Basics of Busbar Protection
Need for Busbar Protection
Need For Bus Protection
 In its absence fault clearance takes place in zone
II of distance relay by remote end tripping.
 This means slow and unselective tripping and
wide spread black out.
Effect of delayed clearance
 Greater damage at fault point
 Indirect shock to connected equipments like shaft
of generator and windings of transformer
Requirements of Busbar Protection
 Must have short tripping time as possible.
 Must be able to detect internal faults (sensitivity).
 Must be absolutely stable to external faults
(stability).
 Must be able to detect and trip only faulty part of
busbar system (selectivity)
 Must be secure against maloperation due to
auxilliary contact failure.
Types of Busbar Protection
Differential type of busbar protection is divided into
two groups.
 Low impedance scheme :
Low impedance scheme uses biased differential relay.
 High impedance Scheme:
High impedance scheme uses a stabilizing resistor in
series with the differential relay.
Differential Relay Principle
ault and the differential rsome internal f elay operates.Protected object
Differential
Relay
Busbar protection relays works on the differential
principle i.e. comparing the currents entering and
leaving a protected object.
If those currents matches the protected object is
assumed to be in healthy condition and relay remains
stable (non operating) . If there is a difference in
magnitudCe.Tof currents, it is assumed that thCe.Treis
Single busbar Protection (Healthy condition)
BUSBAR
ZONE
P1
P1
S P2
2
S
2
S
1
P2
S
1
Busbar87
Current
entering
the bus
Current
leaving
the bus
Under healthy condition the current
entering the busbar and leaving the
busbar will be same and the CT
secondary current circulates thru
the secondaries. No current flows
thru the relay. Hence the relay will
remain restrained (non operating).
Single busbar Protection (fault within bus)
BUSBAR
ZONE
P1
P1
S P2
2
S
1
P2
S
2
S
1
Busbar
87
Current
entering
to the
bus
Current
enters
from the
remote
bus
Under faulty condition all remote
busbars feed into fault and the
direction CT secondary currents
becomes additive and flows
though the rlay.
Single busbar Protection scheme
 Here, in the figure above we assume that at normal condition
feed, A, B, C& D, carries current IA, IB, IC, and ID . Now,
according to Kirchhoff's current law, at node K, IA + IB+ IC+ID = 0
 So, it is clear that under normal condition there is no current
flows through the busbar protection tripping relay.
 Now, say fault is occurred at any of the feeders, outside the
protected zone. In that case, the faulty current will pass through
primary of the CT of that feeder. This fault current is contributed
by all other feeders connected to the bus. So, contributed part of
fault current flows through the corresponding CT of respective
feeder. Hence at that faulty condition, if we apply KCL at node
K, we will still get, iR = 0.
BUSBAR
ZONE
87
A D
B C
Rela
y (R)
K
When fault is occurred on the bus itself. The fault current is
contributed
by all feeders connected to the bus. Hence, at this
condition, sum of all
contributed fault current is equal to total fault current. The
sum of all
secondary currents is no longer zero. It is equal to
secondary equivalent
of fault current.
So at this condition current starts flowing through 87 relay
and it makes
trip the circuit breaker corresponding to all the feeders
connected to this
section of the busbar. As all the incoming and outgoing
feeders,
connected to this section of bus are tripped, the bus
Double busbar system
Double bus system consists of two number of buses (Bus1 &
Bus # 2 )
separated by a bus coupler.
Double busbar Protection Scheme
(explained step-by-step)
Two number of bus bar protection relays are required for
protection of the double bus system , one for each bus. The
relays will
Feeder #1 Feeder #2
Trafo #1 Trafo #2
Bus
#1
Bus #2
Bus
Coupler
Open
87-1
87-2
100
A
100A
100
A
100A
Busbar
Protection
Relay Bus-
1
Busbar
Protection
Relay Bus-
2
Bus coupler closed condition
When bus coupler CB closed and feeder#2 switched- off condition, all the
