The document discusses the development of an Asset Integrity Assessment and Management (AIM) program for an FPSO (floating production, storage, and offloading) facility and associated subsea infrastructure. It describes the key components of the FPSO and subsea system, outlines an approach to developing an AIM program including collecting design and operational data, conducting risk assessments, and prioritizing maintenance. The summary highlights the need to fill data gaps, develop performance indicators to monitor asset degradation, and implement risk management processes to guide the AIM program and ensure the integrity of the offshore oil and gas assets.
Where is your current PM Program? Where are the gaps? This maturity matrix focused on Preventive Maintenance is the most updated one anywhere. Some of the brightest minds in Maintenance and Reliability, world-wide, contributed to the development of this latest version.
Checklist Asset Management for educational purposes - ISO55000Cyrus Sorab
Thank you Martine van den Boomen for this nice checklist for ISO 55000 standards
"Dear all,
For fun and sharing: a checklist that (in my view) captures the highlights of the ISO 55000-series. This instrument allows for a quick assessment for compliance to the standard. It is a great tool for communication and education. Students like it. It can guide interviews. I prepared an English version on request and it would be waste not to share it. I hope you'll enjoy it and improve it.
https://lnkd.in/gkTw-ha"
Where is your current PM Program? Where are the gaps? This maturity matrix focused on Preventive Maintenance is the most updated one anywhere. Some of the brightest minds in Maintenance and Reliability, world-wide, contributed to the development of this latest version.
Checklist Asset Management for educational purposes - ISO55000Cyrus Sorab
Thank you Martine van den Boomen for this nice checklist for ISO 55000 standards
"Dear all,
For fun and sharing: a checklist that (in my view) captures the highlights of the ISO 55000-series. This instrument allows for a quick assessment for compliance to the standard. It is a great tool for communication and education. Students like it. It can guide interviews. I prepared an English version on request and it would be waste not to share it. I hope you'll enjoy it and improve it.
https://lnkd.in/gkTw-ha"
Energy Markets are at an inflection point: a flat global economy, pressure to grow revenue and profit, tighter regulations, and increased competition have significantly changed the way assets are operated. Internal inefficiencies, including lack of operationally relevant insight, still prevent companies from optimizing asset performance. Operators are challenged by a limited visibility into their assets’ data and often lack enhanced capabilities to quantitatively/qualitatively analyze the historical data and demonstrate value-added solutions.
In this second in a series of joint webinars on Asset Performance Management, GE Digital and Stork share the way they respond to the above challenges when it comes to Asset Reliability Management. They present a large scale case study practiced with a client active in the oil & gas industry and explain additional available solutions to the same questions.
John Day developed a proactive maintenance process in 1978 and manage maintenance and engineering at Alumax Mt. Holly and later at Alcoa Mt Holly for over 20 years. These are the slides he presented at the 1997 SMRP Conference. Great slides with great information. If you would like the slides and not PDF send me an email at rsmith@maintenancebestpractices.com. I worked for John Day back in the early 1980s which started my journey in Proactive Maintenance.
Business Continuity Management PowerPoint Presentation SlidesSlideTeam
Presenting this set of slides with name - Business Continuity Management PowerPoint Presentation Slides. This complete deck is oriented to make sure you do not lag in your presentations. Our creatively crafted slides come with apt research and planning. This exclusive deck with fifty-two slides is here to help you to strategize, plan, analyze, or segment the topic with clear understanding and apprehension. Utilize ready to use presentation slides on Business Continuity Management PowerPoint Presentation Slides with all sorts of editable templates, charts and graphs, overviews, analysis templates. It is usable for marking important decisions and covering critical issues. Display and present all possible kinds of underlying nuances, progress factors for an all inclusive presentation for the teams. This presentation deck can be used by all professionals, managers, individuals, internal external teams involved in any company organization.
You want to learn how to rank your equipment based on criticality then this chapter from the "Rules of Thumb for Maintenance and Reliability Engineers Handbook.
