Chapter 3 – Distance measurement (Tape and offset
surveying)
The method of tape surveying is often referred to as chain surveying, deriving its
name from the fact that the principal item of equipment traditionally used was a
measuring chain. owadays, the chain has been replaced by the more accurate steel
band.
Distance measuring techniques
Pacing
i. Pacing is a very useful (although imprecise) technique of distance measurement.
ii. An individual’s length of pace can be determined by repeatedly pacing between
two marks a set distance apart (e.g. 100ft or 30m).
iii. Pacing is particularly useful when looking for previously set survey markers
(property and construction layout markers).
Odometer
i. A measuring wheel (12-in to 24-in diameter) equipped with an odometer.
ii. It is used by assessors and other real-estate personnel to recorded property
frontages and areas.
2
Distance obtained from positioning techniques
Satellite positioning – once the position coordinates are known, it is simple enough to
compute the distance between those positions.
EDM (Electronic Distance Measurement)
It is an instruments function by sending a light wave or microwave along the path to be
measured and then measuring the phase differences between the transmitted and received
signals.
Gunter’s chain
The chain was robust, easily read, and easily repaired in the field if broken. It was liable
to vary somewhat in length, however, because of wear on the metal-to-metal surfaces,
bending of the links, mud between the bearing surfaces etc.
i. normally either 20 m or 30 m long
ii. made of tempered steel wire
iii. made up of links that measured 200 mm from center to center of each middle
connecting ring
iv. swiveling brass handles were fitted at each end, the total length was measured
over the handles
3
v. Tally markers, made of plastic, were attached at every whole metre position, and
those giving 5 m positions were of a different colour.
To be precise, it was 66 ft long and was composed of 100 links. The length of 66 ft was
apparently chosen because of its relationships to other units in the Imperial system:
80 chains = 1 mile
10 square chains = 1 acre (10 x 662
= 43560 ft2
)
4 rods (1 rod = 16.5 ft) = 1 chain
Taping
Taping is used for short distances and in many construction applications.
i. Fiber-glass tapes
a. Fiberglass tapes are used for applications where lower precision is
acceptable.
b. Fiberglass tapes can give accuracies in the centimeter range.
c. Typical uses of fiberglass tapes involve topographic, fencing
measurements and etc.
4
ii. Steel tapes
a. Steel tapes are used for precise measuring.
b. Typical engineering surveying accuracy ratios in the range of 1:3000 to
1:5000 can be readily attained when measuring with a steel tape if the
proper techniques are employed.
c. Steel tapes can measure to the nearest millimeter (or nearest hundredth of
a foot).
d. The most commonly used tape length in metric units is 30m (lengths of
20m, 50m, and 100m can also be obtained).
e. Graduated every 10mm and figured every 100mm. Whole meter figures
are shown in red at every meter.
f. Steel tapes come in two common cross-sections:
i. heavy duty is 8mm x 0.45mm – generally used in route surveys
(e.g. high-ways, railroads)
ii. normal usage is 6mm x 0.30mm – generally used in structural
surveys.
5
6
Taping accessories
i. Plumb bob
a) Plumb bobs are normally made of brass and weight from 8oz to 18oz.
10oz and 12oz plumb bobs most widely used.
b) Plumb bobs come with about 6 ft of string.
c) Plumb bobs are used in taping to permit the surveyor to hold the tape
horizontal when the ground is sloping.
7
ii. Hand level
a) Hand levels are small rectangular or cylindrical sighting tubes equipped
with tubular bubbles and horizontal crosshairs that permit the surveyor to
make low-precision horizontal sightings.
b) The bubble location and the crosshair can be viewed together via a 45°
mounted mirror.
8
c) Hand levels can be used to assist the surveyor in keeping the tape
horizontal while the tape is held off the ground.
d) The hand level is held by the surveyor at the lower elevation and a sight is
taken on the uphill surveyor.
iii. Ranging rods (or range poles)
a) Range poles are 2 m, 2.5 m or 3m wood or steel poles with pointed steel
shoes (or steel points).
b) These poles are usually painted alternately red and white in 500mm (or
1ft) sections.
c) The range pole can be used to provide theodolite and total station sightings
for angle and line work.
d) These poles were also used in taping to help with alignment for distances
longer than one tape length.
e) The pole was set behind the measurement terminal point and the rear tape
person could keep the forward tape person on line by simply sighting on
the pole and then waving the forward tape person left or right until they
are on line.
9
iv. Clamp handle
The clamp handle helps the surveyor to grip the tape at any intermediate point
without kinking the tape.
v. Chaining pin (or Marking arrows)
When measuring the length of a long line, the tape has to be laid down a number
of times and the positions of the ends marked with arrows, which are steel
skewers about 40 mm long and 3-4 mm diameter. A piece of red ribbon at the top
enables them to be seen more clearly.
a) Chaining pin come in a set of eleven.
10
b) They are painted alternately red and white and are 350mm to 450mm long.
c) Chaining pins are used to mark intermediate points on the ground while
making long measurements.
vi. Tension handle
The tension handle used in precise work to ensure that the correct tension is being
applied.
vii. Pegs
a) Points that need to be more permanently marked, such as the intersection
points of survey lines, are marked by nails set in the tops of wooden pegs
driven into ground by a mallet.
b) A typical size is 40 mm x 40 mm x 0.4 m long.
c) In very hard ground, steel dowels are used instead, while in asphalt roads
small 5 or 6 mm square brads are used.
11
viii. Abney hand level
The Abney level consists essentially of a sighting tube, to which is attached a graduated
arc. An index arm, pivoted at the centre of the arc, carries a small bubble tube, whose
axis is normal to the axis of the arm, so that as the tube is tilted the index moves over the
graduated arc.
By means of an inclined mirror mounted in one-half of the sighting tube, the bubble is
observed on the right-hand side of the field of view when looking through the eyepiece of
the sighting tube.
In using the instrument for the measurement of vertical angles, when measuring mean
ground slope, if the sight is taken onto a point whose height above the ground is the same
as that of the observer’s eye, then the line of sight will be parallel to the mean ground
surface.
A ranging rod with a mark on it at the required height makes a suitable target. To
measure the angle, a sight is taken onto the mark, and the bubble is brought into the field
of view by means of the milled head to be bisected by the sighting wire at the same time
as the wire is on the target. The angle is now read on the vernier.
12
Taping techniques
(i) Measuring distance with tape
The operation is carried out by two assistants, known as chainmen because the
measurement was traditionally made by chain, one acting as leading chainman and the
other as follower. The chainmen take one end each of the steel band and the band is
13
pulled out full length and examined for defects. The leader is equipped with ten arrows
and a ranging rod, and the follower also takes a ranging rod. Then, to measure line AB
having previously positioned ranging rods at both A and B:
(1) The leader drags his end of the band forward to A1 and holds his ranging rod
about 0.3 m short of the end.
(2) The follower has to holds end of the band firmly against station at A, and the
surveyor lines in the leader’s pole between A and B by closing one eye, sighting
poles A and B, and signaling the leader till he brings his pole into line AB. The
system of signaling usually adopted is to swing the left arm out to the left as an
instruction to the leader to move his pole in that direction: the right arm is
similarly used to indicate movement to the right, while both arms extended above
the head, then brought down, indicates that the pole is one line.
(3) The leader straightens the band past the rod by sending gentle ‘snakes’ down the
band.
(4) The follower indicates that the band is straight, and the leader puts an arrow at the
end, A1. (At this stage offsets or ties may be taken from known positions to
required detail.)
(5) The leader then drags his end to A2, taking nine arrows and his pole.
(6) The follower moves to A1, and puts his pole behind the arrow; the surveyor again
lines in from here or from A.
The above procedure is repeated, the follower picking up the first arrow before he moves
from A1. The leader moves to A3, carrying eight arrows. The follower moves to A2,
carrying the arrow from A1.
If the line measured is longer than ten times the band length, the leader will exhaust his
supply of arrows, so that when the eleventh band length is stretched out, the follower will
have to hand back the ten arrows to the leader. This fact is pointed out to the surveyor,
who notes it in his field book. The number of arrows held by the follower serves as a
check on the number of full band lengths measured in the line.
14
(ii) Measurements along slopes
The terrain that has to be surveyed in general will not be a horizontal plane, whereas the
distance required for the preparation of a plan or map is the horizontal distance.
When distance is measured along a slope, it has to be converted into horizontal distance
for the purpose of plotting.
In general, there are two methods of chaining along a slope:
a) To measure distances horizontally in steps and transfer the points to the
ground, and