load current is
coming through feeder #1. There will be unbalance current in the relays
and both relays
87-1
Feeder #1 Feeder #2
Trafo #1 Trafo #2
Bus
#1
Bus #2
Bus
Coupler
closed
87-2
100
A
100
A
200A
Feeder #2 CB
open
100
A
Busbar
Protection
Relay Bus-
1
Busbar
Protection
Relay Bus-
2
Buscoupler CTs
When the bus coupler bay is included in the bus bar
protection scheme.
The relays will remain stable during normal condition and
Feeder #1 Feeder #2
Trafo #1 Trafo #2
Bus #1 Bus #2
Bus
Coupler
closed
87-1
87-2
100
A
100
A
200 A
Feeder #2 CB
open
100 A
100A
Busbar
Protection
Relay
Bus-1
Busbar
Protection
Relay
Bus-2
Fault at bus coupler
In case of a fault in busbar heavy fault current flows but
bus coupler CB is
not covered by any bus bar protection zones. So the
Feeder #1 Feeder #2
Trafo #1 Trafo #2
Bus #1 Bus #2
Bus
Coupler
fault
87-1
87-2
100
A
Busbar -1
Protection
Zone
Busbar -2
Protection Zone
fault
Busbar
Protection
Relay
Bus-1
Busbar
Protection
Relay
Bus-2
Overlapping of Zones
Feeder #1 Feeder #2
Trafo #1 Trafo #2
Now the protection zones of Bus-1 and Bus-2 overlaps to
include the
buscoupler CB, So both Relays operates for a fault in the
Bus #1 Bus #2
Bus
Coupler
87-1
87-2
Busbar -1
Protection Zone
Busbar -2
Protection Zone
Busbar
Protection
Relay
Bus-1
Busbar
Protection
Relay
Bus-2
CT Switching
 CT –Circuits are switched depending upon the position of
busbar disconnectors. The current is either connected to
busbar-1’s or busbar 2’s differential protection. Switching
is performed by using repeat relays controlled via two
Bus -1
Bus -2
Check Zone Relay
Trafo #1 Trafo #2
Bus
#1
Bus
#2
Bus
Coupler
87-1 87-287-
CH
87 CH- Check Zone
Relay
Check Relay
protection Zone
The figure above shows double bus bar protection scheme
with a check zone relay.
Check Zone Relay
For a double busbar arrangement, two different high
impedance units are
required. In this case, the current must be switched
between the two
different measuring units by connecting auxiliary switches to
the busbar
isolator contacts.
In some cases the auxiliary switches did not operate
correctly. This causes
the busbar Protection to trip the busbar. For this reason, a
safety
precaution was introduced. Check zone is a safety
precaution to avoid
tripping of bus bars due to defective CT Switching relays.
Double bus with Check Zone - Trip Logic
Trip 1
Trip 2
Trip 87-1
Trip 87-2
Trip 87-CH
The TRIP command is issued only when both discriminating
and check-zone system operates. It is also called two-out-of-
three (2/3) logic.
Busbar protection- CT Switching Relays
In double bus system all the feeders could be connected to
either bus 1 or bus 2 through disconnectors. The auxilairy
contacts of the disconnectors decide to which protection
relays(i.e. bus 1 or bus 2 protection relays) the CT inputs from
the specific feeder should be feeding. So the aux.contacts of
the disconnectors helps in activating the switching relays to
CT wire Supervision Relays
 This is a three phase monitoring device designed to
provide continuous supervision of the bus wires in
high impedance type bus wire protection schemes.
 The relay will detect open circuited bus wires as well
as open circuited main current transformers.
 3-5seconds time lag is provided to ensure that the
protection would not be interfered with.
Breaker Failure Protection (LBB)
In modern networks the critical fault clearing time may be
less than
200ms. Hence, if the fault is not cleared due to failure of
the primary protective relays or their associated circuit
breaker, a fast acting back-up protective relay must clear
the fault.
LBB is a protection designed to clear a system faulty
by initiating tripping other circuit breaker(s) in the case of
failure to trip of the appropriate circuit breaker.
LBB/BFR FLOW CHART
MAIN
PROTECTION
OPERATED
YES
YES
TRIP
MAIN
BREAKER
INITIATE
BFR
WAIT FOR
FAULT
CLEARENCE
FAULT
CLEARED
YES
NO
RESET
BREAKER
FAILURE
SCHEME
TRIP
BACK-UP
BREAKERS
&
LBB trip is given to all breakers in the bus (to which the
failed circuit breaker is connected) and incoming CBs in
the remote station via communication channel to isolate
the CB completely.