This document will describe the structured evaluation methodology used to “Identify Critical Equipment”. Criticality Analysis identifies the assets which contribute the most asset reliability, throughput, safety, etc. Without an effective criticality analysis an organization lacks focus on what assets contribute the most to their business.
If you have questions about asset criticality analysis send an email to Ricky Smith at askrickysmith@gmail,com
By leveraging an automated diagnostic system that is built upon a strong reliability engineering methodology, a drilling platform can make risk-informed decisions to maintain the inherent reliability of their critical equipment using a “cost avoidance” approach that results in lower overall life cycle costs. Used as part of a daily routine, operators and maintainers have access to real-time intelligence on the integrity of critical equipment allowing them to proactively allocate the often limited maintenance resources to targeted higher risk items resulting in reduced non-productive time (NPT), improved performance, greatly increased drilling safety and decreased inspection related costs.
Intelligent Asset Performance & Energy Management for Pulp & Paper IndustriesTata Consultancy Services
Intensive global competition and sustained cost pressure have highlighted the importance of asset management in many industries. Concentration on “Return on Assets” has become a key issue in the process industry. This presentation addresses challenges and provides a solution in the form of Intelligent Asset Performance Management with a focus on the pulp and paper industry.
PECB Webinar: Aligning ISO 31000 and Management of Risk MethodologyPECB
The webinar covers:
• ISO 31000 as the adopted standard, for ISO standards that have risk components, such as ISO 27005 and OHSAS 18001
• Description of Management of Risk (MoR) – how organizations can benefit
• Complementary values that ISO 31000 and MoR bring to each other
• How Risk Managers can evolve a practical approach to carrying out Risk Processes
Presenter:
This webinar was presented by PECB Trainer Orlando Olumide Odejide, an experienced Enterprise Architect and Chief Trainer for Training Heights Limited.
Lufthansa Reference Architecture for the OpenGroupCapgemini
The presentation describes the aviation reference architecture framework including the meta model and a domain overview.
Author of paper and presentation:
Kai Schröder, Carsten Brockmann and Eldar Sultanow from
Capgemini Germany and
Carsten Breithaupt and Christian Vollmer from Lufthansa
Introduction to Reliability Centered MaintenanceDibyendu De
Introduces Reliability Centered Maintenance, strategies employed, formulation of effective maintenance plan, reduction of consequences of failures and failure rate.
Knowledge of the purpose of IT strategy, policies, standards & pro cedures for an organization and the essential elements of each
https://www.infosectrain.com/blog/part-2-cisa-domain-2-governance-and-management-of-it/
KURADA-Methodology of technological disasters risk determination-ID1057-IDRC2...Global Risk Forum GRFDavos
5th International Disaster and Risk Conference IDRC 2014 Integrative Risk Management - The role of science, technology & practice 24-28 August 2014 in Davos, Switzerland
Energy Markets are at an inflection point: a flat global economy, pressure to grow revenue and profit, tighter regulations, and increased competition have significantly changed the way assets are operated. Internal inefficiencies, including lack of operationally relevant insight, still prevent companies from optimizing asset performance. Operators are challenged by a limited visibility into their assets’ data and often lack enhanced capabilities to quantitatively/qualitatively analyze the historical data and demonstrate value-added solutions.
In this second in a series of joint webinars on Asset Performance Management, GE Digital and Stork share the way they respond to the above challenges when it comes to Asset Reliability Management. They present a large scale case study practiced with a client active in the oil & gas industry and explain additional available solutions to the same questions.
John Day developed a proactive maintenance process in 1978 and manage maintenance and engineering at Alumax Mt. Holly and later at Alcoa Mt Holly for over 20 years. These are the slides he presented at the 1997 SMRP Conference. Great slides with great information. If you would like the slides and not PDF send me an email at rsmith@maintenancebestpractices.com. I worked for John Day back in the early 1980s which started my journey in Proactive Maintenance.
