© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2093
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR
SIGNAL
FINU JOHN1 ALEENA NASAR2 ELDHO PAUL C3 FAHMITHA HAMEED4 SULTHANA P S5
1Assistant Professor, Department of Civil Engineering, Viswajyothi college of Engineering and Technology,
Vazhakulam Kerala, India
2,3,4,5UG Scholar, Department of Civil Engineering, Viswajyothi college of Engineering and
Technology, Vazhakulam Kerala, India
------------------------------------------------------------------***------------------------------------------------------------------
Abstract –Urban traffic congestion has been identified has a big problem in the country, having a considerable impact on
the economy, travel behaviour, land use and causing pain to millions of motorists. In India, due to rapid increase in
population along with urbanization and improved living condition, the vehicular population have increased massively.
Traffic congestion has become a major problem at intersections. The project main goal is to analyse traffic problems at the
Perumbavoor crossroad and provide a different solution. In this study, we have taken signalized intersection at Perumbavoor.
After analysis and structures. According to IRC: SP: 90-2010, manual for grade separators and elevated structures the
maximum volume a rotary can handle is specified as 5000 pcu/hr Therefore, a simple grade separator, that is, a flyover is
provided at the intersection over the road having greater traffic volume count. A large amount of traffic volume may be
shifted to the bridges as a result of the flyover bridge at the intersection, and time delays could be minimised over the same
time frame.
Key Words: Urbanization, Traffic congestion, Alternative solution.
1. INTRODUCTION
In this paper, traffic congestions are evaluated at selected intersections and data regarding the traffic volume are collected
manually. Following the analysis of the acquired data, several remedial procedures concentrating on junction
improvement and alternative plans are presented. Despite of huge investment to be laid, congestion could be reduced to a
certain extent by providing signalized traffic junctions, providing roundabouts, flyovers and interchanges, etc
1.1 GENERAL
The projects’ main goal is to analyse the traffic problems at the Perumbavoor crossroads and provide a solution that
includes grade separator and elevated. Collected data various remedial measures are proposed focusing on junction
alternative and improvement operation plan. Despite of the huge investment to be laid, congestions could be reduced to a
certain extent by providing signalized traffic junctions, providing roundabouts, flyovers, interchanges, etc
1.2 OBJECTIVES
• To determine the capacity of approach roads of intersections.
• To estimate the delay and capacity of intersection.
• To evaluate the performance of signalized intersection at Perumbavoor.
• To suggest some methods for improving the performance of intersection.
• To plan and develop current and new traffic operation facilities on the road.
1.3 SCOPE
• To achieve efficient and rapid flow of traffic at intersection.
• To increase traffic capacity of roads.
• To reduce the delays in road journeys and improve speed of the vehicle.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2094
2. RESEARCH FRAMEWORK
The methodology consists of 6 steps, from selecting the intersection to providing layout of the alternative solution. After
choosing the right approach road at intersection based on the analysis on the tabulated data, field measurements are
taken for the same intersection. Then an alternative solution is suggested for reducing the traffic congestion.
The selection of the research area is the initial step in research process. The study’s location determines the research
activities that must be carried out in light of current traffic behaviour and transportation frame work. In this study, an
existing road junction is studied and analysed by using volume count survey. Some implementation will result from data
analysis inorder to improve the road’s condition. It will have a good effect on the inhabitants in the area as well as other
road users. This research will aid in minimising traffic flow issues, hence lowering the rate of accidents and lowering
pollution levels. During peak hours, data for this study was obtained from perumbavoor’s signalized intersection. The
traffic is extremely diverse, with little adherence to lane discipline. Figure shows the aerial view of the signalised
intersection selected for the study. It is the intersection of Aluva-Munnar road (SH 16) and MC road (SH1).
