Abstract - During the past decade, the major town has
under gone hazard growth of Industrialization,
urbanization of the country. To manage travel demand the
intersection should be given least resistance to traffic flow
so that the travel time can become minimized. The present
requirement of urban cities is to absorb the growing traffic
demand but within the same physical aspect at the
intersection. These days all around the globe efforts are
being put forward to protect the environment. In this paper,
an attempt has been done to study the different
intersections, so minimize the delays at these intersections
and simultaneous improve the level service. A traffic signal
can be synchronized so that a vehicle starting at one end of
the Street and traveling at Pre assigned speed can go to
another end without stopping for the red light. At each
intersection, the existing traffic has been calculated and
then signal designed. Improve the level of service at
intersections and to minimize delay, optimized signal has
been synchronizing and estimated the benefits.
Key Words: Signal Design, Webster method, PCU, Field
Studies, Straight road, Timing
1.INTRODUCTION
Traffic signals may defined as power operated signal
displays used to regulate or worn traffic. In a broad sense,
traffic signals include displays for intersection control,
flashing beacons, lane directional signals, and ramp
metering signals. When traffic signals are installed and
properly operated, they can provide specific advantages in
traffic control and safety. Signal installations, however,
also have certain disadvantages that may or may not apply
at a particular location. The objectives of traffic signals are
many, such as they reducing the frequency of certain types
of accidents, increasing traffic handling capacity of the
intersection, bring but considerable economy over manual
control at intersections where alternate assignment of
right of way is required and finally, promoting driver
confidence by assigning right of way. On the other hand,
signal installation at intersections increases the
intersection total delay and fuel consumption and
Performance Index especially during the off peakperiods.
2.LITERATURE REVIEW
2.1 Introduction
A signal design is made by measuring the individual speeds
of the vehicles passing a given point (spot) on a street or
highway. These individual speeds are used to calculate the
speed distribution of the entire traffic stream at that
location under the conditions prevailing at the time of study
and also calculate individual PCU per hour.
2.2 Advantages of Signaling
Properly designed traffic signals have the following uses:
A) They provide orderly movement of traffic and increase
the traffic handling capacity of most of the intersections at
grade.
B) They reduce certain types of accidents, notably the
right angled collisions.
C) Pedestrians can cross the roads safely at the signalized
intersection.
D) The signals allow crossing of the heavy traffic flow with
safety.
E) When the signal system properly coordinates, there is a
reasonable speed along the major road traffic.
F) Signals provide a chance to crossing traffic of minor
road to cross the path of continuous the flow of traffic
stream at reasonable intervals of time.
2.3 Signal Design Procedure
The signals design procedure involves six major steps. They
include the
(a) Phase design,
(b) Determination of amber time and clearancetime,
(c) Determination of cycle length,
(d) Apportioning of green time,
(e) Pedestrian crossing requirements, and
(f) The performance evaluation of the above design.
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3311
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
2.4 Collision Types at Traffic Signals
Single vehicle collisions include vehicles losing control
and hitting street furniture, cyclist and motorcyclists
falling off their vehicles and collisions in which bus
passengers fall either inside he bus or whilst boarding or
alighting. Approaching collisions involve more than one
vehicle on the approach to the signals, and are typically
rear shunts or lane changing collisions. Right angle
collisions are those between two vehicles going ahead on
adjacent approaches. They only occur at 4-arm junctions
and should of course be avoided by the use of signals. The
other major group f vehicle collisions is that of principal
right turn collisions, in which a right turning vehicle
collides with a vehicle from the opposite approach. The
effect on safety of aspects of geometric layout and signal
operation In a cross- sectional study of 4-arm signals
found that after taking account of vehicle flow:
 Wider approach widths were associated with
increased right angle collisions and approaching