Business Continuity Management PowerPoint Presentation SlidesSlideTeam
Presenting this set of slides with name - Business Continuity Management PowerPoint Presentation Slides. This complete deck is oriented to make sure you do not lag in your presentations. Our creatively crafted slides come with apt research and planning. This exclusive deck with fifty-two slides is here to help you to strategize, plan, analyze, or segment the topic with clear understanding and apprehension. Utilize ready to use presentation slides on Business Continuity Management PowerPoint Presentation Slides with all sorts of editable templates, charts and graphs, overviews, analysis templates. It is usable for marking important decisions and covering critical issues. Display and present all possible kinds of underlying nuances, progress factors for an all inclusive presentation for the teams. This presentation deck can be used by all professionals, managers, individuals, internal external teams involved in any company organization.
You want to learn how to rank your equipment based on criticality then this chapter from the "Rules of Thumb for Maintenance and Reliability Engineers Handbook.
This document will describe the structured evaluation methodology used to “Identify Critical Equipment”. Criticality Analysis identifies the assets which contribute the most asset reliability, throughput, safety, etc. Without an effective criticality analysis an organization lacks focus on what assets contribute the most to their business.
If you have questions about asset criticality analysis send an email to Ricky Smith at askrickysmith@gmail,com
By leveraging an automated diagnostic system that is built upon a strong reliability engineering methodology, a drilling platform can make risk-informed decisions to maintain the inherent reliability of their critical equipment using a “cost avoidance” approach that results in lower overall life cycle costs. Used as part of a daily routine, operators and maintainers have access to real-time intelligence on the integrity of critical equipment allowing them to proactively allocate the often limited maintenance resources to targeted higher risk items resulting in reduced non-productive time (NPT), improved performance, greatly increased drilling safety and decreased inspection related costs.
Intelligent Asset Performance & Energy Management for Pulp & Paper IndustriesTata Consultancy Services
Intensive global competition and sustained cost pressure have highlighted the importance of asset management in many industries. Concentration on “Return on Assets” has become a key issue in the process industry. This presentation addresses challenges and provides a solution in the form of Intelligent Asset Performance Management with a focus on the pulp and paper industry.
PECB Webinar: Aligning ISO 31000 and Management of Risk MethodologyPECB
The webinar covers:
• ISO 31000 as the adopted standard, for ISO standards that have risk components, such as ISO 27005 and OHSAS 18001
• Description of Management of Risk (MoR) – how organizations can benefit
• Complementary values that ISO 31000 and MoR bring to each other
• How Risk Managers can evolve a practical approach to carrying out Risk Processes
Presenter:
This webinar was presented by PECB Trainer Orlando Olumide Odejide, an experienced Enterprise Architect and Chief Trainer for Training Heights Limited.
Lufthansa Reference Architecture for the OpenGroupCapgemini
The presentation describes the aviation reference architecture framework including the meta model and a domain overview.
Author of paper and presentation:
Kai Schröder, Carsten Brockmann and Eldar Sultanow from
Capgemini Germany and
Carsten Breithaupt and Christian Vollmer from Lufthansa
Introduction to Reliability Centered MaintenanceDibyendu De
Introduces Reliability Centered Maintenance, strategies employed, formulation of effective maintenance plan, reduction of consequences of failures and failure rate.
Knowledge of the purpose of IT strategy, policies, standards & pro cedures for an organization and the essential elements of each
https://www.infosectrain.com/blog/part-2-cisa-domain-2-governance-and-management-of-it/
KURADA-Methodology of technological disasters risk determination-ID1057-IDRC2...Global Risk Forum GRFDavos
5th International Disaster and Risk Conference IDRC 2014 Integrative Risk Management - The role of science, technology & practice 24-28 August 2014 in Davos, Switzerland
Performance Based Regulation, Implementing an Asset Management Standards and ...HIMADRI BANERJI
Performance Based Rate structure forelectric utilities is imminent and implementing an Asset Management standard PAS II is discussed and a case study developed for electrical utilities.
CAPS define the key aspects of safety-critical elements (SCEs), including equipment, procedures, personnel, inspections and verification necessary to preserve the integrity of the control measures that reduce the risk of a catastrophic major accident event (MAE).The process involves developing CAPS for integration into a Safety and Environmental Management System (SEMS) as part of an overall Risk-Based Asset Management strategy that provides regulatory compliance and system reliability.
