EFFECTIVE CONTRACT
ADMINISTRATION
Seema Lal
May, 2014
Role of Consultant
 Consultant’s role is to administer the contract, i.e., ensure that
the project is completed as per the contract documents
 Contract between owner and consultant outlines consultant’s
administration services
 Contract between owner and general contractor includes
provisions detailing role of consultant
CCDC Contracts
 Under CCDC 2 (2008) and CCDC 3 (1998), consultant is to
interpret the requirements of the contract documents
 Consultant has authority to make findings re claims for
changes in contract price and contract time
 Contractor must submit notice (in writing) of a claim for delay to
the consultant
CCDC Contracts (cont’d)
 Consultant’s services include:
• Site reviews/site visits to ensure contractor’s work is free from
defects and deficiencies
• Work is in conformance with contract documents, applicable
building codes, bylaws and good construction practice
 Pursuant to GC 2.2, the consultant’s findings are final unless
notice of a dispute is provided in writing within 15 days of
receipt of the consultant’s findings.
Dual Role of Consultant
The consultant is hired and paid by the owner/developer and has
a duty:
 to act impartially and objectively
 to act with professional care
 to protect the owner (its client) as per its contract
The majority of claims against consultants are allegations of
failure in the administration of the contract.
Dual Role of Consultant (cont’d)
Four common factors constitute the primary reasons for claims
against consultants re contract administration (field services):
1. Failure to properly define field service obligations, including
number of site attendances
 Courts require the consultant to be at the site at critical times
 Consultant should have discretion re what constitutes “critical”
times
 Consultant alone should determine when he/she should be at the
site
Dual Role of Consultant (cont’d)
2. Consultant becoming involved in dictating contractor’s means,
methods and techniques
• If consultant creates an innovative design for the project, the
consultant may be required to become involved in construction
methods, sequences, etc. (West Coast Paving Co. Ltd. v. British
Columbia (1983) 50 BCLR 234 (SC))
• Consultant might be liable for failure to detect or prevent
breaches of contract which might constitute foreseeable harm to
third parties (Winnipeg Condominium Corp. No. 36 v. Bird
Construction Co., [1995] 1 SCR 85)
Dual Role of Consultant (cont’d)
3. Consultant charging for field services on a fixed price or
percentage of the cost of the work, rather than hourly or per
diem
• Often not possible to determine accurate amount of time to
provide field services
• Fixed fees may lead to an increased likelihood of field service
errors and resulting claims
• Ideal practice is for field services to be performed on an hourly or
per diem basis
Dual Role of Consultant (cont’d)
4. Delay in preparation of a list of defects and deficiencies may
lead to a claim for negligent administration
• Waiting until the end or close to the end of the project to identify
and quantify construction defects and deficiencies is very risky:
» it is possible that the value of the defects and deficiencies, once
determined, will be beyond the value of the funds remaining in the
hands of the owner
» the owner will have lost the strategic advantage of deducting the
value of the defects and deficiencies from the monthly progress
payments, thereby removing the motivation for the contractor to
complete and correct the defects and deficiencies promptly.
Delay Claims and Change Orders
 Finishing a project on time and within budget remains one of
the most difficult goals to accomplish.
 Tips for achieving this goal:
• requiring consultant to prepare a monthly report based upon the
work performed by the contractor during that month
• requiring the contractor to submit an as-built schedule every
month before the consultant issues the certificate for payment, as
well as before releasing the final payment on the project
Delay Claims and Change Orders (cont’d)
• requiring the contractor to provide a total assessment of the time
and cost implications of change orders within a set period of time
(e.g., this could range from 1 to 6 months, depending on the type
and magnitude of the project)
• consider using a performance incentive program to reward the
contractor for completing the project on time and on budget
Construction Bonds
 One method of managing risks
 Most common bond instruments include:
• Bid bonds
• Performance bonds
• Labour and material bonds
• Lien bonds
Bid Bonds
 Refusal by the chosen contractor to enter into a construction
contract with the owner:
• Owner can seek compensation under the bid bond for the
difference between the tender price of the defaulting chosen
contractor and the contract price between the owner and the other
party the owner hires, up to the face value of the bid bond.
Performance Bonds
 Involves an agreement between 3 parties: the surety, the
contractor and the owner, and guarantees the owner that the
contractor will complete the contract in accordance with its
terms. If the contractor defaults, the owner may claim under
the bond requiring the surety to complete the contractor’s
obligations.
 An owner should be careful when faced with a defaulting
contractor to ensure that the terms of the performance bond do
not relieve the surety from its obligations if the owner
terminates the contractor.
Labour and Material Bonds
 Guarantee payment to subcontractors (claimants) in the event
the bonded principal does not make payments as required.
 Main benefit - provides subcontractors and suppliers with
security of amounts owed to them leading to a lower likelihood
of liens being filed.
 Do not prohibit an unpaid supplier or contractor from filing a
lien claim, but reduce the odds of a lien claim actually being
filed and/or pursued.
Labour and Material Bonds (cont’d)
 Subcontractor must establish:
• that it has a direct contract with the principal for labour or material
or both; and
• that the labour or material or both is/are used or reasonably
required for use in the performance of the contract between the
principal and the obligee (Campbell Comeau Engineering Ltd. v.
Alta Surety Co. (1996), 30 CLR (2d) 116 (NSSC)).
Lien Bonds
 Under the BC Builders Lien Act and similar statutes in other
provinces, an owner or contractor is entitled to apply for the
discharge of a lien upon the substitution of another appropriate
form of security.
 Lien bonds can be used to provide security in place of cash or
a letter of credit. The lien bond will be in an amount equivalent
to the amount of the lien and, upon posting the bond with the
court, any liens covered by the bond can be discharged from
title to the owner’s property and the lien bond then stands as
security for the lien.
SEEMA LAL*
604.408.2026
sl@shk.ca

