A client from an established public listed company wishes to develop a RM 600 million hotel and shopping complex
in the center of the Golden Triangle, Kuala Lumpur within the shortest time possible perhaps within 20 months in
order to take advantage of the influx of tourist as the country will be hosting the COMMONWEALTH GAMES in 24
months from now
Problems or Needs
● Nature of project - A high rise building which requires heavy machineries such as crane
● Scope of works - Mixed development of hotel and shopping complex
● Measure of control by client -Client wants hands-on approach, owns full control of the design and are able to
introduce changes from start to completion of the project
● Accountability - Client is accountable to other stakeholders and board of directors
● Appointment of contractor -Client expects a transparent tendering process as well as to eliminate
non- performing contractors
● Certainty of final cost -Client has flexible budget which allows an uncertain final cost
● Start and completion time -Client prefers an overlapping on design and construction
programme
● Restrictions - Working hours from 8am to 5pm from Monday to Saturday, no
work allowed on Sundays and public holidays
● Changes during constructions -Changes are allowed to be made
● Assessment of risks -Risk of time and quality bear by contractor while risk of cost
bear by client
● Client -Inexperienced, not a regular player in the industry
● Time constraint -The project need to be completed before start of COMMONWEALTH GAMES
to take advantage of tourist
Problems or Needs
MANAGEMENT CONTRACTING
Advantages
● Deal with lesser parties
● Time savings
● Competitively tendering
● Flexibility for changes
● Roles, risk and responsibilities for all
parties all clear
Disadvantages
● Price uncertainty
● Required sufficient information
MANAGEMENT CONTRACTING
P r o c u r e m e n t
ADVANTAGES
● Transparent tendering process
● Eliminate non-performing
contractors
● Higher quality
● Reduce Risk
DISADVANTAGES
● Longer tendering process
● Higher prices compared to other
methods
T E N D E R I N G METHOD
TWO STAGE SELECTIVE TENDERING
Cost Plus Contract with
GMP
a variation of cost-reimbursement contract
Type of Contract
Percentage fee or fixed fee or fluctuate fee?
Fixed Fee !
Reasons:
- Contractor will not be able to fluctuate the price to claim more
- As an incentive for contractor to work efficiently
Type of Contract
Agreement of both parties to share
cost savings
G M P
GUARANTEED MAXIMUM PRICE
Reduce client’s cost risk However, if the actual cost is
higher than GMP, such sum need
to be paid by contractor
Advantages:
Incentive
Allocation of risk
Disadvantages :
Overestimate
Mutual agreement on GMP
G M P
GUARANTEED MAXIMUM PRICE
Modified Form of Contract
PAM 2006 (with quantities) ------------------------------- as a basis
Management contractor --------------------------------------- ‘Employer’ & ‘Architect’
Work packages contractors----------------------------------------------builders
CLIENT
MANAGEMENT
CONTRACTOR ARCHITECT
QUANTITY
SURVEYOR ENGINEER
WORK PACKAGES
CONTRACTOR
Management contractor’s obligations
- The term ‘architect’ and ‘employer’ refers to Management contractor
- To pay such sum to contractor as agreed by both parties stated in the
contract
- To instruct WC & issues certificates
Work packages contractor’s obligations
Refers to Clause 1.0 Contractor’s obligations
- Refers to work packages contractor’s obligations
- Dual obligations to ‘carry out’ and to ‘complete’ Works
Employer’s Commercial Consideration
Q U A L I T Y
Clause 6.1- Standards of works, materials, goods and workmanship
● Quality and standards of work materials, goods & workmanship shall be
following the specification in contract
● Any discrepancy, MC can instruct him to rectify or demolish such works
Clause 15.4 - DLP
● Obliged to rectify such works within 28 days after receipt of schedule of
defects
Clause 11.6 -Valuation rules
- Contractors are not able to claim without site measurement
- Thus, MC will not be charged to those undone works
Clause 30.0 -Payment and certificates
- If WC fails to submit application to claim, MC has the right to not issuing
Interim certificate
Clause 30.5 -Retention fund
- A readily accessible amount of money is on hold in the event of default
arises
C O S T
Employer’s Commercial Consideration
Clause 23.4 - CERTIFICATE OF EXTENSION OF TIME
- MC has the right to consider or reject WC’s application of EOT
Clause 23.6 - CONTRACTOR TO PREVENT DELAY
- It is WC’s obligations to prevent and to reduce delays
T I M E
Employer’s Commercial Consideration
Contractor’s Defaults PAM 2006 (as reference)
Fails to commence Works in accordance with the contract Clause 25.1(a)
Suspension of Works Clause 25.1(b)
Fails to proceed regularly and diligently Clause 25.1(c)
Failure to comply with Management contractor’s instructions Clause 25.1(d)
Assignment or sub-letting without consent Clause 25.1(e)
Abandoned the contract Clause 25.1(f)
Contractor’s bankruptcy Clause 25.3
Fail to rectify defect works Clause 15.3
Examples of contractor’s defaults
Brief description of relevant clauses PAM 2006 (as reference)
The contractor must empty the site and remove all machineries and
personnel that belongs to him
Clause 25.4(a) & (c)
The contractor is not entitled to get any payment even though it is
certified until after completion of the outstanding works by the Employer
Clause 25.4(d)
The contractor must assign to the Employer, contracts with his suppliers
and sub-contractors upon notice by the Employer
Clause 25.4(a) & (b)
The employer can claim expenses, loss and damages suffered Clause 25.4(d)
Employer can employ and pay other person to rectify defect works and
such cost will be set off
Clause 15.3 (c)
Examples of rights of Employer
Employer’s Defaults PAM 2006 (as reference)
Failure to pay Clause 26.1(a)
Interference with Certificates Clause 26.1(b)
Suspension of Works Clause 26.1(d)
Failure to appoint Management contractor upon his death Clause 26.1(c)
Employer’s insolvency Clause 26.3
Examples of Employer’s defaults
Brief description of relevant clauses PAM 2006 (as reference)
The contractor to remove all temporary buildings, equipment, personnel
from site (including his sub-contractors)
Clause 26.4(a)
The contractor is entitled to payment of the total value of works
executed on site
Clause 26.4(b)
The contractor is entitled for loss and expense suffered Clause 26.4(b)
Examples of rights of Contractor
T H A N K Y O U
N G I E N G T I E N Y U N G 0 3 2 0 2 2 1
N G O J I A H A U R 0 3 2 0 1 4 4
O O I Y I N J I 0 3 1 9 9 6 2
P A N G K A I Y U N 0 3 1 9 8 0 2
S A M W E I Y I N 0 3 2 0 3 6 4

