SlideShare a Scribd company logo
Take more in, take more out
11/19/20161
Take more in, take more out
11/19/20162
Take more in with AIMS technology
Take more in, take more out
11/19/20163
Project management
Step by step project management
techniques
Take more in, take more out
11/19/20164
Project management steps
1. Objectives
2. Post-it note diagram
3. Time estimates
4. Macro adjustments
5. Gantt chart
6. Risk analysis
7. Monitor progress
8. Modify your plan
9. Review
Good planning makes the
rest easier
A plan is never perfect but it
helps you know what to
expect. Plan to make
changes.
If you want to get better, go
through lessons learned
Take more in, take more out
11/19/20165
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management techniques
Write them down
Take more in, take more out
11/19/20166
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management techniques
What is your priority?
time
costquality
Take more in, take more out
11/19/20167
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management techniques
Set your operating parameters
1. Why is that the constraint?
2. What if we can’t….?
3. Can we trade….?
Take more in, take more out
11/19/20168
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management post-it note diagram
Build a website
Take more in, take more out
11/19/20169
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management post-it note diagram
Define the
site
Hire a
designer
Select a
copywriter
Choose a
domain name
Hire an SEO
company
Make our
design
Write the
copy
Build the site
Publish
Take more in, take more out
11/19/201610
Define the
site
Hire a
designer
Select a
copywriter
Choose a
domain
name
Hire an
SEO
company
Make our
design
Write the
copy
Build the
site Publish
Project management post-it note diagram
Take more in, take more out
11/19/201611
Project management time estimates
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Rules for estimating time
1. Use your experts
2. Ongoing tasks are NOT allowed EVER
3. Estimate time wisely
Take more in, take more out
11/19/201612
Project management time estimates
About half way between
expected and max
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Best guess
Max
Take more in, take more out
11/19/201613
Project management macro adjustments
Define the
site
Hire a
designer
Select a
copywriter
Choose a
domain
name
Hire an
SEO
company
Make our
design
Write the
copy
Build the
site Publish1 w
4 w
4 w 8 w
4 w
12 w
8 w
0 w
Time constraint
Resource
constraint
1 w
21 weeks for the
critical path
Take more in, take more out
11/19/201614
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management techniques
3 ways to save time
1. Spend more
2. Reduce quality
3. Overlap tasks
Take more in, take more out
11/19/201615
Project management macro adjustments
Define the
site
Hire a
designer
Select a
copywriter
Choose a
domain
name
Hire an
SEO
company Make our
design
Write the
copy
Build the
site
Publish
1 w
4 w
4 w
8 w
4 w
8 w
0 w
1 w 10 w
15 weeks!
Take more in, take more out
11/19/201616
Task time wk 1 wk 2 wk 3 wk 4 wk 5 wk 6 wk 7 wk 8 wk 9
wk
10
wk
11
wk
12
wk
13
wk
14
wk
15
Define the site 1 wk
Hire an SEO company 4 wks
Make our design 8 wks
Build the site 4 wks
Publish 0 wks
Hire a designer 4 wks
Hire a copywriter 4 wks
Write the copy 4 wks
Choose a domain name 1 wk
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management Gantt chart
Confident
Watch
Danger
Deliverable
Now line
Float
Take more in, take more out
11/19/201617
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management Gantt chart
www.smartsheet.com
Take more in, take more out
11/19/201618
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management risk analysis
Make something less likely
Make something less serious
How do we manage risk?
Take more in, take more out
11/19/201619
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management risk analysis
1. Spend more
2. Reduce quality
3. Extend time
Ways to reduce risk
time
costquality
Take more in, take more out
11/19/201620
Task time wk 1 wk 2 wk 3 wk 4 wk 5 wk 6 wk 7 wk 8 wk 9
wk
10
wk
11
wk
12
wk
13
wk
14
wk
15
Define the site 1 wk
Hire an SEO company 4 wks
Make our design 8 wks
Build the site 4 wks
Publish 0 wks
Hire a designer 4 wks
Hire a copywriter 4 wks
Write the copy 4 wks
Choose a domain name 1 wk
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management progress monitoring
Confident
Watch
Danger
Deliverable
Now line
Float
Take more in, take more out
11/19/201621
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management modify
Managing cost
1. Each Gantt chart line should have an associated cost
2. Cost = Stuff What do you have to buy
3. Cost = Staff Know who is doing what
4. Cost = Time Think in terms of man-weeks
Take more in, take more out
11/19/201622
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management modify your plan
3 ways to modify your
plan
time
costquality
Take more in, take more out
11/19/201623
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management review
Review right away
Take more in, take more out
11/19/201624
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management review
3 questions
1. What went well?
2. What didn’t go well?
3. What should we change
Take more in, take more out
11/19/201625
The Goal, Eliyahu Goldratt
Take more in, take more out
11/19/201626
Guided e-Learning
David Coarsey
david@gelnet.com
Take more in with AIMS technology
Take more in, take more out
11/19/201627
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time and
cost
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Project management planning
Take more in, take more out
11/19/201628
Project management steps
1. Objectives
2. Post-it note diagram
3. Time and cost estimates
4. Macro adjustments
5. Gantt chart
6. Risk analysis
7. Monitor progress
8. Modify your plan
9. Review
Project management techniques
Take more in, take more out
11/19/201629
Project management time estimates
Don’t say this!
…or this!
Project
management
steps
1. Objectives
2. Post-it note
diagram
3. Time
estimates
4. Macro
adjustments
5. Gantt chart
6. Risk analysis
7. Monitor
progress
8. Modify your
plan
9. Review
Take more in, take more out
11/19/201630
Project management time estimates
Define the
site
Hire a
designer
Select a
copywriter
Choose a
domain
name
Hire an
SEO
company
Make our
design
Write the
copy
Build the
site Publish
1 w 4 w
4 w 8 w
4 w1 w
4 w 4 w
0 w
Take more in, take more out
11/19/201631
Project management macro adjustments
Define the
site
Hire a
designer
Select a
copywriter
Choose a
domain
name
Hire an
SEO
company
Make our
design
Write the
copy
Build the
site Publish
1 w 4 w
4 w 8 w
4 w1 w
4 w 4 w
0 w