b) To measure along the slope and convert the distances into horizontal
distances.
15
(a) Stepping (or measuring horizontally)
Suppose one has to measure the distance between the stations A and B, the procedure is
the following.
1) At least two persons are required for the chaining. One end of the chain is held at
A and a convenient length is selected and the chain is held horizontally. The chain
tends to sag due to its own weight and has to be counteracted by applying
sufficient pull to it so that it remains horizontal.
2) The follower holds the end of the chain at A. the leader goes along the line with a
selected length of the chain and a ranging rod and faces the follower. The
follower directs the leader to be in line and both pull the chain to eliminate the sag
of the chain.
3) The length of the chain is selected such that it can be held truly horizontal and
pull applied by hand. Once the chain has been stretched to be horizontal, the point
C’ of the end of the chain is transferred to the ground using a plumb bob. The
point C is thus obtained. The distance between A and C is the length of the chain
held horizontally.
4) The process can be repeated starting at C to get points D, E, F, etc. till the end B
is reached.
5) The total horizontal distance is the sum of the lengths of the number of steps
taken to reach B from A.
6) In general, measurement using this method should be done downhill. If the
distance has to be measured uphill, the second method is preferable, as the
follower, while going uphill, has to direct the leader for ranging, hold the chain,
and transfer the point to the ground, which is very difficult.
7) The horizontal distance (selected as the step distance) also depends upon the
slope. For steep slopes, the distance has to be small.
16
(b) Measuring along the slope
Length can be measured along the slope and the slope distance converted into horizontal
distance.
To measure the slope either as an angle or gradient and calculate the horizontal distance;
- The slope of the terrain may be determined as an angle θ with an angle-measuring
instrument. The simplest instrument is a clinometers.
- When the slope of the ground has been measured, it is easy to find the horizontal
distance:
Horizontal distance = Ɩcosθ
Where, Ɩ is the length along the slope
θ is the angle made by the ground with the
horizontal.
- If the slope is gentle and uniform for a long distance, this method can be used.
- For undulating ground, this method is not suitable.
17
Standard conditions for the use of steel tapes
Because steel tapes can give different measurements when used under various tension,
support, and temperature conditions, it is necessary to provide standards for their use.
Standard taping conditions are shown below:
Metric system, 30 m steel tape:
1. Temperature = 20°C
2. Tape fully supported
3. Tape under a tension of 50N (because 1 lb force = 4.448N, 50N = 11.24 lbs)
In the real world of field surveying, the above-noted standard conditions seldom occur at
the same time. The temperature is usually something other than standard, and in many
instances the tape cannot be fully supported (one end of the tape is often held off the
ground to keep it horizontal). If the tape is not fully supported, the tension of 50N does
not apply. When standard conditions are not present, systematic errors will be introduced
into the tape measurements.
18
Taping corrections
Systematic Taping Errors Random Taping Errors
1. Slope 1. Slope
2. Erroneous length 2. Temperature
3. Temperature 3. Tension and sag
4. Tension and sag 4. Alignment
5. Marking and plumbing
19
Offset Surveying
Objective: To understand how to set a perpendicular line from a point using tapes
only
Equipment for measuring right angles
The cross staff
The optical square
20
Setting out right angles
Because this operation is often required in connection with the measurement of offsets,
this is a convenient point at which it may be discussed. There are two cases to consider:
(1) dropping a perpendicular from a point to a line; and
(2) setting out a line at right angles to the survey line from a given point on the steel
band.
Dropping a perpendicular from a point to a line
(a) For short offsets, the end of the tape is held at the point to be located, and the
right angle is estimated by eye. Although this is a usual method in practice, it
is not so accurate as the following methods.
(b) Swing the tape with its zero as center about the point, and the minimum
reading at which it crosses the band is noted. This occurs when the tape is
perpendicular to the band.
(c) Swing the tape with the free end of the tape at center P (the point), strike an
arc to cut the band at A and B. Bisect AB at Q. Then angle PQA = 90°.
P
A Q B
21
(d) Run the tape from P to any point A on the band. Bisect PA at B, and with the
center B and radius BA strike an arc to cut the band at Q. Then angle AQP =
90°, being the angle in a semicircle.
P
B
Survey line
A Q
Setting out a line at right angles to the survey line from a given point on the steel band
(a) Cross staff: this is mounted on a short ranging rod, which is stuck in the ground at
the point at which the right angle is to be set out. The cross staff is turned until a
sight is obtained along the survey line, and the normal is then set out by sighting
through the slits at right angles to this.
(b) Optical square: this is used as already described, being either held in the hand or
else propped on a short ranging rod.
(c) Pythagoras’ theorem (3, 4, 5 rule or any multiple thereof, say 9, 12, 15, or
11.62
=8.42
+82
): with the zero end of the tape at P take the 24 m mark of the tape
to A, where AP = 12 m on the band. Take the 9 m mark on the tape in the hand
and, ensuring that the tape is securely held at A and P, pull both parts of the tape
taut to Q. Then angle APQ = 90°.
Q
15 m 9 m
survey line
A P
(d) Take A and B on the band so that PA = PB. Strike arcs from A and B with equal
radii to intersect at Q. Then angle APQ = 90°.
22
Errors in linear measurement and their correction
In all surveying operations, as indeed in any operation involving measurement, errors are
likely to occur, and so far as is possible they must be guarded against or their effects
corrected for. The types of error that can occur have been classified as follows:
1) Mistakes
2) Systematic error
3) Random error
Mistakes
Mistakes occur due to carelessness of human.
Examples of mistake include:
1.) Miscounting the number of tape length when measuring a long distance,
2.) Misreading the graduation on measuring tape,
3.) Erroneous booking
The possibility of occurrence of these mistakes can be minimized by taking suitable
check measurement.
- Omitting an entire band length in booking - This is prevented by noting down
each band length, and by the leader keeping careful count of the arrows.
- Misreading the steel band - It is best if two people make important readings.
- Erroneous booking sometimes occurs - It is prevented by the chainman carefully
calling out the result and the surveyor repeating it, paying attention when calling 5
or 9, 7 or 11.
Systematic or cumulative error
Systematic errors are defined as the errors whose magnitude and algebraic sign can be
determined, allowing the surveyor to eliminate them from the measurements, and hence
improve the accuracy. In other words, under the same measurement conditions, these
errors will have the same magnitude and direction. An example of systematic errors is the
error resulting from the effects of temperature on a steel tape. If the temperature is
known, the lengthening effects on the steel tape can be precisely determined.
If appropriate corrections are not made, these errors can accumulate and cause significant
discrepancies between measured values. By keeping equipment in proper working order
and following established surveying procedures, many of the systematic errors can be
eliminated.
These arise from sources that may be taken to act in a similar manner on successive
observations, although their magnitude can vary. Their effects, when known, may be
eliminated.
23
1) Slope
All measurements in surveying must either be in the horizontal plane, or be corrected to
give the projection on this plane. Lines measured on slopping land must be longer than
lines measured on the flat, and if the slope is excessive, then a correction must be applied.
There are two methods.
i) Stepping
On ground that is of variable slope this are the best method, and no need calculation. The
measurement is done in short lengths of 5-10 m, the leader holding the length horizontal.
The point on the ground below the free end of the band is best located by plumb bob, as
shown in the figure below.
Plumb bob
5 – 10 m held horizontally
Stepping
ii) Measuring along the slope
This method is applicable where the ground runs in long regular slopes. The slope is
measured either by an instrument such as the Abney level, or by leveling, a procedure
that gives the surface height at points along the slope.
(a) Measurement of slope angle, a
Correct length = measured length × cos a where a = angle of slope
Correction = - L(1 – cos a) where L = measured length
L
24
(b) slope can be expressed also as 1 in n, which means a rise of 1 unit vertically for n
units horizontally: for small angles a = 1/n radians.
(c) Slope can also be expresses in terms of the difference in level, h, between two
points.
Correction = - [L – (L2
– h2
)1/2
]
L
h
2
2
−≈
(d) Finally Pythagoras’ theorem may be used.
L
h
a
correct length = √(L2
– h2
)
2) Erroneous length (or Incorrect length of chain)
The most careful measurements will not produce an accurate survey if, for example, the
band has been damaged and is therefore of incorrect length, because every time the band
is stretched out it will measure not 30 m but 30 m ± (some constant or systematic error).
