This document announces an upcoming webinar and seminar series on bolted joint integrity management hosted by Augustus and Asset55. The webinar will discuss recent developments in codes and standards for bolted joints as well as parameters affecting joint integrity. It will also demonstrate Asset55's bolting management software. The seminars will focus on managing leak-free startups. Attendees will receive details on code developments, PCC-1 training, and a free trial of the Asset55 software. The document provides contact information for Augustus and Asset55 to ask questions or request customized training, engineering support, or software services.
Managing your OnStream Inspection Program and External vs Internal inspectionsEdwin A Merrick
API 510 recognizes the need to be able to obtain valid inspection results from conducting and external inspection in-lieu of an internal inspection of Pressure Vessels.
Process Safety Life Cycle Management: Best Practices and ProcessesMd Rahaman
Learn how to transform your current process safety program to deliver intelligent and integrated safety solutions that can directly affect the bottom line, while simultaneously improving process and personnel safety.
Managing your OnStream Inspection Program and External vs Internal inspectionsEdwin A Merrick
API 510 recognizes the need to be able to obtain valid inspection results from conducting and external inspection in-lieu of an internal inspection of Pressure Vessels.
Process Safety Life Cycle Management: Best Practices and ProcessesMd Rahaman
Learn how to transform your current process safety program to deliver intelligent and integrated safety solutions that can directly affect the bottom line, while simultaneously improving process and personnel safety.
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
Abe Nezamian discusses various aspects of ageing related to FPSOs (floating facilities for production, storage and offtake) and outlines the required procedures for maintaining structural integrity.
A real-world introduction to PSM’s 14 Elements360factors
A number of recent incidents in various parts of the world have highlighted the increasing importance of effective Process Safety Management (PSM). This webinar presents a high-level overview of OSHA’s PSM requirements as well as real-world examples of how companies handle compliance.
Objectives
• Describe some of the major catastrophes which led to the formulation of PSM regulations.
• Introduce the 14 Elements of PSM.
• Present examples of various implementation approaches.
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
Successful commissioning new or starting-up revised equipment and systems requires meticulous planning, organizing and controlling. Careful methodical, detailed planning – early – is the key to the success of any commissioning.
This presentation was delivered by Bell Energy as part of training program in 2013. It provides the reader, basic to intermediate level of information on the use of Bowties for managing Hazards & Effects. Bowties can be used by any industry whether they are Oil & Gas, Finance, Banks, Aviation, Power, Nuclear, Construction, Infrastructure. To know more about bowties, please visit www.bell-energy.com or contact us on uaeoffice@bell-energy.net
In the present scenario of global competition RAMS ( Reliability, Availability, Maintainability, and Safety) Engineering plays a vital role in the design, maintenance, safety/security and management of engineering systems. Reliability is considered one of the most important performance assessment index for most of the industrial products, processes and services. It focuses on systematic study and analysis of failures and developing methods for eliminating them or at least minimizing their occurrence with minimum damage to system and environment. It is truly interdisciplinary in nature since failures are not limited to any particular types of engineering systems, processes, and services. It is in effect a specialization sought by all engineering practitioners and researchers.
Reliability Centered Maintenance for minimizing integrity failure by Bhavesh Shukla at APAC 2015 Process Safety Management Conference 9th March 2015 Singapore.
Damage mechanism affecting fixed equipmentsMarcep Inc.
This 2-day training consists of an interactive talk with live case studies and video presentation covering an in-depth industry topic. The speaker will cover from the overview of basic corrosion & degradation damage mechanism of equipment to proactive & dynamic approach for optimizing inspection with caution.
PROFIBUS System Design. PI has recently developed a Certified PROFIBUS System Design course. This presentation shows the need for such certified training and outlines the course content
Automotive Functional Safety ISO 26262 Training Bootcamp : Tonex TrainingBryan Len
Price: $3,999.00
Length: 4 Days
Automotive functional safety ISO 26262 training covers the background of ISO 26262 standard, its scope, the main differences from IEC 61508 (the general safety standard), and how the scope varies with adding new systems.
What is ISO 26262?
ISO 26262 is a Functional Safety standard that is a modification of the general safety standard IEC 61508 for the specifics of Automotive Electric/Electronic Systems.
