Introduction
EPC contract the contractor designs the installation, procures the
necessary materials and builds the project, either directly or by
subcontracting part of the work. In some cases, the contractor
carries the project risk for schedule as well as budget in return for a
fixed price, called lump sum or LSTK depending on the agreed
scope of work.[1] When the scope is restricted to engineering and
procurement, this is referred to as an EP, E and P or E+P contract. This
is often done in situations where the construction risk is too great for
the contractor or when the owner does the construction
IMPORTANCE OF EPC
An owner decides for an EPC contract for reasons that include
• Reduced stress for owner
• easy work and growth of the company.
• Single point of contact for owner simplifies communications.
• Ready availability of post-commissioning services
• Ensures quality and reduces practical issues faced in other ways[clarification
needed]
• Owner protected against changing prices for materials, labor, etc.
• Cost is known at the start of the project
• Scope and the specifications of the plant
• Quality
• Project duration
• Cost
• The cost (the price to be paid to the EPCC) is negotiated and finalised and
paid in mutually agreed installments.
Cost Certainity & Owner Responsiblity
Thank You

More Related Content

Similar to Sagnik_Construction_Management.pdf

Kodi CV( EM )
Kodi CV( EM )Kodi CV( EM )
Kodi CV( EM )
Kodi Periyasamy
 
Updated CV for 11.11.16
Updated CV for 11.11.16 Updated CV for 11.11.16
Updated CV for 11.11.16
R.C Dilli
 
Wind power epc o&m april 2013
Wind power epc o&m  april 2013Wind power epc o&m  april 2013
Wind power epc o&m april 2013
Weero Koster
 
NEW UPDATE RESUME
NEW UPDATE RESUMENEW UPDATE RESUME
NEW UPDATE RESUME
MOHD NASIR AWANG
 
Industrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures LtdIndustrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures Ltd
Sk Md Nayar
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
Elugbe Ambrose
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
Mohd ismail
 
Mepl presentation
Mepl presentationMepl presentation
Mepl presentation
MECCI Engineers
 
Prashant_Kharche new
Prashant_Kharche new Prashant_Kharche new
Prashant_Kharche new
Prashant Kharche
 
Ganesan resume
Ganesan resumeGanesan resume
Ganesan resume
Ganesan Kaliyamurthy
 
Ang kwang Wee_CV Sep 2016
Ang kwang Wee_CV Sep 2016Ang kwang Wee_CV Sep 2016
Ang kwang Wee_CV Sep 2016
Ang Kwang Wee Peter
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
Tawfig Adham
 
Final Project
Final ProjectFinal Project
Final Project
Er Naveen Kumar
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
Nam N.N Tran M.Eng, PMP
 
Rayhan_CV..pdf
Rayhan_CV..pdfRayhan_CV..pdf
Rayhan_CV..pdf
Rayhan598596
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
ayman hussien
 
Akhila CV
Akhila CVAkhila CV
Akhila CV
Akhila V.S.
 
Vali
ValiVali
jeyakumar resume civil
jeyakumar   resume civiljeyakumar   resume civil
jeyakumar resume civil
jeya kumar
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
Imran Asghar
 

Similar to Sagnik_Construction_Management.pdf (20)

Kodi CV( EM )
Kodi CV( EM )Kodi CV( EM )
Kodi CV( EM )
 
Updated CV for 11.11.16
Updated CV for 11.11.16 Updated CV for 11.11.16
Updated CV for 11.11.16
 
Wind power epc o&m april 2013
Wind power epc o&m  april 2013Wind power epc o&m  april 2013
Wind power epc o&m april 2013
 
NEW UPDATE RESUME
NEW UPDATE RESUMENEW UPDATE RESUME
NEW UPDATE RESUME
 
Industrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures LtdIndustrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures Ltd
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
 
Mepl presentation
Mepl presentationMepl presentation
Mepl presentation
 
Prashant_Kharche new
Prashant_Kharche new Prashant_Kharche new
Prashant_Kharche new
 
Ganesan resume
Ganesan resumeGanesan resume
Ganesan resume
 
Ang kwang Wee_CV Sep 2016
Ang kwang Wee_CV Sep 2016Ang kwang Wee_CV Sep 2016
Ang kwang Wee_CV Sep 2016
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Final Project
Final ProjectFinal Project
Final Project
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Rayhan_CV..pdf
Rayhan_CV..pdfRayhan_CV..pdf
Rayhan_CV..pdf
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
 
Akhila CV
Akhila CVAkhila CV
Akhila CV
 
Vali
ValiVali
Vali
 
jeyakumar resume civil
jeyakumar   resume civiljeyakumar   resume civil
jeyakumar resume civil
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 