If uncorrected, such an error could have serious effects. By checking the band against a
standard, such as two marks measured for the purpose, the exact error per band length is
known. If this error cannot be eliminated, a correction can be applied which will enable
the effect of error to be removed.
dardsoflength
usedbandoflength
xlengthmeasuredlengthcorrect
tan
=
Example:
A measurement was recorded as 171.278m with a 30m tape that was only 29.996m under
standard conditions. What is the corrected measurement?
Solution:
Correction per tape length = - 0.004
Number of times the tape was used = 171.278/30
Total correction = -0.004 x 171.278/30 = - 0.023m
Corrected distance = 171.278 – 0.023 = 171.255m
25
Or
dardsoflength
usedbandoflength
xlengthmeasuredlengthcorrect
tan
=
= 171.278 x 29.996/30
= 171.255m
Example:
You must lay out the side of a building, a distance of 210.08ft. The tape to be used is
known to be 100.02ft under standard conditions.
Solution:
Correction per tape length = 0.02ft
Number of times that the tape is to be used = 2.1008
Total correction = 0.02 x 2.1008 = +0.04ft
(When involve laying out a distance, the sign of the correction must be reversed before
being applied to the layout measurement. We must find the distance that, when corrected
by +0.04, will give 210.08ft, that is 210.08 – 0.04 = 210.04ft. This is the distance to be
laid out with the tape (100.02ft) so that the corner points will be exactly 210.08ft apart.)
3) Tape standardization
For very accurate work a spring balance should be attached to one end of the steel band.
The purpose of this is to ensure that the band is tensioned up to the value at which it was
standardized: i.e. if the band is 30 m long at 20° C under a 5 kg pull on the flat, then a
tension of 5 kg should be applied to eliminate any correction for pull. The balance is
usually attached to a short cord. The far end of the band will then be attached to a second
rod, and if these rods are set firmly on or in the ground and levered backwards, the
tension applied to the tape can be regulated to any value. All good-quality bands should
have a standardization certificate, which, for example, might say that the band, nominally
30 m long, is in fact only 29.999 m on the flat at 20° C with a tension of 5 kg applied.
This data is used to make corrections to the length as taped to refine the procedure.
In addition to the standardization and slope corrections mentioned above the following
factors might have to be considered:
- elasticity and thermal changes in those cases where the field conditions differ
from those at which the tape was standardized;
- deviation from the straight;
- height above mean sea level;
- sag, if the tape has been standardized on the flat, not in catenary.
(a) Temperature
Similarly a correction is required if the tape temperature, T, is not equal to the standard
temperature, Ts :
26
Correction for Temperature = α (T – Ts) L
where α = coefficient of linear expansion.
L = length
If T is less than Ts, the tape has contracted, and if T is more than Ts, the tape has
expanded.
The correction to the length measured is positive (correction has to be added) when (T –
Ts) is positive.
The correction to the length measure is negative (correction has to be subtracted) when (T
– Ts) is negative.
Example:
A distance was recorded as being 471.37ft at a temperature of 38°F. What is the distance
when corrected for temperature? If the standardized temperature for the tape is 68° F and
α = 0.00000645 per unit length per degree Fahrenheit (°F).
Solution
Ct = 0.00000645(38 – 68)471.37 = -0.09
Correct distance = 471.37 – 0.09 = 471.28ft
Example:
You must lay out two points in the field that will be exactly 100.000m apart. Field
conditions indicate that the temperature of the tape is 27°C. What distance will be laid
out? If the standardized temperature for the tape is 20°C and α = 0.0000116 per unit
length per degree Celsius (°C).
Solution
Ct = 0.0000116(27 – 20)100.000 = +0.008m
(when corrected by +0.008, will give 100.000m: Layout distance is 100.000 – 0.008 =
99.992m)
(b) Tension
As mentioned, the correct tension can be applied to the band by attaching a spring
balance to the handle at one end. If the standard tension is not applied a correction should
be made, because the length of the tape will have changed:
Pull correction =
AE
LPP sa )( −
27
where Pa, Ps = field and standard tension respectively,
A = cross-sectional area of band,
E = Young’s modulus of elasticity for the band (generally taken as
21x105
kg/cm2
), and
L = length measured.
Example:
A 30m tape is used with a 100N force, instead of the standard tension of 50N. If the
cross-sectional area of the tape is 0.02cm2
, what is the tension error per tape length?
Solution
Cp = (100 – 50)30 / [0.02 x 21 x 105
x 9.807] = + 0.0036m
If a distance of 182.716m had been measured under these conditions, the total correction
would be:
Total Cp = 182.716/30 x 0.0036 = +0.022m
The corrected distance would be 182.738m.
(c) Sag (or correction for Catenary)
If the highest accuracy is required, rather than lie the band along the ground, it can be
suspended between tripod heads, i.e. hung in catenary, and a correction for the sag in the
tape applied if the tape has been standardized on the flat. Fig. 2 shows a simple
arrangement that could be used.
Straining lever Straining post
spring balance
Marking pegs
Fig. 2
When measuring a line the pegs are aligned, preferably by theodolite, and after the pegs
have been driven, zinc strips are tacked on. The levels of the tops are found, a traverse
scratch mark is made on the first peg to serve as the beginning of the base line; a
longitudinal scratch may also be line in. Lever-type straining arms and spring balance
may conveniently used for tensioning and supporting the tape, which is adjusted so that
the first zero is aligned with the scratched reference mark. A traverse scratch is then made
on the second peghead against the second, and this serves as reference mark for the
second bay, the process being repeated. The tape itself is aligned by theodolite, and
temperatures are measured as before. Note that in this operation the tape should float just
28
clear of the stakes. Instead of aligning the zero of the tape with the scratch made when
taping the previous bay, it is also possible to make another scratch to mark the beginning
of the new bay, the necessary correction to the bay length then being measuring the
distance between the two scratches.
Sag correction = 2
32
24P
Lw−
where w = weight per unit length of the tape and L is the measured length of span. If the
tape is standardized in catenary no correction is required for sag so long as the field
tension P is the same as standard tension Ps.
Example
Calculate the length between two supports if the recorded length is 50.000m, the mass of
the tape is 1.63kg, and the applied tension is 100N.
Solution
Cs = -(1.63 x 9.807)2
x 50.000 / (24 x 1002
) = -0.053m
Therefore, the length between supports = 50.000 – 0.053 = 49.947m
4) Alignment
The higher the accuracy required the more critical the alignment of the band becomes.
Corrections can be applied for misalignment, but because this would require actually
measuring the misalignment, as in the figure below, it is generally easier to take care and
line in the band with a theodolite.
Correction = -[AB(1 – cos α) + BC(1 –cos β)]
A B1 C
α β
B
5) Sea level
The length of the line as measured can be reduced to its equivalent length at mean sea
level. In Fig. 1
29
Ɩ = (R + H) θ and Ɩ1 = Rθ
Hence
HR
R
ll
+
=1
Correction = Ɩ – Ɩ1 =
HR
H
l
HR
R
l
+
=
+
− )1(
≈
R
H
l and is deducted.
Where R = radius of earth (approx. 6367km)
30
Example
Four bays of base line AB were measured under a tension of 120 N and the data was given
below. If the tape was standardized on the flat under a pull of 89 N and at temperature 20°C.
Calculate the true length of the line.
Bay Length (m) Difference in level (m)
1 29.478 + 0.294
2 29.208 - 0.384
3 29.396 + 0.923
4 29.916 - 0.726
Field temperature 31°C
Cross-sectional area of tape 3.24 mm2
Density 7700 kg/m3
Coefficient of linear expansion 0.000 001/°C
Young’s Modulus 15.3 x 104
MN/m2
Mean radius of earth 6367 km
Mean level of tape 76.56 m AOD
Solution
`
31
Random errors (or accidental error)
Random (or accidental) errors are associated with the skill and vigilance of the surveyor.
It is not directly related to the conditions or circumstances of the observation. For a single
measurement or a series of measurements, it is the error remaining after all possible
systematic errors and mistakes have been eliminated.
As the name implies, random errors are unpredictable and are often caused by factors
beyond the control of the surveyor. Their occurrence, magnitude and direction (positive
or negative) cannot be predicted. Some random errors, by their very nature, tend to cancel
themselves. Because of their random nature, correction factors cannot be computed and
applied as some systematic errors. It is assumed that the positive and negative random
error measurements would tend to cancel each other out.
Difference between Systematic Error and Random Errors
The diagram below illustrates the distinction between systematic and random errors.
Systematic errors tend to be consistent in magnitude and/or direction. If the magnitude
and direction of the error is known, accuracy can be improved by additive or proportional
corrections.
32
Additive correction involves adding or subtracting a constant adjustment factor to each
measurement;
Proportional correction involves multiplying the measurement(s) by a constant.
Unlike systematic errors, random errors vary in magnitude and direction. It is possible to
calculate the average of a set of measured positions, however, and that average is likely
to be more accurate than most of the measurements.

