This document reviews factors that cause cost overruns and delays in construction projects. It begins with an abstract that identifies time and cost as the main elements of project completion and notes that cost and time overruns are common problems in the construction industry. It then provides a literature review that summarizes several previous studies examining factors like improper planning, inaccurate cost estimates, changes in material prices, lack of skilled labor, and weather conditions that can contribute to cost overruns and delays. The document aims to analyze the main causes of cost overruns and delays in Indian construction management through a questionnaire.
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET Journal
This document summarizes a research paper that reviewed factors leading to schedule and budget overruns in construction projects in India. The paper analyzed previous studies on this topic and identified common critical factors. For schedule overruns, the most influential factors were found to be lack of equipment maintenance and poor procurement planning. For budget overruns, the top factors were delays in handing over sites and low labor productivity. The study also noted that contractor delays in material/equipment delivery and price inflation contributed significantly to cost overruns. The objectives of this paper were to analyze causes of overruns and their impacts, and provide recommendations to minimize time and cost overruns in construction projects.
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
This document discusses a case study on budget and schedule overruns during the construction phase of projects in India. It identifies several key factors that can lead to schedule and budget overruns based on a review of past studies. For schedule overruns, it finds that lack of equipment maintenance, poor procurement planning, and external factors like strikes are critical influencing factors. For budget overruns, it determines that delays in handing over sites, low labor productivity, and contractor delays in material/equipment delivery are important causes. Price inflation is also identified as a major contributor to cost overruns. The study aims to evaluate factors leading to time and cost overruns on construction projects in India in order to improve project success rates.
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
The document discusses factors that cause time and cost overruns in construction projects in India. It begins by providing background on issues in the Indian construction industry related to delays and budget overruns. It then describes the methodology used in the study, which involved developing a questionnaire to survey project stakeholders on factors contributing to overruns. The results of the survey are analyzed to determine the most important factors. The top factors identified through a relative important index analysis include materials management issues, site conditions, inefficient works, contractor financial problems, and equipment/machinery challenges. In conclusion, the study aims to help construction managers avoid delays and overruns by understanding and managing the key risk factors.
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
This document summarizes a research paper on factors influencing time and cost overruns in Indian construction projects. It begins with an abstract describing the objectives of studying and ranking significant factors contributing to delays and cost overruns. It then discusses various causes of time and cost overruns based on a literature review. A methodology is described involving a questionnaire survey of owners, consultants, and contractors to assess their perceptions of influential factors. Finally, a case study is presented analyzing time and cost overruns for a housing construction project in India to evaluate procedures and identify recommendations.
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
This document summarizes several research papers that studied the causes and effects of delays in construction projects. It discusses how delays can negatively impact projects by increasing costs and damaging relationships. The literature review identifies common causes of delays including poor planning, lack of coordination between project participants, miscommunication, weather issues, material shortages, and equipment problems. The document examines research from India and other countries that analyzed major factors contributing to delays through surveys and analysis of construction stakeholders. The conclusion categorizes types of delays and reiterates that scheduling and quality management techniques can help minimize delays in construction projects.
The role of time, cost and quality in project managementIRJET Journal
This document discusses the roles of time, cost, and quality in project management. It states that these three factors are interrelated and impact each other, making it difficult for project managers to balance them. The document reviews literature that analyzed how planning, monitoring, and controlling impact the timely completion of construction projects. It also discusses how tools like Microsoft Project and Primavera P6 can help optimize schedules, budgets, and quality. Overall, the document examines the relationships between time, cost, and quality in project management and how effectively managing these key factors is important for project success.
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
Time and expense overruns are regular occurrences in the construction industry all around the world but these are a major concern in developing countries such as India, and their consequences can be extremely harmful when public infrastructure projects are concerned. In India as per the MoS & PI report, as of October 2019, there were 552 delayed construction projects, and the mean time overrun in these 552 delayed projects is29.07 months. Many studies in the literature review previously, have concentrated on a variety of infrastructure risk management issues but there have only been a few studies that have looked into the overall dynamics of infrastructure and how a project's timeline can be affected by changing risk interactions. This article aids in the investigation of the variables and causes of construction delays in infrastructure projects.
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Sankalp Swarnkar
This work found out the most significant reasons of time and cost overrun for ongoing residential projects, along with this, the study focuses on formulating recommendations for improving construction performance. At the end of this work, I have reached a conclusion that what are common issues that are attributing to time and cost overrun in projects.
IRJET- Review Paper on “Budget and Schedule Overrun in the Construction Phase...IRJET Journal
This document summarizes a research paper that reviewed factors leading to schedule and budget overruns in construction projects in India. The paper analyzed previous studies on this topic and identified common critical factors. For schedule overruns, the most influential factors were found to be lack of equipment maintenance and poor procurement planning. For budget overruns, the top factors were delays in handing over sites and low labor productivity. The study also noted that contractor delays in material/equipment delivery and price inflation contributed significantly to cost overruns. The objectives of this paper were to analyze causes of overruns and their impacts, and provide recommendations to minimize time and cost overruns in construction projects.
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
This document discusses a case study on budget and schedule overruns during the construction phase of projects in India. It identifies several key factors that can lead to schedule and budget overruns based on a review of past studies. For schedule overruns, it finds that lack of equipment maintenance, poor procurement planning, and external factors like strikes are critical influencing factors. For budget overruns, it determines that delays in handing over sites, low labor productivity, and contractor delays in material/equipment delivery are important causes. Price inflation is also identified as a major contributor to cost overruns. The study aims to evaluate factors leading to time and cost overruns on construction projects in India in order to improve project success rates.