More Related Content

What's hot

Microsoft project (msp)
Microsoft project (msp)Microsoft project (msp)
Microsoft project (msp)
naziakhan123
 
Time unit 2012 nov part 2
Time unit 2012 nov part 2 Time unit 2012 nov part 2
Time unit 2012 nov part 2
Skript
 
Time Management Power Point Presentation
Time Management Power Point PresentationTime Management Power Point Presentation
Time Management Power Point Presentation
klharms
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
InSync Conference
 
Afp portfolio component 4, appendices 1.1 1.3 en
Afp portfolio component 4, appendices 1.1 1.3 enAfp portfolio component 4, appendices 1.1 1.3 en
Afp portfolio component 4, appendices 1.1 1.3 en
Dr Lendy Spires
 
Time mgmt project.pptx.2
Time mgmt project.pptx.2Time mgmt project.pptx.2
Time mgmt project.pptx.2
michellesilvaaa
 

What's hot (6)

Microsoft project (msp)
Microsoft project (msp)Microsoft project (msp)
Microsoft project (msp)
 
Time unit 2012 nov part 2
Time unit 2012 nov part 2 Time unit 2012 nov part 2
Time unit 2012 nov part 2
 
Time Management Power Point Presentation
Time Management Power Point PresentationTime Management Power Point Presentation
Time Management Power Point Presentation
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
 
Afp portfolio component 4, appendices 1.1 1.3 en
Afp portfolio component 4, appendices 1.1 1.3 enAfp portfolio component 4, appendices 1.1 1.3 en
Afp portfolio component 4, appendices 1.1 1.3 en
 
Time mgmt project.pptx.2
Time mgmt project.pptx.2Time mgmt project.pptx.2
Time mgmt project.pptx.2
 

Similar to David Coarsey Project management techniques for implementing change

Planning process group
Planning process groupPlanning process group
Planning process group
Mudassir Iqbal
 