collisions.
 Where there were more lanes at the stop line, there
was increased risk of pedestrian
 Collisions with entering vehicles.
 There were fewer right angle (involving vehicles on
adjacent roads) and principal right
 Turn collisions (in which a vehicle turning right is hit
by an on-coming vehicle) where the opposite arm was
displaced, effectively staggering the junction
(although only small displacements of up to 13m were
includedin the study).
2.5 Traffic Studies
Traffic studies or surveys are carried out to analyze the
traffic characteristics. These studies help in deciding the
geometric design features and control for safe and
efficient traffic movement. The various traffic studies
generally carried out are:
 Traffic study
 Speed studies
 Origin and destination study
 Traffic flow characteristics
 Traffic capacity study
3. METHODOLOGY
3.1 Introduction
The objective of this study is to get traffic characteristics
from NH 12 near Barkatullah university Hoshangabad road
Bhopal Madhya Pradesh include manual counting of vehicle
and design of signal. This study is used to determine the
level of service for streets document congestion and
quantify the need for street improvements and also for a
variety of purposes. For a design signal at a selected
location, a sample of vehicles been count manually and there
PCU per hour is indicated. This PCU per hour shows the
variation of traffic flow in NH 12. Traffic counts during peak
period may show exceptionally high volumes and are not
normally used in the analysis; therefore, counts are usually
conducted on a 12 days from 2 June to 13 June.
3.2 TRAFFIC VOLUME STUDY
One of the fundamental measures of traffic on road system
is the volume of traffic using the road in a given interval of
time when the traffic is composed of a number of types of
vehicles; it is the normal practice to convert the flow into
equivalent P.C.U by using certain equivalency factor. The
flow is expressed as PCU per hour.
3.3 PASSENGER CAR UNITS
The flow of traffic with unrestricted mixing of different
vehicle classes forms the Mixed Traffic Flow. In a mixed
traffic condition, the traffic flow characteristics are very
much complex when compared to homogeneous traffic
consisting of passenger cars only. It is very difficult to
estimate the traffic volume and capacity of roadway facilities
under mixed traffic flow. Hence the different vehicle classes
are converted to one common standard vehicle unit.
Fig 1 SATELITE VIEW OF OBSERVATION POINT
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3312
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
Fig 2 Map sketch of NH 12 near Barkatullah University
3.3 TWO PHASE SIGNALS
Two phase system is usually adopted if through traffic is
significant compared to the turning movements. For
example in figure 3, non-conflicting through traffic 3 and 4
are grouped in a single phase and non-conflicting through
traffic 1 and 2 are grouped in the second phase. However, in
the first phase flow 7 and 8 offer some conflicts and are
called permitted right turns. Needless to say that such
phasing is possible only if the turning movements are
relatively low. On the other hand, if the turning movements
are significant, then a four phase system is usually adopted.
Fig 3 Two Phase Signal
3.4 CYCLE TIME
Cycle time is the time taken by a signal to complete one full
cycle of iterations, i.e. one complete rotation through all
signal indications. It is denoted by C. In Webster Method
corresponding to least total delay to the vehicles at
signalized intersection has been worked out. This is
rational approach. The field work consists of finding (i)
Saturation flow S per unit time on each approach of the
intersection and (ii) the normal flow „q‟ on each approach
during the design approach. The standard values for
saturation flow, S according to Webster are given as in the
below table.
Width in
m
3.0 3.5 4.0 4.5 5.0 5.5
PCU/hr 1850 1890 1950 2250 2250 2900
Table 1.1 Saturation flow for widths 3 to 5.5 meters
3.5 MANNUAL COUNT
Very commonly adopted method to get traffic volume like
vehicle class wise, turning movements and loading conditions
• Better than mechanical counters.
• Not practicable for all 24hrs fielddata.
• Done short counts during peak hours.
• Hence need to perform statistical analysis to calculate the
ADT and AADT.
3.5.1 Traffic data collection
Sl.no. Duration
Total P.C.U.
START END
1 9:00AM 10:00AM 1908
2 10:00AM 11:00 AM 2001
3 11:00AM 12:00PM 2218
4 12:00 PM 1:00PM 2039
5 1:00PM 2:00PM 1556
6 2:00PM 3:00PM 1552
7 3:00PM 4:00PM 1677
8 4:00PM 5:00PM 2060
9 5:00PM 6:00PM 2350
10 6:00PM 7:00PM 2535
Table 2 data collection
Fig 4 traffic frequency curve
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3313