More Related Content

What's hot

Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection
michaeljmack
 
Tutorial on Distance and Over Current Protection
Tutorial on Distance and Over  Current ProtectionTutorial on Distance and Over  Current Protection
Tutorial on Distance and Over Current Protection
SARAVANAN A
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
Dinesh Sarda
 
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
BUS BAR  PROTECTION PPT BY:-R.K.PANDITBUS BAR  PROTECTION PPT BY:-R.K.PANDIT
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
RAGHVENDRA KUMAR PANDIT
 
Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)
Rohini Haridas
 
Motor Protection
Motor ProtectionMotor Protection
Motor Protection
michaeljmack
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
Slides Hub
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
kishore kish
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
siddharam kantoli
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
michaeljmack
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
jawaharramaya
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
ayyadurai SHANMUGAM
 
Bus Bar protection
Bus Bar protectionBus Bar protection
Bus Bar protection
srini09
 
Protective relay
Protective relay Protective relay
Protective relay
Uday Wankar
 
Power System Protection basics
Power System Protection basicsPower System Protection basics
Power System Protection basics
Rajan Singh Tanwar
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
J. FR
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
ashwin fcc
 
Protection of Transmission lines
Protection of Transmission linesProtection of Transmission lines
Protection of Transmission lines
Power System Operation
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
Roberto Costa
 

What's hot (20)

Transformer differential protection
Transformer differential protection Transformer differential protection
Transformer differential protection
 
Tutorial on Distance and Over Current Protection
Tutorial on Distance and Over  Current ProtectionTutorial on Distance and Over  Current Protection
Tutorial on Distance and Over Current Protection
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
BUS BAR  PROTECTION PPT BY:-R.K.PANDITBUS BAR  PROTECTION PPT BY:-R.K.PANDIT
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
 
Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)
 
Motor Protection
Motor ProtectionMotor Protection
Motor Protection
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Bus Bar protection
Bus Bar protectionBus Bar protection
Bus Bar protection
 
Protective relay
Protective relay Protective relay
Protective relay
 
Power System Protection basics
Power System Protection basicsPower System Protection basics
Power System Protection basics
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Protection of Transmission lines
Protection of Transmission linesProtection of Transmission lines
Protection of Transmission lines
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 

Similar to Basics of busbar protection

basics of busbar and lbb protection
basics of busbar and lbb protection basics of busbar and lbb protection
basics of busbar and lbb protection
Salim Palayi
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars
PremanandDesai
 
INDUSTRIAL TRAINING:SWITCHYARD STUDY
INDUSTRIAL TRAINING:SWITCHYARD STUDYINDUSTRIAL TRAINING:SWITCHYARD STUDY
INDUSTRIAL TRAINING:SWITCHYARD STUDY
tarun1504
 
Busbar protection LEC 1
Busbar protection  LEC 1Busbar protection  LEC 1
Busbar protection LEC 1
Rahaf Waheep
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
Abhishek Dosaya
 
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).pptos-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
Thien Phan Bản
 
Generator Transformer Protections.
Generator Transformer  Protections.Generator Transformer  Protections.
Generator Transformer Protections.
Nischal Popat
 
basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdf
Thien Phan Bản
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
Rohini Haridas
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx
Thien Phan Bản
 
