Chapter 8 –
Project Quality Management
Plan Quality
management
SIXTH EDITION
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
8.1 Plan Quality Management
Overview
Plan Quality Management definition
Plan Quality Management – ITTO
Test & inspection planning
Cost of Quality and Cost benefit analysis
What is Quality Management Plan?
Review
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Quality Management processes
Plan Quality
management
Manage Quality Control QualityP MCE
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Overview
Client tests concrete strength and says “concrete
does not meet stated requirements”
Client Rejects the deliverables.
Whose
fault is this?
Why this
happened?
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Finding existing quality standard & practices.
Create additional project specific practices & standards.
Determine work to meet the standards.
Determine how you will measure to ensure deliverables meet the
standards.
Perform cost benefit analysis and determine cost of quality?
Balance the need of quality with scope, cost, time, risk, resources &
customer satisfaction.
Create process improvement plan & quality management plan.
Overview
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Identifying quality requirements & standards for project & it’s
deliverables, & documenting how project will demonstrate
compliance with quality requirements.
It provides guidance & direction on how quality will be
managed & validated throughout Project.
Plan Quality Management -> Definition
Project
Requiremen
ts
Identify
Document
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
8.1 Plan Quality Management -> ITTO
Expert Judgment
Data Gathering
Data analysis
Decision Making
Data Representation
Test & inspection
planning
Meetings
Project Charter
Project Management
Plan
Project Documents
Enterprise
Environmental Factors
Organizational Process
Assets
Quality Management
plan
Quality Metrics
PMP updates
Project document
updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project Charter
Project Management
Plan
Project Documents
Enterprise
Environmental Factors
Organizational Process
Assets
Plan Quality Management->Input
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project Charter
Contains the high-level project description and the product characteristics
any requirements for the final product to be approved by the customer
Plan Quality Management->Input-> Project Charter
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project
Management Plan
Plan Quality Management->Input -> PMP
Requirements
Management plan
Scope baseline
Risk Management
plan
Stakeholder
Management plan
Following PMP subsidiary plans & baselines can be used as input:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Following Project Documents can be used as input:
Plan Quality Management->Input -> Project Documents
Assumption log
Requirements
documentation
Requirements
Traceability Matrix
Risk Register Stakeholder Register
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Enterprise
Environmental Factors
Government agency regulations regarding health & Safety
Rules, standards & guidelines specific to application area.
Working or operating conditions.
Plan Quality Management->Input->EEF
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Organizational
Process Assets
Plan Quality Management->Input-> OPA
Policies, processes &
Procedures
Lessons learned
Register
Templates – Check
sheets
Following OPA can be used as input:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Plan Quality Management->T&T
Expert Judgment Data Gathering Data analysis Decision Making
Data Representation
Test & inspection
planning
Meetings
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Expert Judgment
Quality planning
& improvements
Quality
assurance
Quality control Quality systems
Plan Quality Management->T&T-> Expert Judgment
Experts are sought with expertise in anything to do with quality:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data Gathering
Benchmarking Brainstorming Interviews
Plan Quality Management->T&T-> Data Gathering
Following Data Gathering techniques will be used:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Plan Quality Management->T&T-> Data Gathering -> Benchmarking
Used to:
Identify best practices
Generate ideas for
improvement
Basis for measuring
performance.
Standard:
EN 60529
Comparing actual or planned practices, such as
processes & operations, to those of comparable
organizations.
Data Gathering
The organizations compared during benchmarking can be internal or external.
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Plan Quality Management->T&T-> Data Gathering -> Brainstorming
Brainstorming:
• Generate and collect Multiple ideas related to project and product
requirements.
Data Gathering
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data Gathering
Interviews:
Approach to elicit information from stakeholders by directly
talking to them.
Plan Quality Management->T&T-> Data Gathering -> Interviews
Project participants
Sponsors
Other executives
Subject matter experts
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Cost Benefit
analysis
Cost of Quality
Plan Quality Management->T&T-> Data analysis
Following Data analysis techniques will be used:
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Plan Quality Management->T&T-> Data analysis -> Cost of Quality
Costof
Quality
Cost of
conformance
Prevention costs
(Build quality
product)
Training, Process
documentation,
Testing equipment's,
Time required
Appraisal costs
(Asses quality of the
product)
Conducting test,
Destructive testing,
Inspecting
deliverables
Cost of non
conformance
Internal failure costs
(Failure found by
the project)
Rework, Scrap
External failure
costs
(Failure found by the
customer)
Product recall,
Liabilities, Warranty
work, lost business &
credibility
Moneyspentduring