Learn About:
ISO 26262 requirements
The challenges of implementing ISO 26262
The formal safety management processes and the recommended supporting processes
Risk assessment and the functional safety concept
Technical safety concept and system design
Safety-oriented hardware and software development
A methodical approach to safety analysis
Skills required for effective auditing of the ISO 26262 requirements
Skills to review the Safety Case
Functional Safety Audit and Functional Safety Assessment
Confirmation Measures including Confirmation Reviews, Functional Safety Audit and Functional Safety Assessment
Hazard analysis and risk assessment (H&R / HARA)
Parts 2,3,4,5,6,7,8, and 9
FMEA
FTA
ISO 26262 hardware architectural metrics
Dependent failure analysis (DFA)
DRBFM
Why Do You Need ISO 26262 Training?
ISO 26262 is the new automotive application standard for functional safety IEC 61508 that impacts the whole product lifecycle. However, applying and implementing ISO 26262 in an effective, efficient way can be challenging.
Learning Objectives:
Upon the completion of automotive functional safety ISO 26262 training, the attendees are able to:
Understand the details of ISO 26262
Identify how the scope of ISO 26262 applies to their system
Develop a Safety Case plan complying ISO 26262
Respond to Development Interface Agreement compliant to ISO
Define the safety goals and Automotive Safety Integrity Level (ASIL)
Determine the HW requirements based on ASIL
Determine the SW requirements based on ASIL
Course Outline:
Overview of the ISO 26262
Functional Safety Management (Part 2)
Project-Independent Functional Safety Management Activities
Requirements of Safety Management
Work Products, Part 2
Concept Phase (Part 3)
Work Products, Part 3
Product Development, System Level (Part 4)
Work Products, Part 4
Product Development: Hardware Level (Part 5)
Assessing Possibility of Violation of A Safety Goal
Work Products, Part 5
Product Development: Software Level (Part 6)
Work Products, Part 7
Production and Operation (Part 7)
Work Products, Part 7
Supporting Processes (part 8)
Work Products, Part 8
ASIL-Oriented and Safety-Oriented Analyses (Part 9)
Work Products, Part 9
ISO 26262 Tools
ISO 26262 Auditing
TONEX Sample Hands-On Workshop
Request more information.Visit Tonex training link below
https://www.tonex.com/training-courses/automotive-functional-safety-iso-26262-training/
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
Abe Nezamian discusses various aspects of ageing related to FPSOs (floating facilities for production, storage and offtake) and outlines the required procedures for maintaining structural integrity.
A real-world introduction to PSM’s 14 Elements360factors
A number of recent incidents in various parts of the world have highlighted the increasing importance of effective Process Safety Management (PSM). This webinar presents a high-level overview of OSHA’s PSM requirements as well as real-world examples of how companies handle compliance.
Objectives
• Describe some of the major catastrophes which led to the formulation of PSM regulations.
• Introduce the 14 Elements of PSM.
• Present examples of various implementation approaches.
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
Successful commissioning new or starting-up revised equipment and systems requires meticulous planning, organizing and controlling. Careful methodical, detailed planning – early – is the key to the success of any commissioning.
This presentation was delivered by Bell Energy as part of training program in 2013. It provides the reader, basic to intermediate level of information on the use of Bowties for managing Hazards & Effects. Bowties can be used by any industry whether they are Oil & Gas, Finance, Banks, Aviation, Power, Nuclear, Construction, Infrastructure. To know more about bowties, please visit www.bell-energy.com or contact us on uaeoffice@bell-energy.net
In the present scenario of global competition RAMS ( Reliability, Availability, Maintainability, and Safety) Engineering plays a vital role in the design, maintenance, safety/security and management of engineering systems. Reliability is considered one of the most important performance assessment index for most of the industrial products, processes and services. It focuses on systematic study and analysis of failures and developing methods for eliminating them or at least minimizing their occurrence with minimum damage to system and environment. It is truly interdisciplinary in nature since failures are not limited to any particular types of engineering systems, processes, and services. It is in effect a specialization sought by all engineering practitioners and researchers.
Reliability Centered Maintenance for minimizing integrity failure by Bhavesh Shukla at APAC 2015 Process Safety Management Conference 9th March 2015 Singapore.