CEDA LNG Investment, First Gas & Beyond | Opening RemarksAdvisian
At the CEDA (Committee for Economic Development of Australia) Resources and Energy series in Queensland, Steve Porter opened the series on behalf of major sponsor Advisian.
As we journey through the world we see continual changes in the energy sector. Change is inevitable, but today’s energy sector - particularly in hydrocarbons - is dramatically changing relative to the norms that we have become used to over recent years. Brian McShane presented his thoughts at the Energy Conference Trinidad and Tobago
Today operators are faced with the challenges
of ageing offshore installations and the consumed fatigue lives of their structural details. As contracts of offshore installations are renewed or extended, engineers are faced with the challenge to extend the fatigue life of assets for a new required period of time. This training will help engineers and naval architects to tackle these challenges,
With the increase in global competition, more and more costumers consider reliability as one of their primary deciding factors, when purchasing new products. Several companies have invested in developing their own Design for Reliability (DFR) processes and roadmaps in order to be able to meet those requirements and compete in today’s market. This presentation will describe the DFR roadmap and how to effectively use it to ensure the success of the reliability program by focusing on the following DFR elements.
Reliability Centered Maintenance for minimizing integrity failure by Bhavesh Shukla at APAC 2015 Process Safety Management Conference 9th March 2015 Singapore.
In December 2023 we started a series of three webinars about the theme "asset management enabling technologies". In these webinars, we discuss the different aspects of connectivity and the enabling technologies, which in our opinion is crucial for the successful operation of your assets.
In this third webinar, Johan Ferket and Pieter Wielemaker will focus on three important items in the Asset Performance Management (APM) journey: transformational planning, tool and software evaluation and performance tracking.
They will provide answer to the questions:
- What are the main stage gates in the APM Roadmap?
- Which tooling and software are best suited for your situation: how to evaluate and choose?
- How to close the loop: APM performance tracking?
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
Is your FMEA performing for you?
This is advance level of PFMEA, Have basic understanding fo Core IATF Tools before refering to this presentation.
This presentation gives an overview of Lloyd’s Register’s services regarding wind farm operations. In particular Lloyd's Register has worked hard to develop the service for risk-based optimisation of maintenance strategies.
If you operate, own, finance or insure one or more wind farms, Lloyd's Register can add value to your O&M planning by monitoring, learning, retaining and optimising the O&M tasks to minimise downtime, spares count, unscheduled maintenance, unnecessary site visits and to ensure, through informed planning, maintenance technicians arrive at site with correct parts, correct tools, correct training and expertise to keep the wind turbines running throughout their design life for the least possible cost.
Productivity improvement in generation of so ps for oil & gas equipment manuf...QuEST Global
This white paper enables an SOP publisher to understand the advantages of employing an onsite project lead to accelerate the generation of a high quality SOP in Oil & Gas industry. A publisher can critically understand the success factor of such an engagement and the process of arriving at the new generation factor.
Similar to Asset Integrity Management for purpose-built FPSOs and subsea system facilities (20)
Organizations have the opportunity to reevaluate their business-
as-usual, reduce real estate costs, and move towards a more resilient, and sustainable environment, one that ensures employees feel safe at the workplace and have greater control over their daily life. Our team can help evaluate, design, and monitor an optimal workplace strategy that protects your people, profitability and productivity.
Skills development for the new Oil & Gas industryAdvisian
Intecsea's Brian McShane presents how to prepare for and support the potential opportunities arising in the Carribbean Community as a new deepwater basin.
Advisian dynamic process simulation capability june 2019Advisian
Dynamic Process Simulation allows the prediction of not only how a system is expected to behave when it is operating at the targeted design point – it is capable of predicting how it will behave when away from its “design point”.
Advanced Software for Optimized Energy SystemsAdvisian
Meeting the need for resilient energy infrastructure requires accurate sizing and configuration of distributed energy systems (DES). Given the diversity of loads to serve, optimizing DES both technically and economically is a challenge of overwhelming complexity. The solution is advanced design tools capable of considering hundreds of thousands of scenarios in seconds. Learn about the latest in integrated techno-economic optimization for microgrids and other DES as presented by Tristan Jackson at #IDEA2019 in Pittsburgh, PA.
