Overview of Validation Requirements
in
Pharmaceutical Industry

Kaushik Desai
Chairman,
Industrial Pharmacy Division
Indian Pharmaceutical Association
www.ipapharma.org
1






A definition
Where did validation come from ?
Why do it ?
What are the benefits ?
How far do we have to go ?

2
“ Establishing the documented evidence which
provides a high degree of assurance that a
specific process will consistently produce a
product of predetermined specifications and
quality attributes.”
(FDA Guidelines 1987)

3
“Process validation is defined as the collection
& evaluation of data, from the process design
stage through commercial production, which
establishes scientific evidence that process is
capable of consistently delivering quality
product.”
(FDA Guidelines, 2011)

4
“Action of proving, in accordance with the
principles of Good Manufacturing Practice
(GMP), that any procedure, process,
equipment, material, activity or system
actually leads to expected results.”
(EU GMP 1997)

5


Began in 1970’s



Originally sterilized based.



Now evolved into all Product, Process and Facility
matters.

6


Assures Quality



Regulatory Requirement



Reduces Cost



It’s the LAW !

7
Validation can reduce costs by reducing,





Rejects
Reworks
Reliance on In-process controls
Down time

8


Reliance on product testing



Loss of confidence



Possibility of adulterated products



Inspection : Observations / 483’s

9


User Requirement Specification (URS)



Design Qualification



Impact Assessment



Factory Acceptance Testing



Installation Qualification
10








Calibration
Site Acceptance Testing
Operational Qualification
Standard Operating Procedures
Performance Qualification
Process Validation
Change Control

11
User Requirement Specification (URS)


A description of the requirements of the facility
(project) in terms of product to be manufactured,
required throughput and conditions in which the
product should be manufactured.



Approved statements prepared by the user which
defines what is required by the project.

12
Design Qualification (DQ)


Documented review of the design, at an
appropriate stage in a project, for conformance
to operational and regulatory expectations.

(Note : Not an obligation)

13
Impact Assessment


The process of evaluating the impact of the
operating, controlling, alarming and failure
conditions of a system on the quality of a
product

14
Factory Acceptance Testing (FAT)


Inspection and static and/or dynamic testing of
systems or major system components to
support the qualification of an equipment
system conducted and documented at a
supplier site.

(Note : Not an obligation)
15


Documented verification that all aspects of a facility,
utility or equipment that can affect the product
quality adhere to approved specifications and are
correctly installed.



The process of checking/verifying the installation to
ensure that the critical components meet the
approved specifications and that they are installed
correctly in accordance with design documentation.

16


To establish that the critical components are installed
correctly
and
in
accordance
with
design
documentation requirements (i.e. PO’s, Contracts
etc.), that supporting documentation is in place and of
suitable quality.



To record the checks and verifications for critical
components in Direct Impact Systems.

17












Approval Page
Objectives
System Description
Responsibilities
Acceptance Criteria
Engineering Documentation Requirements
Records of Signatures
Qualification Test Equipment/Instrument List
Product Contact Materials Review
Utilities Verification
Control System Verification

18











Instrument/Control Devices Verification
Equipment Verification
Piping Installation Verification
Discrepancy/Justification and corrective Action
As built P&I Diagrams
Specifications
Conclusions
References
Modification/ Change Control
Attachments / Appendices

19
Parameters













Does the vessel meet the design specification?
Does the agitator assembly meet the design specification?
Is the motor housing earthed?
Is the motor over current device set to correct setting?
Is all the pipe work connected?
Are all instruments installed as per P&I diagram?
Have all the temperature indicators been calibrated?
Is calibration procedure available?
Are operation and maintenance manuals available?
all electrical connections securely and safely fitted?
Is insulation complete?
Is vessel clean and free from dirt?

20


After protocol execution is complete and
deviations evaluated, post execution approval
is required.



Requires sign off by original signatories.



IQ execution should be complete and approved
prior to the start of OQ.
21




Calibration
Demonstrating that a measuring device
produces results within the specified limits of
those produced by a reference standard over
an appropriate range of measurements.
The devices are normally tagged and
supported by a maintenance procedures.