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
4 SIGNAL PHASE DIAGRAM
TOTAL CYCLE LENGTH
51 SECONDS
Road Toward BARKATULLAH UNIVERSITY
17 SEC 4 SEC 30 SEC
Road toward Misrod
21 SEC 4 SEC 26 SEC
Fig 5 SIGNAL PHASE DIAGRAM
OBSERVED AREA
FIG 6 Vehicle volume data count at first site
Fig 7 Vehicle volume count at last site
5 SPECIFICATIONS FOR SIGNAL POLES
(IRC: 93-1985)
5.1 Specifications for Signal Footing (IRC: 93- 1985):
The poles must be first positioned in pits of 900 mm* 900
mm* 1050 mm deep. The poles shall then embed in M 20
concrete to a minimum of 300 mm below ground level and
300 mm above the ground level. The circular area of
embedded concrete shall have a minimum diameter of 450
mm. All the cables supplying power to the controller and
signal heads shall run through RCC ducts when these are
required to cross the carriage way. The ducts shall be of 450
mm internal diameter and laid at a depth of about 1000 mm
from the level of the carriage way. For over head traffic
signals, the pit should be 1200 mm * 1200mm * 1800 mm
deep. The poles are to be embedded in M 20 concreter to a
minimum of 500 mm below ground level and 500 mm above
ground level. The circular area of embedding concrete shall
have a minimum diameter of 500 mm.
5.2 Specifications for Height of Signal Faces ( IRC : 93-
1985):
The bottom of the housing of a signal face, not suspended
over a roadway, shall be at a height of 2.5 meter above the
footpath or if none above the pavement grade at the centre
(crown) of the roadway. The bottom of the housing of n
signal face, suspended over a roadway, shall be at a height of
5.5 meter above the pavement grade at the centre of
roadway. Optimum visibility and adequate clearance should
be guiding considerations in deciding signal height. Grades
on approaching streets may be important factors, and
should be considered in determining the most appropriate
height. However, the maximum heights of bottom of housing
of post-mounted signal face should not exceed 4.6 meter and
while in the case of overhead signal face, the same should
not exceed 5.8 meter.
5.3 Signal Timings
Inter green periods in India were set many years ago and
are based on where collision points occur on the junction.
Recent research has confirmed that the amber period should
remain at three seconds and the starting amber (red with
amber) period at two seconds. All-red periods appear to be
beneficial if kept short (generally one or two seconds).
Longer all-red periods have been found to be associated
with increased principal right turn collisions.
In India, amber periods of between three and six seconds
are used, with longer periods at junctions on high speed
roads; increasing amber periods to the these values or
longer periods on high speed roads as recommended by the
Institute of Transport Engineers (ITE) reduces collisions.
Amber periods that are shorter than the ITE recommended
values are associated with increased collisions. However,
inter green periods that are too long may also increase
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3314
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
collisions. Shorter cycle times benefit pedestrians and
improve pedestrian compliance, but provide increased
opportunities for red running. Cycle times are generally
set to minimize vehicle delay but crossings or lightly
trafficked junctions in a UTC system can sometimes be
double-cycled during off peak periods. Although the type
of signal control is generally selected on delay grounds, it
can have an effect on safety.
6 CONCLUSIONS
The choice procedures of the economic design traffic
volume for signal design in saturated flow conditions are
investigated. A traffic count survey was carried out for
continuous 9 hours in under normal operation conditions
in 12 days. Volumes were measured by approach and
direction and consequently, the traffic fluctuation was
obtained and the peak volume and the average of peak
volumes were determined. It was investigated that the
minimum traffic volume presents 85% of the peak
volume. Based on the calculations done on the P.C.U
values obtained from the traffic survey, the signal cycle
length for NH-12 road is 51 seconds for road towards
Barkatullah University and also towards Hoshangabad
road. By providing signals, there will be reduction in the
conflicts.
7 REFERENCES
1. Highway Engineering- S. K. Khanna & C. E. G Justo,
New chand & Bros., 7th Edition.
2. Traffic Engineering & Transportation Planning- L.R
Kadiyali- Khanna Publications. IRC Code: IRC: 93-
1985.
3. Ministry Of Road Transport and Highways (MORTH).
4. F D Hobbs. ,(1979), ‘’ Traffic planning and
engineering ”, 2nd edition.
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3315