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
The document discusses factors that cause time and cost overruns in construction projects in India. It begins by providing background on issues in the Indian construction industry related to delays and budget overruns. It then describes the methodology used in the study, which involved developing a questionnaire to survey project stakeholders on factors contributing to overruns. The results of the survey are analyzed to determine the most important factors. The top factors identified through a relative important index analysis include materials management issues, site conditions, inefficient works, contractor financial problems, and equipment/machinery challenges. In conclusion, the study aims to help construction managers avoid delays and overruns by understanding and managing the key risk factors.
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
This document summarizes a research paper on factors influencing time and cost overruns in Indian construction projects. It begins with an abstract describing the objectives of studying and ranking significant factors contributing to delays and cost overruns. It then discusses various causes of time and cost overruns based on a literature review. A methodology is described involving a questionnaire survey of owners, consultants, and contractors to assess their perceptions of influential factors. Finally, a case study is presented analyzing time and cost overruns for a housing construction project in India to evaluate procedures and identify recommendations.
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
This document summarizes several research papers that studied the causes and effects of delays in construction projects. It discusses how delays can negatively impact projects by increasing costs and damaging relationships. The literature review identifies common causes of delays including poor planning, lack of coordination between project participants, miscommunication, weather issues, material shortages, and equipment problems. The document examines research from India and other countries that analyzed major factors contributing to delays through surveys and analysis of construction stakeholders. The conclusion categorizes types of delays and reiterates that scheduling and quality management techniques can help minimize delays in construction projects.
The role of time, cost and quality in project managementIRJET Journal
This document discusses the roles of time, cost, and quality in project management. It states that these three factors are interrelated and impact each other, making it difficult for project managers to balance them. The document reviews literature that analyzed how planning, monitoring, and controlling impact the timely completion of construction projects. It also discusses how tools like Microsoft Project and Primavera P6 can help optimize schedules, budgets, and quality. Overall, the document examines the relationships between time, cost, and quality in project management and how effectively managing these key factors is important for project success.
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
Time and expense overruns are regular occurrences in the construction industry all around the world but these are a major concern in developing countries such as India, and their consequences can be extremely harmful when public infrastructure projects are concerned. In India as per the MoS & PI report, as of October 2019, there were 552 delayed construction projects, and the mean time overrun in these 552 delayed projects is29.07 months. Many studies in the literature review previously, have concentrated on a variety of infrastructure risk management issues but there have only been a few studies that have looked into the overall dynamics of infrastructure and how a project's timeline can be affected by changing risk interactions. This article aids in the investigation of the variables and causes of construction delays in infrastructure projects.
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Sankalp Swarnkar
This work found out the most significant reasons of time and cost overrun for ongoing residential projects, along with this, the study focuses on formulating recommendations for improving construction performance. At the end of this work, I have reached a conclusion that what are common issues that are attributing to time and cost overrun in projects.
IRJET- Delay in Construction its Causes and Mitigation: A ReviewIRJET Journal
This document discusses causes of delays in construction projects and methods to mitigate them. It identifies several common causes of delay including changes by owners, payment delays, design errors, poor planning, and communication issues. Delays are classified as critical/non-critical, excusable/non-excusable, and compensable/non-compensable. The document also provides a table outlining specific mitigation plans for various delay causes related to the project management, financing, and construction. Overall, the document provides an overview of delays in construction and strategies to minimize them through improved coordination, planning, communication and dispute resolution.
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
This document summarizes a study on the analysis and evaluation of delays in public sector construction projects in Kerala, India. A questionnaire survey was conducted with project owners, contractors, and designers to identify the main causes of delays. The data collected through questionnaires was analyzed using statistical software. The results showed that the top causes of delays included changes to the project by the owner, delayed financing and payments by the owner, delays related to subcontractors' work, shortage of construction materials, and weather effects. The study aims to help minimize and control delays in public construction projects in Kerala by identifying the key reasons for delays.
Delay Analysis in Industrial Projects by using Relative Importance Index MethodIRJET Journal
This document discusses delays in industrial construction projects in India. It aims to identify the key causes and effects of delays by conducting a literature review and survey of consultants and contractors. The top five causes of delay identified are: (1) local political interference, (2) inadequate fund allocation, (3) improper project planning and scheduling, (4) delay in progress payments by clients, and (5) escalation of material prices. The major effects of delays are time overruns, cost overruns, and disputes. The study uses a Relative Importance Index method to rank factors identified from the literature and survey responses on causes and effects of delays and their perspectives.
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
This document discusses controlling and monitoring construction projects using the earned value method. It begins with an introduction to the importance of controlling and monitoring construction projects. It then discusses the methodology of earned value analysis, including defining earned value, variances, and the five steps to set up an earned value system and four steps to use the information generated. Key aspects of earned value discussed include using it as a uniform measure of project progress, its role in cost performance analysis, and how it is calculated based on planned value, earned value, and actual costs.
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
This document discusses project management techniques that can be used to avoid project failure. It analyzes responses from project managers on reasons for project failure and how to ensure success. Some key findings are:
- Poor planning, unrealistic timelines and cost estimates, and lack of clear objectives are common reasons for failure.
- Successful projects meet scope, time and cost goals while satisfying stakeholders.
- Techniques like CPM, PERT, Gantt charts and MS Project help managers monitor progress and implement corrective actions to get projects back on track if issues arise.
The Impact of Project Management Practices on Project SuccessIRJET Journal
1) The document discusses the relationship between project management practices and project success. It analyzes data from project practitioners in 10 countries.
2) The majority of successful projects incorporate but do not fully exploit modern project management tools and techniques. The impact of these tools on success depends on practitioner training, timely implementation, and level of implementation.
3) While project management can positively impact success, human factors are also critical. Project success results from both effective project management and an successful final product.
IRJET- Review: Factors Affecting Scheduling of Multiple ProjectsIRJET Journal
This document discusses factors that affect scheduling of multiple construction projects. It identifies 15 key factors through a literature review and survey of construction professionals in India. The top factors identified are poor site management, commitment of project participants, ineffective planning and scheduling, coordination issues, availability of labor and materials, and project priorities. The document provides background on challenges of multi-project scheduling and analyzes studies that have identified important scheduling factors in different contexts. It aims to help construction firms better understand how to manage schedules across multiple concurrent projects.
