In construction projects, construction errors affect negatively to the production, that influences the overall of the project in both time and budget. Generally, construction companies could not estimate this kind of errors during the bidding process. In this case, these companies did not consider important issues on the budget of the contract, and in the contracting period, project participants assumed that the project would be executed as it scheduled and designed. During the project, different construction processes’ costs are higher than estimated values due to construction errors. The errors that were recognized during the construction process cause time and financial losses, on the other hand, the errors that were noticed after the project’s termination cause repair and correction costs. Moreover, the company may gain a bad reputation in the sector. The key points of this study are to analyze project costs by considering construction errors and re-construction costs due to labor errors by using fuzzy interpretation mechanism. This methodology is applied to a residential construction project. With using of this methodology, forthcoming extra costs related to construction errors can be estimated. And some precautions can be taken for further legal conflicts between parties.