22
Site Acceptance Testing (SAT)
 Inspection and dynamic testing of systems or
major system components to support the
qualification of an equipment system
conducted at a client site.
(Note : Not an obligation)

23


Documented verification that all aspects of
a facility, utility or equipment that can affect
product quality operate as intended
throughout all anticipated ranges. It is the
process of testing to ensure that individual
components and systems operate as
specified, and how that information is
recorded.
24


To establish through documented testing, that all
critical components and direct impact systems are
capable of operating within established limits and
tolerances.



To test parameters that regulate the process or
product quality. To verify the proper operation of
controllers, indicators, recorders, alarms and
interlocks, is performed and documented during the
operational qualification testing.
25













Approval page
Pre-requisites
Objectives
System Description
Responsibilities
Acceptance Criteria
Records of signatures
Qualification test Equipment/Instruments list
Alarm and Interlocks test
Operation testing
Capacity testing
Power failure testing

26










Sequence testing
Test data sheets
SOP’s
Conclusions
Modification / change control
Discrepancy/Justification and corrective action
Operational Qualification Summary
References
Attachments/Appendices
- Verification of test instruments
- Chart recordings
- P&I diagrams
- Printouts

27
Parameters










Have all Installation Qualification been completed for this system?
Is the system clean and free from dirt?
Is the direction of the rotation of agitator correct?
Check the operation of the agitator emergency stop?
Check the operation of all agitator controls, both on the main and local
panels?
Check that the agitator in the vessel free to turn?
Pressurize the vessel and record the pressure drop for 10 min.
Perform a vacuum test and record the vacuum drop.

28


Documented verification that all aspects of
a facility, utility or equipment that can
affect the product quality perform as
intended in meeting the predetermined
acceptance criteria.

29


To integrate procedures, personnel, systems
and materials to verify that the utility /
environment / equipment / support systems
produces the required output. This output
may be a product contact utility, sterilization
condition or environment.

30
















Approval page
Pre-requisites
Objectives
System Description
Responsibilities
Acceptance Criteria
PQ test plan
Challenge test plan
Records of signatures
Test equipment/Instrument list
Test data sheets
SOP’s
References
Conclusions
Attachments

31
Process Validation
 The documented verification providing a high
degree of assurance that a specific process will
consistently produce a product meeting its
predetermined specifications and quality
attributes.
 The new guidelines aligns process validation
activities with a product life cycle concept.

32


211.42, 211.63, 211.68, 211.84



211.100(a) ,
211.110(b)



211.160(b), 211.165(c),
211.165(d), 211.180(e)

211.110(a),

33
Life Cycle of the product & the process


Stage 1 – Process Design



Stage 2 – Process qualification



Stage 3 - Continuous process verification

34


It is the activity of defining the commercial manufacturing
process that will be reflected in planned master production
and control records.



The goal of this stage is to design a process suitable for
routine commercial manufacturing that can consistently
deliver a product that meets its quality attributes.



It is based on the knowledge gained through development &
scale-up activities.

35




During this stage, the process design is evaluated to
determine if the process is capable of reproducible
commercial
manufacturing.
The
products
manufactured during this stage, if acceptable , can be
released for distribution.
Two Aspects
Design of facility and qualification of equipment and
utilities.
Process Performance Qualification ( PPQ).

36
Def.: “Releasing for distribution a lot of finished
product, manufactured following a qualification
protocol, that meets the standards established in
the protocol, but before the entire study has been
executed”.


Orphan Drugs



Specific drug for specific use



Shor t Shelf-life radio pharmaceuticals
37


The goal of this stage is continual assurance that the
process remains in a state of control ( the validated state)
during commercial manufacture.



The cGMP requirements, specifically the collection &
evaluation of information & data about the performance
of the process will allow detection of undesired process
variability.



This stage is also applicable for legacy products.

38
Change Control


Formal evaluation of the potential impact of
planned modifications on the validated status
of a product, process or facility.

39








Training personnel for IQ/OQ execution.
The purpose of the equipment/ system.
Use of test equipment
Applicable SOP’s
cGMP documentation of training
Document all training
Periodically review training requirements

40


A document that summarizes and analyses
the test results at the end of PQ.



Provides a conclusion about the ability of the
system to consistently meet acceptance
criteria.