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
This document discusses identifying constraints that impact construction project schedules. It begins with an abstract that outlines identifying major constraints using the Relative Importance Index (RII) method and analyzing their impact on project schedules using Microsoft Project software.
The document then describes the research methodology, which includes preparing questionnaires to identify constraints, conducting a survey, analyzing the results with RII to determine governing constraints, and rescheduling the project to assess impact of delays. A literature review is also provided on studying factors that cause delays and techniques for reducing constraints. The objectives are to schedule a building project, identify high-impact constraints with RII, and determine total project duration considering constraint impacts.
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
This document summarizes a study that planned and scheduled the construction of a multi-story residential building using Microsoft Project software and applied material management techniques. The study categorized building materials using ABC analysis to prioritize those with the greatest cost impact. Scheduling the project in Microsoft Project and analyzing material usage helped optimize costs and duration to increase construction efficiency. Applying material management principles such as inventory control and efficient procurement supported timely material availability and reduced waste.
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET Journal
This document discusses the application of fuzzy logic to analyze delays in construction projects. It presents a case study of a housing project in Kochi, Kerala, India. Fuzzy logic was used to quantify the probability of scheduled delays. Based on expert interviews, fuzzy rules were created to assess various delay factors. These included labor, project, consultant, contractor, and external related factors. The factors were applied to the case study project using MATLAB fuzzy logic toolbox. This resulted in a scheduled delay probability of 32.9% compared to the actual schedule. The document concludes fuzzy logic can help construction parties predict delay risks and improve project time management.
A study on the analysis and evaluation of delays in private construction Proj...IRJET Journal
The document summarizes a study on the analysis and evaluation of delays in private construction projects in Kerala, India. It identifies the objectives as determining the root causes of delays, their effects, and recommendations to minimize delays. A literature review found the top causes to be poor site management, lack of skilled labor, unrealistic planning, worker absences, design changes, accidents, subcontractor delays, and lack of materials. A questionnaire survey of owners, designers, and contractors in Kerala identified the top 15 causes of delays as issues with payments, design document approval, change orders, rework errors, resource management, design data collection, misunderstanding of requirements, unskilled labor, motivation, material shortages, and damaged materials. The
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of mechanical and civil engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in mechanical and civil engineering. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
This document discusses delays in mining/manufacturing projects in India and their effects. It begins by identifying some of the common causes of delays in these types of projects, such as natural disasters, financial problems, improper planning, and shortages. It then discusses three main techniques for analyzing delays: relative importance index, importance index, and Spearman's rank correlation coefficient. The remainder of the document focuses on different delay analysis methodologies, including foresight, hindsight, and contemporaneous methods. It also discusses how to calculate schedule impacts from lost productivity using time impact analysis and window analysis. Overall, the document aims to identify the root causes of delays in mining/manufacturing projects and develop comprehensive methodologies for analyzing delays
This document discusses delays in mining and manufacturing projects in India. It begins by providing background on the prevalence of delays and cost overruns in infrastructure projects in India. It then reviews literature on causes of delays in construction projects, which are relevant for mining projects given similarities in planning and execution. The document outlines objectives to identify causes of delays specific to mining/manufacturing projects in India and calculate delays in a job shop industry project. It proposes using the Relative Importance Index and Importance Index techniques to rank identified delay causes based on severity and frequency of occurrence.
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET Journal
This document discusses schedule delay analysis in construction projects using Primavera P6 software. It begins with an introduction to the importance of planning, scheduling, and managing delays in construction management. It then reviews common causes of construction delays and different methods for analyzing schedule delays, including as-planned vs. as-built analysis and time impact analysis. The document focuses on using Primavera P6 software to compare planned and actual project schedules to identify delays and their impacts on time and cost. It argues this approach can help construction managers effectively monitor progress and address delays.
Management For Construction Project:-Various Aspects Of DelayIRJET Journal
1. The document discusses various causes of delay in construction projects based on a questionnaire survey conducted with construction project stakeholders in India.
2. The top two most significant causes of delay identified are issues with the quantity and quality of labor, and delays in transporting materials to sites.
3. Other major causes of delay include lack of proper supervision or planning by contractors, work stoppages due to improper methodologies, changes to work orders by owners during construction, and slow decision making.
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
This document discusses project management techniques to avoid project failure. It begins with an introduction to project management and definitions of key terms. The literature review then summarizes several academic papers on topics related to project failure such as identifying common causes of failure, project performance measurement, and techniques for scheduling projects with uncertainty. The conclusion reiterates that project management techniques must be tailored to the specific project and region, and that further research is needed to enhance understanding of avoiding project failure.
Delay Analysis for an On-Going Residential ProjectIRJET Journal
This document discusses delay analysis for an ongoing residential construction project in India. It aims to identify the causes of delays, their effects on project completion, and provide recommendations. The major causes of delay identified are issues with government approvals, staffing changes, poor management, lack of resources, delays in procuring materials, late funding, and drawing problems. The effects of delays include increased costs, postponed work, and changed labor allocation. While not all delays can be avoided, improved management practices could help mitigate some delays. The document also provides background on project management principles, techniques for delay analysis, and the use of project management software.
