The document discusses control charts and run charts. Control charts were first developed by Walter Shewhart in 1924 to monitor process stability and control. They distinguish between common cause and special cause variation. Run charts plot process data over time to detect trends or shifts. They have seven steps: select a measure, gather minimum 10 data points, make a graph with vertical and horizontal axes, plot the data chronologically, and add a center line. Both charts aim to only address non-random variation warranting process improvement actions.
Statistical Control Process - Class PresentationMillat Afridi
Â
Statistical process control (SPC) is a method of quality
control which employs statistical methods to monitor and
control a process. This helps to ensure that the process
operates efficiently, producing more specification-conforming products with less waste (rework or scrap).
Tools Use in SPC
Pareto Analysis, Flowcharts, Checklists, Histograms,
Scatter Diagrams, Control Charts, Cause-and-Effect Diagrams
Quality control methods and important parameters forming these methods.Quality control is important concept in quality management. Quality management is an approach used in industry to manage operations and producing best quality products with minimum producer cost.
Statistical Control Process - Class PresentationMillat Afridi
Â
Statistical process control (SPC) is a method of quality
control which employs statistical methods to monitor and
control a process. This helps to ensure that the process
operates efficiently, producing more specification-conforming products with less waste (rework or scrap).
Tools Use in SPC
Pareto Analysis, Flowcharts, Checklists, Histograms,
Scatter Diagrams, Control Charts, Cause-and-Effect Diagrams
Quality control methods and important parameters forming these methods.Quality control is important concept in quality management. Quality management is an approach used in industry to manage operations and producing best quality products with minimum producer cost.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Â
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
Â
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Forklift Classes Overview by Intella PartsIntella Parts
Â
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Vaccine management system project report documentation..pdfKamal Acharya
Â
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
Â
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Courier management system project report.pdfKamal Acharya
Â
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Cosmetic shop management system project report.pdfKamal Acharya
Â
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Â
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
2. GE6757- Total Quality Management
Control Charts
Prepared By,
V.Sutha Jebakumari, AP/CSE
L.Shanmuga Priya, AP/CSE,
Kamaraj College of Engineering & Technology,
Virudhunagar.
3. Control Charts
• Walter Shewhart first utilized control charts in
1924 to aid the world of manufacturing. Control
charts have two general uses in an improvement
project.
• The most common application is as a tool to
monitor process stability and control.
4. Control Charts
• “No matter how well the process is designed,
there exists a certain amount of nature variability
in output measurements.“
• A control chart tells us how much variation the
process causes.
• A stable process produces predictable results
consistently. An example of a control chart that
shows an unstable process means variables
affected must be analyzed and controlled before
the improvement process can begin.
5. Types of control charts
• There are two types of control charts; those that
analyze attributes and those that look at variables
in a process or project. Examples of a control chart
include:
• X-Bar & R Control Charts
• X-Bar & S Control Charts
• U Charts
• P Control Charts
• C Control Charts
6. Examples of Control Charts
• U Charts – These variable types of control charts utilize an upper and lower
range. Elements falling in the upper range need attention and analysis in order
for the problem to be corrected.
• X-Bar & R Charts – These variable charts utilize the X-Bar or the Mean to
determine subgroups. The R or Range plots the subgroups based on upper and
lower control limits. X-Bar & R Charts are the most widely utilized charts in
project management, however, are only successful if 5 or less subgroups are
analyzed.
• X-Bar & S Charts – Using this example of a variable control chart is effective for
5 or more subgroups and the S or Standard Deviations are considered in both
upper and lower control limits based on the X-Bar or Mean.
• p Control Charts – This attribute-type chart is effective when elements are not
equal. A p Control Chart might be used to determine how many accidents
occur each day at a chosen intersection.
• c Control Charts – Another attribute-type control chart, the c Control Chart
explores elements that are nonconforming. A c Control Chart might be used to
explore mass-production of one similar product where the elements per unit
do not conform to the norm.
7. Two causes of fluctuation
• Most examples of a control chart considers
two causes of fluctuation, common causes
and special causes.
8. Three categories of variation
1. Within piecewise variation(eg. Roughness of a
piece)
2. Piece to piece variation (light intensity of four
bulbs produced from a machine will be
different)
3. Time to time variation (difference in product
produced at different times of the day)
9. Second categories of variation
Variation is due to a combination of
1.Equipment
2.Materials
3.Environment
4.Operator
10. 1. Equipment
• Source includes tool wear, machine vibrations
and electrical fluctuations.