May be a stand alone document at each
stage of IQ/OQ and PQ to summarize results.

41
Commissioning and Qualification
Project Phases
Technology Transfer
Conceptual Design
Basic Design
Detailed Design
Procurement
Construction
Pre commissioning
Commissioning

Validation Phases
Collecting data
Preliminary VMP
Detailed VMP
Detailed planning,DQ
IQ
OQ

Process operation / Validation

42
Introduction

Qualification

Personnel

Installation

Responsibilities

Operation

Training

Schedule

Preventive
Maintenance

Change
Control
Procedures
Documents
Appendices

Process

43
The company’s overall policy, intentions and
approach to validation, including :








Validation of production processes
Cleaning procedures
Analytical methods
In-process control test procedures
Computerized systems
Persons responsible for design, review, approval
Documentation of each validation phase
44


Product validation is NOT ……
- just 3 batches that meet specifications



Product validation is ……
- an ongoing process to build confidence into
the manufacturing activities
- an ability to demonstrate consistency at any
time.

45


Cleaning validation is establishing
documented evidence that the equipment
is consistently cleaned from product,
microbial and cleaning agent residues to
predetermined acceptable levels.

46
A written procedure for cleaning validation
which includes :





Responsibility for development, performance and
approval of the validation study.
Establishment of SOP’s
Acceptance criteria
- defined to prevent cross contamination
- definition of residue limits
47


Cleaning procedure for each piece of equipment
- Flow charts and diagrams
- Cleaning agents, concentration, volume
- Frequency
- time left ‘dirty’

48


Sampling procedures
- swabs, rinse, location



Residue limits



Analytical methods

49


Validation report
- Results Vs. acceptance criteria
- Deviations and how handled
- Conclusion that cleaning process is
validated

50


Major change in cleaning procedure



Change in cleaning agent



New equipment

51


Knowledge of the materials
- Potency of the drug
- Pharmacological and toxic properties
- Degradation products
- Cleaning agents
- Micro residues

52
Residual Limits must be………….
 Practical
 Achievable
 Verifiable
 Safe
FDA does not set acceptance specifications
(limits).

53
MAC = TD x BS x SF / LDD
MAC = Maximum Allowable Carryover
TD = Single Therapeutic Dose
BS = Batch size of next product to be
manufactured on the same equipment.

SF = Safety Factor
LDD = Largest Daily Dose of the next product
in the same equipment.
54
Ranitidine Tablets - Ibuprofen Tablets
TD = Single Therapeutic Dose = 150 mg Ranitidine-Tab
BS = Batch Size = 100 kg of Ibuprofen
SF
= Safety Factor = 1/1000
LDD
= Largest Daily Dose of the next product in the same
equipment = 200 mg X 5 tablets of Ibuprofen
MAC
= Max Allowable Carryover = 150 X 100 X 1000 x
1000 X 1/1000 X 1/1000
i.e 15000 mg in 100 kg Batch size
i.e 150 mg in 1 kg = 150 ppm

55
Validation ksd

More Related Content

What's hot

Validation of pharmaceutical dosage form
Validation of pharmaceutical dosage formValidation of pharmaceutical dosage form
Validation of pharmaceutical dosage form
anurag chanda
 
introduction to validation
introduction to validation introduction to validation
introduction to validation
Sachin G
 
Basic concept of process validation
Basic concept of process validation Basic concept of process validation
Basic concept of process validation
Bishnu Koirala
 
Process Validation
Process ValidationProcess Validation
Process Validation
ANKUSH JADHAV
 
Validation
ValidationValidation
Validation
Shivam Kumar
 
Pharmacutical Validation
 Pharmacutical Validation Pharmacutical Validation
Pharmacutical Validation
Priyanka Kandhare
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
Apoorva Bauskar
 
Pharmaceutical validation
Pharmaceutical  validationPharmaceutical  validation
Pharmaceutical validation
Pavisara
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
amol dighe
 
Process validation of drug product
Process validation of drug productProcess validation of drug product
Process validation of drug product
santoshnarla
 
Process validation
Process validationProcess validation
Process validation
abhishek awasthi
 
Pharmaceutical process validation
Pharmaceutical process validation Pharmaceutical process validation
Pharmaceutical process validation
DRA Consulting Oy
 