More Related Content

What's hot

9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...Hossam Shafiq I
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliManjurali Balya
 
Comparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditionsComparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditionsRaghupathi Kandiboina
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume StudyAbontee
 
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringTraffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringMohammadOsamaJafry
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume StudyWaliur Rahman
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308saibabu48
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET Journal
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
 
Presentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyPresentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyFiroz Ovi
 
O and d study
O and d studyO and d study
O and d studymeetmksvs
 
Traffic volume
Traffic volumeTraffic volume
Traffic volumePENKI RAMU
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveysDhwani Shah
 
Chapter 8
Chapter 8Chapter 8
Chapter 8EWIT
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Civil Zone
 
Transportation planning prince basma teaching hospital in irbid.
Transportation planning prince basma teaching hospital in irbid.Transportation planning prince basma teaching hospital in irbid.
Transportation planning prince basma teaching hospital in irbid.Shomou' Aljizawi
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyZawad khalil
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance SACHIN NAGAYACH
 

What's hot (20)

9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
 
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
 
Comparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditionsComparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditions
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringTraffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineering
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
 
Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308Chapter 2trafficstudies-160822181308
Chapter 2trafficstudies-160822181308
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
Presentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyPresentation on Traffic Volume Survey
Presentation on Traffic Volume Survey
 
O and d study
O and d studyO and d study
O and d study
 
Traffic volume
Traffic volumeTraffic volume
Traffic volume
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Traffic studies (transportation engineering)
Traffic studies (transportation engineering)Traffic studies (transportation engineering)
Traffic studies (transportation engineering)
 
Transportation planning prince basma teaching hospital in irbid.
Transportation planning prince basma teaching hospital in irbid.Transportation planning prince basma teaching hospital in irbid.
Transportation planning prince basma teaching hospital in irbid.
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 

Similar to Design of traffic signal on NH-12 near Barkatullah University, Bhopal District of Madhya Pradesh

TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALIRJET Journal
 
Designing of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-IntersectionDesigning of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-IntersectionIJERA Editor
 
A Review on Optimization of Design and Safety of Intersection
A Review on Optimization of Design and Safety of IntersectionA Review on Optimization of Design and Safety of Intersection
A Review on Optimization of Design and Safety of IntersectionIRJET Journal
 
IRJET- Analysis of Saturation Flow at Signalized Intersections
IRJET-  	  Analysis of Saturation Flow at Signalized IntersectionsIRJET-  	  Analysis of Saturation Flow at Signalized Intersections
IRJET- Analysis of Saturation Flow at Signalized IntersectionsIRJET Journal
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaeSAT Publishing House
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAIRJET Journal
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost EfficiencyIRJET Journal
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWIRJET Journal
 
Channelizing Traffic Flow by Reducing Delay at Intersection
Channelizing Traffic Flow by Reducing Delay at Intersection                  Channelizing Traffic Flow by Reducing Delay at Intersection
Channelizing Traffic Flow by Reducing Delay at Intersection IRJET Journal
 
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...ijtsrd
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptxCivilhod15
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
IRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway IntersectionIRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway IntersectionIRJET Journal
 