StepWise | Helping you make strategic decisions for your capital investmentsAdvisian
There's a need in the market to better understand the risks and opportunities of options early in project or business improvement investments. See how StepWise can help.
Chris Lovelock shares how portfolio management thinking is evolving along with available technology to optimise a portfolio for improved strategic value from capital.
Human factors - what role should they play in Responsible CareAdvisian
This presentation examines one facet of Human Behaviour and how attention paid to it enhances the ability of users to achieve and sustain performance excellence in terms of Plant Reliability and Safety
9 lithium trade-off studies that can reduce CAPEX and OPEXAdvisian
With the popularity of electric vehicles (EVs) growing far faster than predicted, lithium will continue to be a hot commodity in 2018. To maximise return on investment and reduce your risk there are nine trade-off studies that can be undertaken to optimise your technical choices.
Safety and asset management are a corner stone to our industry that enables us to be successful. So how can we achieve zero
incidents, and zero harm for our people, and for our environment?
Aerial Data Management and The Digital EnterpriseAdvisian
Broader industries have seen improved performance across the whole of asset lifecycle with the extensive application of digital technologies and an increase in the integration of information systems. We explain how.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
1. Asset Integrity Assessment and
Management Program for life
preservation of a purpose-built
FPSO and associated subsea
system facilities
Dr Abe Nezamian – Director, Asset Integrity Management
2. Low oil price
During challenging market conditions,
effective integrity management of offshore
assets is more important than ever to
ensure they’re safe and reliable.
3. FPSO
Floating facilities for production, storage and offloading
(FPSO) and subsea facilities are effective options for
exploiting offshore oil and gas resources in remote
marginal fields.
4. While they offer the industry significant benefits,
they also present a number of complex
challenges to the Asset Integrity Manager
7. Jabiru Venture
Most FPSOs were built after 1997, having less than
19 years in operation.
Some may be taken to dry dock
Rubby PrincessNan Hai Kai Tuo
Schiehallion needed to
be replaced by 2015Challis Venture
Studied FPSO
8. Lack of data
Although there is considerable growth for these type of
facilities, it’s generally recognized that when compared
to trading tankers, FPSO/FSOs have limited experience
from which to draw historical data and trends.
As a result, there is limited data for Asset Integrity
Management decision making.
9. Schiehallion FPSO
Source: NOV team
• Non-disconnectable purpose-built FPSO, with a design life of 20 years
• Design constrained
• Built with the best available construction
• Production fluids worse than expected
• Increasing defects (operations expenditure 50% higher)
• Operations efficiency down to 60%
• Expecting major obsolescence “hit”
• Has been replaced
10. The Schiehallion FPSO
needed to be replaced by 2015
Source: NOV team
…due to poor integrity and field performance – 3 years
short of its initial design life
Shutdown period is about 1 year, requiring:
• New risers, umbilicals and mostly new mooring lines (12 to 20)
• Re-used flowlines/SS hardware
11. Out of all the potential failures to occur on a
FPSO, almost all happened to this facility
High
Low
Low High
Manageability
Consequence (Mmbbls)
Polytropic
tubing
Switchboard
connections
Fare tip
PSV failures
Emergency
gen fails
Framo System
Major Leak
Tree corrosion
/ erosion
Shuttle tanker
incident
Main Gen
failure
Subsea pipe corrosion
/ erosion
Drill centre
disabled
Seawater
system failure
Production
equip failure
T/S sand impact
Thruster failure
Turret manifolds
Swivel fails
Riser failureFire – air
compressor
Mooring
integrity
Ware/green
water damage
Hull + pipe-
work defects
Low IR Turret
struct
1 5 10 20 40
Major events as developed for the Joe Leghorn review:
Incident occurred on Schiehallion FPSO
12. These integrity issues regarding
Schiehallon are not unique, but rather
common with FPSOs
14. For an FPSO part of the deep-water oil and gas
development in Africa, an AIM program needed to
be developed to prioritize and maximize resources for
availability, while maintaining the risk profile of the
facility (‘as low as reasonably practicable’)
15. Key features of the facility include:
• FPSO hull and topsides + mooring lines + suction piles
• Modular topsides
• SPM buoy
• Flow lines, risers and export line
• Umbilicals
• Drilling wells
• Subsea manifolds
• Other subsea equipment
16. Asset Groups
Asset Group Asset Type
Main Field Wells
Subsea Systems
Subsea Flowline Systems
FPSO
Risers and Umbilicals
Mooring System
Hull
Topsides – Main Facilities
Topsides – Utilities
SPM
Mooring System
Offloading System
SPM Buoy
The asset data was grouped into three parts, based on functionality:
17. Data was stored and secured
in a unique database and
accessible in real-time by
anyone who was acting on
the AIM activities.