Pharmaceutical validation of formulation
Pharmaceutical validation of formulationPharmaceutical validation of formulation
Pharmaceutical validation of formulation
ROHIT
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
Pramod Pal
 
74 validation
74 validation74 validation
74 validationmayrita01
 
concept of validation
concept of validationconcept of validation
concept of validation
prashik shimpi
 

What's hot (19)

Validation of pharmaceutical dosage form
Validation of pharmaceutical dosage formValidation of pharmaceutical dosage form
Validation of pharmaceutical dosage form
 
Vallidation
VallidationVallidation
Vallidation
 
introduction to validation
introduction to validation introduction to validation
introduction to validation
 
Process validation
Process validationProcess validation
Process validation
 
Basic concept of process validation
Basic concept of process validation Basic concept of process validation
Basic concept of process validation
 
Process Validation
Process ValidationProcess Validation
Process Validation
 
Validation
ValidationValidation
Validation
 
801 pdf
801 pdf801 pdf
801 pdf
 
Pharmacutical Validation
 Pharmacutical Validation Pharmacutical Validation
Pharmacutical Validation
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
Pharmaceutical validation
Pharmaceutical  validationPharmaceutical  validation
Pharmaceutical validation
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
Process validation of drug product
Process validation of drug productProcess validation of drug product
Process validation of drug product
 
Process validation
Process validationProcess validation
Process validation
 
Pharmaceutical process validation
Pharmaceutical process validation Pharmaceutical process validation
Pharmaceutical process validation
 
Pharmaceutical validation of formulation
Pharmaceutical validation of formulationPharmaceutical validation of formulation
Pharmaceutical validation of formulation
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
 
74 validation
74 validation74 validation
74 validation
 
concept of validation
concept of validationconcept of validation
concept of validation
 

Viewers also liked

Madcore Custom Sportswear online uniform builder
Madcore Custom Sportswear online uniform builderMadcore Custom Sportswear online uniform builder
Madcore Custom Sportswear online uniform builder
Madcore Sportswear
 
Presentation румъния2
Presentation румъния2Presentation румъния2
Presentation румъния2
Pavel Ivanov
 
Quasibaryonic Matter in Cosmology
Quasibaryonic Matter in CosmologyQuasibaryonic Matter in Cosmology
Quasibaryonic Matter in Cosmology
Shibaji Banerjee
 
Brigitte slides
Brigitte slidesBrigitte slides
Brigitte slides
LouisKaty2
 
08.10.2013 Wedding
08.10.2013 Wedding08.10.2013 Wedding
08.10.2013 Wedding
LouisKaty2
 
Wedding 151 Pages
Wedding 151 Pages Wedding 151 Pages
Wedding 151 Pages
LouisKaty2
 
125 pages of Wedding photos from 08.10.2013
125 pages of Wedding photos from 08.10.2013125 pages of Wedding photos from 08.10.2013
125 pages of Wedding photos from 08.10.2013
LouisKaty2
 
Kindergarten kosmonavt shumen bg ppt
Kindergarten kosmonavt shumen bg pptKindergarten kosmonavt shumen bg ppt
Kindergarten kosmonavt shumen bg ppt
Pavel Ivanov
 
Taking care of the caregiver
Taking care of the caregiverTaking care of the caregiver
Taking care of the caregiver
Natalie Nachmani-Shohat
 
м.маус проект златното ключе
м.маус  проект златното ключем.маус  проект златното ключе
м.маус проект златното ключе
Pavel Ivanov
 
Task rabbit presentation group c
Task rabbit presentation group cTask rabbit presentation group c
Task rabbit presentation group ctrebollea
 
Certificate- Advanced Credit
Certificate- Advanced CreditCertificate- Advanced Credit
Certificate- Advanced CreditRichard Wanasolo
 
ConCienciArte, primer número
ConCienciArte, primer númeroConCienciArte, primer número
ConCienciArte, primer número
Pedro Romero Gómez
 
โครงงานเบื้องต้น
โครงงานเบื้องต้นโครงงานเบื้องต้น
โครงงานเบื้องต้นPat Pholla
 
Capacity to Contracts !
Capacity to Contracts !Capacity to Contracts !
Capacity to Contracts !
Homework Guru
 