Intelligent Intersection Management: A Survey
Intelligent Intersection Management: A SurveyIntelligent Intersection Management: A Survey
Intelligent Intersection Management: A SurveyIRJET Journal
 
Ieeepro techno solutions 2013 ieee embedded project dynamic traffic control...
Ieeepro techno solutions   2013 ieee embedded project dynamic traffic control...Ieeepro techno solutions   2013 ieee embedded project dynamic traffic control...
Ieeepro techno solutions 2013 ieee embedded project dynamic traffic control...srinivasanece7
 
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...IRJET Journal
 
The Effects of Countdown Signals on Intersection Capacity
The Effects of Countdown Signals on Intersection Capacity The Effects of Countdown Signals on Intersection Capacity
The Effects of Countdown Signals on Intersection Capacity drboon
 
IRJET- Traffic Study on Mid-Block Section & Intersection
IRJET-  	  Traffic Study on Mid-Block Section & IntersectionIRJET-  	  Traffic Study on Mid-Block Section & Intersection
IRJET- Traffic Study on Mid-Block Section & IntersectionIRJET Journal
 

Similar to Design of traffic signal on NH-12 near Barkatullah University, Bhopal District of Madhya Pradesh (20)

TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Designing of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-IntersectionDesigning of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-Intersection
 
A Review on Optimization of Design and Safety of Intersection
A Review on Optimization of Design and Safety of IntersectionA Review on Optimization of Design and Safety of Intersection
A Review on Optimization of Design and Safety of Intersection
 
IRJET- Analysis of Saturation Flow at Signalized Intersections
IRJET-  	  Analysis of Saturation Flow at Signalized IntersectionsIRJET-  	  Analysis of Saturation Flow at Signalized Intersections
IRJET- Analysis of Saturation Flow at Signalized Intersections
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested area
 
R130403115130
R130403115130R130403115130
R130403115130
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost Efficiency
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 
Channelizing Traffic Flow by Reducing Delay at Intersection
Channelizing Traffic Flow by Reducing Delay at Intersection                  Channelizing Traffic Flow by Reducing Delay at Intersection
Channelizing Traffic Flow by Reducing Delay at Intersection
 
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptx
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
IRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway IntersectionIRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway Intersection
 
Intelligent Intersection Management: A Survey
Intelligent Intersection Management: A SurveyIntelligent Intersection Management: A Survey
Intelligent Intersection Management: A Survey
 
Ieeepro techno solutions 2013 ieee embedded project dynamic traffic control...
Ieeepro techno solutions   2013 ieee embedded project dynamic traffic control...Ieeepro techno solutions   2013 ieee embedded project dynamic traffic control...
Ieeepro techno solutions 2013 ieee embedded project dynamic traffic control...
 
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
IRJET- Design and Development of Traffic Flow Prediction System for Efficient...
 
The Effects of Countdown Signals on Intersection Capacity
The Effects of Countdown Signals on Intersection Capacity The Effects of Countdown Signals on Intersection Capacity
The Effects of Countdown Signals on Intersection Capacity
 
IRJET- Traffic Study on Mid-Block Section & Intersection
IRJET-  	  Traffic Study on Mid-Block Section & IntersectionIRJET-  	  Traffic Study on Mid-Block Section & Intersection
IRJET- Traffic Study on Mid-Block Section & Intersection
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

Design of traffic signal on NH-12 near Barkatullah University, Bhopal District of Madhya Pradesh