More Related Content

What's hot

Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
lohwenjun
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
ashleyyeap
 
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKey terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Kegler Brown Hill + Ritter
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
Teo Kean Hui
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment
lucaschinsheng
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project Report
Teo Kean Hui
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSES
Shivam Sood
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letter
Teo Kean Hui
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
lohwenjun
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
Pui Chun Shian
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
Delhi Technological University
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
Shze Hwa Lee
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
ahmong4
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
Shze Hwa Lee
 
Variations under the FIDIC form, subject to EU Procurement law
Variations under the FIDIC form, subject to EU Procurement lawVariations under the FIDIC form, subject to EU Procurement law
Variations under the FIDIC form, subject to EU Procurement law
39 Essex Chambers
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
Shze Hwa Lee
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
Trace96
 
PP2 presentation
PP2 presentationPP2 presentation
PP2 presentation
Yong Sy
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 

What's hot (20)

Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
 
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendmentsKey terms to consider when negotiating cm at-risk agreements + gmp amendments
Key terms to consider when negotiating cm at-risk agreements + gmp amendments
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project Report
 
DEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSESDEFECTS LIABILITY AND TAKING OVER CLAUSES
DEFECTS LIABILITY AND TAKING OVER CLAUSES
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letter
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Variations under the FIDIC form, subject to EU Procurement law
Variations under the FIDIC form, subject to EU Procurement lawVariations under the FIDIC form, subject to EU Procurement law
Variations under the FIDIC form, subject to EU Procurement law
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
 
PP2 presentation
PP2 presentationPP2 presentation
PP2 presentation
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 

Viewers also liked

Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
Kai Yun Pang
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
Francis Ho
 
Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)
Kai Yun Pang
 
Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2
Kai Yun Pang
 
Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1
Kai Yun Pang
 
Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)
Kai Yun Pang
 

Viewers also liked (6)

Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)
 
Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2
 
Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1
 
Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)
 

Similar to Assignment - Management Contracting (Presentation Slide)

Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Francis Ho
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
Ngo Jia Haur
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
MANTHAN CHAUHAN
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
Kailyn Lee
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lin Hui
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slides
ashleyyeap
 
Contract closing ppt
Contract closing pptContract closing ppt
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
Pui Chun Shian
 
Mega project
Mega projectMega project
Mega project
Farah Sham
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
anojan kanagarathnam
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
César del Riego y Fuentes
 
M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3
Project Controls Expo
 
Killer Contract Provisions
Killer Contract ProvisionsKiller Contract Provisions
Killer Contract Provisions
Woods & Aitken LLP
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
SHKLaw
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
kohwenqi
 
An Introduction to Procurement in Social Housing
An Introduction to Procurement in Social HousingAn Introduction to Procurement in Social Housing
An Introduction to Procurement in Social Housing
Peter Bird
 
