MECCI ENGINEERS PVT.
LTD.
Skill enhancement @ work solutions
Be a part of Journey to Success
MECCI Engineers © copy right
SCOPE OF ENGINEERING
 JOB OPPORTUNITIESAFTER ENGINEERING
I. Research & Development
II. EPCM Sector
III. In-Plant
MECCI Engineers © copy right
Research & Development
 Scope For Below Engineering Branches:
i. Electrical Engineers
ii. Mechanical Engineers
iii. Instrumentation Engineers
iv. Civil Engineers
v. Chemical Engineers
vi. Computer Science Engineers
vii. InformationTechnology
MECCI Engineers © copy right
EPCM Sector
 The Sector which having group of contractor companies and is a
prominent form of contracting agreement in the construction industry.
The engineering and construction contractor will carry out the
detailed engineering design of the project, procure all the equipment
and materials necessary, and then construct to deliver a functioning
facility or asset to their clients. Companies that deliver EPC Projects are
commonly referred to as EPCM Contractors.
“ENGINEERING PROCUREMENT CONSTRUCTION & MANAGEMENT COMPANIES”
Opportunities In EPC Sector
Professionals having opportunity at different level:
 Feasibility Study
 FEED
 DESIGN Engineering
 Procurement
 Construction/ Commissioning
MECCI Engineers © copy right
Clients In EPC Sector
On-Shore Off-Shore Sub-Sea
Refineries Process Head
Platforms
Pipeline Projects
Power Plants Flare Head
Platforms
FPSO Supporting
Accessories
Cement Plants LNG Units
Fertilizers FLNG Units
Pharmaceuticals FPSO & Etc.
Hydrogen Units
Ethylene Units
& Etc.
MECCI Engineers © copy right
Few Major Indian Client
Companies
 ONGC
 IOCL
 HPCL
 BHART OMAN GAS
 Reliance Power Ltd.
 NTPC
 Jindal Power/ Steels
 SAIL
 GAIL
 Jaypee Cements/ Power & ETC.
MECCI Engineers © copy right
Few EPC Sector Companies
 Samsung Engineering
 Lahmeyer international Pvt. Ltd.
 Indian Oil Tanking Design
 Degremont Ltd.
 Nuberg Engineering
 Lurgi India
 Flour Daniel
 L&T Ltd.
 Petrofac
 Valdel Engineering
 SMS SIEMAG
 DESEIN Private limited
 Denso India ltd
 Conceptia software solutions
 Bechtel
 KSJ Technocrat
 Wood Group
 KSJ Engineering services
 Sterling and Wilson
 Multitax filteration
 Technofab
 Multimax
 Global Economic Advantage
 Vertex gp of companies
 Cheema boilers ltd
 Esteem Projects Pvt Ltd
 S k Engineering
 Mellcon Engineers
 Ultima Switch Gear
 Chemline India Ltd
 Jakson Ltd.
 S. S. Gas Lab Asia Pvt. Ltd
 Membrane Engineering Pvt Ltd
 Aravali Infrapower ltd
 Creative Oz Air
 Tecpro Systems Ltd
 Deeya Energy India Pvt. Ltd
 Accurate transformers
 Peekay Farm Equipments I P Ltd
 Mtekpro
 Taneja Vidyut Control Private Limited
 Brisanzia Technologies Pvt Ltd
 Hitech Bulk handling systems Pvt ltd
 Sombansi enviro
 Azure power India pvt ltd
 Ecotherm Engineers Pvt Ltd
 Zeus group
 Bhaskar Power Projects Pvt Ltd
 ACSION CHEMICALS & SYSTEMS PVT.LTD
 Ns Terbo Pvt LtdMECCI Engineers © copy right
Coordination b/w Client & EPC
1. Clients
EPC
2. Clients
PMC
EPC
MECCI Engineers © copy right
Other Related Sectors:
PMC- “Project Management Consultancy”
 PMC stands for Project Management Consultant or Project
Management Contract. Under a project management contract an
engineering contractor will overlook the EPC Contractors work to
ensure compliance with client scope of works.