Viewers also liked (20)

Presentation1
Presentation1Presentation1
Presentation1
 
Madcore Custom Sportswear online uniform builder
Madcore Custom Sportswear online uniform builderMadcore Custom Sportswear online uniform builder
Madcore Custom Sportswear online uniform builder
 
Presentation румъния2
Presentation румъния2Presentation румъния2
Presentation румъния2
 
Quasibaryonic Matter in Cosmology
Quasibaryonic Matter in CosmologyQuasibaryonic Matter in Cosmology
Quasibaryonic Matter in Cosmology
 
After His Own
After His OwnAfter His Own
After His Own
 
Brigitte slides
Brigitte slidesBrigitte slides
Brigitte slides
 
08.10.2013 Wedding
08.10.2013 Wedding08.10.2013 Wedding
08.10.2013 Wedding
 
Wedding 151 Pages
Wedding 151 Pages Wedding 151 Pages
Wedding 151 Pages
 
125 pages of Wedding photos from 08.10.2013
125 pages of Wedding photos from 08.10.2013125 pages of Wedding photos from 08.10.2013
125 pages of Wedding photos from 08.10.2013
 
Kindergarten kosmonavt shumen bg ppt
Kindergarten kosmonavt shumen bg pptKindergarten kosmonavt shumen bg ppt
Kindergarten kosmonavt shumen bg ppt
 
Taking care of the caregiver audio
Taking care of the caregiver audioTaking care of the caregiver audio
Taking care of the caregiver audio
 
Taking care of the caregiver
Taking care of the caregiverTaking care of the caregiver
Taking care of the caregiver
 
м.маус проект златното ключе
м.маус  проект златното ключем.маус  проект златното ключе
м.маус проект златното ключе
 
Used to
Used toUsed to
Used to
 
Task rabbit presentation group c
Task rabbit presentation group cTask rabbit presentation group c
Task rabbit presentation group c
 
Certificate- Advanced Credit
Certificate- Advanced CreditCertificate- Advanced Credit
Certificate- Advanced Credit
 
ConCienciArte, primer número
ConCienciArte, primer númeroConCienciArte, primer número
ConCienciArte, primer número
 
โครงงานเบื้องต้น
โครงงานเบื้องต้นโครงงานเบื้องต้น
โครงงานเบื้องต้น
 
Capacity to Contracts !
Capacity to Contracts !Capacity to Contracts !
Capacity to Contracts !
 
La educación
La educaciónLa educación
La educación
 

Similar to Validation ksd

validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdf
AkashChaudhary749568
 
Jatin validation
Jatin validationJatin validation
Jatin validation
jatin singla
 
Validation ksd
Validation ksdValidation ksd
Validation ksd
uyyalamuralikrishna
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
GargiVaghela
 
Validation (1).pptx
Validation (1).pptxValidation (1).pptx
Validation (1).pptx
Yunesalsayadi
 
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật BảnNguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
Công ty Cổ phần Tư vấn Thiết kế GMP EU
 
Pharmaceutical validation
Pharmaceutical validation Pharmaceutical validation
Pharmaceutical validation
Muthu Maharaja Mla
 
Process validation ppt.
Process validation ppt.Process validation ppt.
Process validation ppt.
aishwaryashiremath
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
Pharmaceutical
 
Validation_Tutorial.ppt
Validation_Tutorial.pptValidation_Tutorial.ppt
Validation_Tutorial.ppt
Md. Omar Faruq Khan
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
Prinka Choudhary
 
Process validation and its types
Process validation and its typesProcess validation and its types
Process validation and its types
Anjali9410
 
Concept of validation
Concept of validationConcept of validation
Concept of validation
Mohammad Mudassar
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
MariaSaifee
 
conceptofvalidation-161008......053359.pdf
conceptofvalidation-161008......053359.pdfconceptofvalidation-161008......053359.pdf
conceptofvalidation-161008......053359.pdf
Vaibhavwagh48
 
validation ppt.pptx
 validation ppt.pptx validation ppt.pptx
validation ppt.pptx
PawanDhamala1
 
Validation qualification
Validation qualificationValidation qualification
Validation qualification
Devipriya Viswambharan
 

