CAPITAL GATE –ABU DHABI
MOST INCLINED TOWER ON THE PLANET
CONTENT
• General description
• Introduction
• Architecture
• Soil type
• Structure
• Foundation
• Core
• Façade
• Sun shading
• Floor system
• Fire proofing
• Thermal system
• Sustainable strategies
• Conclusion
• References
GENERAL DESCRIPTION
• Type - Commercial Offices; 5 star hotel
• Location - Abu Dhabi , United Arab Emirate
• Construction - started- Sept 2007
- completed-2011
• Owner - Abu Dhabi National Exhibition
Company(ADNEC)
• Height roof - 160 m (520 ft)
• Floor area - 53,100m2(572,000 ft)
• Floor count - 35
• Project developer -ADNEC Group
• Architect -Robert Mathew , Johnson-
Marshall and partners(RMJM)
• Main contractor - Al Habtoor Engineering
Enterprises
• Inclination - 18 degree westward
• Project Cost - $231m
• Steel Contractor - Eversendai
• Project Manager - Mace
INTRODUCTION
• CAPITAL GATE is one of the tallest skyscraper in Abu
Dhabi(160m).
• Tilting 18 deg westward(over four times as much as
Pisa).
• 35 storey structure includes a cantilevered tea lounge,
open air pool deck and Abu Dhabi’s 1st Hyatt hotel.
• It was the first building in the world to use a pre-
cambered core, with a built in lean of 350mm
engineered to straighten with the addition of the upper
floor.
• Also the 1st to use vertical post-tensioning of the core.
• It has 30 meeting rooms ,conference facilities for
1,200 people, a business center on the ground floor,
a helipad and an eight outlet food court.
• The $231m project was developed by Abu Dhabi
National Exhibitions Company.
• Construction work- Sept 2007-2011. Commercial
leasing of tower began in April 2011.
• In Sept 2011 , the project won the Best
Commercial/Mixed Use and the Best Overall Project
of the Year at 2011 Cityscape Global Awards for
Architecture in Emerging Markets.
• The Guinness Book of World Records certified
Capital Gate as ” World’s furthest leaning man-
made tower”.
ARCHITECTURAL EXPRESSION
• The ground-breaking form of Capital gate is
due not only to its lean, but also to its funnel
shape.
• The façade glazing emphasizes the organic
elements with diagonals spiraling up along the
structural diagrid.
• The potentially monument scale of Capital
Gate is tempered by a sun shading on south
façade known as splash.
• Due to its unique shape the upper half of the
tower widens to create an atrium at the hotel’s
guest room floors.
The atrium is funnel shaped and appears carved out of
the solid form around it, spiraling and leaning along
the tower.
Hotel atrium , looking up
SOIL TYPE
• The construction of building has been done on
the sea shore.
• The sea shore contain more of sand content, the
strength is gained by 30 m steel rods vertically
drilled deep into the ground.
STRUCTURE OF THE TOWER
• The tower has a 2-layer design. The central core of the
tower built leaning in the opposite direction to the
inclination of the building and straights with height.
• Advanced diagrid technology has been adopted for
the buildings twisted design.
• Steel beam support concrete floor & run b/w two
diagrid system.
• Outriggers are horizontal trusses connect building
distant structural element.
• Used to increase strength& overturning stiffness.
• The dense outriggers system started to be used
from 17th mechanical floor.
• Mainly used to resist wind load.
FOUNDATION
• The foundation consist of
rectangular raft footing on 490
concrete piles of 1m diameter.
• Half of the piles are under
compression and run to a depth
of 20 m.
• The other half of the piles run to
a depth of about 30 m and are in
tension due to massive eccentric
overhang of the building.
• The 2m deep raft footing was made up of
7000m3 of reinforced concrete to distribute
the loads evenly on the piles.
•
THE CORE
• The core was pre cambered i.e. it was initially tilted
away from the overhang of the building.
• The core was built using the technique called jump
forming(climbing formwork were used).
• The concreting was done at night to avoid the
extreme day heat.
• Slump test was carried out at every batch of
concrete.
• Concreting was done by pumping .
• The core was post tensioned.
• The core contains 15,000m3 of concrete
reinforced with 10,000tonnes of steel .
FACADE
• The façade/body was made up of steel cross
sections called cruciforms.
• The external diagrid consist of 720 such cruciforms.
• Each cruciform were different in length, curvature
and thickness.
• The external cruciforms were made up of
600x600mm hollow rectangular sections , the
thickness of the section ranged from 80mm at the
bottom to 40 mm at the top of the tower.
• The internal diagrid cruciforms were made with 80
mm dia hollow circular sections.
• The dimensional accuracy +/-1mm.
• The floor height is 4 m.
• Capital Gate’s cladding consist of two distinct
elements-a curtain wall glazing system and a metal
mesh shading system.
• The curtain wall consist of diamond shaped panels
stacked up floor by floor.
• The steel framing used was manufactured in