 Other terms for these type of services include Project
Management Services (PMS) and Project Management Services
Contracts (PMSC).
MECCI Engineers © copy right
“Licensor Company”
 The Company who is responsible for defining the
technology for Process Plant Engineering
MECCI Engineers © copy right
EPCM
 EPCM (engineering, procurement, and construction management) is a
common form of contracting arrangement for very large projects within
the infrastructure, mining, resources and energy industries. In an EPCM
arrangement, the client selects a head contractor who manages the whole
project on behalf of the client.The EPCM contractor coordinates all design,
procurement and construction work and ensures that the whole project is
completed as required and in time.The EPCM contractor may or may not
undertake actual site work.
 An EPCM contract is a natural progression for an EPC contractor as, if one is able
to do an EPC of a project, then getting a bigger EPCM job is advantageous. It
helps to tap the already present competencies while ensuring better control over
the project. Also, the value of the project managed through an EPCM contract is
far greater than the individual EPC contracts.
 Normally, an EPCM contractor completes the basic work such as site surveys,
getting clearances from authorities, doing the basic engineering and preparing
the site for the subcontractors. Subcontractors are chosen by the EPCM
company, but they have an agreement directly with the final customer
(investor).
MECCI Engineers © copy right
EPIC “Engineering Procurement
Installation Commissioning”
 EPIC stands for Engineering Procurement Installation
Commissioning is typically a Lump SumTurn Key (LSTK) type
Contract integrating the responsibility going from the
conception to the final acceptance of one or more elements of
a production system. It can be awarded for all, or part, of a
field development.
LSTK “LumpsumTurnkey”
 LSTK stands for Lump SumTurn Key.This is a contractual
agreement in which a fixed price is agreed for the execution of
a project or part of a project. Once the final development is
completed a finished functioning asset is handed over to the
client, hence the term "Turn Key" which effectively means
ready to operate.
MECCI Engineers © copy right
An owner decides for an EPC
contract for reasons that include:
 Reduced stress for owner
 easy work and growth of the company.
 Single point of contact for owner simplifies communications.
 Ready availability of post-commissioning services
 Ensures quality and reduces practical issues faced in other ways
 Owner protected against changing prices for materials, labour, etc.
 Cost is known at the start of the project
Besides the plant sitting, in an EPC contract the owner defines:
 Scope and the specifications of the plant
 Quality
 Project duration
 Cost
 The cost (the price to be paid to the EPCC) is negotiated and finalised and paid in
mutually agreed instalments.
MECCI Engineers © copy right
EPC Top Management
CEO
ADMINISTRATION
HUMAN RESOURCE
PLANNING/ ESTIMATION
ENGINEERING MGMT.
QHSE
PROCESS ENGINEERING
ENGINEERING
 CIVIL ENGINEERING
 MECHANICAL ENGINEERING
I. MECHANICAL EQUIPMENT DESIGN
II. PIPING DESIGN
III. HVAC
 ELECTRICAL ENGINEERING
 INSTRUMENTATION ENGINEERING
MECCI Engineers © copy right
Functions In Detailed Engineering
•Engineering Functions
•Initiation
•Implementation
•Planning & Programming
•Estimating -> Request for Quote
•Valuation
•Design
Procurement Functions
•Purchasing
•Expediting
•Receiving
•Invoicing
•Reconciliation
Construction Functions
•Construction Schedule
•On-site Material Handling
•Construction Activities
•On-site Client Communications
•Valuation & Cash flow
•Closing
MECCI Engineers © copy right
LEVEL OF DESIGNATION IN ENGINEERING DEPT.
LEVEL MIN. QUALIFICATION
HOD “HEAD OFTHE DEPT.” B.Tech/B.E. or Above
Principal Engineer B.Tech/B.E.
Sr. ENGINEER B.Tech/B.E.
ENGINEER/ DESIGNER B.Tech/B.E.
