
 Approval Page
 Preapproval Selection
 Final approval Selection
 Description
 Statement of purpose
 Standard Operating Procedure
 Calibration
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 23
Examples of Equipment
Validation
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 24
Validation of
Autoclave
Validation of
Ethylene Oxide
Sterilisation System
Validation of
Radiation Sterilisation
Method
Validation of
Filters
Validation of
Dissolution Apparatus
Validation of Autoclave
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 25
Validation of Dissolution
Apparatus
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 26
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 27
Validation of Dissolution Test
Apparatus
 To have a high degree of assurance dissolution
apparatus should be consistent and accurate in its
performance.
 Therefore validation of this equipment is required.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 28
Design Qualification of
Dissolution Apparatus
 When developing dissolution
method design qualification is
built into apparatus selection of
process.
 Dosage form delivery system will
determine choice of equipment.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 29
Example: First choice for beaded product may be
USP app 3... As it is designed to consign beads in a
screened in cylinder.
Installation Qualification of
Dissolution Apparatus
 Used to verify that instrument has
assembled in the appropriate
environment and its functioning
according to predetermined set of
limit.
 Example: Setting of fully automated
dissolution testing apparatus
requires proper plumbing hot water,
source stable bench top.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 30
Operational Qualification of
Dissolution Apparatus
 During this qualification, analyst or
vendor assess that equipment works as
specified and generates the documented
data.
 Example: For dissolution water bath
temperature, Shaft RPM.
 Speed would be operational parameters.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 31
Performance Qualification of
Dissolution Apparatus
 This is conducted to ensure that the system is in
normal, operating environment and performing
designed set of tasks within the specification.
 Example: Centering, Wobble, Height of paddle or
basket to shaft, speed, temperature.
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 32
Reference
 Pharmaceutical quality assurance by Manohar A.
Potdar, Nirali Prakashan, CBS Publishers
 Equipment and its validation by Nash.
 http://pharmatech.com
 www.slideshare.net
 www.wikipedia.com
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 33
4/25/2022
Equipment Validation Swati Swagatika
(RA2122254010006) 34

EQUIPMENT VALIDATION.pptx

  • 1.
    Presented by: Swati SwagatikaSwain Regd no- RA212225401006 Department of Pharmaceutics M. Pharm 1st yr SRM College of Pharmacy
  • 2.
    OUTLINES  Introduction  Validationstudy phase  Parts of equipment validation  Aim of equipment validation  Roles of FDA in equipment validation  Dissolution apparatus validation  References 4/25/2022 2 Equipment Validation Swati Swagatika (RA2122254010006)
  • 3.
    VALIDATION  Definition:  Validationis the documented act of proving that any procedure, process, equipment, material, activity or system showing the correct result or not. Objective of validation: It reduces the risk of regulatory non-compliance. Reduction of time to the market for the new products. It will increase productivity in lower cost. Reduces the chances of product re- call from market. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 3
  • 4.
    TYPES OF VALIDATION •It is a process to validate the reproducibility and consistency of the process. Process validation • Procedure is used to check if a equipment is properly calibrated ,maintained or not. Equipment validation • Procedure used to ensure that the cleaning process has eliminated the residues of drug substance from equipment surface after manufacturing. Cleaning validation • It consist of documenting the quality of analytical procedure. Analytical method validation 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 4
  • 5.
    INTRODUCTION  It isa regulatory requirement for pharmaceutical companies to perform instrument validation on all new equipment.  Equipment validation requires detailed knowledge of the instrumentation system being validated and is therefore performed by company supplying the equipment.  It gives the assurance that the equipment works properly and giving accurate result. 4/25/2022 5 Equipment Validation Swati Swagatika (RA2122254010006)
  • 6.
    VALIDATION STUDY PHASE •Pre-validation Phase • Other name: Qualification Phase Phase-1 • Process Validation • Other Name: Process Qualification Phase Phase-2 • Validation Maintenance Phase Phase-3 4/25/2022 6 Equipment Validation Swati Swagatika (RA2122254010006)
  • 7.
  • 8.
    Principle of Equipment Validation Designed Constructed Adapted Maintained 4/25/2022 EquipmentValidation Swati Swagatika (RA2122254010006) 8 To perform the operations which are to be carried out.
  • 9.
    Aim of EquipmentLayout and Design 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 9 To minimize the risk of errors To permit effective cleaning and maintenance To avoid Cross contamination and dirt, dust build up To avoid any adverse effect on quality of products
  • 10.
    Design qualification  Itprovides documented verification that the design of new instrument or equipment will result in a system that is suitable for the intended purpose. 4/25/2022 10 Equipment Validation Swati Swagatika (RA2122254010006) • Analytical Problem • Use of Equipment • Environment • Function and performance What are to be Considered?
  • 11.
    INSTALLATION QUALIFICATION  It tellswhether the equipment is properly installed and whether it is suitable for that environment. 4/25/2022 11 Equipment Validation Swati Swagatika (RA2122254010006) Support Group Equipment Management Group Plant Engineering Group
  • 12.
    Documented Records for Installation 4/25/2022 EquipmentValidation Swati Swagatika (RA2122254010006) 12 Installation Qualification report includes The Supplier and the manufacturer System or Equipment Name Model and Serial Number Date of Installation
  • 13.
