Importance of perspective in
Projects
According to the Project Management Institute
(PMI):
“A project is a temporary endeavour undertaken to create a
unique product, service, or result.”
What is Project Management?
• Lack of support for the project;
• Lack of project scope definition;
• Continual change requests to scope; and
• Reluctance to discuss/deal with bad news.
Common issues that arise in
PM
• Control and predictability of project outcomes;
• Stakeholder confidence and support;
• Provides reference or roadmap for future similar
projects; and
• Provide you with basic tools to manage future projects.
Benefits of good PM
Topics covered today:
• Stakeholder Analysis;
• Defining the project scope;
• How to create a Work Breakdown Structure;
• How to create the project schedule;
• Managing Project Quality;
• Managing Project Communications; and
• Managing Project Risk.
Creating a Project Management
Plan
• Identify all parties that will be impacted by the project i.e.
the stakeholders;
• Identify stakeholder interest, involvement and impact on
the project;
• Collect project requirements (from identified
stakeholders plus any other relevant source); and
• Create stakeholder register.
Stakeholder Analysis
Stakeholder Register
Stakeholders Stakeholder Interest
Operations Director
(Sponsor)
Keen to improve access time to documentation
(business efficiency). Very keen to expand
warehousing area.
Departmental Managers
Keen to improve access time to documentation.
Maybe reluctant to release personnel for project
due to business commitments.
Departmental Personnel Will be interested but may be indifferent to detail.
Warehouse Manager
Concerns over short term disruption. Need to
keep on side by mitigating issues faced where
possible.
External contractor
Have no direct interest in the project but
interested in the end date so they commence the
warehouse expansion.
Stakeholder Analysis
“Power/Interest” matrix:
Keep Satisfied Manage Closely
Monitor Keep Informed
Interest HighLow
Low
Power
High
Their lack of interest/power means
they are most likely to accept was
is communicated and follow
instructions .
If communicated and presented
in a logical way, will generally
provide support and often ignore
dissenters.
Need to keep satisfied enough to
avoid them getting too interested
and unnecessarily involved.
Reassuring them of outcomes
usually achieves this.
Major supporter (or dissenters).
Potentially major driver of change.
Need to provide regular updates
and provide reassurance of
outcomes.
Create stakeholder
“power/interest” matrix:
Keep Satisfied Manage Closely
Monitor Keep Informed
Interest HighLow
Low
Power
High
External contractor
Departmental Personnel
Warehouse Manager Operations Director (Sponsor)
Assigned project personnel
• Define project scope description/characteristics:
• Digitise/destroy docs held in records area;
• Register of all docs and status must be provided;
• Must be converted to .pdf;
• Create a map of where digitised docs to be stored;
• Access to digitised docs must be assigned; and
• Storage area to be completely cleared for contractor.
Define scope:
• Define product acceptance criteria:
• All docs on register to be digitised/destroyed;
• All digitised docs uploaded as per directory map;
• User access to digitised docs correctly assigned;
• Storage area completely empty for contractors;
• Assigned personnel have digital access to specified
records; and
• Specified area allocated for warehouse expansion.
Define scope:
• Project exclusions:
• Only paper records in storage area to be
digitised/destroyed.
• Project constraints:
• Project cannot start before; and
• Project must complete by.
Define scope:
• Scope freeze:
• This effectively sets the project baseline across all areas;
• Further request for change will be reviewed
accepted/rejected and then documented; and
• Accepted changes may well affect the schedule, cost,
the deliverable and quality etc.
Define scope:
Cost/risk implications of change orders:
£
Time
Risk Cost
Define scope:
How to create a WBS (Work
Breakdown Structure):
Create high-level WBS:
Identify
docs by
dept
Scan docs
Shred or
destroy
docs
Digitised
doc
register
Clear
storage
area
Digitise docs
and clear
store area
How to create a WBS (Work
Breakdown Structure):
Identify Activities:
Identify
docs by
dept
Scan
docs
Shred or
destroy
docs
Digitise
doc
register
Clear
storage
area
Digitise docs
and clear
store area
• Create paper
doc reg
• Tag each doc
i.e. digitise or
destroy
• Sort paperwork
to be digitised
• Covert to txt
via OCR
• Covert to pdf
• Shred/
destroy
• Load pdf
docs to
network
Directory
• Assign user
access
rights
• Clear area
How to create a Project
Schedule:
Critical Path Schedule:
Plan Quality:
• Define quality requirements/standards (how compliance will be
demonstrated)
• Register of each doc by dept;
• Each register section to be signed of by dept manager;
• Sign off authorises doc to be digitised or destroyed; and
• Register to highlight status and date performed.
Perform Quality Assurance:
• Performing quality audit.
Perform Quality Control:
• Graphs/Charts and their use.
Managing Project Quality
Identify what information needs to be communicated:
• Activity Progress against schedule and plan;
• Where will project documentation be stored; and
• Revision control.
o Rev A, Rev 1, Rev A1 etc
Identify when required information needs to be
communicated:
• i.e. every Friday.
Plan Communications
Decide who to distribute to:
• Progress detail to all stakeholders except external
contractor; and
• Schedule progress, all stakeholders.
• Report performance/progress:
• Total docs to convert; and
• % complete by status.
Plan Communications:
Decide who to distribute to:
Plan Communications:
Stakeholder Schedule Doc progress reports
Operations Director Yes Yes
Departmental Managers Yes Yes
Departmental Personnel Yes Yes
Warehouse Manager Yes Yes
External contractor Yes No
Plan risk management:
• Start with what might happen, chances and impact; and
• Add new risks as they are discovered.
Identify and categorise risks:
• High – work with sponsor to resolve or halt project;
• Medium – try and resolve immediately; and
• Low – do nothing but monitor.
Respond to risk:
• Continually review and audit.
Risk Planning
Track risk:
Risk
ID
Description
Prob
H/M/L
Impact Response
Date
Logged
Owner
1
Lack of project
support/help
M
Potential
project delay,
quality of
data
Assigned
personnel to be
made available by
2 Aug 13
10 July 13 Dave M
2
All paper docs
may not be
accounted for
H
Docs could
get mis-
assigned or
even lost
Dept Mgr to review
and sign off
relevant part of doc
reg
10 July 13 Dept Mgr
3
Scanner may
break down
L
Digitising
docs will
delay
schedule
Ensure immediate
repair service
available or
replacement unit
15 July 13 PM
Risk Planning
Any Questions