More Related Content

What's hot

Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
Lilian Nwachukwu
 

What's hot (20)

Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
Epc contracts.
Epc contracts.Epc contracts.
Epc contracts.
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Effective Contract Management
Effective Contract ManagementEffective Contract Management
Effective Contract Management
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Contract management
Contract managementContract management
Contract management
 
Contract management sys
Contract management sysContract management sys
Contract management sys
 
Construction contract
Construction contract Construction contract
Construction contract
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Contract management
Contract managementContract management
Contract management
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 

Similar to Effective contract administration may 2014

Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
Maatla Moadi
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
Melvin Lim
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
ahmong4
 

Similar to Effective contract administration may 2014 (20)

05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Construction contract
Construction contractConstruction contract
Construction contract
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
CL Seminar
CL SeminarCL Seminar
CL Seminar
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...Design & Build contracts - key points for a main contractor with technology a...
Design & Build contracts - key points for a main contractor with technology a...
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Kandil_Sameh_AR50123
Kandil_Sameh_AR50123Kandil_Sameh_AR50123
Kandil_Sameh_AR50123
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Construction Futures Wales - NEC Contracts Overview Workshop
Construction Futures Wales  - NEC Contracts Overview WorkshopConstruction Futures Wales  - NEC Contracts Overview Workshop
Construction Futures Wales - NEC Contracts Overview Workshop
 

More from SHKLaw

Tendering and Procuremen
Tendering and ProcuremenTendering and Procuremen
Tendering and Procuremen
SHKLaw
 

More from SHKLaw (14)

Nuts and bolts of builders liens (Independent Contractors and Businesses Asso...
Nuts and bolts of builders liens (Independent Contractors and Businesses Asso...Nuts and bolts of builders liens (Independent Contractors and Businesses Asso...
Nuts and bolts of builders liens (Independent Contractors and Businesses Asso...
 
Overview of Builders Liens
Overview of Builders LiensOverview of Builders Liens
Overview of Builders Liens
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic Principles
 
Common Problems in the Drafting of Tender Documents
Common Problems in the Drafting of Tender DocumentsCommon Problems in the Drafting of Tender Documents
Common Problems in the Drafting of Tender Documents
 
Tendering and Procurement Basics
Tendering and Procurement BasicsTendering and Procurement Basics
Tendering and Procurement Basics
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the Contract
 
Procurement and Subcontractors
Procurement and SubcontractorsProcurement and Subcontractors
Procurement and Subcontractors
 
An Overview of the 2013 BC Limitation Act
An Overview of the 2013 BC Limitation ActAn Overview of the 2013 BC Limitation Act
An Overview of the 2013 BC Limitation Act
 
Tendering and Procurement Best Practices
Tendering and Procurement Best PracticesTendering and Procurement Best Practices
Tendering and Procurement Best Practices
 
Tendering and Procuremen
Tendering and ProcuremenTendering and Procuremen
Tendering and Procuremen
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project Delivery
 
Canada Anti-Spam Legislation: Obligations and Opportunity
Canada Anti-Spam Legislation: Obligations and OpportunityCanada Anti-Spam Legislation: Obligations and Opportunity
Canada Anti-Spam Legislation: Obligations and Opportunity
 