Damage mechanism affecting fixed equipmentsMarcep Inc.
This 2-day training consists of an interactive talk with live case studies and video presentation covering an in-depth industry topic. The speaker will cover from the overview of basic corrosion & degradation damage mechanism of equipment to proactive & dynamic approach for optimizing inspection with caution.
PROFIBUS System Design. PI has recently developed a Certified PROFIBUS System Design course. This presentation shows the need for such certified training and outlines the course content
Automotive Functional Safety ISO 26262 Training Bootcamp : Tonex TrainingBryan Len
Price: $3,999.00
Length: 4 Days
Automotive functional safety ISO 26262 training covers the background of ISO 26262 standard, its scope, the main differences from IEC 61508 (the general safety standard), and how the scope varies with adding new systems.
What is ISO 26262?
ISO 26262 is a Functional Safety standard that is a modification of the general safety standard IEC 61508 for the specifics of Automotive Electric/Electronic Systems.
Learn About:
ISO 26262 requirements
The challenges of implementing ISO 26262
The formal safety management processes and the recommended supporting processes
Risk assessment and the functional safety concept
Technical safety concept and system design
Safety-oriented hardware and software development
A methodical approach to safety analysis
Skills required for effective auditing of the ISO 26262 requirements
Skills to review the Safety Case
Functional Safety Audit and Functional Safety Assessment
Confirmation Measures including Confirmation Reviews, Functional Safety Audit and Functional Safety Assessment
Hazard analysis and risk assessment (H&R / HARA)
Parts 2,3,4,5,6,7,8, and 9
FMEA
FTA
ISO 26262 hardware architectural metrics
Dependent failure analysis (DFA)
DRBFM
Why Do You Need ISO 26262 Training?
ISO 26262 is the new automotive application standard for functional safety IEC 61508 that impacts the whole product lifecycle. However, applying and implementing ISO 26262 in an effective, efficient way can be challenging.
Learning Objectives:
Upon the completion of automotive functional safety ISO 26262 training, the attendees are able to:
Understand the details of ISO 26262
Identify how the scope of ISO 26262 applies to their system
Develop a Safety Case plan complying ISO 26262
Respond to Development Interface Agreement compliant to ISO
Define the safety goals and Automotive Safety Integrity Level (ASIL)
Determine the HW requirements based on ASIL
Determine the SW requirements based on ASIL
Course Outline:
Overview of the ISO 26262
Functional Safety Management (Part 2)
Project-Independent Functional Safety Management Activities
Requirements of Safety Management
Work Products, Part 2
Concept Phase (Part 3)
Work Products, Part 3
Product Development, System Level (Part 4)
Work Products, Part 4
Product Development: Hardware Level (Part 5)
Assessing Possibility of Violation of A Safety Goal
Work Products, Part 5
Product Development: Software Level (Part 6)
Work Products, Part 7
Production and Operation (Part 7)
Work Products, Part 7
Supporting Processes (part 8)
Work Products, Part 8
ASIL-Oriented and Safety-Oriented Analyses (Part 9)
Work Products, Part 9
ISO 26262 Tools
ISO 26262 Auditing
TONEX Sample Hands-On Workshop
Request more information.Visit Tonex training link below
https://www.tonex.com/training-courses/automotive-functional-safety-iso-26262-training/
Learn how your company can become more competitive in federal government contracting (gwac and idiq) and win more opportunities through ISO and CMMI certification.
Test Metrics in Agile: A Powerful Tool to Demonstrate ValueTechWell
Most understand that an agile development and testing approach improves quality and reduces risks in our projects. In some companies and culture however, there are skeptics. Is the move to agile—and therefore agile testing—really beneficial? Join Iuliia Zavertailo for a closer look at a Scandinavian insurance company that started with one manual tester and within three years moved toward opening a large test center in the Baltic. Behind this story were many small steps of demonstrating testing's value to the client through a well-defined set of agile metrics which quantitatively supported the importance and value of testing. Iullia gives examples of key performance indicators—test coverage, defect open and close rates, issues reported by customers, and regression test suite duration—and provides a roadmap for building a test metrics framework. She then discusses tools that support the agile test framework, provides guidance on how to analyze test statistics, and offers ways to present the facts that interest clients most.