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 Design of traffic signal on NH-12 near Barkatullah University, Bhopal District of Madhya Pradesh Atul Singh Suman1, Dr. Y P Joshi2 1 Student – M.E. Civil (transportation) 2 Professor 3 Department of civil engineering S.A.T.I., Vidisha (M.P), India ---------------------------------------------------------------------***------------------------------------------------------------------- Abstract - During the past decade, the major town has under gone hazard growth of Industrialization, urbanization of the country. To manage travel demand the intersection should be given least resistance to traffic flow so that the travel time can become minimized. The present requirement of urban cities is to absorb the growing traffic demand but within the same physical aspect at the intersection. These days all around the globe efforts are being put forward to protect the environment. In this paper, an attempt has been done to study the different intersections, so minimize the delays at these intersections and simultaneous improve the level service. A traffic signal can be synchronized so that a vehicle starting at one end of the Street and traveling at Pre assigned speed can go to another end without stopping for the red light. At each intersection, the existing traffic has been calculated and then signal designed. Improve the level of service at intersections and to minimize delay, optimized signal has been synchronizing and estimated the benefits. Key Words: Signal Design, Webster method, PCU, Field Studies, Straight road, Timing 1.INTRODUCTION Traffic signals may defined as power operated signal displays used to regulate or worn traffic. In a broad sense, traffic signals include displays for intersection control, flashing beacons, lane directional signals, and ramp metering signals. When traffic signals are installed and properly operated, they can provide specific advantages in traffic control and safety. Signal installations, however, also have certain disadvantages that may or may not apply at a particular location. The objectives of traffic signals are many, such as they reducing the frequency of certain types of accidents, increasing traffic handling capacity of the intersection, bring but considerable economy over manual control at intersections where alternate assignment of right of way is required and finally, promoting driver confidence by assigning right of way. On the other hand, signal installation at intersections increases the intersection total delay and fuel consumption and Performance Index especially during the off peakperiods. 2.LITERATURE REVIEW 2.1 Introduction A signal design is made by measuring the individual speeds of the vehicles passing a given point (spot) on a street or highway. These individual speeds are used to calculate the speed distribution of the entire traffic stream at that location under the conditions prevailing at the time of study and also calculate individual PCU per hour. 2.2 Advantages of Signaling Properly designed traffic signals have the following uses: A) They provide orderly movement of traffic and increase the traffic handling capacity of most of the intersections at grade. B) They reduce certain types of accidents, notably the right angled collisions. C) Pedestrians can cross the roads safely at the signalized intersection. D) The signals allow crossing of the heavy traffic flow with safety. E) When the signal system properly coordinates, there is a reasonable speed along the major road traffic. F) Signals provide a chance to crossing traffic of minor road to cross the path of continuous the flow of traffic stream at reasonable intervals of time. 2.3 Signal Design Procedure The signals design procedure involves six major steps. They include the (a) Phase design, (b) Determination of amber time and clearancetime, (c) Determination of cycle length, (d) Apportioning of green time, (e) Pedestrian crossing requirements, and (f) The performance evaluation of the above design. © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3311
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 2.4 Collision Types at Traffic Signals Single vehicle collisions include vehicles losing control and hitting street furniture, cyclist and motorcyclists falling off their vehicles and collisions in which bus passengers fall either inside he bus or whilst boarding or alighting. Approaching collisions involve more than one vehicle on the approach to the signals, and are typically rear shunts or lane changing collisions. Right angle collisions are those between two vehicles going ahead on adjacent approaches. They only occur at 4-arm junctions and should of course be avoided by the use of signals. The other major group f vehicle collisions is that of principal right turn collisions, in which a right turning vehicle collides with a vehicle from the opposite approach. The effect on safety of aspects of geometric layout and signal operation In a cross- sectional study of 4-arm signals found that after taking account of vehicle flow:  Wider approach widths were associated with increased right angle collisions and approaching collisions.  