Builders liens in Canada
Builders liens in CanadaBuilders liens in Canada
Builders liens in Canada
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014
 

Recently uploaded

一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
Airst S
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
mefyqyn
 
一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证
一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证
一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证
trryfxkn
 
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
ss
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
ZurliaSoop
 
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
e9733fc35af6
 
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
e9733fc35af6
 
一比一原版(IC毕业证书)帝国理工学院毕业证如何办理
一比一原版(IC毕业证书)帝国理工学院毕业证如何办理一比一原版(IC毕业证书)帝国理工学院毕业证如何办理
一比一原版(IC毕业证书)帝国理工学院毕业证如何办理
Fir La
 
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
F La
 

Recently uploaded (20)

Petitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docxPetitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docx
 
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
一比一原版(CQU毕业证书)中央昆士兰大学毕业证如何办理
 
Dematerialisation of securities of private companies
Dematerialisation of securities of private companiesDematerialisation of securities of private companies
Dematerialisation of securities of private companies
 
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdfposts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
 
Sangyun Lee, Duplicate Powers in the Criminal Referral Process and the Overla...
Sangyun Lee, Duplicate Powers in the Criminal Referral Process and the Overla...Sangyun Lee, Duplicate Powers in the Criminal Referral Process and the Overla...
Sangyun Lee, Duplicate Powers in the Criminal Referral Process and the Overla...
 
Chambers Global Practice Guide - Canada M&A
Chambers Global Practice Guide - Canada M&AChambers Global Practice Guide - Canada M&A
Chambers Global Practice Guide - Canada M&A
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
 
Common Legal Risks in Hiring and Firing Practices.pdf
Common Legal Risks in Hiring and Firing Practices.pdfCommon Legal Risks in Hiring and Firing Practices.pdf
Common Legal Risks in Hiring and Firing Practices.pdf
 
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
 
一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证
一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证
一比一原版(McMaster毕业证书)麦克马斯特大学毕业证学历认证可查认证
 
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
一比一原版(UNSW毕业证书)新南威尔士大学毕业证如何办理
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
 
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证书)加拿大卡尔顿大学毕业证如何办理
 
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
一比一原版(纽大毕业证书)美国纽约大学毕业证如何办理
 
一比一原版(IC毕业证书)帝国理工学院毕业证如何办理
一比一原版(IC毕业证书)帝国理工学院毕业证如何办理一比一原版(IC毕业证书)帝国理工学院毕业证如何办理
一比一原版(IC毕业证书)帝国理工学院毕业证如何办理
 
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam TakersPhilippine FIRE CODE REVIEWER for Architecture Board Exam Takers
Philippine FIRE CODE REVIEWER for Architecture Board Exam Takers
 
Navigating Employment Law - Term Project.pptx
Navigating Employment Law - Term Project.pptxNavigating Employment Law - Term Project.pptx
Navigating Employment Law - Term Project.pptx
 
ARTICLE 370 PDF about the indian constitution.
ARTICLE 370 PDF about the  indian constitution.ARTICLE 370 PDF about the  indian constitution.
ARTICLE 370 PDF about the indian constitution.
 
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
一比一原版(Monash毕业证书)澳洲莫纳什大学毕业证如何办理
 
Cyber Laws : National and International Perspective.
Cyber Laws : National and International Perspective.Cyber Laws : National and International Perspective.
Cyber Laws : National and International Perspective.
 