Austria. Frame profile is triangular to take loads in
all direction.
• The glass used is a low emissivity glass, very
transparent, yet provide good thermal insulation
and glare reduction.
• There’s a two storey
extension cantilevered
12 meters from the
tower.
• They are braced to the
external diagrid with
circular steel members
which reach diagonally
down to the
mechanical floor.
• The extension houses
a swimming pool.
SUNSHADING
• The sun shading starts from 18th floor and extends to
the Abu Dhabi National Exhibition Centre Grandstand.
• It is made up of steel members interlocked to form a
mesh.
• The splash reflects upto 30% of the incident radiation
thus decreasing the air conditioning required.
• The splash is supported by circular members which are
connected to external diagrid.
They are braced to the external diagrid with steel profiles
reaching diagonally to the plant floor.
FLOOR SYSTEM
• The floors are constructed using a composite
system, spanning from the main core, to the
internal diagrid and between internal and external
diagrid.
• The floor beams are connected to the concrete core
via embedment plates cast directly into the core
wall when concrete is poured.
FIRE PROOFING
• Fireproofing is done by installing steel fireproofing.
• It was done by PFP contracting.
WATER /VAPOUR
• The ‘pressure plate’ system used that has been
developed for the steel frame guarantees the water
tightness of the façade and allows thinner panes of
glass to be used , thereby reducing wt. of the
glazing system.
THERMAL
• The glass used on the tower’s façade is energy-
efficient containing two layers of silver inner coating
allowing a high degree of natural light permeate.
• It’s designed to keep the inside of building cool and
eliminate glare, while maintaining transparency of
the façade.
SUSTAINABLE STRATEGIES
• The round perimeter encloses space more
efficiently than a rectangle, so less façade surface is
needed. This is reduction in concrete, steel and
glass.
• Landscaping around capital gate creates a vegetated
roof over the basement increasing the thermal
insulation.
• The double-glazed façade is used to achieve greater
efficiency.
• Waste water is pre-cooled in b/w inner and outer
façade thereby reducing the energy consumptions
of the building by recycling the used air.
• Native plants are used which require less
irrigation.
• To further reduce potable water use in this
desert context, low-flow water fixtures are
installed in public areas and washrooms,
including WCs and faucets.
• District cooling is provided by Abu Dhabi
Municipality, a more energy-efficient means of
obtaining chilled water than installing chillers on
site.
• The chilled water is distributed by variable speed
pumping, which reduces energy use in operating
the air conditioning.
• Double skin façade system reduces the temp.
inside the building hence reduce the
requirement of air conditioning.
• The aloft building, another hotel located in
the compound , is tied into a total pf 560 solar
panels installed on the roof of ADNEC Park A,
covering an area of 2300sm that provides
90%of hot water supply.
• This saves an estimated 870 mega watt hours
of electricity per year and supplies hot water
to kitchens, hotel rooms and pool.
SCHEDULE
• It was delayed by 5.5months because of unexpected
excavations and piling restrictions due to nearby main
sewage line.
• There were more than 1,200 workers on site.
FINAL TIMELINE:
• Sept 2007-enabling works commence
• April 2008- core wall construction starts
• Feb 2009 – façade work commences
• May 2009 –Capital Gate reach 100m ht.
• Oct 2009- attains final ht. of 160m
• Dec 2009- completion of exterior core structure
• Feb 2010 – interior fit-out commences
• March 2010- work on link bridge to Abu Dhabi
National Exhibition center begins.
• April 2010 – work of atrium roof begins
• 2011- Construction work completed
• 21st Dec 2011- Opened
CONCLUSION
• While clearly unique structure was built using some
of the world’s advanced construction techniques.
• Functionality and purpose have been a prime focus.
• Owned and developed by ADNEC , Capital Gate is
the ultimate business capital in UAE.
• With far reaching views across Abu Dhabi and the
Arabian gulf , the tower accommodates approx
15,000sqm of exclusive office space as well as the
5star ‘Hyatt Capital gate’ hotel.
• The tower visually represent the Emirate’s progress
and evolution.
• It is focal point of a world class business district.
• It is interconnected with Abu Dhabi National
Exhibition Centre, which hosted more than 200
events in 2011, welcoming around one million
visitors.
• It has a “ Megastructures ” documentary on Nat
Geo channel ,broadcast in more than 166 countries.
• The Guinness Book of World Records certified
Capital Gate as ” World’s furthest leaning man-
made tower. It has shone a spotlight on the tower.
REFERENCES
• www.capitalgate.ae
• www.scribd.com
• Global.ctbuh.org
• www.designbuilt-network.com