Where there were more lanes at the stop line, there was increased risk of pedestrian  Collisions with entering vehicles.  There were fewer right angle (involving vehicles on adjacent roads) and principal right  Turn collisions (in which a vehicle turning right is hit by an on-coming vehicle) where the opposite arm was displaced, effectively staggering the junction (although only small displacements of up to 13m were includedin the study). 2.5 Traffic Studies Traffic studies or surveys are carried out to analyze the traffic characteristics. These studies help in deciding the geometric design features and control for safe and efficient traffic movement. The various traffic studies generally carried out are:  Traffic study  Speed studies  Origin and destination study  Traffic flow characteristics  Traffic capacity study 3. METHODOLOGY 3.1 Introduction The objective of this study is to get traffic characteristics from NH 12 near Barkatullah university Hoshangabad road Bhopal Madhya Pradesh include manual counting of vehicle and design of signal. This study is used to determine the level of service for streets document congestion and quantify the need for street improvements and also for a variety of purposes. For a design signal at a selected location, a sample of vehicles been count manually and there PCU per hour is indicated. This PCU per hour shows the variation of traffic flow in NH 12. Traffic counts during peak period may show exceptionally high volumes and are not normally used in the analysis; therefore, counts are usually conducted on a 12 days from 2 June to 13 June. 3.2 TRAFFIC VOLUME STUDY One of the fundamental measures of traffic on road system is the volume of traffic using the road in a given interval of time when the traffic is composed of a number of types of vehicles; it is the normal practice to convert the flow into equivalent P.C.U by using certain equivalency factor. The flow is expressed as PCU per hour. 3.3 PASSENGER CAR UNITS The flow of traffic with unrestricted mixing of different vehicle classes forms the Mixed Traffic Flow. In a mixed traffic condition, the traffic flow characteristics are very much complex when compared to homogeneous traffic consisting of passenger cars only. It is very difficult to estimate the traffic volume and capacity of roadway facilities under mixed traffic flow. Hence the different vehicle classes are converted to one common standard vehicle unit. Fig 1 SATELITE VIEW OF OBSERVATION POINT © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3312
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 Fig 2 Map sketch of NH 12 near Barkatullah University 3.3 TWO PHASE SIGNALS Two phase system is usually adopted if through traffic is significant compared to the turning movements. For example in figure 3, non-conflicting through traffic 3 and 4 are grouped in a single phase and non-conflicting through traffic 1 and 2 are grouped in the second phase. However, in the first phase flow 7 and 8 offer some conflicts and are called permitted right turns. Needless to say that such phasing is possible only if the turning movements are relatively low. On the other hand, if the turning movements are significant, then a four phase system is usually adopted. Fig 3 Two Phase Signal 3.4 CYCLE TIME Cycle time is the time taken by a signal to complete one full cycle of iterations, i.e. one complete rotation through all signal indications. It is denoted by C. In Webster Method corresponding to least total delay to the vehicles at signalized intersection has been worked out. This is rational approach. The field work consists of finding (i) Saturation flow S per unit time on each approach of the intersection and (ii) the normal flow „q‟ on each approach during the design approach. The standard values for saturation flow, S according to Webster are given as in the below table. Width in m 3.0 3.5 4.0 4.5 5.0 5.5 PCU/hr 1850 1890 1950 2250 2250 2900 Table 1.1 Saturation flow for widths 3 to 5.5 meters 3.5 MANNUAL COUNT Very commonly adopted method to get traffic volume like vehicle class wise, turning movements and loading conditions • Better than mechanical counters. • Not practicable for all 24hrs fielddata. • Done short counts during peak hours. • Hence need to perform statistical analysis to calculate the ADT and AADT. 3.5.1 Traffic data collection Sl.no. Duration Total P.C.U. START END 1 9:00AM 10:00AM 1908 2 10:00AM 11:00 AM 2001 3 11:00AM 12:00PM 2218 4 12:00 PM 1:00PM 2039 5 1:00PM 2:00PM 1556 6 2:00PM 3:00PM 1552 7 3:00PM 4:00PM 1677 8 4:00PM 5:00PM 2060 9 5:00PM 6:00PM 2350 10 6:00PM 7:00PM 2535 Table 2 data collection Fig 4 traffic frequency curve © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3313
