8.2 Manage Quality
Overview
Manage Quality definition
Manage Quality ITTO
Quality Audits
Design of experiment's
Quality improvement methods
Review
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Quality Management processes
Plan Quality
management
Manage Quality Control QualityP MCE
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> Overview
Manage quality includes all the quality assurance activities.
Manage quality is concerned with product design and process
improvements
Build confidence about delivery of future deliverables
Improve efficiency & effectiveness of processes and activities. .
Quality
Management Plan
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
The process of translating the QMP into executable quality activities
that incorporate the organization’s quality policies into the project.
It increases the probability of meeting quality objectives as well
as identifying ineffective processes and causes of poor quality.
Manage Quality Definition
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage
Quality is
Work of
everybody
Project
Manager
Project team
Project
sponsor
Management
of performing
org.
Customer
Manage Quality -> Responsibilities
In traditional Projects, quality management is done by specific team
members, however in agile it is responsibility of everyone
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> ITTO
Data Gathering
Data analysis
Decision Making
Data Representation
Audits
Design for X (DfX)
Problem solving
Quality improvement
methods
Project Management
Plan
Project Documents
Organizational Process
Assets
Quality reports
Test & evaluation
documents
Change requests
PMP updates
Project document
updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> Input
Project Management
Plan
Project Documents
Organizational
Process Assets
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project
Management Plan
Quality management plan:
• Describes how organizations quality policies will be
implemented.
Manage Quality -> Input -> PMP
Acceptable level of project and product
quality
How to achieve planned quality in the
deliverables and processes
How to deal with nonconforming products
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project Documents
• It will tells what we need to measure and what are
the allowable variation for our measurements.
Quality
Metrics:
• Documented results of control quality activities
• Evaluate effectiveness of quality assurance
Quality control
measurements
Lessons learned
Register
Quality Metrics
Quality control
measurements
Risk Report
Manage Quality -> Input -> Project Documents
Following Project Documents can be used as input:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Organizational
Process Assets
Manage Quality -> Input -> OPA
Policies, processes &
Procedures
Templates
Lessons learned
Register
Following OPA may be input to this process:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> Tools & Techniques
Data Gathering Data analysis Decision Making
Data
Representation
Audits Design for X (DfX) Problem solving
Quality improvement
methods
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data Gathering
Manage Quality -> T&T-> Data Gathering
Standardized, industry specific
Acceptance criteria
WBS- lowest level of work packages
Quality Checklist
• They are used to verify if a set of required steps have been
performed, or to see if a list of requirements has been satisfied.
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Manage Quality -> T&T -> Data analysis
Following Data analysis techniques will be used:
Alternative
analysis
Document
analysis
Process analysis
Root cause
analysis
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data
Representation
Manage Quality -> T&T-> Data Representation
Affinity diagrams
Cause & effect
diagrams
Flowcharts
Histograms Matrix diagrams Scatter diagrams
Following Data Representation techniques will be used:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> T&T-> Data Representation -> Affinity Diagram:
Affinity Diagram:
•Classifying large number of ideas into groups.
•Organize potential causes of defects into groups showing areas to be focused
Data
Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> T&T-> Data Representation -> C&E Diagrams
Contributing
causes
Major
causes
Problem to
be solved
Cause-and-Effect diagram(Fishbone or Ishikawa):
• It breaks down the potential causes of the problem statement into
discrete branches. Helps to find root cause of a problem.
Data
Representation
5 whys technique: Repeat question “Why” 5 times
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> T&T-> Data Representation -> C&E Diagrams
Use to
Identify problem.
Work out major
factors involved.
Identify possible
causes.
Cause-and-Effect diagram(Fishbone or Ishikawa):
• It traces complaints about quality problems.
• Help you find the root cause of a problem.
Data
Representation
At the end, entire diagram is analysed & possible causes are identified.
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Flowcharts (or process maps):
• Take outputs from one process, & use them as inputs in another
process, which then takes tools & techniques to create new outputs,
used in other processes.
Manage Quality->T&T-> Data Representation-> Flowcharts
Used in:
Quality planning
Estimate cost of quality
Process communication
Analyse quality problem
• Suppliers, Inputs, Process, Outputs, CustomersSIPOC:
Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Histograms (by Karl Pearson): - Special types of bar charts.
• These are graphical representations of numerical data.
• Each bar represents characteristic of a problem & Height represents
its frequency.
Manage Quality -> T&T-> Data Representation -> Histograms
Data Representation
0 0 0 0 0 0 2 1 2 1
6
9
14
4
7
1
5