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...IJERA Editor
The Construction industry is one of the key economic industry in India and is the main motivating force in Indian national economy. But, it suffers from a number of problems that affect time, cost and quality performances. Successful management of construction projects is based on three major factors i.e. time, cost and quality. The successful completion of construction projects within the specified time has become the most valuable and challenging task for the Managers, Architects, Engineers and Contractors. How to achieve this task is a problem, which should be solved. The overall objective of this study is to identify the factors resposinle for overruns in time and cost of the construction project and suggest the suitable remedial solutions. Poor planning, implementation and management are the main reasons for time and cost overruns in construction projects in India. Since most of the reasons are well known and can be controlled if a proper arrangement is made
The alarming rate of project delays in this country needs urgent attention and resolution as one project delay leads to another therefore affecting the growth of any economy or profit-making organization. This alarming rate would possibly go out of one’s hand if strategies are not put in place to curb these phenomena. The Objectives of this research is to critically identify and evaluate the setbacks or factors causing delays in completing projects on time and its effect. The study narrowed its arrows on Prime Ghana projects executed in the country and it was thus conducted with the usage of questionnaires to solicit for the required data for processing. Results from the study divulge that the actual sources of delays in project delivery are; Inadequate financial resources of clients, delays in honoring payment for work done, underestimation of project duration, poor communication between contracting parties, complexity, difficulties in accessing bank credit (client); change orders during construction and others. It was recommended that, initial proper planning and controlling is essential to the client to have proper action plan, procurement plan, and budget plan prepared before commencement of project. Payment schedule must be agreed by the parties involved. On the part of the contractor adequate knowledge of project management, principles, tools and techniques is required to reduce delays. Consultants must plan very well to ensure that contract processes are duly followed, thus approval of drawings, documentation, and other things to reduce variation during construction. They should monitor their assigned work very well by insisting that corrections are done at the appropriate time to reduce or avoid rework.
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
1) The document discusses the Sungal Tunnel project in Jammu and Kashmir, India, which is being constructed using the New Austrian Tunneling Method (NATM).
2) NATM involves continuous monitoring during construction to adapt to changing ground conditions, and makes extensive use of shotcrete for temporary tunnel support.
3) The methodology section outlines the systematic geotechnical design process for tunnels according to Austrian guidelines, and describes the various steps of NATM tunnel construction including initial and secondary tunnel support.
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
This study examines the effect of response reduction factors (R factors) on reinforced concrete (RC) framed structures through nonlinear dynamic analysis. Three RC frame models with varying heights (4, 8, and 12 stories) were analyzed in ETABS software under different R factors ranging from 1 to 5. The results showed that displacement increased as the R factor decreased, indicating less linear behavior for lower R factors. Drift also decreased proportionally with increasing R factors from 1 to 5. Shear forces in the frames decreased with higher R factors. In general, R factors of 3 to 5 produced more satisfactory performance with less displacement and drift. The displacement variations between different building heights were consistent at different R factors. This study evaluated how R factors influence
More Related Content
Similar to Element of Cost overrun and Delay in Construction: A Review
IRJET- Delay in Construction its Causes and Mitigation: A ReviewIRJET Journal
This document discusses causes of delays in construction projects and methods to mitigate them. It identifies several common causes of delay including changes by owners, payment delays, design errors, poor planning, and communication issues. Delays are classified as critical/non-critical, excusable/non-excusable, and compensable/non-compensable. The document also provides a table outlining specific mitigation plans for various delay causes related to the project management, financing, and construction. Overall, the document provides an overview of delays in construction and strategies to minimize them through improved coordination, planning, communication and dispute resolution.
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
This document summarizes a study on the analysis and evaluation of delays in public sector construction projects in Kerala, India. A questionnaire survey was conducted with project owners, contractors, and designers to identify the main causes of delays. The data collected through questionnaires was analyzed using statistical software. The results showed that the top causes of delays included changes to the project by the owner, delayed financing and payments by the owner, delays related to subcontractors' work, shortage of construction materials, and weather effects. The study aims to help minimize and control delays in public construction projects in Kerala by identifying the key reasons for delays.
Delay Analysis in Industrial Projects by using Relative Importance Index MethodIRJET Journal
This document discusses delays in industrial construction projects in India. It aims to identify the key causes and effects of delays by conducting a literature review and survey of consultants and contractors. The top five causes of delay identified are: (1) local political interference, (2) inadequate fund allocation, (3) improper project planning and scheduling, (4) delay in progress payments by clients, and (5) escalation of material prices. The major effects of delays are time overruns, cost overruns, and disputes. The study uses a Relative Importance Index method to rank factors identified from the literature and survey responses on causes and effects of delays and their perspectives.
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
This document discusses controlling and monitoring construction projects using the earned value method. It begins with an introduction to the importance of controlling and monitoring construction projects. It then discusses the methodology of earned value analysis, including defining earned value, variances, and the five steps to set up an earned value system and four steps to use the information generated. Key aspects of earned value discussed include using it as a uniform measure of project progress, its role in cost performance analysis, and how it is calculated based on planned value, earned value, and actual costs.
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
This document discusses project management techniques that can be used to avoid project failure. It analyzes responses from project managers on reasons for project failure and how to ensure success. Some key findings are:
- Poor planning, unrealistic timelines and cost estimates, and lack of clear objectives are common reasons for failure.
- Successful projects meet scope, time and cost goals while satisfying stakeholders.
- Techniques like CPM, PERT, Gantt charts and MS Project help managers monitor progress and implement corrective actions to get projects back on track if issues arise.
The Impact of Project Management Practices on Project SuccessIRJET Journal
1) The document discusses the relationship between project management practices and project success. It analyzes data from project practitioners in 10 countries.
2) The majority of successful projects incorporate but do not fully exploit modern project management tools and techniques. The impact of these tools on success depends on practitioner training, timely implementation, and level of implementation.
3) While project management can positively impact success, human factors are also critical. Project success results from both effective project management and an successful final product.
IRJET- Review: Factors Affecting Scheduling of Multiple ProjectsIRJET Journal
This document discusses factors that affect scheduling of multiple construction projects. It identifies 15 key factors through a literature review and survey of construction professionals in India. The top factors identified are poor site management, commitment of project participants, ineffective planning and scheduling, coordination issues, availability of labor and materials, and project priorities. The document provides background on challenges of multi-project scheduling and analyzes studies that have identified important scheduling factors in different contexts. It aims to help construction firms better understand how to manage schedules across multiple concurrent projects.