More Related Content

What's hot

GEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plusGEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plus
BPA ABATAYO Land Surveying Services
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
Blue Darlene Palma
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
Bahzad5
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
Zewdu Minwuye Dessie
 
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
BPA ABATAYO Land Surveying Services
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
neharajpl
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
Decentumang
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverse
Aditya Mistry
 
Computation of area
Computation of areaComputation of area
Computation of area
Kavin Raval
 
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
BPA ABATAYO Land Surveying Services
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
anojan kanagarathnam
 
Material Testing Lab Equipments
Material Testing Lab EquipmentsMaterial Testing Lab Equipments
Material Testing Lab Equipments
Naveed Hussain
 
Triangulation
Triangulation Triangulation
Levelling
LevellingLevelling
S2 4 angle and directions
S2 4 angle and directionsS2 4 angle and directions
S2 4 angle and directions
Est
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveyingstooty s
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
musadoto
 
Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations
Awais Ahmad
 

What's hot (20)

GEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plusGEODETIC Least Square with fx 991-es plus
GEODETIC Least Square with fx 991-es plus
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
 
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
70148
70148 70148
70148
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverse
 
Computation of area
Computation of areaComputation of area
Computation of area
 
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
 
Material Testing Lab Equipments
Material Testing Lab EquipmentsMaterial Testing Lab Equipments
Material Testing Lab Equipments
 
Triangulation
Triangulation Triangulation
Triangulation
 
Levelling
LevellingLevelling
Levelling
 
S2 4 angle and directions
S2 4 angle and directionsS2 4 angle and directions
S2 4 angle and directions
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Lecture 11 traverse computations
Lecture 11 traverse computations Lecture 11 traverse computations
Lecture 11 traverse computations
 

Viewers also liked

Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
GAURAV. H .TANDON
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
RAHUL SINHA
 
Introduction to Surveying
Introduction to Surveying Introduction to Surveying
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
Est
 
Correction Tape
Correction TapeCorrection Tape
Correction Tape
Carol Tang
 
Fieldwork 1
Fieldwork 1Fieldwork 1
Fieldwork 1
Melvin Lim
 
Multidirectional survey measurement errors: the latent class MTMM model
Multidirectional survey measurement errors: the latent class MTMM modelMultidirectional survey measurement errors: the latent class MTMM model
Multidirectional survey measurement errors: the latent class MTMM model
Daniel Oberski
 
Surveying l
Surveying lSurveying l
Surveying l
Yourskill Tricks
 
Power point Diabetes
Power point DiabetesPower point Diabetes
Power point Diabetes
mariden santamaria jimenez
 
Surveying
SurveyingSurveying
Surveying
Wajji Mirza
 
Getting To Know The Microscope Lab
Getting To Know The Microscope LabGetting To Know The Microscope Lab
Getting To Know The Microscope Labjrt004
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Yap Xin
 
surveying ii
surveying iisurveying ii
surveying ii
Gowtham Raja
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
Kai Yun Pang
 
levelling survey
levelling surveylevelling survey
levelling survey
prashantsingham
 
chain surveying
chain surveyingchain surveying
chain surveying
Self-employed
 

Viewers also liked (20)

Chain surveying
Chain surveyingChain surveying
Chain surveying
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Surveying
Surveying Surveying
Surveying
 
Introduction to Surveying
Introduction to Surveying Introduction to Surveying
Introduction to Surveying
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
Correction Tape
Correction TapeCorrection Tape
Correction Tape
 
Fieldwork 1
Fieldwork 1Fieldwork 1
Fieldwork 1
 
Multidirectional survey measurement errors: the latent class MTMM model
Multidirectional survey measurement errors: the latent class MTMM modelMultidirectional survey measurement errors: the latent class MTMM model
Multidirectional survey measurement errors: the latent class MTMM model
 
Surveying l
Surveying lSurveying l
Surveying l
 
Power point Diabetes
Power point DiabetesPower point Diabetes
Power point Diabetes
 