0 0 0 0
0
2
4
6
8
10
12
14
16
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
No.ofStudents
Percentage
Bar -
characteristic
of a problem
Height ->
frequency
distribution of
data
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Matrix Diagram:
• It shows relationship between factors, causes, and objectives.
• It provides a compact way of representing many-to-many
relationships of varying strength.
List 1 List 2
Item1 Item A
Item2 Item B
Item3 Item C
Item4 Item D
Item5 Item E
ItemA
ItemB
ItemC
ItemD
ItemE
Item1 O
Item2 O O
Item3 O O O
Item4 O
Item5 O
Manage Quality ->T&T-> Data Representation-> Matrix Diagram
Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality ->T&T-> Data Representation->Scatter Diagram
Show if there is a relationship
between two variables.
Usually first variable is
independent & second is
dependent on first.
Useful when one variable is easy to
measure & other is not.
Scatter Diagram(scatter plot/ graph, correlation chart):
• Predict how change in an independent variable will change a
dependent variable.
Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality ->T&T-> Data Representation->Scatter Diagram
Scatter Diagram(scatter plot/ graph, correlation chart):
• Predict how change in an independent variable will change a
dependent variable.
Data Representation
Regression line
No
Correlation
Three Types of
correlation:
No Correlation
Moderate
Correlation
Strong
Correlation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality ->T&T-> Data Representation->Scatter Diagram
Scatter Diagram(scatter plot/ graph, correlation chart):
• Predict how change in an independent variable will change a
dependent variable.
Data Representation
Accidents
Moderate
-Positive
Strong -
Positive
Speed of vehicle
140 to 160 KM/Hour
Speed of vehicle
160 to 180 KM/Hour
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality ->T&T-> Data Representation->Scatter Diagram
Scatter Diagram(scatter plot/ graph, correlation chart):
• Predict how change in an independent variable will change a
dependent variable.
Moderate -
Negative
Strong -
Negative
Reducing project profit Reducing project profit
CostofProjectresources
If resource cost is one of the factor then correlation will be moderate, however if this is only
factor then correlation will be strong.
Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Audits
It is a structured, independent process used to determine, if project activities
comply with organizational and project policies, processes, and procedures.
Identify best practices being implemented
Identify all nonconformity, gaps, and shortcomings
Share good practices
help the team raise productivity
It can confirm implementation of Approved changes, including
Updates Corrective actions Preventive action Defect repairs
Manage Quality ->T&T-> Audits
Quality
audit will
look for:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Design for X
Set of technical guidelines applied during the design of a product
Optimizes specific aspect of design such as
Reliability Deployment Assembly
Cost Safety Quality
Using DfX may result in:
Cost reduction
Quality
improvement
Better
performance
and Customer
satisfaction
Manage Quality -> T&T -> Design for X (DfX)
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Problem solving
Problem solving is about finding solutions for issues/challenges.
Defining the problem
Identifying the root
cause
Generating possible
solutions
Choosing the best
solution
Implementing the
solution, and
Verifying the solution
effectiveness
Manage Quality -> T&T-> Problem solving
Problem may arise :
Control quality
process
Quality Audits
process or
deliverables
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Quality
improvement
methods
Manage Quality -> T&T-> Quality improvement methods
can be based on recommendations from quality control processes or they can
be uncovered during Manage Quality process.
Six Sigma PDCA Cycle
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> Output
Quality reports
Test & evaluation
documents
Change requests
PMP updates
Project document
updates
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Quality reports Quality management issues
Recommendations for improvements
(preventive actions)
Recommendations for corrective actions
Summary of findings from the Control Quality
process.
Manage Quality -> Output ->Quality reports
Quality reports is used by the project team in order to take corrective actions
Information
may includes
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Test & evaluation
documents
They are inputs to Control quality process
Used to evaluate the achievement of quality objectives
They may include:
Checklists
Requirements traceability
matrices
Manage Quality -> Output -> Test & evaluation documents
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Change requests
There may be recommendations for changes to the following:
Project management
plan
Project documents
Project or product
management processes
Manage Quality -> Output ->Change requests
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
PMP updates
Following PMP subsidiary plans & baselines may get updated
Manage Quality -> Output -> PMP updates
Quality
Management plan
Scope baseline Schedule baseline
Cost baseline
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project document
updates
Issue log
Lessons Learned
Register
Risk Register
Manage Quality -> Output -> Project document updates
Following Project Documents may get updated:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Manage Quality -> Review
Overview
Manage Quality definition
Manage Quality ITTO
Quality Audits
Design of experiment's
Quality improvement methods
The happiness of your life depends upon the
quality of your thoughts.
Marcus Aurelius
Kids playing Holi, India