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
This document discusses identifying constraints that impact construction project schedules. It begins with an abstract that outlines identifying major constraints using the Relative Importance Index (RII) method and analyzing their impact on project schedules using Microsoft Project software.
The document then describes the research methodology, which includes preparing questionnaires to identify constraints, conducting a survey, analyzing the results with RII to determine governing constraints, and rescheduling the project to assess impact of delays. A literature review is also provided on studying factors that cause delays and techniques for reducing constraints. The objectives are to schedule a building project, identify high-impact constraints with RII, and determine total project duration considering constraint impacts.
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
This document summarizes a study that planned and scheduled the construction of a multi-story residential building using Microsoft Project software and applied material management techniques. The study categorized building materials using ABC analysis to prioritize those with the greatest cost impact. Scheduling the project in Microsoft Project and analyzing material usage helped optimize costs and duration to increase construction efficiency. Applying material management principles such as inventory control and efficient procurement supported timely material availability and reduced waste.
IRJET - Fuzzy Logic Approach in Construction Delay AnalysisIRJET Journal
This document discusses the application of fuzzy logic to analyze delays in construction projects. It presents a case study of a housing project in Kochi, Kerala, India. Fuzzy logic was used to quantify the probability of scheduled delays. Based on expert interviews, fuzzy rules were created to assess various delay factors. These included labor, project, consultant, contractor, and external related factors. The factors were applied to the case study project using MATLAB fuzzy logic toolbox. This resulted in a scheduled delay probability of 32.9% compared to the actual schedule. The document concludes fuzzy logic can help construction parties predict delay risks and improve project time management.
A study on the analysis and evaluation of delays in private construction Proj...IRJET Journal
The document summarizes a study on the analysis and evaluation of delays in private construction projects in Kerala, India. It identifies the objectives as determining the root causes of delays, their effects, and recommendations to minimize delays. A literature review found the top causes to be poor site management, lack of skilled labor, unrealistic planning, worker absences, design changes, accidents, subcontractor delays, and lack of materials. A questionnaire survey of owners, designers, and contractors in Kerala identified the top 15 causes of delays as issues with payments, design document approval, change orders, rework errors, resource management, design data collection, misunderstanding of requirements, unskilled labor, motivation, material shortages, and damaged materials. The
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of mechanical and civil engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in mechanical and civil engineering. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
This document discusses delays in mining/manufacturing projects in India and their effects. It begins by identifying some of the common causes of delays in these types of projects, such as natural disasters, financial problems, improper planning, and shortages. It then discusses three main techniques for analyzing delays: relative importance index, importance index, and Spearman's rank correlation coefficient. The remainder of the document focuses on different delay analysis methodologies, including foresight, hindsight, and contemporaneous methods. It also discusses how to calculate schedule impacts from lost productivity using time impact analysis and window analysis. Overall, the document aims to identify the root causes of delays in mining/manufacturing projects and develop comprehensive methodologies for analyzing delays
This document discusses delays in mining and manufacturing projects in India. It begins by providing background on the prevalence of delays and cost overruns in infrastructure projects in India. It then reviews literature on causes of delays in construction projects, which are relevant for mining projects given similarities in planning and execution. The document outlines objectives to identify causes of delays specific to mining/manufacturing projects in India and calculate delays in a job shop industry project. It proposes using the Relative Importance Index and Importance Index techniques to rank identified delay causes based on severity and frequency of occurrence.
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET Journal
This document discusses schedule delay analysis in construction projects using Primavera P6 software. It begins with an introduction to the importance of planning, scheduling, and managing delays in construction management. It then reviews common causes of construction delays and different methods for analyzing schedule delays, including as-planned vs. as-built analysis and time impact analysis. The document focuses on using Primavera P6 software to compare planned and actual project schedules to identify delays and their impacts on time and cost. It argues this approach can help construction managers effectively monitor progress and address delays.
Management For Construction Project:-Various Aspects Of DelayIRJET Journal
1. The document discusses various causes of delay in construction projects based on a questionnaire survey conducted with construction project stakeholders in India.
2. The top two most significant causes of delay identified are issues with the quantity and quality of labor, and delays in transporting materials to sites.
3. Other major causes of delay include lack of proper supervision or planning by contractors, work stoppages due to improper methodologies, changes to work orders by owners during construction, and slow decision making.
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
This document discusses project management techniques to avoid project failure. It begins with an introduction to project management and definitions of key terms. The literature review then summarizes several academic papers on topics related to project failure such as identifying common causes of failure, project performance measurement, and techniques for scheduling projects with uncertainty. The conclusion reiterates that project management techniques must be tailored to the specific project and region, and that further research is needed to enhance understanding of avoiding project failure.
Delay Analysis for an On-Going Residential ProjectIRJET Journal
This document discusses delay analysis for an ongoing residential construction project in India. It aims to identify the causes of delays, their effects on project completion, and provide recommendations. The major causes of delay identified are issues with government approvals, staffing changes, poor management, lack of resources, delays in procuring materials, late funding, and drawing problems. The effects of delays include increased costs, postponed work, and changed labor allocation. While not all delays can be avoided, improved management practices could help mitigate some delays. The document also provides background on project management principles, techniques for delay analysis, and the use of project management software.