Surveying
SurveyingSurveying
Surveying
 
Getting To Know The Microscope Lab
Getting To Know The Microscope LabGetting To Know The Microscope Lab
Getting To Know The Microscope Lab
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
 
surveying ii
surveying iisurveying ii
surveying ii
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
levelling survey
levelling surveylevelling survey
levelling survey
 
chain surveying
chain surveyingchain surveying
chain surveying
 

Similar to S2 3.1 tape and offset surveying

Linear measurement
Linear measurementLinear measurement
Linear measurement
Linear measurement Linear measurement
Linear measurement
RAMPRASAD KUMAWAT
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
Janak82
 
Ce6304 surveying i-2015_07_16_10_57_06_997
Ce6304 surveying i-2015_07_16_10_57_06_997Ce6304 surveying i-2015_07_16_10_57_06_997
Ce6304 surveying i-2015_07_16_10_57_06_997
Massanja Tollah
 
73941338 surveying-lab-manual-1
73941338 surveying-lab-manual-173941338 surveying-lab-manual-1
73941338 surveying-lab-manual-1
Anu Parameswaran
 
Surveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdfSurveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdf
sdfghj21
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
Rakesh Verma
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
KishanKelothu
 
Surveying i
Surveying iSurveying i
Surveying i
Self employed
 
btech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdfbtech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdf
SaloniSingh252386
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Parimal Jha
 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
Rashmi.R.Belur Setty
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
Kamal B
 
Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
A Makwana
 
survey 12.pdf
survey 12.pdfsurvey 12.pdf
survey 12.pdf
DarSafwan
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
Mir Zafarullah
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
Ashok Narisetti
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveying
SimonReuben2
 
Chain Surveying Lecture notes very important 2.pptx
Chain Surveying Lecture  notes very important 2.pptxChain Surveying Lecture  notes very important 2.pptx
Chain Surveying Lecture notes very important 2.pptx
sahaniashish582003
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
sandipanpaul16
 

Similar to S2 3.1 tape and offset surveying (20)

Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Linear measurement
Linear measurement Linear measurement
Linear measurement
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
 
Ce6304 surveying i-2015_07_16_10_57_06_997
Ce6304 surveying i-2015_07_16_10_57_06_997Ce6304 surveying i-2015_07_16_10_57_06_997
Ce6304 surveying i-2015_07_16_10_57_06_997
 
73941338 surveying-lab-manual-1
73941338 surveying-lab-manual-173941338 surveying-lab-manual-1
73941338 surveying-lab-manual-1
 
Surveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdfSurveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdf
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Surveying i
Surveying iSurveying i
Surveying i
 
btech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdfbtech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdf
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
 
survey 12.pdf
survey 12.pdfsurvey 12.pdf
survey 12.pdf
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveying
 
Chain Surveying Lecture notes very important 2.pptx
Chain Surveying Lecture  notes very important 2.pptxChain Surveying Lecture  notes very important 2.pptx
Chain Surveying Lecture notes very important 2.pptx
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
Est
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
Est
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
Est
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
Est
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
Est
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
Est
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
Est
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
Est
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
Est
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
Est
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
Est
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
Est
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
Est
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
 

Recently uploaded

Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptxLiving-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
TristanJasperRamos
 
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shopHistory+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
laozhuseo02
 
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
3ipehhoa
 
How to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptxHow to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptx
Gal Baras
 
guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...
Rogerio Filho
 
Latest trends in computer networking.pptx
Latest trends in computer networking.pptxLatest trends in computer networking.pptx
Latest trends in computer networking.pptx
JungkooksNonexistent
 
The+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptxThe+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptx
laozhuseo02
 
ER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAEER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAE
Himani415946
 
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
3ipehhoa
 
test test test test testtest test testtest test testtest test testtest test ...
test test  test test testtest test testtest test testtest test testtest test ...test test  test test testtest test testtest test testtest test testtest test ...
test test test test testtest test testtest test testtest test testtest test ...
Arif0071
 
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
3ipehhoa
 
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesMulti-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Sanjeev Rampal
 
Output determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CCOutput determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CC
ShahulHameed54211
 
1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...
JeyaPerumal1
 
This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!
nirahealhty
 
BASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptxBASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptx
natyesu
 

Recently uploaded (16)

Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptxLiving-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
 
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shopHistory+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
 
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
 
How to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptxHow to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptx
 
guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...
 
Latest trends in computer networking.pptx
Latest trends in computer networking.pptxLatest trends in computer networking.pptx
Latest trends in computer networking.pptx
 
The+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptxThe+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptx
 
ER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAEER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAE
 
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
 
test test test test testtest test testtest test testtest test testtest test ...
test test  test test testtest test testtest test testtest test testtest test ...test test  test test testtest test testtest test testtest test testtest test ...
test test test test testtest test testtest test testtest test testtest test ...
 
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
 
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesMulti-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
 
Output determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CCOutput determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CC
 
1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...
 
This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!
 
BASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptxBASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptx
 