Construction contract
Construction contractConstruction contract
Construction contract
Delhi Technological University
 
Construction contract
Construction contractConstruction contract
Construction contract
Delhi Technological University
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
fareezsham
 
CSCM Sla cscm
CSCM Sla cscmCSCM Sla cscm
CSCM Sla cscm
Est
 

Similar to Assignment - Management Contracting (Presentation Slide) (20)

Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
Chartered Institute of Building - Launch of Complex Projects Contract 2013 - ...
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slides
 
Contract closing ppt
Contract closing pptContract closing ppt
Contract closing ppt
 
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
 
Mega project
Mega projectMega project
Mega project
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
 
M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3
 
Killer Contract Provisions
Killer Contract ProvisionsKiller Contract Provisions
Killer Contract Provisions
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
An Introduction to Procurement in Social Housing
An Introduction to Procurement in Social HousingAn Introduction to Procurement in Social Housing
An Introduction to Procurement in Social Housing
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Pp2 assignment
Pp2 assignmentPp2 assignment
Pp2 assignment
 
CSCM Sla cscm
CSCM Sla cscmCSCM Sla cscm
CSCM Sla cscm
 

More from Kai Yun Pang

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
Kai Yun Pang
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
Kai Yun Pang
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
Kai Yun Pang
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
Kai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
Kai Yun Pang
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
Kai Yun Pang
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
Kai Yun Pang
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
Kai Yun Pang
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
Kai Yun Pang
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
Kai Yun Pang
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
Kai Yun Pang
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
Kai Yun Pang
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
Kai Yun Pang
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
Kai Yun Pang
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
Kai Yun Pang
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
Kai Yun Pang
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
Kai Yun Pang
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
Kai Yun Pang
 
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Kai Yun Pang
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
Kai Yun Pang
 

More from Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 

Recently uploaded

Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
danielkiash986
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
nitinpv4ai
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Henry Hollis
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
nitinpv4ai
 
Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...
Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...
Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...
TechSoup
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
SWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptxSWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptx
zuzanka
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
deepaannamalai16
 
MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025
khuleseema60
 
Data Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsxData Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsx
Prof. Dr. K. Adisesha
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17
Celine George
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
David Douglas School District
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
RidwanHassanYusuf
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
zuzanka
 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
Mohammad Al-Dhahabi
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 

Recently uploaded (20)

Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
 
Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...
Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...
Elevate Your Nonprofit's Online Presence_ A Guide to Effective SEO Strategies...
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
SWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptxSWOT analysis in the project Keeping the Memory @live.pptx
SWOT analysis in the project Keeping the Memory @live.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Standardized tool for Intelligence test.
Standardized tool for Intelligence test.Standardized tool for Intelligence test.
Standardized tool for Intelligence test.
 
MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025
 
Data Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsxData Structure using C by Dr. K Adisesha .ppsx
Data Structure using C by Dr. K Adisesha .ppsx
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptxBIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
BIOLOGY NATIONAL EXAMINATION COUNCIL (NECO) 2024 PRACTICAL MANUAL.pptx
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 

Assignment - Management Contracting (Presentation Slide)