More Related Content

What's hot

chap 4.4 Manage knowledge
chap 4.4 Manage knowledgechap 4.4 Manage knowledge
chap 4.4 Manage knowledgeAnand Bobade
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1Anand Bobade
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource ManagementAnand Bobade
 
Chap 5.4 Create WBS
Chap 5.4 Create WBSChap 5.4 Create WBS
Chap 5.4 Create WBSAnand Bobade
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2Anand Bobade
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 

What's hot (20)

chap 4.4 Manage knowledge
chap 4.4 Manage knowledgechap 4.4 Manage knowledge
chap 4.4 Manage knowledge
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Chap 5.4 Create WBS
Chap 5.4 Create WBSChap 5.4 Create WBS
Chap 5.4 Create WBS
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 

Similar to Chap 8.2 Manage Quality

Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control ScopeAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
PMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRPMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersAnand Bobade
 

Similar to Chap 8.2 Manage Quality (20)

Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
SPuranik25Aug
SPuranik25AugSPuranik25Aug
SPuranik25Aug
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
ressume -Ujjwal-4-Aug-2016
ressume -Ujjwal-4-Aug-2016ressume -Ujjwal-4-Aug-2016
ressume -Ujjwal-4-Aug-2016
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
PMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRPMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPR
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholders
 
Six Sigma - The Journey of Quality and Management
Six Sigma - The Journey of Quality and Management Six Sigma - The Journey of Quality and Management
Six Sigma - The Journey of Quality and Management
 
NEW RESUME sdo.DOC
NEW RESUME sdo.DOCNEW RESUME sdo.DOC
NEW RESUME sdo.DOC
 

More from Anand Bobade

Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementAnand Bobade
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 

More from Anand Bobade (10)

Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 

Recently uploaded

Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...afaqsaeed463
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 

Recently uploaded (17)

Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...self respect is very important in this crual word where everyone in just thin...
self respect is very important in this crual word where everyone in just thin...
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 