Recently uploaded

9 Ways Managers Kill Morale (and What to Do Instead)
9 Ways Managers Kill Morale (and What to Do Instead)9 Ways Managers Kill Morale (and What to Do Instead)
9 Ways Managers Kill Morale (and What to Do Instead)
experienceprosarah
 
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
ssuserf63bd7
 
m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...
m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...
m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...
LinghuaKong2
 
Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...
Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...
Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...
Istanbul Beykent University (İstanbul Beykent Üniversitesi)
 
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
Rokibul Hasan
 
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Alexey Krivitsky
 
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
Samirsinh Parmar
 
team presentation of the role and responsibility of HSE teamreviewed.pptx
team presentation of the role and responsibility of HSE teamreviewed.pptxteam presentation of the role and responsibility of HSE teamreviewed.pptx
team presentation of the role and responsibility of HSE teamreviewed.pptx
ProsperOghalomeno1
 
Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024
Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024
Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024
Neal Elbaum
 
一比一原版(philau毕业证书)美国费城大学毕业证如何办理
一比一原版(philau毕业证书)美国费城大学毕业证如何办理一比一原版(philau毕业证书)美国费城大学毕业证如何办理
一比一原版(philau毕业证书)美国费城大学毕业证如何办理
nozaxy
 
Maximize Your Efficiency with This Comprehensive Project Management Platform ...
Maximize Your Efficiency with This Comprehensive Project Management Platform ...Maximize Your Efficiency with This Comprehensive Project Management Platform ...
Maximize Your Efficiency with This Comprehensive Project Management Platform ...
SOFTTECHHUB
 

Recently uploaded (11)

9 Ways Managers Kill Morale (and What to Do Instead)
9 Ways Managers Kill Morale (and What to Do Instead)9 Ways Managers Kill Morale (and What to Do Instead)
9 Ways Managers Kill Morale (and What to Do Instead)
 
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
Small Business Management An Entrepreneur’s Guidebook 8th edition by Byrd tes...
 
m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...
m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...
m249-saw PMI To familiarize the soldier with the M249 Squad Automatic Weapon ...
 
Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...
Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...
Customer Relationship Managemenet’s Impact on Customer Satisfaction and Perfo...
 
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
From Concept to reality : Implementing Lean Managements DMAIC Methodology for...
 
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
 
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
A comprehensive-study-of-biparjoy-cyclone-disaster-management-in-gujarat-a-ca...
 
team presentation of the role and responsibility of HSE teamreviewed.pptx
team presentation of the role and responsibility of HSE teamreviewed.pptxteam presentation of the role and responsibility of HSE teamreviewed.pptx
team presentation of the role and responsibility of HSE teamreviewed.pptx
 
Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024
Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024
Neal Elbaum Shares Top 5 Trends Shaping the Logistics Industry in 2024
 
一比一原版(philau毕业证书)美国费城大学毕业证如何办理
一比一原版(philau毕业证书)美国费城大学毕业证如何办理一比一原版(philau毕业证书)美国费城大学毕业证如何办理
一比一原版(philau毕业证书)美国费城大学毕业证如何办理
 
Maximize Your Efficiency with This Comprehensive Project Management Platform ...
Maximize Your Efficiency with This Comprehensive Project Management Platform ...Maximize Your Efficiency with This Comprehensive Project Management Platform ...
Maximize Your Efficiency with This Comprehensive Project Management Platform ...
 

Sagnik_Construction_Management.pdf

  • 1. NAME:- SAGNIK BHATTACHARJEE STREAM:- CIVIL ENGINEERING YEAR:- B-TECH 3RD YEAR 6TH SEM ROLL NO.:- 27901321011 SUBJECT:- Construction Management SUBJECT CODE:- CE(PC)601 KALYANI SHILPANCHAL, PO+P.S. – KALYANI, DIST – NADIA, WEST BENGAL – 741235, INDIA
  • 2. Introduction EPC contract the contractor designs the installation, procures the necessary materials and builds the project, either directly or by subcontracting part of the work. In some cases, the contractor carries the project risk for schedule as well as budget in return for a fixed price, called lump sum or LSTK depending on the agreed scope of work.[1] When the scope is restricted to engineering and procurement, this is referred to as an EP, E and P or E+P contract. This is often done in situations where the construction risk is too great for the contractor or when the owner does the construction
  • 3. IMPORTANCE OF EPC An owner decides for an EPC contract for reasons that include • Reduced stress for owner • easy work and growth of the company. • Single point of contact for owner simplifies communications. • Ready availability of post-commissioning services • Ensures quality and reduces practical issues faced in other ways[clarification needed] • Owner protected against changing prices for materials, labor, etc. • Cost is known at the start of the project • Scope and the specifications of the plant • Quality • Project duration • Cost • The cost (the price to be paid to the EPCC) is negotiated and finalised and paid in mutually agreed installments.
  • 4. Cost Certainity & Owner Responsiblity