How to Optimize Supply Chain Collaboration: The Road to a Unified Automotive ...Tasktop
During this webinar, Trevor Bruner, Sr. Product Manager at Tasktop and Adam Somorjai, Pre-sales Consultant at Intland Software, explain how your organization can boost collaboration between teams, minimize budget and time waste, and ensure fast delivery of high quality software by:
Synchronizing system critical data between systems while retaining relationship and context information
Unifying a multi-tier development scenario using a single central management platform
Ensuring compliance with ISO 26262 using codeBeamer ALM’s preconfigured automotive template
Managing Traceability in an Agile, Safety-critical Development EnvironmentIntland Software GmbH
Tracing requirements through test cases to released features is vital in the development of safety-critical end products and a key activity to help compliance with standards. Traceability helps ensure that all requirements are covered with features, and that there is no unnecessary code in the released product which could create risks. However, with the increasing adoption of less structured Agile methods, and the growing complexity of mission-critical development projects, ensuring traceability is a challenge.
Our webinar helps you to learn how to establish links between all work items across the lifecycle in complex, multi-tier safety-critical (embedded) software projects in an Agile environment. During the webinar, we cover the basics of traceability, why it's vital in mission-critical projects, and how it can be ensured even if your teams are working with Agile. Whether you're operating in the medical device, automotive, avionics, defense, or any other safety-critical sector, this webinar provides valuable practical knowledge on work item traceability.
Intland Software's Functional Safety Expert Szabolcs Agai presented this talk at MethodPark Process Insights USA 2020 about managing ASPICE and ISO 26262 compliance in automotive systems engineering using Application Lifecycle Management.
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car DashboardJayesh Sarode
The main goals of Six Sigma need to incorporate
these specific expected outcomes for the program, and
typically fall within the key areas like Quality, Variability,
Productivity. Without attacking quality issues in any process,
all other improvement efforts will certainly come up short. For
doing that Six Sigma implementation can differ widely
between organizations, depending on their individual goals
and operational strategies.
In this project I have successfully applied many design
processes related with six sigma like Identify Customer CTQs/
Customer Survey, develop a Fishbone Diagram, Input
Requirement Checklist, Quality Function Deployment, Design
Concepts (Competitive assessments (Benchmarking), Tradeoff
Analysis, Engineering Analysis - Develop System & Subsystem
Models, Error Proofing and Fixing, Validation, etc.
The aim is to achieve the essential function at the lowest
overall cost while maintaining customers’ optimum value
assurance. In this project I try to develop a such dashboard
design which follow a plastic design guideline, and analyze
and discuss the results to Obtain valid conclusions which
follows a design Standards. Plastic part dashboard is designed
by following Plastic trim design guidelines as well as DFM
(Design for manufacturing) and DFA (Design for Assembly)
guidelines. This project intends to explore the adoption of Six
sigma as a value creation tool. This project presents the basics
of Six sigma and its different phases that can be implemented
to a dashboard for its optimization.
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s RoleEnergySec
Presenter: Joseph Loomis, Southwest Research Institute (SwRI)
Asset Owners face challenges as they strive towards implementing the NERC-CIP V5 requirements. Meeting the requirements often require documentation and technical knowledge of how an asset operates that can only be provided by a Vendor. Vendors, likewise, may be unclear about how the NERC-CIP requirements affect them, and are unsure about how to meet the technical requirements. In this presentation we detail the lessons learned from a recent project where SwRI worked with a Vendor to determine how the requirements apply to them and what the Vendor needs to have to help support an Asset Owner in an audit.
Dear Colleague,
If your organization has been already implemented ISO 9001, here is the comparison sheet with additional ISO/TS 22163:217 (IRIS) requirements which you need to be implemented to achieve the ISO/TS 22163:2017 (IRIS) Certification.
Soon I will share more details about IRIS (ISO 22163:2017).