Introduction to system_protection-_protection_basics
Introduction to system_protection-_protection_basicsIntroduction to system_protection-_protection_basics
Introduction to system_protection-_protection_basics
Md. Rashedul Islam
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power system
Arvind Nathan
 
General electric
General electricGeneral electric
General electric
Carlos Rodriguez
 
1 transmission
1 transmission1 transmission
1 transmission
pradhuman deolia
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
Satish Pydimarla
 
SGP-4 PROTECTION OF ALTRNTR.pptx
SGP-4 PROTECTION OF ALTRNTR.pptxSGP-4 PROTECTION OF ALTRNTR.pptx
SGP-4 PROTECTION OF ALTRNTR.pptx
SHIVANICHAUUHAN1
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functions
Monzer Abdallah Eisa
 
Switch gear and protection
Switch gear and protectionSwitch gear and protection
Switch gear and protection
Dinesh Sharma
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
yohannes feleke
 
Transmission line protection principles
Transmission line protection principlesTransmission line protection principles
Transmission line protection principles
Jhon Miranda Ramos
 

Similar to Basics of busbar protection (20)

basics of busbar and lbb protection
basics of busbar and lbb protection basics of busbar and lbb protection
basics of busbar and lbb protection
 
Unit 05 Protection of feeders and bus-bars
Unit  05 Protection of feeders and bus-bars Unit  05 Protection of feeders and bus-bars
Unit 05 Protection of feeders and bus-bars
 
INDUSTRIAL TRAINING:SWITCHYARD STUDY
INDUSTRIAL TRAINING:SWITCHYARD STUDYINDUSTRIAL TRAINING:SWITCHYARD STUDY
INDUSTRIAL TRAINING:SWITCHYARD STUDY
 
Busbar protection LEC 1
Busbar protection  LEC 1Busbar protection  LEC 1
Busbar protection LEC 1
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).pptos-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
os-exe3-23-may2011-sr-i-776s21tr-lineprotection-120425095503-phpapp02 (2).ppt
 
Generator Transformer Protections.
Generator Transformer  Protections.Generator Transformer  Protections.
Generator Transformer Protections.
 
basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdf
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
 
47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx47526172-DIFFERENTIAL-PROTECTION-8.pptx
47526172-DIFFERENTIAL-PROTECTION-8.pptx
 
Introduction to system_protection-_protection_basics
Introduction to system_protection-_protection_basicsIntroduction to system_protection-_protection_basics
Introduction to system_protection-_protection_basics
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power system
 
General electric
General electricGeneral electric
General electric
 
1 transmission
1 transmission1 transmission
1 transmission
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
SGP-4 PROTECTION OF ALTRNTR.pptx
SGP-4 PROTECTION OF ALTRNTR.pptxSGP-4 PROTECTION OF ALTRNTR.pptx
SGP-4 PROTECTION OF ALTRNTR.pptx
 
Substation equipments & its functions
Substation equipments & its functionsSubstation equipments & its functions
Substation equipments & its functions
 
Switch gear and protection
Switch gear and protectionSwitch gear and protection
Switch gear and protection
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
Transmission line protection principles
Transmission line protection principlesTransmission line protection principles
Transmission line protection principles
 

More from Power System Operation

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
Power System Operation
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
Power System Operation
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
Power System Operation
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
Power System Operation
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
Power System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
Power System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
Power System Operation
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
Power System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
Power System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
Power System Operation
 
What is load management
What is load managementWhat is load management
What is load management
Power System Operation
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
Power System Operation
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
Power System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power System Operation
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
Power System Operation
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
Power System Operation
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
Power System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 

Recently uploaded (20)