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...IJERA Editor
The Construction industry is one of the key economic industry in India and is the main motivating force in Indian national economy. But, it suffers from a number of problems that affect time, cost and quality performances. Successful management of construction projects is based on three major factors i.e. time, cost and quality. The successful completion of construction projects within the specified time has become the most valuable and challenging task for the Managers, Architects, Engineers and Contractors. How to achieve this task is a problem, which should be solved. The overall objective of this study is to identify the factors resposinle for overruns in time and cost of the construction project and suggest the suitable remedial solutions. Poor planning, implementation and management are the main reasons for time and cost overruns in construction projects in India. Since most of the reasons are well known and can be controlled if a proper arrangement is made
The alarming rate of project delays in this country needs urgent attention and resolution as one project delay leads to another therefore affecting the growth of any economy or profit-making organization. This alarming rate would possibly go out of one’s hand if strategies are not put in place to curb these phenomena. The Objectives of this research is to critically identify and evaluate the setbacks or factors causing delays in completing projects on time and its effect. The study narrowed its arrows on Prime Ghana projects executed in the country and it was thus conducted with the usage of questionnaires to solicit for the required data for processing. Results from the study divulge that the actual sources of delays in project delivery are; Inadequate financial resources of clients, delays in honoring payment for work done, underestimation of project duration, poor communication between contracting parties, complexity, difficulties in accessing bank credit (client); change orders during construction and others. It was recommended that, initial proper planning and controlling is essential to the client to have proper action plan, procurement plan, and budget plan prepared before commencement of project. Payment schedule must be agreed by the parties involved. On the part of the contractor adequate knowledge of project management, principles, tools and techniques is required to reduce delays. Consultants must plan very well to ensure that contract processes are duly followed, thus approval of drawings, documentation, and other things to reduce variation during construction. They should monitor their assigned work very well by insisting that corrections are done at the appropriate time to reduce or avoid rework.
Similar to Element of Cost overrun and Delay in Construction: A Review (20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
1) The document discusses the Sungal Tunnel project in Jammu and Kashmir, India, which is being constructed using the New Austrian Tunneling Method (NATM).
2) NATM involves continuous monitoring during construction to adapt to changing ground conditions, and makes extensive use of shotcrete for temporary tunnel support.
3) The methodology section outlines the systematic geotechnical design process for tunnels according to Austrian guidelines, and describes the various steps of NATM tunnel construction including initial and secondary tunnel support.
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
This study examines the effect of response reduction factors (R factors) on reinforced concrete (RC) framed structures through nonlinear dynamic analysis. Three RC frame models with varying heights (4, 8, and 12 stories) were analyzed in ETABS software under different R factors ranging from 1 to 5. The results showed that displacement increased as the R factor decreased, indicating less linear behavior for lower R factors. Drift also decreased proportionally with increasing R factors from 1 to 5. Shear forces in the frames decreased with higher R factors. In general, R factors of 3 to 5 produced more satisfactory performance with less displacement and drift. The displacement variations between different building heights were consistent at different R factors. This study evaluated how R factors influence
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
This study compares the use of Stark Steel and TMT Steel as reinforcement materials in a two-way reinforced concrete slab. Mechanical testing is conducted to determine the tensile strength, yield strength, and other properties of each material. A two-way slab design adhering to codes and standards is executed with both materials. The performance is analyzed in terms of deflection, stability under loads, and displacement. Cost analyses accounting for material, durability, maintenance, and life cycle costs are also conducted. The findings provide insights into the economic and structural implications of each material for reinforcement selection and recommendations on the most suitable material based on the analysis.
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
This document discusses a study analyzing the effect of camber, position of camber, and angle of attack on the aerodynamic characteristics of airfoils. Sixteen modified asymmetric NACA airfoils were analyzed using computational fluid dynamics (CFD) by varying the camber, camber position, and angle of attack. The results showed the relationship between these parameters and the lift coefficient, drag coefficient, and lift to drag ratio. This provides insight into how changes in airfoil geometry impact aerodynamic performance.
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
This document reviews the progress and challenges of aluminum-based metal matrix composites (MMCs), focusing on their fabrication processes and applications. It discusses how various aluminum MMCs have been developed using reinforcements like borides, carbides, oxides, and nitrides to improve mechanical and wear properties. These composites have gained prominence for their lightweight, high-strength and corrosion resistance properties. The document also examines recent advancements in fabrication techniques for aluminum MMCs and their growing applications in industries such as aerospace and automotive. However, it notes that challenges remain around issues like improper mixing of reinforcements and reducing reinforcement agglomeration.
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
This document discusses research on using graph neural networks (GNNs) for dynamic optimization of public transportation networks in real-time. GNNs represent transit networks as graphs with nodes as stops and edges as connections. The GNN model aims to optimize networks using real-time data on vehicle locations, arrival times, and passenger loads. This helps increase mobility, decrease traffic, and improve efficiency. The system continuously trains and infers to adapt to changing transit conditions, providing decision support tools. While research has focused on performance, more work is needed on security, socio-economic impacts, contextual generalization of models, continuous learning approaches, and effective real-time visualization.
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
This document summarizes a research project that aims to compare the structural performance of conventional slab and grid slab systems in multi-story buildings using ETABS software. The study will analyze both symmetric and asymmetric building models under various loading conditions. Parameters like deflections, moments, shears, and stresses will be examined to evaluate the structural effectiveness of each slab type. The results will provide insights into the comparative behavior of conventional and grid slabs to help engineers and architects select appropriate slab systems based on building layouts and design requirements.
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
This document summarizes and reviews a research paper on the seismic response of reinforced concrete (RC) structures with plan and vertical irregularities, with and without infill walls. It discusses how infill walls can improve or reduce the seismic performance of RC buildings, depending on factors like wall layout, height distribution, connection to the frame, and relative stiffness of walls and frames. The reviewed research paper analyzes the behavior of infill walls, effects of vertical irregularities, and seismic performance of high-rise structures under linear static and dynamic analysis. It studies response characteristics like story drift, deflection and shear. The document also provides literature on similar research investigating the effects of infill walls, soft stories, plan irregularities, and different
This document provides a review of machine learning techniques used in Advanced Driver Assistance Systems (ADAS). It begins with an abstract that summarizes key applications of machine learning in ADAS, including object detection, recognition, and decision-making. The introduction discusses the integration of machine learning in ADAS and how it is transforming vehicle safety. The literature review then examines several research papers on topics like lightweight deep learning models for object detection and lane detection models using image processing. It concludes by discussing challenges and opportunities in the field, such as improving algorithm robustness and adaptability.