12 Ways to Budget Better
12 Ways to Budget Better12 Ways to Budget Better
12 Ways to Budget Better
Kimberly Palmer
 
Ch03_Step_Wise.ppt
Ch03_Step_Wise.pptCh03_Step_Wise.ppt
Ch03_Step_Wise.ppt
IsmailKhan781310
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
jamilireifij
 
day 3-1 PMP.pptx
day 3-1 PMP.pptxday 3-1 PMP.pptx
day 3-1 PMP.pptx
AhmedKayed6
 
Using The One Page Project Manager
Using The One Page Project ManagerUsing The One Page Project Manager
Using The One Page Project Manager
Performance People Pty Ltd
 
Using the-one-page-project-manager-1233449659402110-1
Using the-one-page-project-manager-1233449659402110-1Using the-one-page-project-manager-1233449659402110-1
Using the-one-page-project-manager-1233449659402110-1
Nguyen Huy Toan
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
Ashwin Kumar M N
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
PhngPhmTrung
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.ppt
TecnicoItca
 
Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...
Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...
Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...
Minitab, LLC
 
Pmp training bangalore
Pmp training bangalorePmp training bangalore
Pmp training bangalore
priyankaravilla
 
Homework 8.docxHomework 8 (50 Points)AssignmentWrite .docx
Homework 8.docxHomework 8 (50 Points)AssignmentWrite .docxHomework 8.docxHomework 8 (50 Points)AssignmentWrite .docx
Homework 8.docxHomework 8 (50 Points)AssignmentWrite .docx
adampcarr67227
 
PMI-ACP Domain V: Adaptive Planning v1.0
PMI-ACP Domain V: Adaptive Planning v1.0PMI-ACP Domain V: Adaptive Planning v1.0
PMI-ACP Domain V: Adaptive Planning v1.0
PhuocNT (Fresher.VN)
 
GANTT CHARTS.pptx
GANTT CHARTS.pptxGANTT CHARTS.pptx
Session 10 gdas pmp study group presentation
Session 10   gdas pmp study group presentationSession 10   gdas pmp study group presentation
Session 10 gdas pmp study group presentation
Tu Nguyen, PMP®,PMI-RMP®
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
B Sai Prasad
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
B Sai Prasad
 
Investment Planning: Meeting today's challenges and planning for the future
Investment Planning: Meeting today's challenges and planning for the futureInvestment Planning: Meeting today's challenges and planning for the future
Investment Planning: Meeting today's challenges and planning for the future
seamsltd
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
Anand Bobade
 

Similar to David Coarsey Project management techniques for implementing change (20)

Planning process group
Planning process groupPlanning process group
Planning process group
 
12 Ways to Budget Better
12 Ways to Budget Better12 Ways to Budget Better
12 Ways to Budget Better
 
Ch03_Step_Wise.ppt
Ch03_Step_Wise.pptCh03_Step_Wise.ppt
Ch03_Step_Wise.ppt
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
 
day 3-1 PMP.pptx
day 3-1 PMP.pptxday 3-1 PMP.pptx
day 3-1 PMP.pptx
 
Using The One Page Project Manager
Using The One Page Project ManagerUsing The One Page Project Manager
Using The One Page Project Manager
 
Using the-one-page-project-manager-1233449659402110-1
Using the-one-page-project-manager-1233449659402110-1Using the-one-page-project-manager-1233449659402110-1
Using the-one-page-project-manager-1233449659402110-1
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
 
-Project-Management.ppt
-Project-Management.ppt-Project-Management.ppt
-Project-Management.ppt
 
Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...
Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...
Meet Minitab Engage Your End-to-End Improvement Solution From Idea Generation...
 
Pmp training bangalore
Pmp training bangalorePmp training bangalore
Pmp training bangalore
 
Homework 8.docxHomework 8 (50 Points)AssignmentWrite .docx
Homework 8.docxHomework 8 (50 Points)AssignmentWrite .docxHomework 8.docxHomework 8 (50 Points)AssignmentWrite .docx
Homework 8.docxHomework 8 (50 Points)AssignmentWrite .docx
 
PMI-ACP Domain V: Adaptive Planning v1.0
PMI-ACP Domain V: Adaptive Planning v1.0PMI-ACP Domain V: Adaptive Planning v1.0
PMI-ACP Domain V: Adaptive Planning v1.0
 