• Even identical machines will have different
capabilities.
• It becomes crucial when scheduling the
manufacture of critical parts.
11. 2. Material
• Because variation occurs in the finished
product, it must also occur in the raw
material.
• Quality characteristics as tensile strength,
ductility, thickness, porosity and moisture
content can be expected to contribute to the
overall variation in the final product.
12. 3. Environment
• Temperature, light, radiation, particle size,
pressure and humidity all can contribute to
variation in the product.
• Experiments are conducted in outer space to
learn more about the effect of the environment
on product variation.
13. 4. Operator
• The source of variation includes the method by
which the operator performs the operation.
• The operator’s physical and emotional well-
being contribute to the variation.
• A cut finger, a personal problem or a headache
can make an operator’s quality performance
vary.
14. Elements of a Control Chart
• A control chart begins with a time series graph.
• A central line (X) is added as a visual reference
for detecting shifts or trends – this is also
referred to as the process location.
• Upper and lower control limits (UCL and LCL) are
computed from available data and placed
equidistant from the central line. This is also
referred to as process dispersion.
•
15.
16. • Control limits (CLs) ensure time is not wasted looking for
unnecessary trouble – the goal of any process
improvement practitioner should be to only take action
when warranted. Control limits are calculated by:
• Estimating the standard deviation, σ, of the sample data
• Multiplying that number by three
• Adding (3 x σ to the average) for the UCL and subtracting (3
x σ from the average) for the LCL
• Mathematically, the calculation of control limits looks like:
•
17. Run Charts
• Monitor the performance of one or more
processes over time to detect trends, shifts or
cycles.
• Allow us to compare a performance measure
before and after implementation of a solution to
measure its impact.
• Focuses attention on truly vital changes in the
process.
• Assess whether improved performance has been
sustained.
18. How to Create a Run Chart
There are seven steps to creating a run chart.
• Decide on the measure to be analyzed (assuming there is a
reliable measurement system in place).
• Gather the data – have a minimum of 10 data points.
• Draw a graph with a vertical line and a horizontal line.
• On the vertical line, or the y-axis, draw the scale relative to
the variable you are measuring.
• On the horizontal line, or the x-axis, draw the time or
sequence scale.
• Calculate the mean/median (whichever the data set
indicates to be appropriate) and draw a horizontal line at
that value – going across the graph.
• Plot the data in the sequence, or the time order, in which
the data was collected.
19. Characteristics of a run chart
• On the X axis you have data in some sort of
chronological order e.g. Jan, Feb, Mar
• On the Y axis you have the measure of interest
e.g. %, count
• Once the data points are connected you put a
centre line (CL) between the graph. For a run
chart the CL is called the Median.
20. Interpreting a run chart
• There are four rules that can be used to
interpret a run chart. Non-random variation
can be recognized by looking for:
• Rule 1 – Shift
Six or more consecutive points either all above
or all below the centre line (CL). Values that
fall on the CL do not add to nor break a shift.
Skip values that fall on the median and
continue counting.
22. Rule 2 – Trend
• Five or more consecutive points all going up or
all going down. If the value of two or more
successive points is the same (repeats), ignore
the like points when counting.
24. Rule 3 – Too many or too few runs
• A non-random pattern is signalled by too few or too
many runs, or crossings of the median line. If there are
too many or too few runs, this is a sign of non-random
variation. An easy way to count the number of runs is
to count the number of times the line connecting all
the data points crosses the median and add one. If the
number of runs you have are:
• Within the range outlined in the table, then you have a
random pattern.
• Outside the range outline in the table, then you have a
non-random pattern or signal of change.
26. Rule 4 – An astronomical data point
• This is a data point that is clearly different
from all others. Different people looking at
the same graph would be expected to
recognize the same data point as
astronomical.
28. Rule 4 – An astronomical data point
By applying each of the four rules, you can evaluate the
run chart for a signal for change (through a non-
random variation). However, it is not necessary to find
evidence of change with each of the four rules to
determine that a change has occurred. Any single rule
occurring is sufficient evidence of a non-random signal
of change.
29. Benefits of Run Charts
The following are a few benefits of a run chart:
• Easy to draft.
• Easy to analyze and interpret.
• Does not require much technical skill.
• Straightforward representation of data.