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
The document analyzes temperature and precipitation trends in Asosa District, Benishangul Gumuz Region, Ethiopia from 1993 to 2022 based on data from the local meteorological station. The results show:
1) The average maximum and minimum annual temperatures have generally decreased over time, with maximum temperatures decreasing by a factor of -0.0341 and minimum by -0.0152.
2) Mann-Kendall tests found the decreasing temperature trends to be statistically significant for annual maximum temperatures but not for annual minimum temperatures.
3) Annual precipitation in Asosa District showed a statistically significant increasing trend.
The conclusions recommend development planners account for rising summer precipitation and declining temperatures in
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
This document discusses the design and analysis of pre-engineered building (PEB) framed structures using STAAD Pro software. It provides an overview of PEBs, including that they are designed off-site with building trusses and beams produced in a factory. STAAD Pro is identified as a key tool for modeling, analyzing, and designing PEBs to ensure their performance and safety under various load scenarios. The document outlines modeling structural parts in STAAD Pro, evaluating structural reactions, assigning loads, and following international design codes and standards. In summary, STAAD Pro is used to design and analyze PEB framed structures to ensure safety and code compliance.
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
This document provides a review of research on innovative fiber integration methods for reinforcing concrete structures. It discusses studies that have explored using carbon fiber reinforced polymer (CFRP) composites with recycled plastic aggregates to develop more sustainable strengthening techniques. It also examines using ultra-high performance fiber reinforced concrete to improve shear strength in beams. Additional topics covered include the dynamic responses of FRP-strengthened beams under static and impact loads, and the performance of preloaded CFRP-strengthened fiber reinforced concrete beams. The review highlights the potential of fiber composites to enable more sustainable and resilient construction practices.
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
This document summarizes a survey on securing patient healthcare data in cloud-based systems. It discusses using technologies like facial recognition, smart cards, and cloud computing combined with strong encryption to securely store patient data. The survey found that healthcare professionals believe digitizing patient records and storing them in a centralized cloud system would improve access during emergencies and enable more efficient care compared to paper-based systems. However, ensuring privacy and security of patient data is paramount as healthcare incorporates these digital technologies.
Review on studies and research on widening of existing concrete bridgesIRJET Journal
This document summarizes several studies that have been conducted on widening existing concrete bridges. It describes a study from China that examined load distribution factors for a bridge widened with composite steel-concrete girders. It also outlines challenges and solutions for widening a bridge in the UAE, including replacing bearings and stitching the new and existing structures. Additionally, it discusses two bridge widening projects in New Zealand that involved adding precast beams and stitching to connect structures. Finally, safety measures and challenges for strengthening a historic bridge in Switzerland under live traffic are presented.
React based fullstack edtech web applicationIRJET Journal
The document describes the architecture of an educational technology web application built using the MERN stack. It discusses the frontend developed with ReactJS, backend with NodeJS and ExpressJS, and MongoDB database. The frontend provides dynamic user interfaces, while the backend offers APIs for authentication, course management, and other functions. MongoDB enables flexible data storage. The architecture aims to provide a scalable, responsive platform for online learning.
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
This paper proposes integrating Internet of Things (IoT) and blockchain technologies to help implement objectives of India's National Education Policy (NEP) in the education sector. The paper discusses how blockchain could be used for secure student data management, credential verification, and decentralized learning platforms. IoT devices could create smart classrooms, automate attendance tracking, and enable real-time monitoring. Blockchain would ensure integrity of exam processes and resource allocation, while smart contracts automate agreements. The paper argues this integration has potential to revolutionize education by making it more secure, transparent and efficient, in alignment with NEP goals. However, challenges like infrastructure needs, data privacy, and collaborative efforts are also discussed.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
This document provides a review of research on the performance of coconut fibre reinforced concrete. It summarizes several studies that tested different volume fractions and lengths of coconut fibres in concrete mixtures with varying compressive strengths. The studies found that coconut fibre improved properties like tensile strength, toughness, crack resistance, and spalling resistance compared to plain concrete. Volume fractions of 2-5% and fibre lengths of 20-50mm produced the best results. The document concludes that using a 4-5% volume fraction of coconut fibres 30-40mm in length with M30-M60 grade concrete would provide benefits based on previous research.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
The document discusses optimizing business management processes through automation using Microsoft Power Automate and artificial intelligence. It provides an overview of Power Automate's key components and features for automating workflows across various apps and services. The document then presents several scenarios applying automation solutions to common business processes like data entry, monitoring, HR, finance, customer support, and more. It estimates the potential time and cost savings from implementing automation for each scenario. Finally, the conclusion emphasizes the transformative impact of AI and automation tools on business processes and the need for ongoing optimization.
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
The document describes the seismic design of a G+5 steel building frame located in Roorkee, India according to Indian codes IS 1893-2002 and IS 800. The frame was analyzed using the equivalent static load method and response spectrum method, and its response in terms of displacements and shear forces were compared. Based on the analysis, the frame was designed as a seismic-resistant steel structure according to IS 800:2007. The software STAAD Pro was used for the analysis and design.
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
This research paper explores using plastic waste as a sustainable and cost-effective construction material. The study focuses on manufacturing pavers and bricks using recycled plastic and partially replacing concrete with plastic alternatives. Initial results found that pavers and bricks made from recycled plastic demonstrate comparable strength and durability to traditional materials while providing environmental and cost benefits. Additionally, preliminary research indicates incorporating plastic waste as a partial concrete replacement significantly reduces construction costs without compromising structural integrity. The outcomes suggest adopting plastic waste in construction can address plastic pollution while optimizing costs, promoting more sustainable building practices.