GANTT CHARTS.pptx
GANTT CHARTS.pptxGANTT CHARTS.pptx
GANTT CHARTS.pptx
 
Session 10 gdas pmp study group presentation
Session 10   gdas pmp study group presentationSession 10   gdas pmp study group presentation
Session 10 gdas pmp study group presentation
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
 
Investment Planning: Meeting today's challenges and planning for the future
Investment Planning: Meeting today's challenges and planning for the futureInvestment Planning: Meeting today's challenges and planning for the future
Investment Planning: Meeting today's challenges and planning for the future
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 

More from eaquals

Steve Phillips: Internationalisation. Home. Overseas. Both
Steve Phillips: Internationalisation. Home. Overseas. BothSteve Phillips: Internationalisation. Home. Overseas. Both
Steve Phillips: Internationalisation. Home. Overseas. Both
eaquals
 
Eaquals Training for Excellence: Digital Marketing, Caroline Moore
Eaquals Training for Excellence: Digital Marketing, Caroline MooreEaquals Training for Excellence: Digital Marketing, Caroline Moore
Eaquals Training for Excellence: Digital Marketing, Caroline Moore
eaquals
 
Eaquals Training for Excellence: Adjusting to global changes - effects at loc...
Eaquals Training for Excellence: Adjusting to global changes - effects at loc...Eaquals Training for Excellence: Adjusting to global changes - effects at loc...
Eaquals Training for Excellence: Adjusting to global changes - effects at loc...
eaquals
 
Eaquals Training for Excellence: Coaching, Loraine Kennedy
Eaquals Training for Excellence: Coaching, Loraine Kennedy Eaquals Training for Excellence: Coaching, Loraine Kennedy
Eaquals Training for Excellence: Coaching, Loraine Kennedy
eaquals
 
Eaquals Training for Excellence: Assessment, Elaine Boyd
Eaquals Training for Excellence: Assessment, Elaine BoydEaquals Training for Excellence: Assessment, Elaine Boyd
Eaquals Training for Excellence: Assessment, Elaine Boyd
eaquals
 
Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...
Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...
Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...
eaquals
 
Nick Beer: Teacher Training in the 21st Century is CELTA Still Relevant
Nick Beer: Teacher Training in the 21st Century is CELTA Still RelevantNick Beer: Teacher Training in the 21st Century is CELTA Still Relevant
Nick Beer: Teacher Training in the 21st Century is CELTA Still Relevant
eaquals
 
Chris Moore: Applying the Business Model Canvas to Your Business
Chris Moore: Applying the Business Model Canvas to Your BusinessChris Moore: Applying the Business Model Canvas to Your Business
Chris Moore: Applying the Business Model Canvas to Your Business
eaquals
 
Chris Moore: Developing Coherent Strategy in Turbulent Times
Chris Moore: Developing Coherent Strategy in Turbulent TimesChris Moore: Developing Coherent Strategy in Turbulent Times
Chris Moore: Developing Coherent Strategy in Turbulent Times
eaquals
 
Elaine Boyd: Feedback from the Perspective of the Learner
Elaine Boyd: Feedback from the Perspective of the LearnerElaine Boyd: Feedback from the Perspective of the Learner
Elaine Boyd: Feedback from the Perspective of the Learner
eaquals
 
Alex Thorp: Testing tests. Realising the potential of assessment practices
Alex Thorp: Testing tests. Realising the potential of assessment practicesAlex Thorp: Testing tests. Realising the potential of assessment practices
Alex Thorp: Testing tests. Realising the potential of assessment practices
eaquals
 
Chris Farrell: Mentoring as the Foundation for Effective Teacher Development
Chris Farrell: Mentoring as the Foundation for Effective Teacher DevelopmentChris Farrell: Mentoring as the Foundation for Effective Teacher Development
Chris Farrell: Mentoring as the Foundation for Effective Teacher Development
eaquals
 
Duncan Foord: A Coaching Approach to Teacher Development
Duncan Foord: A Coaching Approach to Teacher DevelopmentDuncan Foord: A Coaching Approach to Teacher Development
Duncan Foord: A Coaching Approach to Teacher Development
eaquals
 
Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...
Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...
Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...
eaquals
 