2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 

Basics of busbar protection

  • 1. Basics of Busbar Protection
  • 2. Need for Busbar Protection Need For Bus Protection  In its absence fault clearance takes place in zone II of distance relay by remote end tripping.  This means slow and unselective tripping and wide spread black out. Effect of delayed clearance  Greater damage at fault point  Indirect shock to connected equipments like shaft of generator and windings of transformer
  • 3. Requirements of Busbar Protection  Must have short tripping time as possible.  Must be able to detect internal faults (sensitivity).  Must be absolutely stable to external faults (stability).  Must be able to detect and trip only faulty part of busbar system (selectivity)  Must be secure against maloperation due to auxilliary contact failure.
  • 4. Types of Busbar Protection Differential type of busbar protection is divided into two groups.  Low impedance scheme : Low impedance scheme uses biased differential relay.  High impedance Scheme: High impedance scheme uses a stabilizing resistor in series with the differential relay.
  • 5. Differential Relay Principle ault and the differential rsome internal f elay operates.Protected object Differential Relay Busbar protection relays works on the differential principle i.e. comparing the currents entering and leaving a protected object. If those currents matches the protected object is assumed to be in healthy condition and relay remains stable (non operating) . If there is a difference in magnitudCe.Tof currents, it is assumed that thCe.Treis
  • 6. Single busbar Protection (Healthy condition) BUSBAR ZONE P1 P1 S P2 2 S 2 S 1 P2 S 1 Busbar87 Current entering the bus Current leaving the bus Under healthy condition the current entering the busbar and leaving the busbar will be same and the CT secondary current circulates thru the secondaries. No current flows thru the relay. Hence the relay will remain restrained (non operating).
  • 7. Single busbar Protection (fault within bus) BUSBAR ZONE P1 P1 S P2 2 S 1 P2 S 2 S 1 Busbar 87 Current entering to the bus Current enters from the remote bus Under faulty condition all remote busbars feed into fault and the direction CT secondary currents becomes additive and flows though the rlay.
  • 8. Single busbar Protection scheme  Here, in the figure above we assume that at normal condition feed, A, B, C& D, carries current IA, IB, IC, and ID . Now, according to Kirchhoff's current law, at node K, IA + IB+ IC+ID = 0  So, it is clear that under normal condition there is no current flows through the busbar protection tripping relay.  Now, say fault is occurred at any of the feeders, outside the protected zone. In that case, the faulty current will pass through primary of the CT of that feeder. This fault current is contributed by all other feeders connected to the bus. So, contributed part of fault current flows through the corresponding CT of respective feeder. Hence at that faulty condition, if we apply KCL at node K, we will still get, iR = 0. BUSBAR ZONE 87 A D B C Rela y (R) K
  • 9. When fault is occurred on the bus itself. The fault current is contributed by all feeders connected to the bus. Hence, at this condition, sum of all contributed fault current is equal to total fault current. The sum of all secondary currents is no longer zero. It is equal to secondary equivalent of fault current. So at this condition current starts flowing through 87 relay and it makes trip the circuit breaker corresponding to all the feeders connected to this section of the busbar. As all the incoming and outgoing feeders, connected to this section of bus are tripped, the bus
  • 10. Double busbar system Double bus system consists of two number of buses (Bus1 & Bus # 2 ) separated by a bus coupler.
  • 11. Double busbar Protection Scheme (explained step-by-step) Two number of bus bar protection relays are required for protection of the double bus system , one for each bus. The relays will Feeder #1 Feeder #2 Trafo #1 Trafo #2 Bus #1 Bus #2 Bus Coupler Open 87-1 87-2 100 A 100A 100 A 100A Busbar Protection Relay Bus- 1 Busbar Protection Relay Bus- 2