18. AIM Process
Data Evaluation Strategy Program
Managed system
for recording,
archive and
retrieval of AIM
data and other
pertinent records
Evaluation of
integrity and
fitness-for-
service;
development of
remedial actions
Overall
inspection,
monitoring,
maintenance,
mitigation and
decommissioning
philosophies
Detailed work
scopes for
inspection
activities and
execution to
ensure integrity
of asset
Design DecommissionData update
19. The most critical part of the process is
data capture and gap analysis
20. Data Requirements
Design Basis Data
Requirements
General Facility Data
Design Data
Fabrication Data
Installation Data
Environmental Data
Requirements
Metocean
Seismic
Soil Data
Weather Events
Regulatory Data
Requirements
Certification Authority
Facilities Safety Case
Scheme of Examinations
Operational Process
Data Requirements
Heat & Mass Balance
Original & Current
Operational Performance
Process Chemistry
Process Description
Production Limitations
Production Rates
What is developed in the design stage of a development is often based off
presumptions. Once all the required data has been collected, what is done in
the design stage can be recalibrated - data from operations is now available
and therefore uncertainty can be narrowed and reliability increased.
21. Data Requirements
Condition Data Requirements
In-service Inspection Reports
Incident Reports
Modifications
Anomaly Register
Weight Report
Condition Monitoring reports
Corrosion Protection
Engineering Assessment
Engineering Evaluation
Asset Integrity Manual
Scour Trend Analysis
Marine Growth Trend Analysis
Corrosion Assessment
Damage Evaluation
Mitigation
Risk Assessment
Structural Assessment
Analyse data to build a trend for lifecycle
management - look at all the implications
and determine how these will be managed
for the life of the asset.
22. Gap Analysis Methodology
Data
Requirements
Received /
Required Data
Conclusions
Component
Breakdown
Operator Asset Management team
CDMS
(data
management
system)
Complete a couple of rounds of gap analysis to ensure all data and information has been captured
and correlated to the AIM program.
Gap Analysis
23. 1
2
3
4
5
Performance Indicators
Represents design set point
when new
Represents performance
degradation that survives
through life extension
Represents performance
degradation that survives to end
of design life
Represents performance
degradation requiring repair /
replacement but still following
the “bath tub” wear out curve
Represents rapid degradation
before end of design life
Life
extension
1
2
3
4
5
Set point
when new
Performance Indicators (PIs)
required as aging starts
Minimum acceptable
performance level
Structural Integrity
Assessment confirms that
acceptance level is
achieved, exceeded or not
achieved
Performancestandard
Time
Original design life
The Performance Indicator area is where degradation, issues and problems can be identified. It’s important
to have systems in place to pick up issues before they happen.
24. Asset Integrity Assessment Criteria
Risk
Assessment
Minimum
Acceptance
Action List
Condition
Assessment
Available AIM System
Optimized
Complete a couple of rounds to optimize and develop the Asset Integrity program, and to develop
an action list.
AIM program
25. Safety Management
STOP STOP STOP
Hazard
PREVENT
Containment
DETECT
Gas/flame
detection
CONTROL
ESD Blowdown
MITIGATE
Fire protection,
deluge
Release Event
As part of the review, all safety values need to be put in place as well as a sound monitoring system.