Chart 1 Flow Chart
Data Collection
Data Assessment
Analysis and Comparison
Dimensioning
Conclusion and
recommendation
Traffic Volume Count
Creating the data to analyze vehicle count to
PCU conversion
Intersection road with greater PCU value is
selected
Using total station
Layout of the proposed solutions is drawn
Site Visit
Four intersections of Perumbavoor signal
3. STUDY AREA
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2095
Chart 2 Aerial map of intersection at Perumbavoor
4. DATACOLLECTION & ANALYSIS
4.1 Data collection method
There are mainly 2 categories in traffic counting, they are manual counts and automatic counts. The manual counting
method is used in this investigation, and is done with tally marks. Following that the raw data from the inventories is
organised for analysis. The traffic on each arm is counted and recorded separately for each movement. Automatic
counting is an alternate method that employs a number of equipment each with its own set of the most widely used
instruments include pneumatic tubes, inductive loops, weigh in motion sensors, micro-millimetres, and video cameras.
Here the method adopted is manual counting of different category of vehicles, since it is a direct and easy method
involving no expensive equipment.
4.2 Estimation of PCU
The Passenger Car Unit (PCU) is a relative weightage factor used to the traffic volume of individual vehicle categories to
account for variability in a mixed traffic environment. To far, a large number of studies have been undertaken to estimate
PCU for various vehicle classifications. The nature of traffic flow is often heterogeneous. The degree of heterogeneity, on
the other hand, varies depending on the situation. It is usually more for developing countries, for example. Because of this
diversity, traffic studies are frequently required. The Passenger Car Unit (PCU) is a widely used method for converting
diverse traffic volumes into homogenous traffic volumes. The measure of relative interaction between a vehicle and a
traffic stream in contrast to a normal passenger automobile under a set of roadway circumstances, according to the PCU.
4.3 Traffic Volume count
Table 1 Total vehicular count in PCU Unit
FROM TO DAY 1
TOTAL IN PCU
9:30 – 10:30 AM
DAY 1
TOTAL IN PCU
4:30 – 5:30 PM
DAY 2
TOTAL IN PCU
9:30 – 10:30 AM
DAY 2
TOTAL IN PCU
4:30 – 5:30 PM
Muvattu-
puzha
Aluva 610 750 634 772
Angamaly 883 1095 876 1111
Kotha- mangalam 539 778 550 741
Angamaly Muvattu- puzha 964 1127 932 1173
Aluva 630 870 649 934
Kotha- mangalam 623 741 635 731
Aluva Muvattupuzha 682 681 697 832
Angamaly 817 913 834 887
Kotha- mangalam 665 718 689 744
Kotha-
mangalam
Muvattu- puzha 596 866 608 870
Angamaly 760 861 773 790
Aluva 504 807 510 813
TOTAL 8273 10215 8387 10398
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2096
5. TOPOGRAPHY OF INTERSECTION
Field measurements of Perumbavoor intersection was taken using total station. On 2nd April 2022 we had surveyed
nearby junction of Perumbavoor signal that is Oushadhi junction and on 5th April 2022 we had surveyed Perumbavoor
intersection.
Chart 3 Joined lined diagram of existing road produced from AutoCAD
6. PROPOSED SOLUTION-FLYOVER
After analysing the Perumbavoor intersection it is clear that Muvattupuzha- Angamali road has peak values that is
around 1000 PCU/Hr. From the capacity calculations made from field data it is evident that this intersection
would fail to cater to the future traffic demands. The traffic volume that a roundabout can handle efficiently is
3000 PCU/hr, according to IRC: 65-2017, Guidelines for planning and design of roundabouts. The maximum
volume a rotary can handle is set as 5000 PCU/hr in IRC: SP: 90-2010, Manual for grade separators and elevated
structures, and an elevated structure could be provided beyond this limit. A simple grade separator, such as a
flyover, would be the most practical option to separate the huge volume of traffic at this crossroads. While traffic
on the road grows every day and there is no more space in both dimensions, the only alternative left is to proceed
to the third dimension, which is accomplished entirely by flyover construction.
6.1 2D LAYOUT
2D layout of the flyover is plotted in AutoCAD considering the existing measurements. The median of existing and
the proposed layout are kept the same and lanes are off set from the median to both the sides.
Chart 4 2D Layout
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2097
6.1 Detailed View
Data obtained from survey using total station is used to design a flyover. As the detailed file is imported from AutoCAD to