S2 3.1 tape and offset surveying

  • 1. 1 Chapter 3 – Distance measurement (Tape and offset surveying) The method of tape surveying is often referred to as chain surveying, deriving its name from the fact that the principal item of equipment traditionally used was a measuring chain. owadays, the chain has been replaced by the more accurate steel band. Distance measuring techniques Pacing i. Pacing is a very useful (although imprecise) technique of distance measurement. ii. An individual’s length of pace can be determined by repeatedly pacing between two marks a set distance apart (e.g. 100ft or 30m). iii. Pacing is particularly useful when looking for previously set survey markers (property and construction layout markers). Odometer i. A measuring wheel (12-in to 24-in diameter) equipped with an odometer. ii. It is used by assessors and other real-estate personnel to recorded property frontages and areas.
  • 2. 2 Distance obtained from positioning techniques Satellite positioning – once the position coordinates are known, it is simple enough to compute the distance between those positions. EDM (Electronic Distance Measurement) It is an instruments function by sending a light wave or microwave along the path to be measured and then measuring the phase differences between the transmitted and received signals. Gunter’s chain The chain was robust, easily read, and easily repaired in the field if broken. It was liable to vary somewhat in length, however, because of wear on the metal-to-metal surfaces, bending of the links, mud between the bearing surfaces etc. i. normally either 20 m or 30 m long ii. made of tempered steel wire iii. made up of links that measured 200 mm from center to center of each middle connecting ring iv. swiveling brass handles were fitted at each end, the total length was measured over the handles
  • 3. 3 v. Tally markers, made of plastic, were attached at every whole metre position, and those giving 5 m positions were of a different colour. To be precise, it was 66 ft long and was composed of 100 links. The length of 66 ft was apparently chosen because of its relationships to other units in the Imperial system: 80 chains = 1 mile 10 square chains = 1 acre (10 x 662 = 43560 ft2 ) 4 rods (1 rod = 16.5 ft) = 1 chain Taping Taping is used for short distances and in many construction applications. i. Fiber-glass tapes a. Fiberglass tapes are used for applications where lower precision is acceptable. b. Fiberglass tapes can give accuracies in the centimeter range. c. Typical uses of fiberglass tapes involve topographic, fencing measurements and etc.
  • 4. 4 ii. Steel tapes a. Steel tapes are used for precise measuring. b. Typical engineering surveying accuracy ratios in the range of 1:3000 to 1:5000 can be readily attained when measuring with a steel tape if the proper techniques are employed. c. Steel tapes can measure to the nearest millimeter (or nearest hundredth of a foot). d. The most commonly used tape length in metric units is 30m (lengths of 20m, 50m, and 100m can also be obtained). e. Graduated every 10mm and figured every 100mm. Whole meter figures are shown in red at every meter. f. Steel tapes come in two common cross-sections: i. heavy duty is 8mm x 0.45mm – generally used in route surveys (e.g. high-ways, railroads) ii. normal usage is 6mm x 0.30mm – generally used in structural surveys.
  • 5. 5
  • 6. 6 Taping accessories i. Plumb bob a) Plumb bobs are normally made of brass and weight from 8oz to 18oz. 10oz and 12oz plumb bobs most widely used. b) Plumb bobs come with about 6 ft of string. c) Plumb bobs are used in taping to permit the surveyor to hold the tape horizontal when the ground is sloping.
  • 7. 7 ii. Hand level a) Hand levels are small rectangular or cylindrical sighting tubes equipped with tubular bubbles and horizontal crosshairs that permit the surveyor to make low-precision horizontal sightings. b) The bubble location and the crosshair can be viewed together via a 45° mounted mirror.
  • 8. 8 c) Hand levels can be used to assist the surveyor in keeping the tape horizontal while the tape is held off the ground. d) The hand level is held by the surveyor at the lower elevation and a sight is taken on the uphill surveyor. iii. Ranging rods (or range poles) a) Range poles are 2 m, 2.5 m or 3m wood or steel poles with pointed steel shoes (or steel points). b) These poles are usually painted alternately red and white in 500mm (or 1ft) sections. c) The range pole can be used to provide theodolite and total station sightings for angle and line work. d) These poles were also used in taping to help with alignment for distances longer than one tape length. e) The pole was set behind the measurement terminal point and the rear tape person could keep the forward tape person on line by simply sighting on the pole and then waving the forward tape person left or right until they are on line.
  • 9. 9 iv. Clamp handle The clamp handle helps the surveyor to grip the tape at any intermediate point without kinking the tape. v. Chaining pin (or Marking arrows) When measuring the length of a long line, the tape has to be laid down a number of times and the positions of the ends marked with arrows, which are steel skewers about 40 mm long and 3-4 mm diameter. A piece of red ribbon at the top enables them to be seen more clearly. a) Chaining pin come in a set of eleven.
  • 10. 10 b) They are painted alternately red and white and are 350mm to 450mm long. c) Chaining pins are used to mark intermediate points on the ground while making long measurements. vi. Tension handle The tension handle used in precise work to ensure that the correct tension is being applied. vii. Pegs a) Points that need to be more permanently marked, such as the intersection points of survey lines, are marked by nails set in the tops of wooden pegs driven into ground by a mallet. b) A typical size is 40 mm x 40 mm x 0.4 m long. c) In very hard ground, steel dowels are used instead, while in asphalt roads small 5 or 6 mm square brads are used.
  • 11. 11 viii. Abney hand level The Abney level consists essentially of a sighting tube, to which is attached a graduated arc. An index arm, pivoted at the centre of the arc, carries a small bubble tube, whose axis is normal to the axis of the arm, so that as the tube is tilted the index moves over the graduated arc. By means of an inclined mirror mounted in one-half of the sighting tube, the bubble is observed on the right-hand side of the field of view when looking through the eyepiece of the sighting tube. In using the instrument for the measurement of vertical angles, when measuring mean ground slope, if the sight is taken onto a point whose height above the ground is the same as that of the observer’s eye, then the line of sight will be parallel to the mean ground surface. A ranging rod with a mark on it at the required height makes a suitable target. To measure the angle, a sight is taken onto the mark, and the bubble is brought into the field of view by means of the milled head to be bisected by the sighting wire at the same time as the wire is on the target. The angle is now read on the vernier.
  • 12. 12 Taping techniques (i) Measuring distance with tape The operation is carried out by two assistants, known as chainmen because the measurement was traditionally made by chain, one acting as leading chainman and the other as follower. The chainmen take one end each of the steel band and the band is
  • 13. 13 pulled out full length and examined for defects. The leader is equipped with ten arrows and a ranging rod, and the follower also takes a ranging rod. Then, to measure line AB having previously positioned ranging rods at both A and B: (1) The leader drags his end of the band forward to A1 and holds his ranging rod about 0.3 m short of the end. (2) The follower has to holds end of the band firmly against station at A, and the surveyor lines in the leader’s pole between A and B by closing one eye, sighting poles A and B, and signaling the leader till he brings his pole into line AB. The system of signaling usually adopted is to swing the left arm out to the left as an instruction to the leader to move his pole in that direction: the right arm is similarly used to indicate movement to the right, while both arms extended above the head, then brought down, indicates that the pole is one line. (3) The leader straightens the band past the rod by sending gentle ‘snakes’ down the band. (4) The follower indicates that the band is straight, and the leader puts an arrow at the end, A1. (At this stage offsets or ties may be taken from known positions to required detail.) (5) The leader then drags his end to A2, taking nine arrows and his pole. (6) The follower moves to A1, and puts his pole behind the arrow; the surveyor again lines in from here or from A. The above procedure is repeated, the follower picking up the first arrow before he moves from A1. The leader moves to A3, carrying eight arrows. The follower moves to A2, carrying the arrow from A1. If the line measured is longer than ten times the band length, the leader will exhaust his supply of arrows, so that when the eleventh band length is stretched out, the follower will have to hand back the ten arrows to the leader. This fact is pointed out to the surveyor, who notes it in his field book. The number of arrows held by the follower serves as a check on the number of full band lengths measured in the line.
  • 14. 14 (ii) Measurements along slopes The terrain that has to be surveyed in general will not be a horizontal plane, whereas the distance required for the preparation of a plan or map is the horizontal distance. When distance is measured along a slope, it has to be converted into horizontal distance for the purpose of plotting. In general, there are two methods of chaining along a slope: a) To measure distances horizontally in steps and transfer the points to the ground, and b) To measure along the slope and convert the distances into horizontal distances.