More Related Content

What's hot

The Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case StudyThe Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case Study
Dinesh Kumar
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
Simi Sayed
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
Shubham Jain
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
Nitesh Parmar
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
Nuruzzamanpeash
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
Ar. M. Senthil [ senthilmani ]
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
Sanskriti Jindal
 
Cayan tower,dubai
Cayan tower,dubaiCayan tower,dubai
Cayan tower,dubai
Ar.Muhammad Riyas
 
Turning torso
Turning torsoTurning torso
Turning torso
Miral Hadakia
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
Chittagong University Of Engineering & Technology
 
Al Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, KuwaitAl Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, Kuwait
Sushil Kumar Gupta.
 
Burj al Arab Constuction
Burj al Arab ConstuctionBurj al Arab Constuction
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
Anurag Mathur
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
SaloniHosmani
 
Turning torso
Turning torsoTurning torso
Turning torso
youthelast
 
Sears tower
Sears tower Sears tower
Sears tower
akshayaraghavendran1
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
Zabihullah Nasiri
 
Burj khalifa, Dubai.
Burj khalifa, Dubai.Burj khalifa, Dubai.
Burj khalifa, Dubai.
Mayur Waghulde
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
Rithika Ravishankar
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
ShrushtiAhirrao1
 

What's hot (20)

The Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case StudyThe Shard, Skyscraper - Architectural Case Study
The Shard, Skyscraper - Architectural Case Study
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Cayan tower,dubai
Cayan tower,dubaiCayan tower,dubai
Cayan tower,dubai
 
Turning torso
Turning torsoTurning torso
Turning torso
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
 
Al Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, KuwaitAl Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, Kuwait
 
Burj al Arab Constuction
Burj al Arab ConstuctionBurj al Arab Constuction
Burj al Arab Constuction
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Turning torso
Turning torsoTurning torso
Turning torso
 
Sears tower
Sears tower Sears tower
Sears tower
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Burj khalifa, Dubai.
Burj khalifa, Dubai.Burj khalifa, Dubai.
Burj khalifa, Dubai.
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 

Similar to Capital gate abu dhabi

Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
Neha Rampuria
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyChyi Ong
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
VISHAKA BOTHRA
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
Sushil Kumar Gupta.
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
Dinesh Rishi Bhoga
 
burjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdfburjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdf
DinaraAldabergenova1
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
Chiranjita Jibhkate
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
RaiyyanKhalak
 
steel roof truss
steel roof trusssteel roof truss
steel roof truss
Rohit Dutta
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
BirukYared3
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
parimal manekar
 
Making of burj khalifa
Making of burj khalifaMaking of burj khalifa
Making of burj khalifa
Shivani Kulshrestha
 
Pm burj case
Pm burj casePm burj case
Pm burj case
Pooja Mishra
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
Souvik Mondal
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
AlasAlthaher
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
MOHAMMED JIRUWALA
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
Dhanveersinh Chavda
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
AlaaAbdelbaset3
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
AnshuBarmase
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
dheeraj byrapu
 

Similar to Capital gate abu dhabi (20)

Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
burjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdfburjkhalifa-160318164437.pdf
burjkhalifa-160318164437.pdf
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptxAl Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
Al Hamra Firdous Tower, Kuwait and 432 park avenue , NY BMC 6.pptx
 
steel roof truss
steel roof trusssteel roof truss
steel roof truss
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Making of burj khalifa
Making of burj khalifaMaking of burj khalifa
Making of burj khalifa
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 

Recently uploaded

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
nikitacareer3
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 

Recently uploaded (20)