More Related Content

What's hot

ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
Michael Punzo
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]
Saddan Juhari
 

What's hot (19)

Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Stakeholder management - a short introduction
Stakeholder management - a short introduction Stakeholder management - a short introduction
Stakeholder management - a short introduction
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela Anyomi
 
Stakeholder management and reporting
Stakeholder management and reportingStakeholder management and reporting
Stakeholder management and reporting
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Managing Stakeholders
Managing StakeholdersManaging Stakeholders
Managing Stakeholders
 
Improving the Effectiveness of Stakeholder Management
Improving the Effectiveness of Stakeholder ManagementImproving the Effectiveness of Stakeholder Management
Improving the Effectiveness of Stakeholder Management
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
6 best practices in stakeholder engagement
6 best practices in stakeholder engagement6 best practices in stakeholder engagement
6 best practices in stakeholder engagement
 
Managing difficult stakeholders - how to...
Managing difficult stakeholders - how to...Managing difficult stakeholders - how to...
Managing difficult stakeholders - how to...
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
Managing Stakeholder Relationships
Managing Stakeholder RelationshipsManaging Stakeholder Relationships
Managing Stakeholder Relationships
 
Project Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or FailureProject Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or Failure
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]
 

Viewers also liked

5 aces stakeholder management presentation v6
5 aces   stakeholder management presentation v65 aces   stakeholder management presentation v6
5 aces stakeholder management presentation v6
tycshih
 
Enron Sutton Bridge Power Project
Enron Sutton Bridge Power ProjectEnron Sutton Bridge Power Project
Enron Sutton Bridge Power Project
hyperactive010
 

Viewers also liked (15)

Stakeholder Mapping
Stakeholder MappingStakeholder Mapping
Stakeholder Mapping
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Significant Properties, Practical 2: Stakeholder Analysis (SPs part 4), by St...
Significant Properties, Practical 2: Stakeholder Analysis (SPs part 4), by St...Significant Properties, Practical 2: Stakeholder Analysis (SPs part 4), by St...
Significant Properties, Practical 2: Stakeholder Analysis (SPs part 4), by St...
 