Thanks
Improving the User Story Agile Technique Using the INVEST CriteriaLuigi Buglione
Although the Agile Software Development (ADS) approach has been around for the last 15 years, it is only recently that attention has moved towards Agile Software Management (ASM) for tackling some of the management-related weaknesses, such as estimating on the basis of User Story points. This paper presents an application of the INVEST criteria (Independent – Negotiable – Valuable – Estimable – Small –Testable) for improving the measurement technique of User Stories, introducing sizing units and a technique to negotiate requirements. It includes a discussion on an approach to balancing the six criteria used to evaluate a set of User Stories in a Sprint.
Similar to Augustus Asset55 Joint Integrity Webinar July2015 r2 (20)
Earth moving equipment refers to heavy-duty machines used in construction, mining, agriculture, and other industries to move large amounts of earth, soil, and other materials. These machines include excavators, bulldozers, loaders, and backhoes, which are essential for tasks such as digging, grading, and leveling land.
Earthmovers is a leading brand in the industry, known for providing reliable and high-performance earth moving equipment. Their machines are designed to handle the toughest jobs with efficiency and precision, ensuring optimal productivity on any project.
BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem sol...gitapress3
TOP No AsTro 1 black magic SpecialiSt UK baba ji +91-9463629203 VashIkaRan blaCk maGiC specialist in uSA Uk England Luxembourg CanAdA America BEst VASHIKARAN SPECIALIST 9463629203 in UK Baba ji Love Marriage problem solution Uk USA america england LonDon Divorce problem solution astroloGer
Experience the breathtaking beauty of a Waikiki sunset aboard the MAITAI Catamaran. Sail along the stunning coastline as the sun dips below the horizon, casting vibrant hues across the sky. Enjoy the gentle ocean breeze, refreshing drinks, and a relaxed atmosphere. This unforgettable voyage offers panoramic views of Diamond Head and the Waikiki skyline, making it the perfect way to end your day in paradise. Join us for a memorable sunset cruise you won't forget. Please visit our website: https://www.maitaicatamaran.net/ and call us at 808-922-5665 for additional information.
SMS2ORBIT | launched in 2022 in Mumbai's Andheri area, aims to be the most reliable Bulk SMS Service Provider in Mumbai.
If More Information About The SMS Service Provided By SMS2ORBIT Is Desired, Please Don’t Hesitate To Contact The Business Team. They Can Be Reached At
business@sms2orbit.com Or By Calling 97248 55877.
BesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand...gitapress3
love problem solution astrologer
best love problem solution astrologer
online love problem solution astrologer
love problem solution astrologer in india
love problem solution astrologer in kolkata
love problem solution astrologer near me
love problem solution astrologer in ludhiana
love problem solution astrologer acharya ji
love problem solution astrologer in delhi
love problem solution astrologer amritsar
astrologer love problem solution
astrologer for love problem
astrology love problem solution
love solution astrologer
love problem solution specialist astrologer
love problem solution by astrologer
astrology love problem solution baba ji
love problem solve astrologer
love problem solution usa
love problem solution expert astrologer
astrologer for love marriage problem solution
love problem solution astrologer in mumbai
love problem solution muslim astrologer
love marriage specialist astrologer problem solution
famous love astrologer
love problem solution astrologer specialist
love problem solution astrologer tantrikBesT panDit Ji LoVe problem solution 9463629203 UK uSA California New Zealand baba ji LoVe marriage specialist Uk USA LonDOn panDit ji
Are Gutters Necessary? Explore the details now!AmeliaLauren3
Gutters are typically installed at a slight downward slope to allow water to flow freely towards downspouts or drains – the downspout being the vertical pipe attached to the gutters. The water is subsequently transported by the downspout to either the ground or an underground drainage system. Maintaining a gutter system that is free of blockages and functional requires regular maintenance.
But, many wonder in what situations gutters are required and not required. In this ppt we will discuss in detail the matter, ‘Are Gutters Necessary?’
Courier & Package Tracking System Actually WorksIn Targos
In the world of modern logistics, the courier and package tracking system stands as a pivotal tool, offering transparency and efficiency throughout the shipping process. Let’s delve into the intricacies of courier and package tracking systems and explore how INTARGOS plays a key role in this domain.