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMHODECEDSIET
Time Division Multiplexing (TDM) is a method of transmitting multiple signals over a single communication channel by dividing the signal into many segments, each having a very short duration of time. These time slots are then allocated to different data streams, allowing multiple signals to share the same transmission medium efficiently. TDM is widely used in telecommunications and data communication systems.
### How TDM Works
1. **Time Slots Allocation**: The core principle of TDM is to assign distinct time slots to each signal. During each time slot, the respective signal is transmitted, and then the process repeats cyclically. For example, if there are four signals to be transmitted, the TDM cycle will divide time into four slots, each assigned to one signal.
2. **Synchronization**: Synchronization is crucial in TDM systems to ensure that the signals are correctly aligned with their respective time slots. Both the transmitter and receiver must be synchronized to avoid any overlap or loss of data. This synchronization is typically maintained by a clock signal that ensures time slots are accurately aligned.
3. **Frame Structure**: TDM data is organized into frames, where each frame consists of a set of time slots. Each frame is repeated at regular intervals, ensuring continuous transmission of data streams. The frame structure helps in managing the data streams and maintaining the synchronization between the transmitter and receiver.
4. **Multiplexer and Demultiplexer**: At the transmitting end, a multiplexer combines multiple input signals into a single composite signal by assigning each signal to a specific time slot. At the receiving end, a demultiplexer separates the composite signal back into individual signals based on their respective time slots.
### Types of TDM
1. **Synchronous TDM**: In synchronous TDM, time slots are pre-assigned to each signal, regardless of whether the signal has data to transmit or not. This can lead to inefficiencies if some time slots remain empty due to the absence of data.
2. **Asynchronous TDM (or Statistical TDM)**: Asynchronous TDM addresses the inefficiencies of synchronous TDM by allocating time slots dynamically based on the presence of data. Time slots are assigned only when there is data to transmit, which optimizes the use of the communication channel.
### Applications of TDM
- **Telecommunications**: TDM is extensively used in telecommunication systems, such as in T1 and E1 lines, where multiple telephone calls are transmitted over a single line by assigning each call to a specific time slot.
- **Digital Audio and Video Broadcasting**: TDM is used in broadcasting systems to transmit multiple audio or video streams over a single channel, ensuring efficient use of bandwidth.
- **Computer Networks**: TDM is used in network protocols and systems to manage the transmission of data from multiple sources over a single network medium.
### Advantages of TDM
- **Efficient Use of Bandwidth**: TDM all
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...IJECEIAES
Medical image analysis has witnessed significant advancements with deep learning techniques. In the domain of brain tumor segmentation, the ability to
precisely delineate tumor boundaries from magnetic resonance imaging (MRI)
scans holds profound implications for diagnosis. This study presents an ensemble convolutional neural network (CNN) with transfer learning, integrating
the state-of-the-art Deeplabv3+ architecture with the ResNet18 backbone. The
model is rigorously trained and evaluated, exhibiting remarkable performance
metrics, including an impressive global accuracy of 99.286%, a high-class accuracy of 82.191%, a mean intersection over union (IoU) of 79.900%, a weighted
IoU of 98.620%, and a Boundary F1 (BF) score of 83.303%. Notably, a detailed comparative analysis with existing methods showcases the superiority of
our proposed model. These findings underscore the model’s competence in precise brain tumor localization, underscoring its potential to revolutionize medical
image analysis and enhance healthcare outcomes. This research paves the way
for future exploration and optimization of advanced CNN models in medical
imaging, emphasizing addressing false positives and resource efficiency.
Batteries -Introduction – Types of Batteries – discharging and charging of battery - characteristics of battery –battery rating- various tests on battery- – Primary battery: silver button cell- Secondary battery :Ni-Cd battery-modern battery: lithium ion battery-maintenance of batteries-choices of batteries for electric vehicle applications.
Fuel Cells: Introduction- importance and classification of fuel cells - description, principle, components, applications of fuel cells: H2-O2 fuel cell, alkaline fuel cell, molten carbonate fuel cell and direct methanol fuel cells.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
International Conference on NLP, Artificial Intelligence, Machine Learning an...gerogepatton
International Conference on NLP, Artificial Intelligence, Machine Learning and Applications (NLAIM 2024) offers a premier global platform for exchanging insights and findings in the theory, methodology, and applications of NLP, Artificial Intelligence, Machine Learning, and their applications. The conference seeks substantial contributions across all key domains of NLP, Artificial Intelligence, Machine Learning, and their practical applications, aiming to foster both theoretical advancements and real-world implementations. With a focus on facilitating collaboration between researchers and practitioners from academia and industry, the conference serves as a nexus for sharing the latest developments in the field.
Advanced control scheme of doubly fed induction generator for wind turbine us...IJECEIAES
This paper describes a speed control device for generating electrical energy on an electricity network based on the doubly fed induction generator (DFIG) used for wind power conversion systems. At first, a double-fed induction generator model was constructed. A control law is formulated to govern the flow of energy between the stator of a DFIG and the energy network using three types of controllers: proportional integral (PI), sliding mode controller (SMC) and second order sliding mode controller (SOSMC). Their different results in terms of power reference tracking, reaction to unexpected speed fluctuations, sensitivity to perturbations, and resilience against machine parameter alterations are compared. MATLAB/Simulink was used to conduct the simulations for the preceding study. Multiple simulations have shown very satisfying results, and the investigations demonstrate the efficacy and power-enhancing capabilities of the suggested control system.
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsVictor Morales
K8sGPT is a tool that analyzes and diagnoses Kubernetes clusters. This presentation was used to share the requirements and dependencies to deploy K8sGPT in a local environment.