5 aces stakeholder management presentation v6
5 aces   stakeholder management presentation v65 aces   stakeholder management presentation v6
5 aces stakeholder management presentation v6
 
Enron Sutton Bridge Power Project
Enron Sutton Bridge Power ProjectEnron Sutton Bridge Power Project
Enron Sutton Bridge Power Project
 
Generating electricity by earth magnetic field
Generating electricity by earth magnetic fieldGenerating electricity by earth magnetic field
Generating electricity by earth magnetic field
 
Earths magnetic field
Earths magnetic fieldEarths magnetic field
Earths magnetic field
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder Analysis
 
Stakeholder mapping
Stakeholder mappingStakeholder mapping
Stakeholder mapping
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Stakeholder Engagement
Stakeholder EngagementStakeholder Engagement
Stakeholder Engagement
 
Requisitos Para Deducir Importaciones
Requisitos Para Deducir ImportacionesRequisitos Para Deducir Importaciones
Requisitos Para Deducir Importaciones
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder Engagement: Simple Steps to Better Public Consultation
Stakeholder Engagement: Simple Steps to Better Public ConsultationStakeholder Engagement: Simple Steps to Better Public Consultation
Stakeholder Engagement: Simple Steps to Better Public Consultation
 
Case Study Analysis on General Electric
Case Study Analysis on General ElectricCase Study Analysis on General Electric
Case Study Analysis on General Electric
 

Similar to EDT Project Management Workshop

Project Management Toolkit_Final v1.0
Project Management Toolkit_Final v1.0Project Management Toolkit_Final v1.0
Project Management Toolkit_Final v1.0
lee_anderson40
 
Yini conferencing project rev0
Yini conferencing project rev0Yini conferencing project rev0
Yini conferencing project rev0
aprice102
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFail
Barbara Franks
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
chikuverma1
 
OIT Project Management - Day 1
OIT Project Management - Day 1OIT Project Management - Day 1
OIT Project Management - Day 1
Kevin Thomas
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
apoorvaguptaspn27
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
SAMPREET3
 

Similar to EDT Project Management Workshop (20)

Project Management Toolkit_Final v1.0
Project Management Toolkit_Final v1.0Project Management Toolkit_Final v1.0
Project Management Toolkit_Final v1.0
 
Yini conferencing project rev0
Yini conferencing project rev0Yini conferencing project rev0
Yini conferencing project rev0
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFail
 
Interactive activity I
Interactive activity IInteractive activity I
Interactive activity I
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Project Planning and Development Intro.pptx
Project Planning and Development Intro.pptxProject Planning and Development Intro.pptx
Project Planning and Development Intro.pptx
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Project Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptxProject Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptx
 
OIT Project Management - Day 1
OIT Project Management - Day 1OIT Project Management - Day 1
OIT Project Management - Day 1
 
OIT Project Management - Day 1
OIT Project Management - Day 1OIT Project Management - Day 1
OIT Project Management - Day 1
 
Getting the basics right
Getting the basics rightGetting the basics right
Getting the basics right
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
executing process group.pdf
executing process group.pdfexecuting process group.pdf
executing process group.pdf
 
WRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptxWRITING-PROJECT-PROPOSALS.pptx
WRITING-PROJECT-PROPOSALS.pptx
 
Project Development and Management.pptx
Project Development and Management.pptxProject Development and Management.pptx
Project Development and Management.pptx
 
Project Managemet Basics
Project Managemet BasicsProject Managemet Basics
Project Managemet Basics
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 

Recently uploaded

chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 

Recently uploaded (20)

Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 

EDT Project Management Workshop

  • 1. Project Management Masterclass Mark Curran Year in Industry Mentor Welcome to the Session!
  • 3. According to the Project Management Institute (PMI): “A project is a temporary endeavour undertaken to create a unique product, service, or result.” What is Project Management?
  • 4. • Lack of support for the project; • Lack of project scope definition; • Continual change requests to scope; and • Reluctance to discuss/deal with bad news. Common issues that arise in PM
  • 5. • Control and predictability of project outcomes; • Stakeholder confidence and support; • Provides reference or roadmap for future similar projects; and • Provide you with basic tools to manage future projects. Benefits of good PM
  • 6. Topics covered today: • Stakeholder Analysis; • Defining the project scope; • How to create a Work Breakdown Structure; • How to create the project schedule; • Managing Project Quality; • Managing Project Communications; and • Managing Project Risk. Creating a Project Management Plan
  • 7. • Identify all parties that will be impacted by the project i.e. the stakeholders; • Identify stakeholder interest, involvement and impact on the project; • Collect project requirements (from identified stakeholders plus any other relevant source); and • Create stakeholder register. Stakeholder Analysis
  • 8. Stakeholder Register Stakeholders Stakeholder Interest Operations Director (Sponsor) Keen to improve access time to documentation (business efficiency). Very keen to expand warehousing area. Departmental Managers Keen to improve access time to documentation. Maybe reluctant to release personnel for project due to business commitments. Departmental Personnel Will be interested but may be indifferent to detail. Warehouse Manager Concerns over short term disruption. Need to keep on side by mitigating issues faced where possible. External contractor Have no direct interest in the project but interested in the end date so they commence the warehouse expansion.
  • 9. Stakeholder Analysis “Power/Interest” matrix: Keep Satisfied Manage Closely Monitor Keep Informed Interest HighLow Low Power High Their lack of interest/power means they are most likely to accept was is communicated and follow instructions . If communicated and presented in a logical way, will generally provide support and often ignore dissenters. Need to keep satisfied enough to avoid them getting too interested and unnecessarily involved. Reassuring them of outcomes usually achieves this. Major supporter (or dissenters). Potentially major driver of change. Need to provide regular updates and provide reassurance of outcomes.
  • 10. Create stakeholder “power/interest” matrix: Keep Satisfied Manage Closely Monitor Keep Informed Interest HighLow Low Power High External contractor Departmental Personnel Warehouse Manager Operations Director (Sponsor) Assigned project personnel
  • 11. • Define project scope description/characteristics: • Digitise/destroy docs held in records area; • Register of all docs and status must be provided; • Must be converted to .pdf; • Create a map of where digitised docs to be stored; • Access to digitised docs must be assigned; and • Storage area to be completely cleared for contractor. Define scope:
  • 12. • Define product acceptance criteria: • All docs on register to be digitised/destroyed; • All digitised docs uploaded as per directory map; • User access to digitised docs correctly assigned; • Storage area completely empty for contractors; • Assigned personnel have digital access to specified records; and • Specified area allocated for warehouse expansion. Define scope:
  • 13. • Project exclusions: • Only paper records in storage area to be digitised/destroyed. • Project constraints: • Project cannot start before; and • Project must complete by. Define scope:
  • 14. • Scope freeze: • This effectively sets the project baseline across all areas; • Further request for change will be reviewed accepted/rejected and then documented; and • Accepted changes may well affect the schedule, cost, the deliverable and quality etc. Define scope:
  • 15. Cost/risk implications of change orders: £ Time Risk Cost Define scope:
  • 16. How to create a WBS (Work Breakdown Structure): Create high-level WBS: Identify docs by dept Scan docs Shred or destroy docs Digitised doc register Clear storage area Digitise docs and clear store area
  • 17. How to create a WBS (Work Breakdown Structure): Identify Activities: Identify docs by dept Scan docs Shred or destroy docs Digitise doc register Clear storage area Digitise docs and clear store area • Create paper doc reg • Tag each doc i.e. digitise or destroy • Sort paperwork to be digitised • Covert to txt via OCR • Covert to pdf • Shred/ destroy • Load pdf docs to network Directory • Assign user access rights • Clear area
  • 18. How to create a Project Schedule:
  • 20. Plan Quality: • Define quality requirements/standards (how compliance will be demonstrated) • Register of each doc by dept; • Each register section to be signed of by dept manager; • Sign off authorises doc to be digitised or destroyed; and • Register to highlight status and date performed. Perform Quality Assurance: • Performing quality audit. Perform Quality Control: • Graphs/Charts and their use. Managing Project Quality
  • 21. Identify what information needs to be communicated: • Activity Progress against schedule and plan; • Where will project documentation be stored; and • Revision control. o Rev A, Rev 1, Rev A1 etc Identify when required information needs to be communicated: • i.e. every Friday. Plan Communications
  • 22. Decide who to distribute to: • Progress detail to all stakeholders except external contractor; and • Schedule progress, all stakeholders. • Report performance/progress: • Total docs to convert; and • % complete by status. Plan Communications:
  • 23. Decide who to distribute to: Plan Communications: Stakeholder Schedule Doc progress reports Operations Director Yes Yes Departmental Managers Yes Yes Departmental Personnel Yes Yes Warehouse Manager Yes Yes External contractor Yes No
  • 24. Plan risk management: • Start with what might happen, chances and impact; and • Add new risks as they are discovered. Identify and categorise risks: • High – work with sponsor to resolve or halt project; • Medium – try and resolve immediately; and • Low – do nothing but monitor. Respond to risk: • Continually review and audit. Risk Planning
  • 25. Track risk: Risk ID Description Prob H/M/L Impact Response Date Logged Owner 1 Lack of project support/help M Potential project delay, quality of data Assigned personnel to be made available by 2 Aug 13 10 July 13 Dave M 2 All paper docs may not be accounted for H Docs could get mis- assigned or even lost Dept Mgr to review and sign off relevant part of doc reg 10 July 13 Dept Mgr 3 Scanner may break down L Digitising docs will delay schedule Ensure immediate repair service available or replacement unit 15 July 13 PM Risk Planning