  • 1. A client from an established public listed company wishes to develop a RM 600 million hotel and shopping complex in the center of the Golden Triangle, Kuala Lumpur within the shortest time possible perhaps within 20 months in order to take advantage of the influx of tourist as the country will be hosting the COMMONWEALTH GAMES in 24 months from now
  • 2. Problems or Needs ● Nature of project - A high rise building which requires heavy machineries such as crane ● Scope of works - Mixed development of hotel and shopping complex ● Measure of control by client -Client wants hands-on approach, owns full control of the design and are able to introduce changes from start to completion of the project ● Accountability - Client is accountable to other stakeholders and board of directors ● Appointment of contractor -Client expects a transparent tendering process as well as to eliminate non- performing contractors
  • 3. ● Certainty of final cost -Client has flexible budget which allows an uncertain final cost ● Start and completion time -Client prefers an overlapping on design and construction programme ● Restrictions - Working hours from 8am to 5pm from Monday to Saturday, no work allowed on Sundays and public holidays ● Changes during constructions -Changes are allowed to be made ● Assessment of risks -Risk of time and quality bear by contractor while risk of cost bear by client ● Client -Inexperienced, not a regular player in the industry ● Time constraint -The project need to be completed before start of COMMONWEALTH GAMES to take advantage of tourist Problems or Needs
  • 5. Advantages ● Deal with lesser parties ● Time savings ● Competitively tendering ● Flexibility for changes ● Roles, risk and responsibilities for all parties all clear Disadvantages ● Price uncertainty ● Required sufficient information MANAGEMENT CONTRACTING P r o c u r e m e n t
  • 6. ADVANTAGES ● Transparent tendering process ● Eliminate non-performing contractors ● Higher quality ● Reduce Risk DISADVANTAGES ● Longer tendering process ● Higher prices compared to other methods T E N D E R I N G METHOD TWO STAGE SELECTIVE TENDERING
  • 7. Cost Plus Contract with GMP a variation of cost-reimbursement contract Type of Contract
  • 8. Percentage fee or fixed fee or fluctuate fee? Fixed Fee ! Reasons: - Contractor will not be able to fluctuate the price to claim more - As an incentive for contractor to work efficiently Type of Contract
  • 9. Agreement of both parties to share cost savings G M P GUARANTEED MAXIMUM PRICE Reduce client’s cost risk However, if the actual cost is higher than GMP, such sum need to be paid by contractor
  • 10. Advantages: Incentive Allocation of risk Disadvantages : Overestimate Mutual agreement on GMP G M P GUARANTEED MAXIMUM PRICE
  • 11. Modified Form of Contract PAM 2006 (with quantities) ------------------------------- as a basis Management contractor --------------------------------------- ‘Employer’ & ‘Architect’ Work packages contractors----------------------------------------------builders
  • 13. Management contractor’s obligations - The term ‘architect’ and ‘employer’ refers to Management contractor - To pay such sum to contractor as agreed by both parties stated in the contract - To instruct WC & issues certificates Work packages contractor’s obligations Refers to Clause 1.0 Contractor’s obligations - Refers to work packages contractor’s obligations - Dual obligations to ‘carry out’ and to ‘complete’ Works
  • 14. Employer’s Commercial Consideration Q U A L I T Y Clause 6.1- Standards of works, materials, goods and workmanship ● Quality and standards of work materials, goods & workmanship shall be following the specification in contract ● Any discrepancy, MC can instruct him to rectify or demolish such works Clause 15.4 - DLP ● Obliged to rectify such works within 28 days after receipt of schedule of defects
  • 15. Clause 11.6 -Valuation rules - Contractors are not able to claim without site measurement - Thus, MC will not be charged to those undone works Clause 30.0 -Payment and certificates - If WC fails to submit application to claim, MC has the right to not issuing Interim certificate Clause 30.5 -Retention fund - A readily accessible amount of money is on hold in the event of default arises C O S T Employer’s Commercial Consideration
  • 16. Clause 23.4 - CERTIFICATE OF EXTENSION OF TIME - MC has the right to consider or reject WC’s application of EOT Clause 23.6 - CONTRACTOR TO PREVENT DELAY - It is WC’s obligations to prevent and to reduce delays T I M E Employer’s Commercial Consideration
  • 17. Contractor’s Defaults PAM 2006 (as reference) Fails to commence Works in accordance with the contract Clause 25.1(a) Suspension of Works Clause 25.1(b) Fails to proceed regularly and diligently Clause 25.1(c) Failure to comply with Management contractor’s instructions Clause 25.1(d) Assignment or sub-letting without consent Clause 25.1(e) Abandoned the contract Clause 25.1(f) Contractor’s bankruptcy Clause 25.3 Fail to rectify defect works Clause 15.3 Examples of contractor’s defaults
  • 18. Brief description of relevant clauses PAM 2006 (as reference) The contractor must empty the site and remove all machineries and personnel that belongs to him Clause 25.4(a) & (c) The contractor is not entitled to get any payment even though it is certified until after completion of the outstanding works by the Employer Clause 25.4(d) The contractor must assign to the Employer, contracts with his suppliers and sub-contractors upon notice by the Employer Clause 25.4(a) & (b) The employer can claim expenses, loss and damages suffered Clause 25.4(d) Employer can employ and pay other person to rectify defect works and such cost will be set off Clause 15.3 (c) Examples of rights of Employer
  • 19. Employer’s Defaults PAM 2006 (as reference) Failure to pay Clause 26.1(a) Interference with Certificates Clause 26.1(b) Suspension of Works Clause 26.1(d) Failure to appoint Management contractor upon his death Clause 26.1(c) Employer’s insolvency Clause 26.3 Examples of Employer’s defaults
  • 20. Brief description of relevant clauses PAM 2006 (as reference) The contractor to remove all temporary buildings, equipment, personnel from site (including his sub-contractors) Clause 26.4(a) The contractor is entitled to payment of the total value of works executed on site Clause 26.4(b) The contractor is entitled for loss and expense suffered Clause 26.4(b) Examples of rights of Contractor
  • 21. T H A N K Y O U N G I E N G T I E N Y U N G 0 3 2 0 2 2 1 N G O J I A H A U R 0 3 2 0 1 4 4 O O I Y I N J I 0 3 1 9 9 6 2 P A N G K A I Y U N 0 3 1 9 8 0 2 S A M W E I Y I N 0 3 2 0 3 6 4