Effective contract administration may 2014

  • 2. Role of Consultant  Consultant’s role is to administer the contract, i.e., ensure that the project is completed as per the contract documents  Contract between owner and consultant outlines consultant’s administration services  Contract between owner and general contractor includes provisions detailing role of consultant
  • 3. CCDC Contracts  Under CCDC 2 (2008) and CCDC 3 (1998), consultant is to interpret the requirements of the contract documents  Consultant has authority to make findings re claims for changes in contract price and contract time  Contractor must submit notice (in writing) of a claim for delay to the consultant
  • 4. CCDC Contracts (cont’d)  Consultant’s services include: • Site reviews/site visits to ensure contractor’s work is free from defects and deficiencies • Work is in conformance with contract documents, applicable building codes, bylaws and good construction practice  Pursuant to GC 2.2, the consultant’s findings are final unless notice of a dispute is provided in writing within 15 days of receipt of the consultant’s findings.
  • 5. Dual Role of Consultant The consultant is hired and paid by the owner/developer and has a duty:  to act impartially and objectively  to act with professional care  to protect the owner (its client) as per its contract The majority of claims against consultants are allegations of failure in the administration of the contract.
  • 6. Dual Role of Consultant (cont’d) Four common factors constitute the primary reasons for claims against consultants re contract administration (field services): 1. Failure to properly define field service obligations, including number of site attendances  Courts require the consultant to be at the site at critical times  Consultant should have discretion re what constitutes “critical” times  Consultant alone should determine when he/she should be at the site
  • 7. Dual Role of Consultant (cont’d) 2. Consultant becoming involved in dictating contractor’s means, methods and techniques • If consultant creates an innovative design for the project, the consultant may be required to become involved in construction methods, sequences, etc. (West Coast Paving Co. Ltd. v. British Columbia (1983) 50 BCLR 234 (SC)) • Consultant might be liable for failure to detect or prevent breaches of contract which might constitute foreseeable harm to third parties (Winnipeg Condominium Corp. No. 36 v. Bird Construction Co., [1995] 1 SCR 85)
  • 8. Dual Role of Consultant (cont’d) 3. Consultant charging for field services on a fixed price or percentage of the cost of the work, rather than hourly or per diem • Often not possible to determine accurate amount of time to provide field services • Fixed fees may lead to an increased likelihood of field service errors and resulting claims • Ideal practice is for field services to be performed on an hourly or per diem basis
  • 9. Dual Role of Consultant (cont’d) 4. Delay in preparation of a list of defects and deficiencies may lead to a claim for negligent administration • Waiting until the end or close to the end of the project to identify and quantify construction defects and deficiencies is very risky: » it is possible that the value of the defects and deficiencies, once determined, will be beyond the value of the funds remaining in the hands of the owner » the owner will have lost the strategic advantage of deducting the value of the defects and deficiencies from the monthly progress payments, thereby removing the motivation for the contractor to complete and correct the defects and deficiencies promptly.
  • 10. Delay Claims and Change Orders  Finishing a project on time and within budget remains one of the most difficult goals to accomplish.  Tips for achieving this goal: • requiring consultant to prepare a monthly report based upon the work performed by the contractor during that month • requiring the contractor to submit an as-built schedule every month before the consultant issues the certificate for payment, as well as before releasing the final payment on the project
  • 11. Delay Claims and Change Orders (cont’d) • requiring the contractor to provide a total assessment of the time and cost implications of change orders within a set period of time (e.g., this could range from 1 to 6 months, depending on the type and magnitude of the project) • consider using a performance incentive program to reward the contractor for completing the project on time and on budget
  • 12. Construction Bonds  One method of managing risks  Most common bond instruments include: • Bid bonds • Performance bonds • Labour and material bonds • Lien bonds
  • 13. Bid Bonds  Refusal by the chosen contractor to enter into a construction contract with the owner: • Owner can seek compensation under the bid bond for the difference between the tender price of the defaulting chosen contractor and the contract price between the owner and the other party the owner hires, up to the face value of the bid bond.
  • 14. Performance Bonds  Involves an agreement between 3 parties: the surety, the contractor and the owner, and guarantees the owner that the contractor will complete the contract in accordance with its terms. If the contractor defaults, the owner may claim under the bond requiring the surety to complete the contractor’s obligations.  An owner should be careful when faced with a defaulting contractor to ensure that the terms of the performance bond do not relieve the surety from its obligations if the owner terminates the contractor.
  • 15. Labour and Material Bonds  Guarantee payment to subcontractors (claimants) in the event the bonded principal does not make payments as required.  Main benefit - provides subcontractors and suppliers with security of amounts owed to them leading to a lower likelihood of liens being filed.  Do not prohibit an unpaid supplier or contractor from filing a lien claim, but reduce the odds of a lien claim actually being filed and/or pursued.
  • 16. Labour and Material Bonds (cont’d)  Subcontractor must establish: • that it has a direct contract with the principal for labour or material or both; and • that the labour or material or both is/are used or reasonably required for use in the performance of the contract between the principal and the obligee (Campbell Comeau Engineering Ltd. v. Alta Surety Co. (1996), 30 CLR (2d) 116 (NSSC)).
  • 17. Lien Bonds  Under the BC Builders Lien Act and similar statutes in other provinces, an owner or contractor is entitled to apply for the discharge of a lien upon the substitution of another appropriate form of security.  Lien bonds can be used to provide security in place of cash or a letter of credit. The lien bond will be in an amount equivalent to the amount of the lien and, upon posting the bond with the court, any liens covered by the bond can be discharged from title to the owner’s property and the lien bond then stands as security for the lien.