MODELLER DIPLOMA
DRAFTMAN ITI
MECCI Engineers © copy right
SCOPE IN DESIGNATION RELATED BRANCH
PROCESS DEPT. PROCESS DESIGN
ENGINEER
CHEMICAL ENGINEERING
CIVIL DEPT. CIVIL & STRUCTURAL
ENGINEER
CIVIL ENGINEERING
PIPING/STRESS DEPT. PIPING STRESS
ENGINEER
MECHANICAL
ENGINEERING
MECHANICAL
EQUIPMENT
MECH. EQUIPMENT
ENGINEER
MECHANICAL
ENGINEERING
HVAC HVAC ENGINEER MECHANICAL
ENGINEERING
ELECTRICAL DEPT. ELECTRICAL DESIGN
ENGINEER
ELECTRICAL
ENGINEERING
INSTRUMENTATION
DEPT.
INST. DESIGN ENGINEER INSTRUMENTATION /
ELECTRONICS
ENGINEERING
MECCI Engineers © copy right
WORK FLOW
INVOLVEMENT
CLIENT MGMT. CLIENT
DFR EPC
FEED EPC
PROPOSAL EPC
DETAILED ENGINEERING EPC
PROCUREMENT EPC
INSTALLATION/COMMISSIONING EPC
MECCI Engineers © copy right
DEFINATIONS
 DFR “DETAILED FEASIBILITY REPORT”
 The Feasibility Report constitutes one of the most important steps in the decision-
making process involved with embarking on a project. Approvals from financial
institutions and Clients' Managements are based on the viability of the project, and a
proper Feasibility Report / Study provides an unbiased and authentic evaluation of
this viability.
 Essential features of a bankable Report include proper technical basis, accurate cost
estimates with back-up quotations fromVendors, appropriate market surveys and
realistic financial analyses
 FEED “FRONT END ENGINEERING DESIGN”
 FEED stands for Front End Engineering Design.The FEED is basic engineering
which comes after the Conceptual design or Feasibility study.The FEED design
focuses the technical requirements as well as rough investment cost for the
project.The FEED can be divided into separate packages covering different
portions of the project.The FEED package is used as the basis for bidding the
Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis.
Cont….
MECCI Engineers © copy right
A good FEED will reflect all the clients project specific requirements and avoid
significant changes during the execution phase. FEED Contracts usually take around
1 year to complete for larger sized projects. During the FEED phase there is close
communication between Project Owners and Operators and the Engineering
Contractor to work up the project specific requirements.
MECCI Engineers © copy right
PROPOSAL
 This is the type of quotation which prepared by
EPC Companies. It defines process involve to
complete the requirement of Client with
involving the factors like Quality/Standards, Cost
& Estimation,Total Duration of Project & etc.
 Finally client will decide a L1 (Lower One)
Company after a bid/tender.Who is responsible
for Detailed Engineering.
MECCI Engineers © copy right
Detailed Engineering
 Detail Engineering Design (DED) is the essential bridge between the basic
engineering design and construction phase of a project in order to convert
the ideas into reality.
DED involves close coordination and synchronization among various
disciplines of engineering, all in house resources for interactive and
progressive manner. With having the DED, is vital to the owner flexibility
time to execute the project.
 A dedicated team of reliable and knowledgeable managers, engineers and
designers who are able to provide the complete detail engineering design
solution.
 Computer aided design techniques are extensively used as design aids to
help develop optimum layout & design to assure maximum construction,
operational & maintenance convenience, and detailed construction
drawings with bill of materials are extracted automatically from the system,
ensuring highest degree of accuracy and error-free drawings.
MECCI Engineers © copy right
PROCUREMENT
WHICH INVOLVES:
•Purchasing
•Expediting
•Receiving
•Invoicing
•Reconciliation
INSTALLATION/ COMMISSIONING
WHICH INVOLVES:
•Construction Schedule
•On-site Material Handling
•Construction Activities
•On-site Client Communications
•Valuation & Cash flow
•Closing MECCI Engineers © copy right
THANKS & REGARDS
MECCI Engineers Pvt. Ltd.