theprojecttoavoidthe
failures
Moneyspentduring&
aftertheproject
becauseoffailures
Data analysis
Cost of Quality
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Cost-benefit Analysis: A financial analysis tool used to determine the
benefits provided by a project against its costs.
Plan Quality Management->T&T->Data analysis ->Cost Benefit Analysis
Benefits
Less rework
Higher
productivity
Lower costs
Increased
stakeholder
satisfaction.
The primary cost of meeting quality requirements is expenses associated
with quality management activities.
Cost of quality
Data analysis
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data Representation
Following Data Representation techniques will be used:
Flowcharts Logical data Model Matrix diagrams
Mind mapping
Plan Quality Management->T&T-> Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Flowcharts (or process maps):
• Take outputs from one process, & use them as inputs in another
process, which then takes tools & techniques to create new outputs,
used in other processes.
Plan Quality Management->T&T-> Data Representation-> Flowcharts
Used in:
Quality planning
Estimate cost of quality
Process communication
Analyse quality problem
• Suppliers, Inputs, Process, Outputs, CustomersSIPOC:
Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Matrix Diagram:
• It shows relationship between factors, causes, and objectives.
• It provides a compact way of representing many-to-many
relationships of varying strength.
List 1 List 2
Item1 Item A
Item2 Item B
Item3 Item C
Item4 Item D
Item5 Item E
ItemA
ItemB
ItemC
ItemD
ItemE
Item1 O
Item2 O O
Item3 O O O
Item4 O
Item5 O
Plan Quality Management->T&T-> Data Representation-> Matrix Diagram
Data Representation
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data Representation
Plan Quality Management->T&T-> Data Representation-> Matrix Diagram
# Defect description
Module1
Module2
Module3
Module4
Module5
Module6
Module7
Module8
Module9
Module10
1 System is calculating wrong totals
2 System not meeting Performance
3 Background colour is not as per
specification.
4 Validation message box has wrong
message.
5 System
Matrix Diagram:
• It shows relationship between factors, causes, and objectives.
• It provides a compact way of representing many-to-many
relationships of varying strength.
# Defect description
Module1
Module2
Module3
Module4
Module5
Module6
Module7
Module8
Module9
Module10
1 System is calculating wrong totals O O O O O O
2 System not meeting Performance O O O O
3 Background colour is not as per
specification.
O O O O O O O O O O
4 Validation message box has wrong
message.
O O O O
5 System O O O O O O O
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Data Representation
Mind mapping:
• Ideas created through brainstorming are consolidated
into a single map to reflect commonality & differences.
Plan Quality Management->T&T-> Data Representation->Mind mapping
Used for:
Thinking through
complex problems.
Summarizing
information
Consolidating
information
Presenting information
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Test & inspection
planning
How to test or inspect the product or deliverable to meet the requirements
How to meet the goal for the product’s performance and reliability
Software projects –Alpha and beta tests
Construction projects–Strength tests
Manufacturing–Inspection
Engineering–Field and non destructive tests
Plan Quality Management->T&T-> Test & inspection planning
Examples
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Decision Making
Prioritization matrices
• Used when deciding which design features are Critical to
Quality, or in making a decision.
Plan Quality Management->T&T-> Decision Making
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Plan Quality Management->Outputs
Quality Management
plan
Quality Metrics PMP updates
Project document
updates
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Quality
Management Plan
Quality management plans explains how organizations quality policies will be
implemented.
Quality standards
Quality objectives
Quality roles and responsibilities
Project deliverables and processes subject to quality review
Quality control and quality management activities planned
Quality tools that will be used
Procedures - non-conformances, corrective actions and
continuous improvement
Plan Quality Management->Outputs ->QMP
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Quality metrics
Describes a project or product attribute and how the control quality will verify the
compliance to it.
Translate customer needs into acceptable performance measures in both products and
processes.
Plan Quality Management->Outputs->Quality Metrics
Tactical Measure
Time
Cost
Resources
Scope
Sample Indicator
Schedule Performance Index (SPI) = Earned Value / Planned Value
Cost Performance Index (CPI) = Earned Value / Actual Cost
Amount of hours overspent per Testing cycle
Number of Change Requests
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
PMP updates
Scope baseline
Risk Management
plan
Plan Quality Management->Outputs-> PMP updates
PMP components which are updated as a result of this process
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Project documents
updates
Plan Quality Management->Outputs -> Project documents updates
Project documents updated as a result of this process are:
Lessons Learned
Register
Requirements
Traceability Matrix
Risk Register
Stakeholder
Register
PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com)
Plan Quality Management -> Review
Overview
Plan Quality Management definition
Plan Quality Management – ITTO
Test & inspection planning
Cost of Quality and Cost benefit analysis
What is Quality Management Plan?
Quality questions create a quality life. Successful people asks better
questions, and as a result they get better answers.
Tony Robbins
Golden Temple, India
(Serves free food to 100,000 people daily)