Maximizing Efficiency with Integrated Water Management SystemsIrri Design Studio
Integrated water management systems are essential for improving irrigation design sustainability and efficiency. Irri Design Studio helps customers maximize water consumption, reduce waste, and encourage responsible stewardship of water resources by utilizing cutting-edge technology like drone-based construction updates and BIM modeling. The increasing issues of water shortage and environmental protection require an all-encompassing strategy to water management. Irrigation systems may be planned to optimize water consumption efficiency while guaranteeing the safety of people and the environment by putting new ideas and concepts into practice. Visit our website https://www.irridesignstudio.com/ for more information.
Unlocking Insights: AI-powered Enhanced Due Diligence Strategies for Increase...RNayak3
Explore how a risk-based approach to Enhanced Due Diligence can deliver effective Anti-Money Laundering (AML) compliance and monitoring in banking and financial services.
Looking for the Reliable Logistics Solutions in India? Discover unparalleled efficiency and reliability with our top-rated logistics services. We specialize in streamlining supply chains, ensuring timely deliveries, and providing cutting-edge tracking solutions. Our platform caters to businesses of all sizes, offering customizable logistics solutions to meet your unique needs. With a focus on innovation and customer satisfaction, we are your trusted partner in navigating the complexities of logistics in India. Choose us for seamless, cost-effective, and scalable logistics solutions. Experience the best in Indian logistics with our expert team by your side.
Islamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxamilabibi1
Islamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docxIslamabad No 1 Amil Baba In Pakistan amil baba kala ilm.docx
A Bulgarian work permit is valid for up to one year, after which it can be renewed as long as the conditions of employment have not changed. After obtaining a work permit, the employee will need to apply for a Type D visa at the Bulgarian embassy or consulate in their country. Urgent requirement for Bulgaria 🇧🇬🇧🇬work D Category National Permit Visa ( Indian /Nepali Nationality only) Visa Validity - 3 to 6 months on renewables basis. Job category - General worker/ Helper Salary - 800 Euro @ 8 hrs.+ Over time extra Age- 20- 40 years Total processing time -4-5 Months
DOJO Training Center - Empowering Workforce ExcellenceHimanshu
The document delves into DOJO training, an immersive offline training concept designed to educate both new hires and existing staff. This method follows an organized eight-step process within a simulated work setting. The steps encompass safety protocols, behavioral coaching, product familiarity, production guidelines, and procedural understanding. Trainees acquire skills through hands-on simulations and rehearsal prior to transitioning to actual shop floor duties under supervision. The primary aim is to minimize accidents and defects by ensuring employees undergo comprehensive training, preparing them effectively for their job roles.
What Are the Latest Trends in Endpoint Security for 2024?VRS Technologies
In this PDF, Discover the top 2024 endpoint security trends, including zero trust, AI integration, XDR, cloud security, and enhanced mobile protection. VRS Technologies LLC supplies the top level Endpoint Security Service Dubai. For More Info Contact us: +971 56 7029840 Visit us: https://www.vrstech.com/endpoint-security-solutions.html
Don't Wait Until It's Too Late! 5-Signs Your Garage Door Needs ReplacingCR Garage Doors
This infographic unveils the 5 telltale signs your garage door needs a replacement. Avoid costly repairs and upgrade to a modern, secure, and silent entryway. Visit our website for more information about garage door replacement.
Website-> https://cr-garagedoors.com/
Elevate Your Brand with Digital Marketing for Fashion IndustryMatebiz Pvt. Ltd
Matebiz Pvt. Ltd. specializes in providing cutting-edge digital marketing for Fashion Industry. Our comprehensive strategies ensure that your brand stands out in the competitive fashion landscape. From targeted social media campaigns to search engine optimization tailored for fashion keywords, we cover it all. With a deep understanding of industry trends and consumer behavior, we craft compelling content and engaging visuals to enhance your online presence. Trust Matebiz Pvt. Ltd. to elevate your fashion brand through strategic digital marketing initiatives.
Comprehensive Water Damage Restoration Serviceskleenupdisaster
Find out how Disaster Kleenup's professional water damage restoration services can quickly and efficiently restore your property. Find more about our advanced techniques and quick action plans. Visit here: https://iddk.com/disaster-cleanup-services/flood-damage/
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...Landscape Express
Create a harmonious blend of luxury and sustainability in your outdoor living space with eco-friendly kitchens, enchanting water features, and lush plant landscaping. Embrace energy-efficient appliances, solar lighting, rainwater harvesting, and native plants to enhance beauty while reducing environmental impact. Transform your space into a glamorous, eco-conscious retreat for relaxation and social gatherings.
