This document summarizes a research study that evaluated the performance of design-build (D-B) construction projects that used agency construction management (CM) versus those that did not use agency CM. The study collected data on 200 D-B projects, with 100 using agency CM and 100 not using it. Project performance was evaluated based on cost growth, time growth, and quality. Statistical analyses using t-tests were conducted to test hypotheses about differences in the mean values of these performance metrics between projects with and without agency CM. The results provide insights into whether the use of agency CM improves project outcomes for D-B projects.