Martina Limburg: Teaching English with Movies Made Easy
Martina Limburg: Teaching English with Movies Made EasyMartina Limburg: Teaching English with Movies Made Easy
Martina Limburg: Teaching English with Movies Made Easy
eaquals
 
Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...
Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...
Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...
eaquals
 
Beccy Wigglesworth: Improving Your Customers Experience
Beccy Wigglesworth: Improving Your Customers ExperienceBeccy Wigglesworth: Improving Your Customers Experience
Beccy Wigglesworth: Improving Your Customers Experience
eaquals
 
John Hughes: Make critical thinking part of your teacher toolkit
John Hughes: Make critical thinking part of your teacher toolkitJohn Hughes: Make critical thinking part of your teacher toolkit
John Hughes: Make critical thinking part of your teacher toolkit
eaquals
 
Silvana Richardson: Impactful professional learning for teachers – from input...
Silvana Richardson: Impactful professional learning for teachers – from input...Silvana Richardson: Impactful professional learning for teachers – from input...
Silvana Richardson: Impactful professional learning for teachers – from input...
eaquals
 
Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...
Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...
Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...
eaquals
 

More from eaquals (20)

Steve Phillips: Internationalisation. Home. Overseas. Both
Steve Phillips: Internationalisation. Home. Overseas. BothSteve Phillips: Internationalisation. Home. Overseas. Both
Steve Phillips: Internationalisation. Home. Overseas. Both
 
Eaquals Training for Excellence: Digital Marketing, Caroline Moore
Eaquals Training for Excellence: Digital Marketing, Caroline MooreEaquals Training for Excellence: Digital Marketing, Caroline Moore
Eaquals Training for Excellence: Digital Marketing, Caroline Moore
 
Eaquals Training for Excellence: Adjusting to global changes - effects at loc...
Eaquals Training for Excellence: Adjusting to global changes - effects at loc...Eaquals Training for Excellence: Adjusting to global changes - effects at loc...
Eaquals Training for Excellence: Adjusting to global changes - effects at loc...
 
Eaquals Training for Excellence: Coaching, Loraine Kennedy
Eaquals Training for Excellence: Coaching, Loraine Kennedy Eaquals Training for Excellence: Coaching, Loraine Kennedy
Eaquals Training for Excellence: Coaching, Loraine Kennedy
 
Eaquals Training for Excellence: Assessment, Elaine Boyd
Eaquals Training for Excellence: Assessment, Elaine BoydEaquals Training for Excellence: Assessment, Elaine Boyd
Eaquals Training for Excellence: Assessment, Elaine Boyd
 
Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...
Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...
Ekaterina Fleisher & Anna Karlova: Beyond the Classroom: Motivating Language ...
 
Nick Beer: Teacher Training in the 21st Century is CELTA Still Relevant
Nick Beer: Teacher Training in the 21st Century is CELTA Still RelevantNick Beer: Teacher Training in the 21st Century is CELTA Still Relevant
Nick Beer: Teacher Training in the 21st Century is CELTA Still Relevant
 
Chris Moore: Applying the Business Model Canvas to Your Business
Chris Moore: Applying the Business Model Canvas to Your BusinessChris Moore: Applying the Business Model Canvas to Your Business
Chris Moore: Applying the Business Model Canvas to Your Business
 
Chris Moore: Developing Coherent Strategy in Turbulent Times
Chris Moore: Developing Coherent Strategy in Turbulent TimesChris Moore: Developing Coherent Strategy in Turbulent Times
Chris Moore: Developing Coherent Strategy in Turbulent Times
 
Elaine Boyd: Feedback from the Perspective of the Learner
Elaine Boyd: Feedback from the Perspective of the LearnerElaine Boyd: Feedback from the Perspective of the Learner
Elaine Boyd: Feedback from the Perspective of the Learner
 
Alex Thorp: Testing tests. Realising the potential of assessment practices
Alex Thorp: Testing tests. Realising the potential of assessment practicesAlex Thorp: Testing tests. Realising the potential of assessment practices
Alex Thorp: Testing tests. Realising the potential of assessment practices
 
Chris Farrell: Mentoring as the Foundation for Effective Teacher Development
Chris Farrell: Mentoring as the Foundation for Effective Teacher DevelopmentChris Farrell: Mentoring as the Foundation for Effective Teacher Development
Chris Farrell: Mentoring as the Foundation for Effective Teacher Development
 
Duncan Foord: A Coaching Approach to Teacher Development
Duncan Foord: A Coaching Approach to Teacher DevelopmentDuncan Foord: A Coaching Approach to Teacher Development
Duncan Foord: A Coaching Approach to Teacher Development
 
Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...
Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...
Richard Rossner & Ela Jarosz & Mila Angelova: Managing Language Education_ ho...
 