Revit software. In general length of the flyover is 580.5m. Standard estimations of path width (3.5m), shoulder width
(0.6m to 1m), middle (2m) are given in IRC: SP: 73-2015, Manual for determinations and norms for two coating of
thruways. As indicated by IRC:3-1983, Dimensions and Weights of street plan vehicles, no vehicle other than multilevel
buses will have a level surpassing 3.8m for ordinary application and multilevel buses might have a level not surpassing
4.75m.Therefore, according to Indian Standards, the height of flyover should be 5.5m. Total width of the flyover is 7.6m.
Slope of the ramp is 15°. Pillars are provided at an interval of 7m throughout the length. Pillar diameter is 75cm and 83
number of pillars are provided.
Chart 5 3D layout of flyover at intersection
Chart 6 Starting and landing portion of flyover
Chart 7 Landing portion of flyover
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2098
Chart 8 3D Layout of flyover
7. ADVANTAGES AND LIMITATIONS
Flyovers contain a few benefits, yet limits emerge simply because of a few mix-ups committed at some stage in their
development or, in all likelihood due to ill-advised arranging, etc. Flyovers are not, when in doubt, proper for created
regions as they need a colossal region and furthermore it is costly. Absence of legitimate overseeing inside flyover
development could create bunches of issues. Different designing studies were completed for appropriate preparation and
planning of grade separator at proposed intersection. The significant expectation is to get better current situation
immeasurably and make relationship of traffic helpful to conceivable expand, albeit a totally contrast free circumstance
can't be perceived. The essential plan norms executed for foundational layouts are according to necessities set down in
latest versions of Indian Roads Congress codes of practices and customary details of Ministry of Road Transport as well as
Highways. Land acquisition is also required for its construction. This project deals with traffic analysis and proposing a
design layout for a flyover, hence it is not detailing about the structural aspect.
8. CONCLUSION
Expanded in populace and fast urbanization of India have brought about expanded utilization of vehicles and
transportation offices, which thus brings about gridlock and related issues. The project study is based on 4 main
intersection and the traffic data is collected through manual counting on peak hours and converted to PCU/Hr. After
comparing the values of 4 roads Muvattupuza – Angamaly has the highest peak value. The total vehicular count is around
10000PCU/Hr. Field measurements are done using total station. The maximum value a rotary can handle is 5000PCU/Hr
and elevated highways can carry beyond this limit. So, an alternate solution suggested is the design of a flyover. Data
obtained from survey using total station is used to design a flyover. As the detailed file is imported from AutoCAD to Revit
software. Overall length of the flyover is 580.5m. Standard measurements of lane width (3.5m), shoulder width (0.6m to
1m), median (2m) are provided in IRC: SP: 73-2015, Manual for determinations and norms for two covering of highways.
Although governments may never be able to eliminate road congestion, with the flyover construction it could be reduced
to a certain extent and crisis can be mitigated well. Despite of huge investment to be laid, it would provide an easy, safe
and fast transportation. If the project is implemented the present and future demands of traffic may be satisfied.
9. REFERENCES
1) Chandra, Sikdar and P.K. (1993): ‘Dynamic PCU for Intersection [2] Capacity Estimation’, Indian Highways,
Volume 115.
2) Arasan, V.T. and Koshy (2005): ‘Methodology for Modelling Highly Heterogenous Traffic Flow’, Journal of
Transportation Engineering, ASCE 2005, Volume 131.
3) Arasan, V.T. and Arkatkar (2010): ‘Micro simulation Study of Effect of Volume and Road Width on PCU of Vehicles
Under Heterogenous Traffic’, Journal of Transportation Engineering, ASCE 2010, Volume 181.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2099
4) Praveen, Arasan, V.T (2013): ‘Influence of traffic mix on PCU value of vehicles under heterogenous traffic
conditions’, IJTTE 2013, Volume 210.
5) Naveen Kuma (2014): ‘Performance evaluation of at grade intersection and improvement using signal
coordination’, IJSRET 2014, Volume 131.
6) Satyajit Mondal, Vijay Kumar Arya, Ankit Gupta and Samsi Gunarta (2020): ‘Comparative analysis of saturation
flow using various PCU estimation methods’, Transportation Research Procedia 2020, Volume 48