More Related Content

What's hot

Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1Anand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementAnand Bobade
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2Anand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2Anand Bobade
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 

What's hot (20)

Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 12.2 Conduct Procurement
Chap 12.2 Conduct ProcurementChap 12.2 Conduct Procurement
Chap 12.2 Conduct Procurement
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management Overview
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 

Similar to Chap 8.1 Plan quality management

Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control ScopeAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 13.3 Manage stakeholder
Chap 13.3 Manage stakeholderChap 13.3 Manage stakeholder
Chap 13.3 Manage stakeholderAnand Bobade
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewAnand Bobade
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scopeAnand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Start Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP ExamStart Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP ExamMeghna Arora
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersAnand Bobade
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterAnand Bobade
 
Chap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderChap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 

Similar to Chap 8.1 Plan quality management (20)

Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 13.3 Manage stakeholder
Chap 13.3 Manage stakeholderChap 13.3 Manage stakeholder
Chap 13.3 Manage stakeholder
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management Overview
 
Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Start Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP ExamStart Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP Exam
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management plan
 
ressume -Ujjwal-4-Aug-2016
ressume -Ujjwal-4-Aug-2016ressume -Ujjwal-4-Aug-2016
ressume -Ujjwal-4-Aug-2016
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholdersChap 13.1 Identify stakeholders
Chap 13.1 Identify stakeholders
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project Charter
 
Chap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholderChap 13.4 Monitor stakeholder
Chap 13.4 Monitor stakeholder
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 

More from Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 

More from Anand Bobade (9)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 

Recently uploaded

Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 

Recently uploaded (15)