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 

Capital gate abu dhabi

  • 1. CAPITAL GATE –ABU DHABI MOST INCLINED TOWER ON THE PLANET
  • 2. CONTENT • General description • Introduction • Architecture • Soil type • Structure • Foundation • Core • Façade • Sun shading • Floor system • Fire proofing • Thermal system • Sustainable strategies • Conclusion • References
  • 3. GENERAL DESCRIPTION • Type - Commercial Offices; 5 star hotel • Location - Abu Dhabi , United Arab Emirate • Construction - started- Sept 2007 - completed-2011 • Owner - Abu Dhabi National Exhibition Company(ADNEC) • Height roof - 160 m (520 ft) • Floor area - 53,100m2(572,000 ft) • Floor count - 35 • Project developer -ADNEC Group
  • 4. • Architect -Robert Mathew , Johnson- Marshall and partners(RMJM) • Main contractor - Al Habtoor Engineering Enterprises • Inclination - 18 degree westward • Project Cost - $231m • Steel Contractor - Eversendai • Project Manager - Mace
  • 5. INTRODUCTION • CAPITAL GATE is one of the tallest skyscraper in Abu Dhabi(160m). • Tilting 18 deg westward(over four times as much as Pisa). • 35 storey structure includes a cantilevered tea lounge, open air pool deck and Abu Dhabi’s 1st Hyatt hotel. • It was the first building in the world to use a pre- cambered core, with a built in lean of 350mm engineered to straighten with the addition of the upper floor. • Also the 1st to use vertical post-tensioning of the core.
  • 6. • It has 30 meeting rooms ,conference facilities for 1,200 people, a business center on the ground floor, a helipad and an eight outlet food court. • The $231m project was developed by Abu Dhabi National Exhibitions Company. • Construction work- Sept 2007-2011. Commercial leasing of tower began in April 2011. • In Sept 2011 , the project won the Best Commercial/Mixed Use and the Best Overall Project of the Year at 2011 Cityscape Global Awards for Architecture in Emerging Markets. • The Guinness Book of World Records certified Capital Gate as ” World’s furthest leaning man- made tower”.
  • 7.
  • 8. ARCHITECTURAL EXPRESSION • The ground-breaking form of Capital gate is due not only to its lean, but also to its funnel shape. • The façade glazing emphasizes the organic elements with diagonals spiraling up along the structural diagrid. • The potentially monument scale of Capital Gate is tempered by a sun shading on south façade known as splash. • Due to its unique shape the upper half of the tower widens to create an atrium at the hotel’s guest room floors.
  • 9. The atrium is funnel shaped and appears carved out of the solid form around it, spiraling and leaning along the tower. Hotel atrium , looking up
  • 10. SOIL TYPE • The construction of building has been done on the sea shore. • The sea shore contain more of sand content, the strength is gained by 30 m steel rods vertically drilled deep into the ground.
  • 11. STRUCTURE OF THE TOWER • The tower has a 2-layer design. The central core of the tower built leaning in the opposite direction to the inclination of the building and straights with height. • Advanced diagrid technology has been adopted for the buildings twisted design.
  • 12. • Steel beam support concrete floor & run b/w two diagrid system. • Outriggers are horizontal trusses connect building distant structural element. • Used to increase strength& overturning stiffness. • The dense outriggers system started to be used from 17th mechanical floor. • Mainly used to resist wind load.
  • 13.
  • 14. FOUNDATION • The foundation consist of rectangular raft footing on 490 concrete piles of 1m diameter. • Half of the piles are under compression and run to a depth of 20 m. • The other half of the piles run to a depth of about 30 m and are in tension due to massive eccentric overhang of the building.
  • 15. • The 2m deep raft footing was made up of 7000m3 of reinforced concrete to distribute the loads evenly on the piles.
  • 16.
  • 17. THE CORE • The core was pre cambered i.e. it was initially tilted away from the overhang of the building. • The core was built using the technique called jump forming(climbing formwork were used). • The concreting was done at night to avoid the extreme day heat. • Slump test was carried out at every batch of concrete. • Concreting was done by pumping . • The core was post tensioned.
  • 18.
  • 19. • The core contains 15,000m3 of concrete reinforced with 10,000tonnes of steel .
  • 20. FACADE • The façade/body was made up of steel cross sections called cruciforms. • The external diagrid consist of 720 such cruciforms. • Each cruciform were different in length, curvature and thickness. • The external cruciforms were made up of 600x600mm hollow rectangular sections , the thickness of the section ranged from 80mm at the bottom to 40 mm at the top of the tower. • The internal diagrid cruciforms were made with 80 mm dia hollow circular sections.
  • 21. • The dimensional accuracy +/-1mm. • The floor height is 4 m.
  • 22. • Capital Gate’s cladding consist of two distinct elements-a curtain wall glazing system and a metal mesh shading system. • The curtain wall consist of diamond shaped panels stacked up floor by floor. • The steel framing used was manufactured in Austria. Frame profile is triangular to take loads in all direction. • The glass used is a low emissivity glass, very transparent, yet provide good thermal insulation and glare reduction.