More Related Content

Similar to TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL

IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...IRJET Journal
 
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...IRJET Journal
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterIRJET Journal
 
Traffic analysis and Road Widening
Traffic analysis and Road WideningTraffic analysis and Road Widening
Traffic analysis and Road WideningAbhinav Pateriya
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsAbhinav Pateriya
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONIRJET Journal
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost EfficiencyIRJET Journal
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring SystemIRJET Journal
 
IRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET Journal
 
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilitiesTraffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilitiesAbhinav Pateriya
 
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATIONLAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATIONTobi Lafinhan
 
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareTraffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareIRJET Journal
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET Journal
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET Journal
 
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesA Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesIRJET Journal
 
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreAnalysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreIRJET Journal
 
Intelligent urban traffic control system
Intelligent urban traffic control systemIntelligent urban traffic control system
Intelligent urban traffic control systemmustafa_talib_yousif
 

Similar to TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL (20)

IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...IRJET -  	  Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
 
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
Traffic analysis and Road Widening
Traffic analysis and Road WideningTraffic analysis and Road Widening
Traffic analysis and Road Widening
 
Traffic analysis and Widening of Roads
Traffic analysis and Widening of RoadsTraffic analysis and Widening of Roads
Traffic analysis and Widening of Roads
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost Efficiency
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring System
 
IRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in Avadi
 
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilitiesTraffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilities
 
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATIONLAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
LAFINHAN O. O. FINAL YEAR PROJECT PRESENTATION
 
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareTraffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim Software
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
 
Sustainable Transportation Strategies for Nagpur City
Sustainable Transportation Strategies for Nagpur CitySustainable Transportation Strategies for Nagpur City
Sustainable Transportation Strategies for Nagpur City
 
tG04 06 5255
tG04 06 5255tG04 06 5255
tG04 06 5255
 
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesA Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining Techniques
 
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreAnalysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
 
Intelligent urban traffic control system
Intelligent urban traffic control systemIntelligent urban traffic control system
Intelligent urban traffic control system
 
Its copy
Its   copyIts   copy
Its copy
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL

  • 1. © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2093 TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL FINU JOHN1 ALEENA NASAR2 ELDHO PAUL C3 FAHMITHA HAMEED4 SULTHANA P S5 1Assistant Professor, Department of Civil Engineering, Viswajyothi college of Engineering and Technology, Vazhakulam Kerala, India 2,3,4,5UG Scholar, Department of Civil Engineering, Viswajyothi college of Engineering and Technology, Vazhakulam Kerala, India ------------------------------------------------------------------***------------------------------------------------------------------ Abstract –Urban traffic congestion has been identified has a big problem in the country, having a considerable impact on the economy, travel behaviour, land use and causing pain to millions of motorists. In India, due to rapid increase in population along with urbanization and improved living condition, the vehicular population have increased massively. Traffic congestion has become a major problem at intersections. The project main goal is to analyse traffic problems at the Perumbavoor crossroad and provide a different solution. In this study, we have taken signalized intersection at Perumbavoor. After analysis and structures. According to IRC: SP: 90-2010, manual for grade separators and elevated structures the maximum volume a rotary can handle is specified as 5000 pcu/hr Therefore, a simple grade separator, that is, a flyover is provided at the intersection over the road having greater traffic volume count. A large amount of traffic volume may be shifted to the bridges as a result of the flyover bridge at the intersection, and time delays could be minimised over the same time frame. Key Words: Urbanization, Traffic congestion, Alternative solution. 1. INTRODUCTION In this paper, traffic congestions are evaluated at selected intersections and data regarding the traffic volume are collected manually. Following the analysis of the acquired data, several remedial procedures concentrating on junction improvement and alternative plans are presented. Despite of huge investment to be laid, congestion could be reduced to a certain extent by providing signalized traffic junctions, providing roundabouts, flyovers and interchanges, etc 1.1 GENERAL The projects’ main goal is to analyse the traffic problems at the Perumbavoor crossroads and provide a solution that includes grade separator and elevated. Collected data various remedial measures are proposed focusing on junction alternative and improvement operation plan. Despite of the huge investment to be laid, congestions could be reduced to a certain extent by providing signalized traffic junctions, providing roundabouts, flyovers, interchanges, etc 1.2 OBJECTIVES • To determine the capacity of approach roads of intersections. • To estimate the delay and capacity of intersection. • To evaluate the performance of signalized intersection at Perumbavoor. • To suggest some methods for improving the performance of intersection. • To plan and develop current and new traffic operation facilities on the road. 1.3 SCOPE • To achieve efficient and rapid flow of traffic at intersection. • To increase traffic capacity of roads. • To reduce the delays in road journeys and improve speed of the vehicle. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2094 2. RESEARCH FRAMEWORK The methodology consists of 6 steps, from selecting the intersection to providing layout of the alternative solution. After choosing the right approach road at intersection based on the analysis on the tabulated data, field measurements are taken for the same intersection. Then an alternative solution is suggested for reducing the traffic congestion. The selection of the research area is the initial step in research process. The study’s location determines the research activities that must be carried out in light of current traffic behaviour and transportation frame work. In this study, an existing road junction is studied and analysed by using volume count survey. Some implementation will result from data analysis inorder to improve the road’s condition. It will have a good effect on the inhabitants in the area as well as other road users. This research will aid in minimising traffic flow issues, hence lowering the rate of accidents and lowering pollution levels. During peak hours, data for this study was obtained from perumbavoor’s signalized intersection. The traffic is extremely diverse, with little adherence to lane discipline. Figure shows the aerial view of the signalised intersection selected for the study. It is the intersection of Aluva-Munnar road (SH 16) and MC road (SH1). Chart 1 Flow Chart Data Collection Data Assessment Analysis and Comparison Dimensioning Conclusion and recommendation Traffic Volume Count Creating the data to analyze vehicle count to PCU conversion Intersection road with greater PCU value is selected Using total station Layout of the proposed solutions is drawn Site Visit Four intersections of Perumbavoor signal 3. STUDY AREA
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2095 Chart 2 Aerial map of intersection at Perumbavoor 4. DATACOLLECTION & ANALYSIS 4.1 Data collection method There are mainly 2 categories in traffic counting, they are manual counts and automatic counts. The manual counting method is used in this investigation, and is done with tally marks. Following that the raw data from the inventories is organised for analysis. The traffic on each arm is counted and recorded separately for each movement. Automatic counting is an alternate method that employs a number of equipment each with its own set of the most widely used instruments include pneumatic tubes, inductive loops, weigh in motion sensors, micro-millimetres, and video cameras. Here the method adopted is manual counting of different category of vehicles, since it is a direct and easy method involving no expensive equipment. 4.2 Estimation of PCU The Passenger Car Unit (PCU) is a relative weightage factor used to the traffic volume of individual vehicle categories to account for variability in a mixed traffic environment. To far, a large number of studies have been undertaken to estimate PCU for various vehicle classifications. The nature of traffic flow is often heterogeneous. The degree of heterogeneity, on the other hand, varies depending on the situation. It is usually more for developing countries, for example. Because of this diversity, traffic studies are frequently required. The Passenger Car Unit (PCU) is a widely used method for converting diverse traffic volumes into homogenous traffic volumes. The measure of relative interaction between a vehicle and a traffic stream in contrast to a normal passenger automobile under a set of roadway circumstances, according to the PCU. 4.3 Traffic Volume count Table 1 Total vehicular count in PCU Unit FROM TO DAY 1 TOTAL IN PCU 9:30 – 10:30 AM DAY 1 TOTAL IN PCU 4:30 – 5:30 PM DAY 2 TOTAL IN PCU 9:30 – 10:30 AM DAY 2 TOTAL IN PCU 4:30 – 5:30 PM Muvattu- puzha Aluva 610 750 634 772 Angamaly 883 1095 876 1111 Kotha- mangalam 539 778 550 741 Angamaly Muvattu- puzha 964 1127 932 1173 Aluva 630 870 649 934 Kotha- mangalam 623 741 635 731 Aluva Muvattupuzha 682 681 697 832 Angamaly 817 913 834 887 Kotha- mangalam 665 718 689 744 Kotha- mangalam Muvattu- puzha 596 866 608 870 Angamaly 760 861 773 790 Aluva 504 807 510 813 TOTAL 8273 10215 8387 10398