Shape Your Core Engineering……..
MECCI Engineers © copy right

Mepl presentation

  • 1.
    MECCI ENGINEERS PVT. LTD. Skillenhancement @ work solutions Be a part of Journey to Success MECCI Engineers © copy right
  • 2.
    SCOPE OF ENGINEERING JOB OPPORTUNITIESAFTER ENGINEERING I. Research & Development II. EPCM Sector III. In-Plant MECCI Engineers © copy right
  • 3.
    Research & Development Scope For Below Engineering Branches: i. Electrical Engineers ii. Mechanical Engineers iii. Instrumentation Engineers iv. Civil Engineers v. Chemical Engineers vi. Computer Science Engineers vii. InformationTechnology MECCI Engineers © copy right
  • 4.
    EPCM Sector  TheSector which having group of contractor companies and is a prominent form of contracting agreement in the construction industry. The engineering and construction contractor will carry out the detailed engineering design of the project, procure all the equipment and materials necessary, and then construct to deliver a functioning facility or asset to their clients. Companies that deliver EPC Projects are commonly referred to as EPCM Contractors. “ENGINEERING PROCUREMENT CONSTRUCTION & MANAGEMENT COMPANIES” Opportunities In EPC Sector Professionals having opportunity at different level:  Feasibility Study  FEED  DESIGN Engineering  Procurement  Construction/ Commissioning MECCI Engineers © copy right
  • 5.
    Clients In EPCSector On-Shore Off-Shore Sub-Sea Refineries Process Head Platforms Pipeline Projects Power Plants Flare Head Platforms FPSO Supporting Accessories Cement Plants LNG Units Fertilizers FLNG Units Pharmaceuticals FPSO & Etc. Hydrogen Units Ethylene Units & Etc. MECCI Engineers © copy right
  • 6.
    Few Major IndianClient Companies  ONGC  IOCL  HPCL  BHART OMAN GAS  Reliance Power Ltd.  NTPC  Jindal Power/ Steels  SAIL  GAIL  Jaypee Cements/ Power & ETC. MECCI Engineers © copy right
  • 7.
    Few EPC SectorCompanies  Samsung Engineering  Lahmeyer international Pvt. Ltd.  Indian Oil Tanking Design  Degremont Ltd.  Nuberg Engineering  Lurgi India  Flour Daniel  L&T Ltd.  Petrofac  Valdel Engineering  SMS SIEMAG  DESEIN Private limited  Denso India ltd  Conceptia software solutions  Bechtel  KSJ Technocrat  Wood Group  KSJ Engineering services  Sterling and Wilson  Multitax filteration  Technofab  Multimax  Global Economic Advantage  Vertex gp of companies  Cheema boilers ltd  Esteem Projects Pvt Ltd  S k Engineering  Mellcon Engineers  Ultima Switch Gear  Chemline India Ltd  Jakson Ltd.  S. S. Gas Lab Asia Pvt. Ltd  Membrane Engineering Pvt Ltd  Aravali Infrapower ltd  Creative Oz Air  Tecpro Systems Ltd  Deeya Energy India Pvt. Ltd  Accurate transformers  Peekay Farm Equipments I P Ltd  Mtekpro  Taneja Vidyut Control Private Limited  Brisanzia Technologies Pvt Ltd  Hitech Bulk handling systems Pvt ltd  Sombansi enviro  Azure power India pvt ltd  Ecotherm Engineers Pvt Ltd  Zeus group  Bhaskar Power Projects Pvt Ltd  ACSION CHEMICALS & SYSTEMS PVT.LTD  Ns Terbo Pvt LtdMECCI Engineers © copy right
  • 8.
    Coordination b/w Client& EPC 1. Clients EPC 2. Clients PMC EPC MECCI Engineers © copy right
  • 9.