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 

Chap 8.1 Plan quality management

  • 1. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) PMP Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved. Chapter 8 – Project Quality Management Plan Quality management SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) 8.1 Plan Quality Management Overview Plan Quality Management definition Plan Quality Management – ITTO Test & inspection planning Cost of Quality and Cost benefit analysis What is Quality Management Plan? Review
  • 3. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Quality Management processes Plan Quality management Manage Quality Control QualityP MCE
  • 4. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Overview Client tests concrete strength and says “concrete does not meet stated requirements” Client Rejects the deliverables. Whose fault is this? Why this happened?
  • 5. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Finding existing quality standard & practices. Create additional project specific practices & standards. Determine work to meet the standards. Determine how you will measure to ensure deliverables meet the standards. Perform cost benefit analysis and determine cost of quality? Balance the need of quality with scope, cost, time, risk, resources & customer satisfaction. Create process improvement plan & quality management plan. Overview
  • 6. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Identifying quality requirements & standards for project & it’s deliverables, & documenting how project will demonstrate compliance with quality requirements. It provides guidance & direction on how quality will be managed & validated throughout Project. Plan Quality Management -> Definition Project Requiremen ts Identify Document
  • 7. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) 8.1 Plan Quality Management -> ITTO Expert Judgment Data Gathering Data analysis Decision Making Data Representation Test & inspection planning Meetings Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets Quality Management plan Quality Metrics PMP updates Project document updates Inputs Tools & Techniques Outputs
  • 8. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets Plan Quality Management->Input
  • 9. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project Charter Contains the high-level project description and the product characteristics any requirements for the final product to be approved by the customer Plan Quality Management->Input-> Project Charter
  • 10. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project Management Plan Plan Quality Management->Input -> PMP Requirements Management plan Scope baseline Risk Management plan Stakeholder Management plan Following PMP subsidiary plans & baselines can be used as input:
  • 11. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project Documents Following Project Documents can be used as input: Plan Quality Management->Input -> Project Documents Assumption log Requirements documentation Requirements Traceability Matrix Risk Register Stakeholder Register
  • 12. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Enterprise Environmental Factors Government agency regulations regarding health & Safety Rules, standards & guidelines specific to application area. Working or operating conditions. Plan Quality Management->Input->EEF
  • 13. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Organizational Process Assets Plan Quality Management->Input-> OPA Policies, processes & Procedures Lessons learned Register Templates – Check sheets Following OPA can be used as input:
  • 14. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Plan Quality Management->T&T Expert Judgment Data Gathering Data analysis Decision Making Data Representation Test & inspection planning Meetings
  • 15. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Expert Judgment Quality planning & improvements Quality assurance Quality control Quality systems Plan Quality Management->T&T-> Expert Judgment Experts are sought with expertise in anything to do with quality:
  • 16. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Gathering Benchmarking Brainstorming Interviews Plan Quality Management->T&T-> Data Gathering Following Data Gathering techniques will be used:
  • 17. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Plan Quality Management->T&T-> Data Gathering -> Benchmarking Used to: Identify best practices Generate ideas for improvement Basis for measuring performance. Standard: EN 60529 Comparing actual or planned practices, such as processes & operations, to those of comparable organizations. Data Gathering The organizations compared during benchmarking can be internal or external.
  • 18. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Plan Quality Management->T&T-> Data Gathering -> Brainstorming Brainstorming: • Generate and collect Multiple ideas related to project and product requirements. Data Gathering
  • 19. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Gathering Interviews: Approach to elicit information from stakeholders by directly talking to them. Plan Quality Management->T&T-> Data Gathering -> Interviews Project participants Sponsors Other executives Subject matter experts
  • 20. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data analysis Cost Benefit analysis Cost of Quality Plan Quality Management->T&T-> Data analysis Following Data analysis techniques will be used:
  • 21. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Plan Quality Management->T&T-> Data analysis -> Cost of Quality Costof Quality Cost of conformance Prevention costs (Build quality product) Training, Process documentation, Testing equipment's, Time required Appraisal costs (Asses quality of the product) Conducting test, Destructive testing, Inspecting deliverables Cost of non conformance Internal failure costs (Failure found by the project) Rework, Scrap External failure costs (Failure found by the customer) Product recall, Liabilities, Warranty work, lost business & credibility Moneyspentduring theprojecttoavoidthe failures Moneyspentduring& aftertheproject becauseoffailures Data analysis Cost of Quality