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2096 5. TOPOGRAPHY OF INTERSECTION Field measurements of Perumbavoor intersection was taken using total station. On 2nd April 2022 we had surveyed nearby junction of Perumbavoor signal that is Oushadhi junction and on 5th April 2022 we had surveyed Perumbavoor intersection. Chart 3 Joined lined diagram of existing road produced from AutoCAD 6. PROPOSED SOLUTION-FLYOVER After analysing the Perumbavoor intersection it is clear that Muvattupuzha- Angamali road has peak values that is around 1000 PCU/Hr. From the capacity calculations made from field data it is evident that this intersection would fail to cater to the future traffic demands. The traffic volume that a roundabout can handle efficiently is 3000 PCU/hr, according to IRC: 65-2017, Guidelines for planning and design of roundabouts. The maximum volume a rotary can handle is set as 5000 PCU/hr in IRC: SP: 90-2010, Manual for grade separators and elevated structures, and an elevated structure could be provided beyond this limit. A simple grade separator, such as a flyover, would be the most practical option to separate the huge volume of traffic at this crossroads. While traffic on the road grows every day and there is no more space in both dimensions, the only alternative left is to proceed to the third dimension, which is accomplished entirely by flyover construction. 6.1 2D LAYOUT 2D layout of the flyover is plotted in AutoCAD considering the existing measurements. The median of existing and the proposed layout are kept the same and lanes are off set from the median to both the sides. Chart 4 2D Layout
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2097 6.1 Detailed View Data obtained from survey using total station is used to design a flyover. As the detailed file is imported from AutoCAD to Revit software. In general length of the flyover is 580.5m. Standard estimations of path width (3.5m), shoulder width (0.6m to 1m), middle (2m) are given in IRC: SP: 73-2015, Manual for determinations and norms for two coating of thruways. As indicated by IRC:3-1983, Dimensions and Weights of street plan vehicles, no vehicle other than multilevel buses will have a level surpassing 3.8m for ordinary application and multilevel buses might have a level not surpassing 4.75m.Therefore, according to Indian Standards, the height of flyover should be 5.5m. Total width of the flyover is 7.6m. Slope of the ramp is 15°. Pillars are provided at an interval of 7m throughout the length. Pillar diameter is 75cm and 83 number of pillars are provided. Chart 5 3D layout of flyover at intersection Chart 6 Starting and landing portion of flyover Chart 7 Landing portion of flyover
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2098 Chart 8 3D Layout of flyover 7. ADVANTAGES AND LIMITATIONS Flyovers contain a few benefits, yet limits emerge simply because of a few mix-ups committed at some stage in their development or, in all likelihood due to ill-advised arranging, etc. Flyovers are not, when in doubt, proper for created regions as they need a colossal region and furthermore it is costly. Absence of legitimate overseeing inside flyover development could create bunches of issues. Different designing studies were completed for appropriate preparation and planning of grade separator at proposed intersection. The significant expectation is to get better current situation immeasurably and make relationship of traffic helpful to conceivable expand, albeit a totally contrast free circumstance can't be perceived. The essential plan norms executed for foundational layouts are according to necessities set down in latest versions of Indian Roads Congress codes of practices and customary details of Ministry of Road Transport as well as Highways. Land acquisition is also required for its construction. This project deals with traffic analysis and proposing a design layout for a flyover, hence it is not detailing about the structural aspect. 8. CONCLUSION Expanded in populace and fast urbanization of India have brought about expanded utilization of vehicles and transportation offices, which thus brings about gridlock and related issues. The project study is based on 4 main intersection and the traffic data is collected through manual counting on peak hours and converted to PCU/Hr. After comparing the values of 4 roads Muvattupuza – Angamaly has the highest peak value. The total vehicular count is around 10000PCU/Hr. Field measurements are done using total station. The maximum value a rotary can handle is 5000PCU/Hr and elevated highways can carry beyond this limit. So, an alternate solution suggested is the design of a flyover. Data obtained from survey using total station is used to design a flyover. As the detailed file is imported from AutoCAD to Revit software. Overall length of the flyover is 580.5m. Standard measurements of lane width (3.5m), shoulder width (0.6m to 1m), median (2m) are provided in IRC: SP: 73-2015, Manual for determinations and norms for two covering of highways. Although governments may never be able to eliminate road congestion, with the flyover construction it could be reduced to a certain extent and crisis can be mitigated well. Despite of huge investment to be laid, it would provide an easy, safe and fast transportation. If the project is implemented the present and future demands of traffic may be satisfied. 9. REFERENCES 1) Chandra, Sikdar and P.K. (1993): ‘Dynamic PCU for Intersection [2] Capacity Estimation’, Indian Highways, Volume 115. 2) Arasan, V.T. and Koshy (2005): ‘Methodology for Modelling Highly Heterogenous Traffic Flow’, Journal of Transportation Engineering, ASCE 2005, Volume 131. 3) Arasan, V.T. and Arkatkar (2010): ‘Micro simulation Study of Effect of Volume and Road Width on PCU of Vehicles Under Heterogenous Traffic’, Journal of Transportation Engineering, ASCE 2010, Volume 181.
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2099 4) Praveen, Arasan, V.T (2013): ‘Influence of traffic mix on PCU value of vehicles under heterogenous traffic conditions’, IJTTE 2013, Volume 210. 5) Naveen Kuma (2014): ‘Performance evaluation of at grade intersection and improvement using signal coordination’, IJSRET 2014, Volume 131. 6) Satyajit Mondal, Vijay Kumar Arya, Ankit Gupta and Samsi Gunarta (2020): ‘Comparative analysis of saturation flow using various PCU estimation methods’, Transportation Research Procedia 2020, Volume 48