    Contd... Installation Qualification Includes: 4/25/2022 EquipmentValidation Swati Swagatika (RA2122254010006) 13 Inspection Checklist Installation Checklist
  • 14.
    Inspection Checklist Instructions Explainshow this section is physically executed Table of Contents Lists the major components of an equipment Specification Explains manufacturers specifications Actual Things that are actually observed are listed here 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 14
  • 15.
    Installation Checklist  Thissection of protocol determines whether or not a piece of the equipment or system as a whole meets the manufacturer’s design specifications.  It is recorded as “Yes” or “No”.  If “No”s are then recorded as deviations or deficiencies.  Environmental Requirements: Specifically considers humidity, temperature of a particular piece of the equipment. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 15
  • 16.
    Operational Qualification  Itdemonstrates that an instrument will function according to its operational qualification in the selected environment within the acceptance criteria. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 16 Start up of Equipment according to the manual Programm able Logic Controller (PLC) All Functions and features are Operational SOP, Maintenance and Calibration Report Generation and Data Analysis
  • 17.
    Contd... 4/25/2022 Equipment Validation SwatiSwagatika (RA2122254010006) 17 Application SOPs Utilization List Process Description Critical Parameters Test Function List Test Function Summary Test Instrument Details Test Instrument Calibration Contents
  • 18.
    Contd... 4/25/2022 Equipment Validation SwatiSwagatika (RA2122254010006) 18 List the necessary test instruments before starting the test the instrument is to be calibrated and maintained till the completion of the test. Alarm testing Operation Testing Test Equipment Test Procedure
  • 19.
    Performance Qualification  PerformanceQualification : The final selection for equipment qualification protocols.  A process of demonstrating that an instrument or piece of equipment consistently performs according to a specification for it routine use.  The factors like Loads, Volumes, Capacity and Power related issues should not be problematic throughout the specified range. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 19
  • 20.
    Documentation System 4/25/2022 Equipment ValidationSwati Swagatika (RA2122254010006) 20 Working Documentation System Documentation of Inspection Documentation of Internal Audit Documentation For quick location of document In case of fault in production For reliability on documentation
  • 21.
    Contd... 4/25/2022 Equipment Validation SwatiSwagatika (RA2122254010006) 21 List any test instrument necessary and must be calibrated prior to use and till the process complete. This is the final phase of validation process. Test Equipment
  • 22.
    Roles of FDAin Equipment Validation 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 22 Validation Process Regulated by CFR : Code of Federal Regulation (US Govt.) for food and drugs Guidelines and regulations set forth by the FDA Validation Rules as per 21 CFR Part 210 and 211
  • 23.
    Testing Procedure  Tableof Contents  List of standardised sections  Unique testing procedure  Approval Page  Preapproval Selection  Final approval Selection  Description  Statement of purpose  Standard Operating Procedure  Calibration 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 23
  • 24.
    Examples of Equipment Validation 4/25/2022 EquipmentValidation Swati Swagatika (RA2122254010006) 24 Validation of Autoclave Validation of Ethylene Oxide Sterilisation System Validation of Radiation Sterilisation Method Validation of Filters Validation of Dissolution Apparatus
  • 25.
    Validation of Autoclave 4/25/2022 EquipmentValidation Swati Swagatika (RA2122254010006) 25
  • 26.
    Validation of Dissolution Apparatus 4/25/2022 EquipmentValidation Swati Swagatika (RA2122254010006) 26
  • 27.
    4/25/2022 Equipment Validation SwatiSwagatika (RA2122254010006) 27
  • 28.
    Validation of DissolutionTest Apparatus  To have a high degree of assurance dissolution apparatus should be consistent and accurate in its performance.  Therefore validation of this equipment is required. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 28
  • 29.
    Design Qualification of DissolutionApparatus  When developing dissolution method design qualification is built into apparatus selection of process.  Dosage form delivery system will determine choice of equipment. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 29 Example: First choice for beaded product may be USP app 3... As it is designed to consign beads in a screened in cylinder.
  • 30.
    Installation Qualification of DissolutionApparatus  Used to verify that instrument has assembled in the appropriate environment and its functioning according to predetermined set of limit.  Example: Setting of fully automated dissolution testing apparatus requires proper plumbing hot water, source stable bench top. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 30
  • 31.
    Operational Qualification of DissolutionApparatus  During this qualification, analyst or vendor assess that equipment works as specified and generates the documented data.  Example: For dissolution water bath temperature, Shaft RPM.  Speed would be operational parameters. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 31
  • 32.
    Performance Qualification of DissolutionApparatus  This is conducted to ensure that the system is in normal, operating environment and performing designed set of tasks within the specification.  Example: Centering, Wobble, Height of paddle or basket to shaft, speed, temperature. 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 32
  • 33.
    Reference  Pharmaceutical qualityassurance by Manohar A. Potdar, Nirali Prakashan, CBS Publishers  Equipment and its validation by Nash.  http://pharmatech.com  www.slideshare.net  www.wikipedia.com 4/25/2022 Equipment Validation Swati Swagatika (RA2122254010006) 33
  • 34.
    4/25/2022 Equipment Validation SwatiSwagatika (RA2122254010006) 34