Martina Limburg: Teaching English with Movies Made Easy
Martina Limburg: Teaching English with Movies Made EasyMartina Limburg: Teaching English with Movies Made Easy
Martina Limburg: Teaching English with Movies Made Easy
 
Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...
Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...
Khadidja Guerrab: Situational Leadership: When to Move on the Leadership Spec...
 
Beccy Wigglesworth: Improving Your Customers Experience
Beccy Wigglesworth: Improving Your Customers ExperienceBeccy Wigglesworth: Improving Your Customers Experience
Beccy Wigglesworth: Improving Your Customers Experience
 
John Hughes: Make critical thinking part of your teacher toolkit
John Hughes: Make critical thinking part of your teacher toolkitJohn Hughes: Make critical thinking part of your teacher toolkit
John Hughes: Make critical thinking part of your teacher toolkit
 
Silvana Richardson: Impactful professional learning for teachers – from input...
Silvana Richardson: Impactful professional learning for teachers – from input...Silvana Richardson: Impactful professional learning for teachers – from input...
Silvana Richardson: Impactful professional learning for teachers – from input...
 
Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...
Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...
Damien Lonsdale: Breaking out of the traditional classroom setting with Mobil...
 

Recently uploaded

Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
JomonJoseph58
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
nitinpv4ai
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
heathfieldcps1
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
Iris Thiele Isip-Tan
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
National Information Standards Organization (NISO)
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdfمصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
سمير بسيوني
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Henry Hollis
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
EduSkills OECD
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
nitinpv4ai
 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
ImMuslim
 

Recently uploaded (20)

Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
Stack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 MicroprocessorStack Memory Organization of 8086 Microprocessor
Stack Memory Organization of 8086 Microprocessor
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
 
Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"Benner "Expanding Pathways to Publishing Careers"
Benner "Expanding Pathways to Publishing Careers"
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdfمصحف القراءات العشر   أعد أحرف الخلاف سمير بسيوني.pdf
مصحف القراءات العشر أعد أحرف الخلاف سمير بسيوني.pdf
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
 