  • 22. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Cost-benefit Analysis: A financial analysis tool used to determine the benefits provided by a project against its costs. Plan Quality Management->T&T->Data analysis ->Cost Benefit Analysis Benefits Less rework Higher productivity Lower costs Increased stakeholder satisfaction. The primary cost of meeting quality requirements is expenses associated with quality management activities. Cost of quality Data analysis
  • 23. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Representation Following Data Representation techniques will be used: Flowcharts Logical data Model Matrix diagrams Mind mapping Plan Quality Management->T&T-> Data Representation
  • 24. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Flowcharts (or process maps): • Take outputs from one process, & use them as inputs in another process, which then takes tools & techniques to create new outputs, used in other processes. Plan Quality Management->T&T-> Data Representation-> Flowcharts Used in: Quality planning Estimate cost of quality Process communication Analyse quality problem • Suppliers, Inputs, Process, Outputs, CustomersSIPOC: Data Representation
  • 25. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Matrix Diagram: • It shows relationship between factors, causes, and objectives. • It provides a compact way of representing many-to-many relationships of varying strength. List 1 List 2 Item1 Item A Item2 Item B Item3 Item C Item4 Item D Item5 Item E ItemA ItemB ItemC ItemD ItemE Item1 O Item2 O O Item3 O O O Item4 O Item5 O Plan Quality Management->T&T-> Data Representation-> Matrix Diagram Data Representation
  • 26. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Representation Plan Quality Management->T&T-> Data Representation-> Matrix Diagram # Defect description Module1 Module2 Module3 Module4 Module5 Module6 Module7 Module8 Module9 Module10 1 System is calculating wrong totals 2 System not meeting Performance 3 Background colour is not as per specification. 4 Validation message box has wrong message. 5 System Matrix Diagram: • It shows relationship between factors, causes, and objectives. • It provides a compact way of representing many-to-many relationships of varying strength. # Defect description Module1 Module2 Module3 Module4 Module5 Module6 Module7 Module8 Module9 Module10 1 System is calculating wrong totals O O O O O O 2 System not meeting Performance O O O O 3 Background colour is not as per specification. O O O O O O O O O O 4 Validation message box has wrong message. O O O O 5 System O O O O O O O
  • 27. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Data Representation Mind mapping: • Ideas created through brainstorming are consolidated into a single map to reflect commonality & differences. Plan Quality Management->T&T-> Data Representation->Mind mapping Used for: Thinking through complex problems. Summarizing information Consolidating information Presenting information
  • 28. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Test & inspection planning How to test or inspect the product or deliverable to meet the requirements How to meet the goal for the product’s performance and reliability Software projects –Alpha and beta tests Construction projects–Strength tests Manufacturing–Inspection Engineering–Field and non destructive tests Plan Quality Management->T&T-> Test & inspection planning Examples
  • 29. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Decision Making Prioritization matrices • Used when deciding which design features are Critical to Quality, or in making a decision. Plan Quality Management->T&T-> Decision Making
  • 30. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Plan Quality Management->Outputs Quality Management plan Quality Metrics PMP updates Project document updates
  • 31. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Quality Management Plan Quality management plans explains how organizations quality policies will be implemented. Quality standards Quality objectives Quality roles and responsibilities Project deliverables and processes subject to quality review Quality control and quality management activities planned Quality tools that will be used Procedures - non-conformances, corrective actions and continuous improvement Plan Quality Management->Outputs ->QMP
  • 32. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Quality metrics Describes a project or product attribute and how the control quality will verify the compliance to it. Translate customer needs into acceptable performance measures in both products and processes. Plan Quality Management->Outputs->Quality Metrics Tactical Measure Time Cost Resources Scope Sample Indicator Schedule Performance Index (SPI) = Earned Value / Planned Value Cost Performance Index (CPI) = Earned Value / Actual Cost Amount of hours overspent per Testing cycle Number of Change Requests
  • 33. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) PMP updates Scope baseline Risk Management plan Plan Quality Management->Outputs-> PMP updates PMP components which are updated as a result of this process
  • 34. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Project documents updates Plan Quality Management->Outputs -> Project documents updates Project documents updated as a result of this process are: Lessons Learned Register Requirements Traceability Matrix Risk Register Stakeholder Register
  • 35. PMBOK 6 - All rights reserved 2019, By: Anand Bobade (nmbobade@gmail.com) Plan Quality Management -> Review Overview Plan Quality Management definition Plan Quality Management – ITTO Test & inspection planning Cost of Quality and Cost benefit analysis What is Quality Management Plan?
  • 36. Quality questions create a quality life. Successful people asks better questions, and as a result they get better answers. Tony Robbins Golden Temple, India (Serves free food to 100,000 people daily)