Similar to Validation ksd (20)

Validation
ValidationValidation
Validation
 
validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdf
 
Jatin validation
Jatin validationJatin validation
Jatin validation
 
Validation ksd
Validation ksdValidation ksd
Validation ksd
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
 
Validation (1).pptx
Validation (1).pptxValidation (1).pptx
Validation (1).pptx
 
Validation
ValidationValidation
Validation
 
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật BảnNguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
Nguyên tắc Thẩm định theo Bộ tiêu chuẩn GMP Nhật Bản
 
Pharmaceutical validation
Pharmaceutical validation Pharmaceutical validation
Pharmaceutical validation
 
Process validation ppt.
Process validation ppt.Process validation ppt.
Process validation ppt.
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Validation_Tutorial.ppt
Validation_Tutorial.pptValidation_Tutorial.ppt
Validation_Tutorial.ppt
 
Law down1 6
Law down1 6Law down1 6
Law down1 6
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
Process validation and its types
Process validation and its typesProcess validation and its types
Process validation and its types
 
Concept of validation
Concept of validationConcept of validation
Concept of validation
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
 
conceptofvalidation-161008......053359.pdf
conceptofvalidation-161008......053359.pdfconceptofvalidation-161008......053359.pdf
conceptofvalidation-161008......053359.pdf
 
validation ppt.pptx
 validation ppt.pptx validation ppt.pptx
validation ppt.pptx
 
Validation qualification
Validation qualificationValidation qualification
Validation qualification
 

Recently uploaded

Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 

Recently uploaded (20)

Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 

Validation ksd

  • 1. Overview of Validation Requirements in Pharmaceutical Industry Kaushik Desai Chairman, Industrial Pharmacy Division Indian Pharmaceutical Association www.ipapharma.org 1
  • 2.      A definition Where did validation come from ? Why do it ? What are the benefits ? How far do we have to go ? 2
  • 3. “ Establishing the documented evidence which provides a high degree of assurance that a specific process will consistently produce a product of predetermined specifications and quality attributes.” (FDA Guidelines 1987) 3
  • 4. “Process validation is defined as the collection & evaluation of data, from the process design stage through commercial production, which establishes scientific evidence that process is capable of consistently delivering quality product.” (FDA Guidelines, 2011) 4
  • 5. “Action of proving, in accordance with the principles of Good Manufacturing Practice (GMP), that any procedure, process, equipment, material, activity or system actually leads to expected results.” (EU GMP 1997) 5
  • 6.  Began in 1970’s  Originally sterilized based.  Now evolved into all Product, Process and Facility matters. 6
  • 8. Validation can reduce costs by reducing,     Rejects Reworks Reliance on In-process controls Down time 8
  • 9.  Reliance on product testing  Loss of confidence  Possibility of adulterated products  Inspection : Observations / 483’s 9
  • 10.  User Requirement Specification (URS)  Design Qualification  Impact Assessment  Factory Acceptance Testing  Installation Qualification 10
  • 11.        Calibration Site Acceptance Testing Operational Qualification Standard Operating Procedures Performance Qualification Process Validation Change Control 11
  • 12. User Requirement Specification (URS)  A description of the requirements of the facility (project) in terms of product to be manufactured, required throughput and conditions in which the product should be manufactured.  Approved statements prepared by the user which defines what is required by the project. 12
  • 13. Design Qualification (DQ)  Documented review of the design, at an appropriate stage in a project, for conformance to operational and regulatory expectations. (Note : Not an obligation) 13
  • 14. Impact Assessment  The process of evaluating the impact of the operating, controlling, alarming and failure conditions of a system on the quality of a product 14
  • 15. Factory Acceptance Testing (FAT)  Inspection and static and/or dynamic testing of systems or major system components to support the qualification of an equipment system conducted and documented at a supplier site. (Note : Not an obligation) 15
  • 16.  Documented verification that all aspects of a facility, utility or equipment that can affect the product quality adhere to approved specifications and are correctly installed.  The process of checking/verifying the installation to ensure that the critical components meet the approved specifications and that they are installed correctly in accordance with design documentation. 16
  • 17.  To establish that the critical components are installed correctly and in accordance with design documentation requirements (i.e. PO’s, Contracts etc.), that supporting documentation is in place and of suitable quality.  To record the checks and verifications for critical components in Direct Impact Systems. 17
  • 18.            Approval Page Objectives System Description Responsibilities Acceptance Criteria Engineering Documentation Requirements Records of Signatures Qualification Test Equipment/Instrument List Product Contact Materials Review Utilities Verification Control System Verification 18
  • 19.           Instrument/Control Devices Verification Equipment Verification Piping Installation Verification Discrepancy/Justification and corrective Action As built P&I Diagrams Specifications Conclusions References Modification/ Change Control Attachments / Appendices 19
  • 20. Parameters             Does the vessel meet the design specification? Does the agitator assembly meet the design specification? Is the motor housing earthed? Is the motor over current device set to correct setting? Is all the pipe work connected? Are all instruments installed as per P&I diagram? Have all the temperature indicators been calibrated? Is calibration procedure available? Are operation and maintenance manuals available? all electrical connections securely and safely fitted? Is insulation complete? Is vessel clean and free from dirt? 20
  • 21.  After protocol execution is complete and deviations evaluated, post execution approval is required.  Requires sign off by original signatories.  IQ execution should be complete and approved prior to the start of OQ. 21
  • 22.   Calibration Demonstrating that a measuring device produces results within the specified limits of those produced by a reference standard over an appropriate range of measurements. The devices are normally tagged and supported by a maintenance procedures. 22
  • 23. Site Acceptance Testing (SAT)  Inspection and dynamic testing of systems or major system components to support the qualification of an equipment system conducted at a client site. (Note : Not an obligation) 23
  • 24.  Documented verification that all aspects of a facility, utility or equipment that can affect product quality operate as intended throughout all anticipated ranges. It is the process of testing to ensure that individual components and systems operate as specified, and how that information is recorded. 24
  • 25.  To establish through documented testing, that all critical components and direct impact systems are capable of operating within established limits and tolerances.  To test parameters that regulate the process or product quality. To verify the proper operation of controllers, indicators, recorders, alarms and interlocks, is performed and documented during the operational qualification testing. 25
  • 26.             Approval page Pre-requisites Objectives System Description Responsibilities Acceptance Criteria Records of signatures Qualification test Equipment/Instruments list Alarm and Interlocks test Operation testing Capacity testing Power failure testing 26
  • 27.          Sequence testing Test data sheets SOP’s Conclusions Modification / change control Discrepancy/Justification and corrective action Operational Qualification Summary References Attachments/Appendices - Verification of test instruments - Chart recordings - P&I diagrams - Printouts 27