  • 23. • There’s a two storey extension cantilevered 12 meters from the tower. • They are braced to the external diagrid with circular steel members which reach diagonally down to the mechanical floor. • The extension houses a swimming pool.
  • 24. SUNSHADING • The sun shading starts from 18th floor and extends to the Abu Dhabi National Exhibition Centre Grandstand. • It is made up of steel members interlocked to form a mesh. • The splash reflects upto 30% of the incident radiation thus decreasing the air conditioning required. • The splash is supported by circular members which are connected to external diagrid.
  • 25. They are braced to the external diagrid with steel profiles reaching diagonally to the plant floor.
  • 26. FLOOR SYSTEM • The floors are constructed using a composite system, spanning from the main core, to the internal diagrid and between internal and external diagrid. • The floor beams are connected to the concrete core via embedment plates cast directly into the core wall when concrete is poured. FIRE PROOFING • Fireproofing is done by installing steel fireproofing. • It was done by PFP contracting.
  • 27.
  • 28. WATER /VAPOUR • The ‘pressure plate’ system used that has been developed for the steel frame guarantees the water tightness of the façade and allows thinner panes of glass to be used , thereby reducing wt. of the glazing system. THERMAL • The glass used on the tower’s façade is energy- efficient containing two layers of silver inner coating allowing a high degree of natural light permeate. • It’s designed to keep the inside of building cool and eliminate glare, while maintaining transparency of the façade.
  • 29. SUSTAINABLE STRATEGIES • The round perimeter encloses space more efficiently than a rectangle, so less façade surface is needed. This is reduction in concrete, steel and glass. • Landscaping around capital gate creates a vegetated roof over the basement increasing the thermal insulation. • The double-glazed façade is used to achieve greater efficiency. • Waste water is pre-cooled in b/w inner and outer façade thereby reducing the energy consumptions of the building by recycling the used air.
  • 30. • Native plants are used which require less irrigation. • To further reduce potable water use in this desert context, low-flow water fixtures are installed in public areas and washrooms, including WCs and faucets. • District cooling is provided by Abu Dhabi Municipality, a more energy-efficient means of obtaining chilled water than installing chillers on site. • The chilled water is distributed by variable speed pumping, which reduces energy use in operating the air conditioning.
  • 31. • Double skin façade system reduces the temp. inside the building hence reduce the requirement of air conditioning. • The aloft building, another hotel located in the compound , is tied into a total pf 560 solar panels installed on the roof of ADNEC Park A, covering an area of 2300sm that provides 90%of hot water supply. • This saves an estimated 870 mega watt hours of electricity per year and supplies hot water to kitchens, hotel rooms and pool.
  • 32. SCHEDULE • It was delayed by 5.5months because of unexpected excavations and piling restrictions due to nearby main sewage line. • There were more than 1,200 workers on site. FINAL TIMELINE: • Sept 2007-enabling works commence • April 2008- core wall construction starts • Feb 2009 – façade work commences • May 2009 –Capital Gate reach 100m ht. • Oct 2009- attains final ht. of 160m • Dec 2009- completion of exterior core structure • Feb 2010 – interior fit-out commences
  • 33. • March 2010- work on link bridge to Abu Dhabi National Exhibition center begins. • April 2010 – work of atrium roof begins • 2011- Construction work completed • 21st Dec 2011- Opened
  • 34. CONCLUSION • While clearly unique structure was built using some of the world’s advanced construction techniques. • Functionality and purpose have been a prime focus. • Owned and developed by ADNEC , Capital Gate is the ultimate business capital in UAE. • With far reaching views across Abu Dhabi and the Arabian gulf , the tower accommodates approx 15,000sqm of exclusive office space as well as the 5star ‘Hyatt Capital gate’ hotel. • The tower visually represent the Emirate’s progress and evolution. • It is focal point of a world class business district.
  • 35. • It is interconnected with Abu Dhabi National Exhibition Centre, which hosted more than 200 events in 2011, welcoming around one million visitors. • It has a “ Megastructures ” documentary on Nat Geo channel ,broadcast in more than 166 countries. • The Guinness Book of World Records certified Capital Gate as ” World’s furthest leaning man- made tower. It has shone a spotlight on the tower.
  • 36. REFERENCES • www.capitalgate.ae • www.scribd.com • Global.ctbuh.org • www.designbuilt-network.com

Editor's Notes

  1. The building was designed in tekla software which gave accuracy in mm