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 4 SIGNAL PHASE DIAGRAM TOTAL CYCLE LENGTH 51 SECONDS Road Toward BARKATULLAH UNIVERSITY 17 SEC 4 SEC 30 SEC Road toward Misrod 21 SEC 4 SEC 26 SEC Fig 5 SIGNAL PHASE DIAGRAM OBSERVED AREA FIG 6 Vehicle volume data count at first site Fig 7 Vehicle volume count at last site 5 SPECIFICATIONS FOR SIGNAL POLES (IRC: 93-1985) 5.1 Specifications for Signal Footing (IRC: 93- 1985): The poles must be first positioned in pits of 900 mm* 900 mm* 1050 mm deep. The poles shall then embed in M 20 concrete to a minimum of 300 mm below ground level and 300 mm above the ground level. The circular area of embedded concrete shall have a minimum diameter of 450 mm. All the cables supplying power to the controller and signal heads shall run through RCC ducts when these are required to cross the carriage way. The ducts shall be of 450 mm internal diameter and laid at a depth of about 1000 mm from the level of the carriage way. For over head traffic signals, the pit should be 1200 mm * 1200mm * 1800 mm deep. The poles are to be embedded in M 20 concreter to a minimum of 500 mm below ground level and 500 mm above ground level. The circular area of embedding concrete shall have a minimum diameter of 500 mm. 5.2 Specifications for Height of Signal Faces ( IRC : 93- 1985): The bottom of the housing of a signal face, not suspended over a roadway, shall be at a height of 2.5 meter above the footpath or if none above the pavement grade at the centre (crown) of the roadway. The bottom of the housing of n signal face, suspended over a roadway, shall be at a height of 5.5 meter above the pavement grade at the centre of roadway. Optimum visibility and adequate clearance should be guiding considerations in deciding signal height. Grades on approaching streets may be important factors, and should be considered in determining the most appropriate height. However, the maximum heights of bottom of housing of post-mounted signal face should not exceed 4.6 meter and while in the case of overhead signal face, the same should not exceed 5.8 meter. 5.3 Signal Timings Inter green periods in India were set many years ago and are based on where collision points occur on the junction. Recent research has confirmed that the amber period should remain at three seconds and the starting amber (red with amber) period at two seconds. All-red periods appear to be beneficial if kept short (generally one or two seconds). Longer all-red periods have been found to be associated with increased principal right turn collisions. In India, amber periods of between three and six seconds are used, with longer periods at junctions on high speed roads; increasing amber periods to the these values or longer periods on high speed roads as recommended by the Institute of Transport Engineers (ITE) reduces collisions. Amber periods that are shorter than the ITE recommended values are associated with increased collisions. However, inter green periods that are too long may also increase © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3314
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 collisions. Shorter cycle times benefit pedestrians and improve pedestrian compliance, but provide increased opportunities for red running. Cycle times are generally set to minimize vehicle delay but crossings or lightly trafficked junctions in a UTC system can sometimes be double-cycled during off peak periods. Although the type of signal control is generally selected on delay grounds, it can have an effect on safety. 6 CONCLUSIONS The choice procedures of the economic design traffic volume for signal design in saturated flow conditions are investigated. A traffic count survey was carried out for continuous 9 hours in under normal operation conditions in 12 days. Volumes were measured by approach and direction and consequently, the traffic fluctuation was obtained and the peak volume and the average of peak volumes were determined. It was investigated that the minimum traffic volume presents 85% of the peak volume. Based on the calculations done on the P.C.U values obtained from the traffic survey, the signal cycle length for NH-12 road is 51 seconds for road towards Barkatullah University and also towards Hoshangabad road. By providing signals, there will be reduction in the conflicts. 7 REFERENCES 1. Highway Engineering- S. K. Khanna & C. E. G Justo, New chand & Bros., 7th Edition. 2. Traffic Engineering & Transportation Planning- L.R Kadiyali- Khanna Publications. IRC Code: IRC: 93- 1985. 3. Ministry Of Road Transport and Highways (MORTH). 4. F D Hobbs. ,(1979), ‘’ Traffic planning and engineering ”, 2nd edition. © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 3315