  • 28. Parameters         Have all Installation Qualification been completed for this system? Is the system clean and free from dirt? Is the direction of the rotation of agitator correct? Check the operation of the agitator emergency stop? Check the operation of all agitator controls, both on the main and local panels? Check that the agitator in the vessel free to turn? Pressurize the vessel and record the pressure drop for 10 min. Perform a vacuum test and record the vacuum drop. 28
  • 29.  Documented verification that all aspects of a facility, utility or equipment that can affect the product quality perform as intended in meeting the predetermined acceptance criteria. 29
  • 30.  To integrate procedures, personnel, systems and materials to verify that the utility / environment / equipment / support systems produces the required output. This output may be a product contact utility, sterilization condition or environment. 30
  • 31.                Approval page Pre-requisites Objectives System Description Responsibilities Acceptance Criteria PQ test plan Challenge test plan Records of signatures Test equipment/Instrument list Test data sheets SOP’s References Conclusions Attachments 31
  • 32. Process Validation  The documented verification providing a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes.  The new guidelines aligns process validation activities with a product life cycle concept. 32
  • 33.  211.42, 211.63, 211.68, 211.84  211.100(a) , 211.110(b)  211.160(b), 211.165(c), 211.165(d), 211.180(e) 211.110(a), 33
  • 34. Life Cycle of the product & the process  Stage 1 – Process Design  Stage 2 – Process qualification  Stage 3 - Continuous process verification 34
  • 35.  It is the activity of defining the commercial manufacturing process that will be reflected in planned master production and control records.  The goal of this stage is to design a process suitable for routine commercial manufacturing that can consistently deliver a product that meets its quality attributes.  It is based on the knowledge gained through development & scale-up activities. 35
  • 36.   During this stage, the process design is evaluated to determine if the process is capable of reproducible commercial manufacturing. The products manufactured during this stage, if acceptable , can be released for distribution. Two Aspects Design of facility and qualification of equipment and utilities. Process Performance Qualification ( PPQ). 36
  • 37. Def.: “Releasing for distribution a lot of finished product, manufactured following a qualification protocol, that meets the standards established in the protocol, but before the entire study has been executed”.  Orphan Drugs  Specific drug for specific use  Shor t Shelf-life radio pharmaceuticals 37
  • 38.  The goal of this stage is continual assurance that the process remains in a state of control ( the validated state) during commercial manufacture.  The cGMP requirements, specifically the collection & evaluation of information & data about the performance of the process will allow detection of undesired process variability.  This stage is also applicable for legacy products. 38
  • 39. Change Control  Formal evaluation of the potential impact of planned modifications on the validated status of a product, process or facility. 39
  • 40.        Training personnel for IQ/OQ execution. The purpose of the equipment/ system. Use of test equipment Applicable SOP’s cGMP documentation of training Document all training Periodically review training requirements 40
  • 41.  A document that summarizes and analyses the test results at the end of PQ.  Provides a conclusion about the ability of the system to consistently meet acceptance criteria.  May be a stand alone document at each stage of IQ/OQ and PQ to summarize results. 41
  • 42. Commissioning and Qualification Project Phases Technology Transfer Conceptual Design Basic Design Detailed Design Procurement Construction Pre commissioning Commissioning Validation Phases Collecting data Preliminary VMP Detailed VMP Detailed planning,DQ IQ OQ Process operation / Validation 42
  • 44. The company’s overall policy, intentions and approach to validation, including :        Validation of production processes Cleaning procedures Analytical methods In-process control test procedures Computerized systems Persons responsible for design, review, approval Documentation of each validation phase 44
  • 45.  Product validation is NOT …… - just 3 batches that meet specifications  Product validation is …… - an ongoing process to build confidence into the manufacturing activities - an ability to demonstrate consistency at any time. 45
  • 46.  Cleaning validation is establishing documented evidence that the equipment is consistently cleaned from product, microbial and cleaning agent residues to predetermined acceptable levels. 46
  • 47. A written procedure for cleaning validation which includes :    Responsibility for development, performance and approval of the validation study. Establishment of SOP’s Acceptance criteria - defined to prevent cross contamination - definition of residue limits 47
  • 48.  Cleaning procedure for each piece of equipment - Flow charts and diagrams - Cleaning agents, concentration, volume - Frequency - time left ‘dirty’ 48
  • 49.  Sampling procedures - swabs, rinse, location  Residue limits  Analytical methods 49
  • 50.  Validation report - Results Vs. acceptance criteria - Deviations and how handled - Conclusion that cleaning process is validated 50
  • 51.  Major change in cleaning procedure  Change in cleaning agent  New equipment 51
  • 52.  Knowledge of the materials - Potency of the drug - Pharmacological and toxic properties - Degradation products - Cleaning agents - Micro residues 52
  • 53. Residual Limits must be………….  Practical  Achievable  Verifiable  Safe FDA does not set acceptance specifications (limits). 53
  • 54. MAC = TD x BS x SF / LDD MAC = Maximum Allowable Carryover TD = Single Therapeutic Dose BS = Batch size of next product to be manufactured on the same equipment. SF = Safety Factor LDD = Largest Daily Dose of the next product in the same equipment. 54
  • 55. Ranitidine Tablets - Ibuprofen Tablets TD = Single Therapeutic Dose = 150 mg Ranitidine-Tab BS = Batch Size = 100 kg of Ibuprofen SF = Safety Factor = 1/1000 LDD = Largest Daily Dose of the next product in the same equipment = 200 mg X 5 tablets of Ibuprofen MAC = Max Allowable Carryover = 150 X 100 X 1000 x 1000 X 1/1000 X 1/1000 i.e 15000 mg in 100 kg Batch size i.e 150 mg in 1 kg = 150 ppm 55