  • 15. 15 (a) Stepping (or measuring horizontally) Suppose one has to measure the distance between the stations A and B, the procedure is the following. 1) At least two persons are required for the chaining. One end of the chain is held at A and a convenient length is selected and the chain is held horizontally. The chain tends to sag due to its own weight and has to be counteracted by applying sufficient pull to it so that it remains horizontal. 2) The follower holds the end of the chain at A. the leader goes along the line with a selected length of the chain and a ranging rod and faces the follower. The follower directs the leader to be in line and both pull the chain to eliminate the sag of the chain. 3) The length of the chain is selected such that it can be held truly horizontal and pull applied by hand. Once the chain has been stretched to be horizontal, the point C’ of the end of the chain is transferred to the ground using a plumb bob. The point C is thus obtained. The distance between A and C is the length of the chain held horizontally. 4) The process can be repeated starting at C to get points D, E, F, etc. till the end B is reached. 5) The total horizontal distance is the sum of the lengths of the number of steps taken to reach B from A. 6) In general, measurement using this method should be done downhill. If the distance has to be measured uphill, the second method is preferable, as the follower, while going uphill, has to direct the leader for ranging, hold the chain, and transfer the point to the ground, which is very difficult. 7) The horizontal distance (selected as the step distance) also depends upon the slope. For steep slopes, the distance has to be small.
  • 16. 16 (b) Measuring along the slope Length can be measured along the slope and the slope distance converted into horizontal distance. To measure the slope either as an angle or gradient and calculate the horizontal distance; - The slope of the terrain may be determined as an angle θ with an angle-measuring instrument. The simplest instrument is a clinometers. - When the slope of the ground has been measured, it is easy to find the horizontal distance: Horizontal distance = Ɩcosθ Where, Ɩ is the length along the slope θ is the angle made by the ground with the horizontal. - If the slope is gentle and uniform for a long distance, this method can be used. - For undulating ground, this method is not suitable.
  • 17. 17 Standard conditions for the use of steel tapes Because steel tapes can give different measurements when used under various tension, support, and temperature conditions, it is necessary to provide standards for their use. Standard taping conditions are shown below: Metric system, 30 m steel tape: 1. Temperature = 20°C 2. Tape fully supported 3. Tape under a tension of 50N (because 1 lb force = 4.448N, 50N = 11.24 lbs) In the real world of field surveying, the above-noted standard conditions seldom occur at the same time. The temperature is usually something other than standard, and in many instances the tape cannot be fully supported (one end of the tape is often held off the ground to keep it horizontal). If the tape is not fully supported, the tension of 50N does not apply. When standard conditions are not present, systematic errors will be introduced into the tape measurements.
  • 18. 18 Taping corrections Systematic Taping Errors Random Taping Errors 1. Slope 1. Slope 2. Erroneous length 2. Temperature 3. Temperature 3. Tension and sag 4. Tension and sag 4. Alignment 5. Marking and plumbing
  • 19. 19 Offset Surveying Objective: To understand how to set a perpendicular line from a point using tapes only Equipment for measuring right angles The cross staff The optical square
  • 20. 20 Setting out right angles Because this operation is often required in connection with the measurement of offsets, this is a convenient point at which it may be discussed. There are two cases to consider: (1) dropping a perpendicular from a point to a line; and (2) setting out a line at right angles to the survey line from a given point on the steel band. Dropping a perpendicular from a point to a line (a) For short offsets, the end of the tape is held at the point to be located, and the right angle is estimated by eye. Although this is a usual method in practice, it is not so accurate as the following methods. (b) Swing the tape with its zero as center about the point, and the minimum reading at which it crosses the band is noted. This occurs when the tape is perpendicular to the band. (c) Swing the tape with the free end of the tape at center P (the point), strike an arc to cut the band at A and B. Bisect AB at Q. Then angle PQA = 90°. P A Q B
  • 21. 21 (d) Run the tape from P to any point A on the band. Bisect PA at B, and with the center B and radius BA strike an arc to cut the band at Q. Then angle AQP = 90°, being the angle in a semicircle. P B Survey line A Q Setting out a line at right angles to the survey line from a given point on the steel band (a) Cross staff: this is mounted on a short ranging rod, which is stuck in the ground at the point at which the right angle is to be set out. The cross staff is turned until a sight is obtained along the survey line, and the normal is then set out by sighting through the slits at right angles to this. (b) Optical square: this is used as already described, being either held in the hand or else propped on a short ranging rod. (c) Pythagoras’ theorem (3, 4, 5 rule or any multiple thereof, say 9, 12, 15, or 11.62 =8.42 +82 ): with the zero end of the tape at P take the 24 m mark of the tape to A, where AP = 12 m on the band. Take the 9 m mark on the tape in the hand and, ensuring that the tape is securely held at A and P, pull both parts of the tape taut to Q. Then angle APQ = 90°. Q 15 m 9 m survey line A P (d) Take A and B on the band so that PA = PB. Strike arcs from A and B with equal radii to intersect at Q. Then angle APQ = 90°.
  • 22. 22 Errors in linear measurement and their correction In all surveying operations, as indeed in any operation involving measurement, errors are likely to occur, and so far as is possible they must be guarded against or their effects corrected for. The types of error that can occur have been classified as follows: 1) Mistakes 2) Systematic error 3) Random error Mistakes Mistakes occur due to carelessness of human. Examples of mistake include: 1.) Miscounting the number of tape length when measuring a long distance, 2.) Misreading the graduation on measuring tape, 3.) Erroneous booking The possibility of occurrence of these mistakes can be minimized by taking suitable check measurement. - Omitting an entire band length in booking - This is prevented by noting down each band length, and by the leader keeping careful count of the arrows. - Misreading the steel band - It is best if two people make important readings. - Erroneous booking sometimes occurs - It is prevented by the chainman carefully calling out the result and the surveyor repeating it, paying attention when calling 5 or 9, 7 or 11. Systematic or cumulative error Systematic errors are defined as the errors whose magnitude and algebraic sign can be determined, allowing the surveyor to eliminate them from the measurements, and hence improve the accuracy. In other words, under the same measurement conditions, these errors will have the same magnitude and direction. An example of systematic errors is the error resulting from the effects of temperature on a steel tape. If the temperature is known, the lengthening effects on the steel tape can be precisely determined. If appropriate corrections are not made, these errors can accumulate and cause significant discrepancies between measured values. By keeping equipment in proper working order and following established surveying procedures, many of the systematic errors can be eliminated. These arise from sources that may be taken to act in a similar manner on successive observations, although their magnitude can vary. Their effects, when known, may be eliminated.
  • 23. 23 1) Slope All measurements in surveying must either be in the horizontal plane, or be corrected to give the projection on this plane. Lines measured on slopping land must be longer than lines measured on the flat, and if the slope is excessive, then a correction must be applied. There are two methods. i) Stepping On ground that is of variable slope this are the best method, and no need calculation. The measurement is done in short lengths of 5-10 m, the leader holding the length horizontal. The point on the ground below the free end of the band is best located by plumb bob, as shown in the figure below. Plumb bob 5 – 10 m held horizontally Stepping ii) Measuring along the slope This method is applicable where the ground runs in long regular slopes. The slope is measured either by an instrument such as the Abney level, or by leveling, a procedure that gives the surface height at points along the slope. (a) Measurement of slope angle, a Correct length = measured length × cos a where a = angle of slope Correction = - L(1 – cos a) where L = measured length L