  • 12. Bus coupler closed condition When bus coupler CB closed and feeder#2 switched- off condition, all the load current is coming through feeder #1. There will be unbalance current in the relays and both relays 87-1 Feeder #1 Feeder #2 Trafo #1 Trafo #2 Bus #1 Bus #2 Bus Coupler closed 87-2 100 A 100 A 200A Feeder #2 CB open 100 A Busbar Protection Relay Bus- 1 Busbar Protection Relay Bus- 2
  • 13. Buscoupler CTs When the bus coupler bay is included in the bus bar protection scheme. The relays will remain stable during normal condition and Feeder #1 Feeder #2 Trafo #1 Trafo #2 Bus #1 Bus #2 Bus Coupler closed 87-1 87-2 100 A 100 A 200 A Feeder #2 CB open 100 A 100A Busbar Protection Relay Bus-1 Busbar Protection Relay Bus-2
  • 14. Fault at bus coupler In case of a fault in busbar heavy fault current flows but bus coupler CB is not covered by any bus bar protection zones. So the Feeder #1 Feeder #2 Trafo #1 Trafo #2 Bus #1 Bus #2 Bus Coupler fault 87-1 87-2 100 A Busbar -1 Protection Zone Busbar -2 Protection Zone fault Busbar Protection Relay Bus-1 Busbar Protection Relay Bus-2
  • 15. Overlapping of Zones Feeder #1 Feeder #2 Trafo #1 Trafo #2 Now the protection zones of Bus-1 and Bus-2 overlaps to include the buscoupler CB, So both Relays operates for a fault in the Bus #1 Bus #2 Bus Coupler 87-1 87-2 Busbar -1 Protection Zone Busbar -2 Protection Zone Busbar Protection Relay Bus-1 Busbar Protection Relay Bus-2
  • 16. CT Switching  CT –Circuits are switched depending upon the position of busbar disconnectors. The current is either connected to busbar-1’s or busbar 2’s differential protection. Switching is performed by using repeat relays controlled via two Bus -1 Bus -2
  • 17. Check Zone Relay Trafo #1 Trafo #2 Bus #1 Bus #2 Bus Coupler 87-1 87-287- CH 87 CH- Check Zone Relay Check Relay protection Zone The figure above shows double bus bar protection scheme with a check zone relay.
  • 18. Check Zone Relay For a double busbar arrangement, two different high impedance units are required. In this case, the current must be switched between the two different measuring units by connecting auxiliary switches to the busbar isolator contacts. In some cases the auxiliary switches did not operate correctly. This causes the busbar Protection to trip the busbar. For this reason, a safety precaution was introduced. Check zone is a safety precaution to avoid tripping of bus bars due to defective CT Switching relays.
  • 19. Double bus with Check Zone - Trip Logic Trip 1 Trip 2 Trip 87-1 Trip 87-2 Trip 87-CH The TRIP command is issued only when both discriminating and check-zone system operates. It is also called two-out-of- three (2/3) logic.
  • 20. Busbar protection- CT Switching Relays In double bus system all the feeders could be connected to either bus 1 or bus 2 through disconnectors. The auxilairy contacts of the disconnectors decide to which protection relays(i.e. bus 1 or bus 2 protection relays) the CT inputs from the specific feeder should be feeding. So the aux.contacts of the disconnectors helps in activating the switching relays to
  • 21. CT wire Supervision Relays  This is a three phase monitoring device designed to provide continuous supervision of the bus wires in high impedance type bus wire protection schemes.  The relay will detect open circuited bus wires as well as open circuited main current transformers.  3-5seconds time lag is provided to ensure that the protection would not be interfered with.
  • 22. Breaker Failure Protection (LBB) In modern networks the critical fault clearing time may be less than 200ms. Hence, if the fault is not cleared due to failure of the primary protective relays or their associated circuit breaker, a fast acting back-up protective relay must clear the fault. LBB is a protection designed to clear a system faulty by initiating tripping other circuit breaker(s) in the case of failure to trip of the appropriate circuit breaker.
  • 23. LBB/BFR FLOW CHART MAIN PROTECTION OPERATED YES YES TRIP MAIN BREAKER INITIATE BFR WAIT FOR FAULT CLEARENCE FAULT CLEARED YES NO RESET BREAKER FAILURE SCHEME TRIP BACK-UP BREAKERS & LBB trip is given to all breakers in the bus (to which the failed circuit breaker is connected) and incoming CBs in the remote station via communication channel to isolate the CB completely.