    Other Related Sectors: PMC-“Project Management Consultancy”  PMC stands for Project Management Consultant or Project Management Contract. Under a project management contract an engineering contractor will overlook the EPC Contractors work to ensure compliance with client scope of works.  Other terms for these type of services include Project Management Services (PMS) and Project Management Services Contracts (PMSC). MECCI Engineers © copy right
  • 10.
    “Licensor Company”  TheCompany who is responsible for defining the technology for Process Plant Engineering MECCI Engineers © copy right
  • 11.
    EPCM  EPCM (engineering,procurement, and construction management) is a common form of contracting arrangement for very large projects within the infrastructure, mining, resources and energy industries. In an EPCM arrangement, the client selects a head contractor who manages the whole project on behalf of the client.The EPCM contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time.The EPCM contractor may or may not undertake actual site work.  An EPCM contract is a natural progression for an EPC contractor as, if one is able to do an EPC of a project, then getting a bigger EPCM job is advantageous. It helps to tap the already present competencies while ensuring better control over the project. Also, the value of the project managed through an EPCM contract is far greater than the individual EPC contracts.  Normally, an EPCM contractor completes the basic work such as site surveys, getting clearances from authorities, doing the basic engineering and preparing the site for the subcontractors. Subcontractors are chosen by the EPCM company, but they have an agreement directly with the final customer (investor). MECCI Engineers © copy right
  • 12.
    EPIC “Engineering Procurement InstallationCommissioning”  EPIC stands for Engineering Procurement Installation Commissioning is typically a Lump SumTurn Key (LSTK) type Contract integrating the responsibility going from the conception to the final acceptance of one or more elements of a production system. It can be awarded for all, or part, of a field development. LSTK “LumpsumTurnkey”  LSTK stands for Lump SumTurn Key.This is a contractual agreement in which a fixed price is agreed for the execution of a project or part of a project. Once the final development is completed a finished functioning asset is handed over to the client, hence the term "Turn Key" which effectively means ready to operate. MECCI Engineers © copy right
  • 13.
    An owner decidesfor an EPC contract for reasons that include:  Reduced stress for owner  easy work and growth of the company.  Single point of contact for owner simplifies communications.  Ready availability of post-commissioning services  Ensures quality and reduces practical issues faced in other ways  Owner protected against changing prices for materials, labour, etc.  Cost is known at the start of the project Besides the plant sitting, in an EPC contract the owner defines:  Scope and the specifications of the plant  Quality  Project duration  Cost  The cost (the price to be paid to the EPCC) is negotiated and finalised and paid in mutually agreed instalments. MECCI Engineers © copy right
  • 14.
    EPC Top Management CEO ADMINISTRATION HUMANRESOURCE PLANNING/ ESTIMATION ENGINEERING MGMT. QHSE PROCESS ENGINEERING ENGINEERING  CIVIL ENGINEERING  MECHANICAL ENGINEERING I. MECHANICAL EQUIPMENT DESIGN II. PIPING DESIGN III. HVAC  ELECTRICAL ENGINEERING  INSTRUMENTATION ENGINEERING MECCI Engineers © copy right
  • 15.
    Functions In DetailedEngineering •Engineering Functions •Initiation •Implementation •Planning & Programming •Estimating -> Request for Quote •Valuation •Design Procurement Functions •Purchasing •Expediting •Receiving •Invoicing •Reconciliation Construction Functions •Construction Schedule •On-site Material Handling •Construction Activities •On-site Client Communications •Valuation & Cash flow •Closing MECCI Engineers © copy right
  • 16.
    LEVEL OF DESIGNATIONIN ENGINEERING DEPT. LEVEL MIN. QUALIFICATION HOD “HEAD OFTHE DEPT.” B.Tech/B.E. or Above Principal Engineer B.Tech/B.E. Sr. ENGINEER B.Tech/B.E. ENGINEER/ DESIGNER B.Tech/B.E. MODELLER DIPLOMA DRAFTMAN ITI MECCI Engineers © copy right
  • 17.