  • 24. 24 (b) slope can be expressed also as 1 in n, which means a rise of 1 unit vertically for n units horizontally: for small angles a = 1/n radians. (c) Slope can also be expresses in terms of the difference in level, h, between two points. Correction = - [L – (L2 – h2 )1/2 ] L h 2 2 −≈ (d) Finally Pythagoras’ theorem may be used. L h a correct length = √(L2 – h2 ) 2) Erroneous length (or Incorrect length of chain) The most careful measurements will not produce an accurate survey if, for example, the band has been damaged and is therefore of incorrect length, because every time the band is stretched out it will measure not 30 m but 30 m ± (some constant or systematic error). If uncorrected, such an error could have serious effects. By checking the band against a standard, such as two marks measured for the purpose, the exact error per band length is known. If this error cannot be eliminated, a correction can be applied which will enable the effect of error to be removed. dardsoflength usedbandoflength xlengthmeasuredlengthcorrect tan = Example: A measurement was recorded as 171.278m with a 30m tape that was only 29.996m under standard conditions. What is the corrected measurement? Solution: Correction per tape length = - 0.004 Number of times the tape was used = 171.278/30 Total correction = -0.004 x 171.278/30 = - 0.023m Corrected distance = 171.278 – 0.023 = 171.255m
  • 25. 25 Or dardsoflength usedbandoflength xlengthmeasuredlengthcorrect tan = = 171.278 x 29.996/30 = 171.255m Example: You must lay out the side of a building, a distance of 210.08ft. The tape to be used is known to be 100.02ft under standard conditions. Solution: Correction per tape length = 0.02ft Number of times that the tape is to be used = 2.1008 Total correction = 0.02 x 2.1008 = +0.04ft (When involve laying out a distance, the sign of the correction must be reversed before being applied to the layout measurement. We must find the distance that, when corrected by +0.04, will give 210.08ft, that is 210.08 – 0.04 = 210.04ft. This is the distance to be laid out with the tape (100.02ft) so that the corner points will be exactly 210.08ft apart.) 3) Tape standardization For very accurate work a spring balance should be attached to one end of the steel band. The purpose of this is to ensure that the band is tensioned up to the value at which it was standardized: i.e. if the band is 30 m long at 20° C under a 5 kg pull on the flat, then a tension of 5 kg should be applied to eliminate any correction for pull. The balance is usually attached to a short cord. The far end of the band will then be attached to a second rod, and if these rods are set firmly on or in the ground and levered backwards, the tension applied to the tape can be regulated to any value. All good-quality bands should have a standardization certificate, which, for example, might say that the band, nominally 30 m long, is in fact only 29.999 m on the flat at 20° C with a tension of 5 kg applied. This data is used to make corrections to the length as taped to refine the procedure. In addition to the standardization and slope corrections mentioned above the following factors might have to be considered: - elasticity and thermal changes in those cases where the field conditions differ from those at which the tape was standardized; - deviation from the straight; - height above mean sea level; - sag, if the tape has been standardized on the flat, not in catenary. (a) Temperature Similarly a correction is required if the tape temperature, T, is not equal to the standard temperature, Ts :
  • 26. 26 Correction for Temperature = α (T – Ts) L where α = coefficient of linear expansion. L = length If T is less than Ts, the tape has contracted, and if T is more than Ts, the tape has expanded. The correction to the length measured is positive (correction has to be added) when (T – Ts) is positive. The correction to the length measure is negative (correction has to be subtracted) when (T – Ts) is negative. Example: A distance was recorded as being 471.37ft at a temperature of 38°F. What is the distance when corrected for temperature? If the standardized temperature for the tape is 68° F and α = 0.00000645 per unit length per degree Fahrenheit (°F). Solution Ct = 0.00000645(38 – 68)471.37 = -0.09 Correct distance = 471.37 – 0.09 = 471.28ft Example: You must lay out two points in the field that will be exactly 100.000m apart. Field conditions indicate that the temperature of the tape is 27°C. What distance will be laid out? If the standardized temperature for the tape is 20°C and α = 0.0000116 per unit length per degree Celsius (°C). Solution Ct = 0.0000116(27 – 20)100.000 = +0.008m (when corrected by +0.008, will give 100.000m: Layout distance is 100.000 – 0.008 = 99.992m) (b) Tension As mentioned, the correct tension can be applied to the band by attaching a spring balance to the handle at one end. If the standard tension is not applied a correction should be made, because the length of the tape will have changed: Pull correction = AE LPP sa )( −
  • 27. 27 where Pa, Ps = field and standard tension respectively, A = cross-sectional area of band, E = Young’s modulus of elasticity for the band (generally taken as 21x105 kg/cm2 ), and L = length measured. Example: A 30m tape is used with a 100N force, instead of the standard tension of 50N. If the cross-sectional area of the tape is 0.02cm2 , what is the tension error per tape length? Solution Cp = (100 – 50)30 / [0.02 x 21 x 105 x 9.807] = + 0.0036m If a distance of 182.716m had been measured under these conditions, the total correction would be: Total Cp = 182.716/30 x 0.0036 = +0.022m The corrected distance would be 182.738m. (c) Sag (or correction for Catenary) If the highest accuracy is required, rather than lie the band along the ground, it can be suspended between tripod heads, i.e. hung in catenary, and a correction for the sag in the tape applied if the tape has been standardized on the flat. Fig. 2 shows a simple arrangement that could be used. Straining lever Straining post spring balance Marking pegs Fig. 2 When measuring a line the pegs are aligned, preferably by theodolite, and after the pegs have been driven, zinc strips are tacked on. The levels of the tops are found, a traverse scratch mark is made on the first peg to serve as the beginning of the base line; a longitudinal scratch may also be line in. Lever-type straining arms and spring balance may conveniently used for tensioning and supporting the tape, which is adjusted so that the first zero is aligned with the scratched reference mark. A traverse scratch is then made on the second peghead against the second, and this serves as reference mark for the second bay, the process being repeated. The tape itself is aligned by theodolite, and temperatures are measured as before. Note that in this operation the tape should float just
  • 28. 28 clear of the stakes. Instead of aligning the zero of the tape with the scratch made when taping the previous bay, it is also possible to make another scratch to mark the beginning of the new bay, the necessary correction to the bay length then being measuring the distance between the two scratches. Sag correction = 2 32 24P Lw− where w = weight per unit length of the tape and L is the measured length of span. If the tape is standardized in catenary no correction is required for sag so long as the field tension P is the same as standard tension Ps. Example Calculate the length between two supports if the recorded length is 50.000m, the mass of the tape is 1.63kg, and the applied tension is 100N. Solution Cs = -(1.63 x 9.807)2 x 50.000 / (24 x 1002 ) = -0.053m Therefore, the length between supports = 50.000 – 0.053 = 49.947m 4) Alignment The higher the accuracy required the more critical the alignment of the band becomes. Corrections can be applied for misalignment, but because this would require actually measuring the misalignment, as in the figure below, it is generally easier to take care and line in the band with a theodolite. Correction = -[AB(1 – cos α) + BC(1 –cos β)] A B1 C α β B 5) Sea level The length of the line as measured can be reduced to its equivalent length at mean sea level. In Fig. 1
  • 29. 29 Ɩ = (R + H) θ and Ɩ1 = Rθ Hence HR R ll + =1 Correction = Ɩ – Ɩ1 = HR H l HR R l + = + − )1( ≈ R H l and is deducted. Where R = radius of earth (approx. 6367km)
  • 30. 30 Example Four bays of base line AB were measured under a tension of 120 N and the data was given below. If the tape was standardized on the flat under a pull of 89 N and at temperature 20°C. Calculate the true length of the line. Bay Length (m) Difference in level (m) 1 29.478 + 0.294 2 29.208 - 0.384 3 29.396 + 0.923 4 29.916 - 0.726 Field temperature 31°C Cross-sectional area of tape 3.24 mm2 Density 7700 kg/m3 Coefficient of linear expansion 0.000 001/°C Young’s Modulus 15.3 x 104 MN/m2 Mean radius of earth 6367 km Mean level of tape 76.56 m AOD Solution `
  • 31. 31 Random errors (or accidental error) Random (or accidental) errors are associated with the skill and vigilance of the surveyor. It is not directly related to the conditions or circumstances of the observation. For a single measurement or a series of measurements, it is the error remaining after all possible systematic errors and mistakes have been eliminated. As the name implies, random errors are unpredictable and are often caused by factors beyond the control of the surveyor. Their occurrence, magnitude and direction (positive or negative) cannot be predicted. Some random errors, by their very nature, tend to cancel themselves. Because of their random nature, correction factors cannot be computed and applied as some systematic errors. It is assumed that the positive and negative random error measurements would tend to cancel each other out. Difference between Systematic Error and Random Errors The diagram below illustrates the distinction between systematic and random errors. Systematic errors tend to be consistent in magnitude and/or direction. If the magnitude and direction of the error is known, accuracy can be improved by additive or proportional corrections.
  • 32. 32 Additive correction involves adding or subtracting a constant adjustment factor to each measurement; Proportional correction involves multiplying the measurement(s) by a constant. Unlike systematic errors, random errors vary in magnitude and direction. It is possible to calculate the average of a set of measured positions, however, and that average is likely to be more accurate than most of the measurements.