26. Risk Management
Critical throughout the management of an asset’s integrity program.
2.
Communication and
consultation
5.
Monitoring and
review
1.
Establishing the context
Risk identification
Risk analysis
Risk evaluation
4.
Risk treatment
3.Riskassessment
This underpins the
overall risk management
process, should occur
throughout the cycle
and be two-way (as
shown by the arrows)
Monitoring at every
stage, feeding back to
improvements based on
increased understanding
Review of the entire
process at intervals to
ensure it continues to be
effective
27. FPSO degradation mechanisms examples
• Operational degradation
• Topside facility CP and coating degradation
• Marine growth
• Subsea systems
• CP system depletion
• Subsea pipelines internal and external corrosion
• Fatigue
• Scouring
• Erosion
• Crane systems de-rating
29. FPSO degradation mechanisms root causes
Active SRB (Sulfate Reducing Bacteria) corrosion:
• A bacteria that obtains energy by oxidizing organic compounds or molecular
hydrogen (H2) while reducing sulfate (SO2) to hydrogen sulfide (H2S)
• “Breathes" sulfate rather than oxygen
• Not familiar
• Could be a driving factor for corrosion rate
• Have been found on mooring lines and suction pile
30. SRB can lead to 2x the corrosion, not
accounted for in the design stage.
A program needs to be developed
to control these events.
31. Purposed RBI Methodology
Inspection
Plan
Asset Hierarchy
Subdivision Tag
System
Review of the
Documentation
Component
Selection
Qualitative
Assessment
(HAZID)
Quantitative
Assessment
(FDF)
Probability of
failure
Consequences of
failure
Risk
Ranking
Detailed
RBI of
Failure
(FDF <10)
Qualitative and quantitative risk assessment is required – in some cases quantitative data is not available.
32. Risk Rating and Prioritizing
The risk matrix for the project was simplified into three
ratings, helping to prioritize maintenance:
Risk Rating = 1 (unacceptable) – design
improvements/mitigations are strongly
recommended;
Risk Rating = 2 (ALARP - As Low
As Reasonably Practicable) design
improvements are suggested;
Risk Rating = 3 (acceptable)
- design features already prevent/
mitigate failures.
34. Conclusions
• Carefully review AIM program and available data
• Conduct a gap analysis of the data and determine the areas
for improvement
• Update the AIM system and data management systems to optimize
the Asset Integrity Program
• Develop a baseline of conditions
• Conduct a risk assessment and prioritize maintenance
• Develop an acceptance criteria
• Determine required mitigations to achieve ALARP Level and
maintenance of fitness-for-service
• Develop Requalification and Life Extension plans for the operating
life of the asset
37. DISCLAIMER
This presentation has been prepared by a representative of Advisian.
The presentation contains the professional and personal opinions of the presenter, which are given in good faith. As such, opinions presented
herein may not always necessarily reflect the position of Advisian as a whole, its officers or executive.
Any forward-looking statements included in this presentation will involve subjective judgment and analysis and are subject to uncertainties, risks and
contingencies—many of which are outside the control of, and may be unknown to, Advisian.
Advisian and all associated entities and representatives make no representation or warranty as to the accuracy, reliability or completeness of
information in this document and do not take responsibility for updating any information or correcting any error or omission that may become
apparent after this document has been issued.
To the extent permitted by law, Advisian and its officers, employees, related bodies and agents disclaim all liability—direct, indirect or consequential
(and whether or not arising out of the negligence, default or lack of care of Advisian and/or any of its agents)—for any loss or damage suffered by a
recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.
Editor's Notes
All potential failures, almost all happened in this facility
48km of flow lines
Divided because of functionality and then next level down
25,000 components
Integrity of systems, sub-systems and critical components
48km of flow lines
48km of flow lines
# 4 and 5 when it starts to degrated
In the Performance indicator area is where you can pick up degratation issues and problems, and is important ot have systems implemented at this stage to pick it up before it happens before it happens
5 -
Not accounted for in design.
Need to develop a program to control these events
Simplified the risk matrix with 3 ratings. This way what