Chap 8.2 Manage Quality

  • 1. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) PMP Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved. Chapter 8 – Project Quality Management Manage Quality SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) 8.2 Manage Quality Overview Manage Quality definition Manage Quality ITTO Quality Audits Design of experiment's Quality improvement methods Review
  • 3. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Quality Management processes Plan Quality management Manage Quality Control QualityP MCE
  • 4. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> Overview Manage quality includes all the quality assurance activities. Manage quality is concerned with product design and process improvements Build confidence about delivery of future deliverables Improve efficiency & effectiveness of processes and activities. . Quality Management Plan
  • 5. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) The process of translating the QMP into executable quality activities that incorporate the organization’s quality policies into the project. It increases the probability of meeting quality objectives as well as identifying ineffective processes and causes of poor quality. Manage Quality Definition
  • 6. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality is Work of everybody Project Manager Project team Project sponsor Management of performing org. Customer Manage Quality -> Responsibilities In traditional Projects, quality management is done by specific team members, however in agile it is responsibility of everyone
  • 7. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> ITTO Data Gathering Data analysis Decision Making Data Representation Audits Design for X (DfX) Problem solving Quality improvement methods Project Management Plan Project Documents Organizational Process Assets Quality reports Test & evaluation documents Change requests PMP updates Project document updates Inputs Tools & Techniques Outputs
  • 8. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> Input Project Management Plan Project Documents Organizational Process Assets
  • 9. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project Management Plan Quality management plan: • Describes how organizations quality policies will be implemented. Manage Quality -> Input -> PMP Acceptable level of project and product quality How to achieve planned quality in the deliverables and processes How to deal with nonconforming products
  • 10. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project Documents • It will tells what we need to measure and what are the allowable variation for our measurements. Quality Metrics: • Documented results of control quality activities • Evaluate effectiveness of quality assurance Quality control measurements Lessons learned Register Quality Metrics Quality control measurements Risk Report Manage Quality -> Input -> Project Documents Following Project Documents can be used as input:
  • 11. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Organizational Process Assets Manage Quality -> Input -> OPA Policies, processes & Procedures Templates Lessons learned Register Following OPA may be input to this process:
  • 12. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> Tools & Techniques Data Gathering Data analysis Decision Making Data Representation Audits Design for X (DfX) Problem solving Quality improvement methods
  • 13. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Gathering Manage Quality -> T&T-> Data Gathering Standardized, industry specific Acceptance criteria WBS- lowest level of work packages Quality Checklist • They are used to verify if a set of required steps have been performed, or to see if a list of requirements has been satisfied.
  • 14. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data analysis Manage Quality -> T&T -> Data analysis Following Data analysis techniques will be used: Alternative analysis Document analysis Process analysis Root cause analysis
  • 15. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Representation Manage Quality -> T&T-> Data Representation Affinity diagrams Cause & effect diagrams Flowcharts Histograms Matrix diagrams Scatter diagrams Following Data Representation techniques will be used:
  • 16. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> T&T-> Data Representation -> Affinity Diagram: Affinity Diagram: •Classifying large number of ideas into groups. •Organize potential causes of defects into groups showing areas to be focused Data Representation
  • 17. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> T&T-> Data Representation -> C&E Diagrams Contributing causes Major causes Problem to be solved Cause-and-Effect diagram(Fishbone or Ishikawa): • It breaks down the potential causes of the problem statement into discrete branches. Helps to find root cause of a problem. Data Representation 5 whys technique: Repeat question “Why” 5 times
  • 18. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> T&T-> Data Representation -> C&E Diagrams Use to Identify problem. Work out major factors involved. Identify possible causes. Cause-and-Effect diagram(Fishbone or Ishikawa): • It traces complaints about quality problems. • Help you find the root cause of a problem. Data Representation At the end, entire diagram is analysed & possible causes are identified.
  • 19. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Flowcharts (or process maps): • Take outputs from one process, & use them as inputs in another process, which then takes tools & techniques to create new outputs, used in other processes. Manage Quality->T&T-> Data Representation-> Flowcharts Used in: Quality planning Estimate cost of quality Process communication Analyse quality problem • Suppliers, Inputs, Process, Outputs, CustomersSIPOC: Data Representation