    SCOPE IN DESIGNATIONRELATED BRANCH PROCESS DEPT. PROCESS DESIGN ENGINEER CHEMICAL ENGINEERING CIVIL DEPT. CIVIL & STRUCTURAL ENGINEER CIVIL ENGINEERING PIPING/STRESS DEPT. PIPING STRESS ENGINEER MECHANICAL ENGINEERING MECHANICAL EQUIPMENT MECH. EQUIPMENT ENGINEER MECHANICAL ENGINEERING HVAC HVAC ENGINEER MECHANICAL ENGINEERING ELECTRICAL DEPT. ELECTRICAL DESIGN ENGINEER ELECTRICAL ENGINEERING INSTRUMENTATION DEPT. INST. DESIGN ENGINEER INSTRUMENTATION / ELECTRONICS ENGINEERING MECCI Engineers © copy right
  • 18.
    WORK FLOW INVOLVEMENT CLIENT MGMT.CLIENT DFR EPC FEED EPC PROPOSAL EPC DETAILED ENGINEERING EPC PROCUREMENT EPC INSTALLATION/COMMISSIONING EPC MECCI Engineers © copy right
  • 19.
    DEFINATIONS  DFR “DETAILEDFEASIBILITY REPORT”  The Feasibility Report constitutes one of the most important steps in the decision- making process involved with embarking on a project. Approvals from financial institutions and Clients' Managements are based on the viability of the project, and a proper Feasibility Report / Study provides an unbiased and authentic evaluation of this viability.  Essential features of a bankable Report include proper technical basis, accurate cost estimates with back-up quotations fromVendors, appropriate market surveys and realistic financial analyses  FEED “FRONT END ENGINEERING DESIGN”  FEED stands for Front End Engineering Design.The FEED is basic engineering which comes after the Conceptual design or Feasibility study.The FEED design focuses the technical requirements as well as rough investment cost for the project.The FEED can be divided into separate packages covering different portions of the project.The FEED package is used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis. Cont…. MECCI Engineers © copy right
  • 20.
    A good FEEDwill reflect all the clients project specific requirements and avoid significant changes during the execution phase. FEED Contracts usually take around 1 year to complete for larger sized projects. During the FEED phase there is close communication between Project Owners and Operators and the Engineering Contractor to work up the project specific requirements. MECCI Engineers © copy right
  • 21.
    PROPOSAL  This isthe type of quotation which prepared by EPC Companies. It defines process involve to complete the requirement of Client with involving the factors like Quality/Standards, Cost & Estimation,Total Duration of Project & etc.  Finally client will decide a L1 (Lower One) Company after a bid/tender.Who is responsible for Detailed Engineering. MECCI Engineers © copy right
  • 22.
    Detailed Engineering  DetailEngineering Design (DED) is the essential bridge between the basic engineering design and construction phase of a project in order to convert the ideas into reality. DED involves close coordination and synchronization among various disciplines of engineering, all in house resources for interactive and progressive manner. With having the DED, is vital to the owner flexibility time to execute the project.  A dedicated team of reliable and knowledgeable managers, engineers and designers who are able to provide the complete detail engineering design solution.  Computer aided design techniques are extensively used as design aids to help develop optimum layout & design to assure maximum construction, operational & maintenance convenience, and detailed construction drawings with bill of materials are extracted automatically from the system, ensuring highest degree of accuracy and error-free drawings. MECCI Engineers © copy right
  • 23.
    PROCUREMENT WHICH INVOLVES: •Purchasing •Expediting •Receiving •Invoicing •Reconciliation INSTALLATION/ COMMISSIONING WHICHINVOLVES: •Construction Schedule •On-site Material Handling •Construction Activities •On-site Client Communications •Valuation & Cash flow •Closing MECCI Engineers © copy right
  • 24.
    THANKS & REGARDS MECCIEngineers Pvt. Ltd. Shape Your Core Engineering…….. MECCI Engineers © copy right