David Coarsey Project management techniques for implementing change

  • 1. Take more in, take more out 11/19/20161
  • 2. Take more in, take more out 11/19/20162 Take more in with AIMS technology
  • 3. Take more in, take more out 11/19/20163 Project management Step by step project management techniques
  • 4. Take more in, take more out 11/19/20164 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Good planning makes the rest easier A plan is never perfect but it helps you know what to expect. Plan to make changes. If you want to get better, go through lessons learned
  • 5. Take more in, take more out 11/19/20165 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management techniques Write them down
  • 6. Take more in, take more out 11/19/20166 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management techniques What is your priority? time costquality
  • 7. Take more in, take more out 11/19/20167 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management techniques Set your operating parameters 1. Why is that the constraint? 2. What if we can’t….? 3. Can we trade….?
  • 8. Take more in, take more out 11/19/20168 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management post-it note diagram Build a website
  • 9. Take more in, take more out 11/19/20169 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management post-it note diagram Define the site Hire a designer Select a copywriter Choose a domain name Hire an SEO company Make our design Write the copy Build the site Publish
  • 10. Take more in, take more out 11/19/201610 Define the site Hire a designer Select a copywriter Choose a domain name Hire an SEO company Make our design Write the copy Build the site Publish Project management post-it note diagram
  • 11. Take more in, take more out 11/19/201611 Project management time estimates Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Rules for estimating time 1. Use your experts 2. Ongoing tasks are NOT allowed EVER 3. Estimate time wisely
  • 12. Take more in, take more out 11/19/201612 Project management time estimates About half way between expected and max Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Best guess Max
  • 13. Take more in, take more out 11/19/201613 Project management macro adjustments Define the site Hire a designer Select a copywriter Choose a domain name Hire an SEO company Make our design Write the copy Build the site Publish1 w 4 w 4 w 8 w 4 w 12 w 8 w 0 w Time constraint Resource constraint 1 w 21 weeks for the critical path
  • 14. Take more in, take more out 11/19/201614 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management techniques 3 ways to save time 1. Spend more 2. Reduce quality 3. Overlap tasks
  • 15. Take more in, take more out 11/19/201615 Project management macro adjustments Define the site Hire a designer Select a copywriter Choose a domain name Hire an SEO company Make our design Write the copy Build the site Publish 1 w 4 w 4 w 8 w 4 w 8 w 0 w 1 w 10 w 15 weeks!
  • 16. Take more in, take more out 11/19/201616 Task time wk 1 wk 2 wk 3 wk 4 wk 5 wk 6 wk 7 wk 8 wk 9 wk 10 wk 11 wk 12 wk 13 wk 14 wk 15 Define the site 1 wk Hire an SEO company 4 wks Make our design 8 wks Build the site 4 wks Publish 0 wks Hire a designer 4 wks Hire a copywriter 4 wks Write the copy 4 wks Choose a domain name 1 wk Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management Gantt chart Confident Watch Danger Deliverable Now line Float
  • 17. Take more in, take more out 11/19/201617 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management Gantt chart www.smartsheet.com
  • 18. Take more in, take more out 11/19/201618 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management risk analysis Make something less likely Make something less serious How do we manage risk?
  • 19. Take more in, take more out 11/19/201619 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management risk analysis 1. Spend more 2. Reduce quality 3. Extend time Ways to reduce risk time costquality
  • 20. Take more in, take more out 11/19/201620 Task time wk 1 wk 2 wk 3 wk 4 wk 5 wk 6 wk 7 wk 8 wk 9 wk 10 wk 11 wk 12 wk 13 wk 14 wk 15 Define the site 1 wk Hire an SEO company 4 wks Make our design 8 wks Build the site 4 wks Publish 0 wks Hire a designer 4 wks Hire a copywriter 4 wks Write the copy 4 wks Choose a domain name 1 wk Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management progress monitoring Confident Watch Danger Deliverable Now line Float
  • 21. Take more in, take more out 11/19/201621 Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management modify Managing cost 1. Each Gantt chart line should have an associated cost 2. Cost = Stuff What do you have to buy 3. Cost = Staff Know who is doing what 4. Cost = Time Think in terms of man-weeks
  • 22. Take more in, take more out 11/19/201622 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management modify your plan 3 ways to modify your plan time costquality
  • 23. Take more in, take more out 11/19/201623 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management review Review right away
  • 24. Take more in, take more out 11/19/201624 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management review 3 questions 1. What went well? 2. What didn’t go well? 3. What should we change
  • 25. Take more in, take more out 11/19/201625 The Goal, Eliyahu Goldratt
  • 26. Take more in, take more out 11/19/201626 Guided e-Learning David Coarsey david@gelnet.com Take more in with AIMS technology
  • 27. Take more in, take more out 11/19/201627 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management planning
  • 28. Take more in, take more out 11/19/201628 Project management steps 1. Objectives 2. Post-it note diagram 3. Time and cost estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review Project management techniques
  • 29. Take more in, take more out 11/19/201629 Project management time estimates Don’t say this! …or this! Project management steps 1. Objectives 2. Post-it note diagram 3. Time estimates 4. Macro adjustments 5. Gantt chart 6. Risk analysis 7. Monitor progress 8. Modify your plan 9. Review
  • 30. Take more in, take more out 11/19/201630 Project management time estimates Define the site Hire a designer Select a copywriter Choose a domain name Hire an SEO company Make our design Write the copy Build the site Publish 1 w 4 w 4 w 8 w 4 w1 w 4 w 4 w 0 w
  • 31. Take more in, take more out 11/19/201631 Project management macro adjustments Define the site Hire a designer Select a copywriter Choose a domain name Hire an SEO company Make our design Write the copy Build the site Publish 1 w 4 w 4 w 8 w 4 w1 w 4 w 4 w 0 w