  • 20. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Histograms (by Karl Pearson): - Special types of bar charts. • These are graphical representations of numerical data. • Each bar represents characteristic of a problem & Height represents its frequency. Manage Quality -> T&T-> Data Representation -> Histograms Data Representation 0 0 0 0 0 0 2 1 2 1 6 9 14 4 7 1 5 0 0 0 0 0 2 4 6 8 10 12 14 16 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 No.ofStudents Percentage Bar - characteristic of a problem Height -> frequency distribution of data
  • 21. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Matrix Diagram: • It shows relationship between factors, causes, and objectives. • It provides a compact way of representing many-to-many relationships of varying strength. List 1 List 2 Item1 Item A Item2 Item B Item3 Item C Item4 Item D Item5 Item E ItemA ItemB ItemC ItemD ItemE Item1 O Item2 O O Item3 O O O Item4 O Item5 O Manage Quality ->T&T-> Data Representation-> Matrix Diagram Data Representation
  • 22. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality ->T&T-> Data Representation->Scatter Diagram Show if there is a relationship between two variables. Usually first variable is independent & second is dependent on first. Useful when one variable is easy to measure & other is not. Scatter Diagram(scatter plot/ graph, correlation chart): • Predict how change in an independent variable will change a dependent variable. Data Representation
  • 23. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality ->T&T-> Data Representation->Scatter Diagram Scatter Diagram(scatter plot/ graph, correlation chart): • Predict how change in an independent variable will change a dependent variable. Data Representation Regression line No Correlation Three Types of correlation: No Correlation Moderate Correlation Strong Correlation
  • 24. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality ->T&T-> Data Representation->Scatter Diagram Scatter Diagram(scatter plot/ graph, correlation chart): • Predict how change in an independent variable will change a dependent variable. Data Representation Accidents Moderate -Positive Strong - Positive Speed of vehicle 140 to 160 KM/Hour Speed of vehicle 160 to 180 KM/Hour
  • 25. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality ->T&T-> Data Representation->Scatter Diagram Scatter Diagram(scatter plot/ graph, correlation chart): • Predict how change in an independent variable will change a dependent variable. Moderate - Negative Strong - Negative Reducing project profit Reducing project profit CostofProjectresources If resource cost is one of the factor then correlation will be moderate, however if this is only factor then correlation will be strong. Data Representation
  • 26. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Audits It is a structured, independent process used to determine, if project activities comply with organizational and project policies, processes, and procedures. Identify best practices being implemented Identify all nonconformity, gaps, and shortcomings Share good practices help the team raise productivity It can confirm implementation of Approved changes, including Updates Corrective actions Preventive action Defect repairs Manage Quality ->T&T-> Audits Quality audit will look for:
  • 27. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Design for X Set of technical guidelines applied during the design of a product Optimizes specific aspect of design such as Reliability Deployment Assembly Cost Safety Quality Using DfX may result in: Cost reduction Quality improvement Better performance and Customer satisfaction Manage Quality -> T&T -> Design for X (DfX)
  • 28. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Problem solving Problem solving is about finding solutions for issues/challenges. Defining the problem Identifying the root cause Generating possible solutions Choosing the best solution Implementing the solution, and Verifying the solution effectiveness Manage Quality -> T&T-> Problem solving Problem may arise : Control quality process Quality Audits process or deliverables
  • 29. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Quality improvement methods Manage Quality -> T&T-> Quality improvement methods can be based on recommendations from quality control processes or they can be uncovered during Manage Quality process. Six Sigma PDCA Cycle
  • 30. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> Output Quality reports Test & evaluation documents Change requests PMP updates Project document updates
  • 31. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Quality reports Quality management issues Recommendations for improvements (preventive actions) Recommendations for corrective actions Summary of findings from the Control Quality process. Manage Quality -> Output ->Quality reports Quality reports is used by the project team in order to take corrective actions Information may includes
  • 32. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Test & evaluation documents They are inputs to Control quality process Used to evaluate the achievement of quality objectives They may include: Checklists Requirements traceability matrices Manage Quality -> Output -> Test & evaluation documents
  • 33. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Change requests There may be recommendations for changes to the following: Project management plan Project documents Project or product management processes Manage Quality -> Output ->Change requests
  • 34. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) PMP updates Following PMP subsidiary plans & baselines may get updated Manage Quality -> Output -> PMP updates Quality Management plan Scope baseline Schedule baseline Cost baseline
  • 35. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project document updates Issue log Lessons Learned Register Risk Register Manage Quality -> Output -> Project document updates Following Project Documents may get updated:
  • 36. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Manage Quality -> Review Overview Manage Quality definition Manage Quality ITTO Quality Audits Design of experiment's Quality improvement methods
  • 37. The happiness of your life depends upon the quality of your thoughts. Marcus Aurelius Kids playing Holi, India