Nature’s Paradise Glamorous And Sustainable Designs For Your Outdoor Living S...
Augustus Asset55 Joint Integrity Webinar July2015 r2
1. Welcome to 3rd Quarter Augustus
Webinar-Seminar Series
Augustus Provides Mechanical Integrity and Risk Based Solutions
to Heavy Industry
Asset55 Specializes in Independent Bolted Joint Consulting,
Technical Support and Intelligent Scalable Software Solutions
Teamed Providing Practical INDEPENDENT Bolted Joint Flange
Management and Technical Services to Industry
Specialized Consulting on Bolting Technology and Quality Control
Asset55’s Integrity IQ - Bolting Management Software
On-site Management and Implementation Assistance
2. July 23 Webinar – Recent Developments in
Bolted Joint Integrity Management
Advances in the Codes and Standards
European
ASME – USA
Parameters Affecting Joint Integrity and Management
Considerations
ASSET55 Integrity IQ - Bolting Management Software
Some Recent Experience
NEXT WEEK – Attend Our “SEMINAR ON MANAGING FOR LEAK
FREE STARTUPS”
7/30 – Woodlands Texas, Chamber of Commerce
7/31 – Lake Charles Louisiana, Holiday Inn
3. Augustus/Asset55
Ed Merrick (Augustus) – Organizer and
Facilitator
• Bolting Problem Solving; Responsible
for TVA’s Bolting Program in 1970’s &
1980’s
• Former Secretary to ASTM F16.02 on
Bolting
• Chairman AIF/MPC Task Group on
Bolting – Resolved Generic Safety Issue
B-29 for Nuclear Industry to NRC
Satisfaction
• Requested ASME Circa 1982 Main
Committee to Develop what Became
PCC-1
• Recent Successful Experience with
Refinery Turnaround Leak Management
Robert Noble (Asset55) – Primary
Presenter
• Serves on Energy Institute and
European Committees.
• Contributor to ASME Pressure
Vessel and Piping Committees and
PCC-1 Guidelines for Pressure
Boundary Bolted Joint Assembly
• Over 20 Years Current Experience
Solving Bolting and Flange Joint
Problems
• Worldwide
• Developed Asset55’s Software and
Flange Management Solution
5. Management of Integrity of Bolted Joints - Evolution
DNV Guidelines Published
2011
ASME PCC-1-2010 Published
2010
EI GUIDELINES Published
2007
HSE SAFETY NOTICE
2/2000
UKOOA GUIDELINES Published
2002
EI GUIDELINES
Publishing 2015
ASME PCC-1-2013
Sep 2013
6. Training & Competence in Bolted Joints
ECITB PF010
ECITB PF018
ECITB PF019
UKCS
PF Competence > MJI
Competence
NORWAY
? > OLF118 training
2000
ASME
PCC-2010 App A (2013)
EUROPE
Var>Training Spec
>Competence standard
2005 2010
ECITB
PF015
EN1591-4
2013
ASME PCC-1 APP A
2013
MJI UNITS
2012-2013
7. Bolt Load Calculations - Evolution
VDI 2230
ASME PCC-1-2013 Appendix O
Updated% YIELD
EN1591-1 issued (2013)
ASME VIII BPVC
TAYLOR FORGE
PD5500
PVRC
TRENDS:
FOCUS ON GASKET
MORE GASKET DATA
FEA OF FLANGE
HIGHER BOLT LOADS
TIGHTNESS CLASS
EN13555 Updated to provide
key gasket data.
8. • Independent bolt load calculations
• 3rd party verified based on latest
guidelines
• Smart auto-select of tools, gaskets, bolts
and lubricants
• Every calculation verified and traceable
to the latest standards
Bringing this into practice using Bolted Joint Integrity
Software
INTELLIGENT, INDEPENDENT, INTEGRITY CALCULATIONS & ASSURANCE
Integrity iQ™ Calculation Engine
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 8
9. Step 1 – Understand the Joint Specification
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 9
10. Step 1A – Joint specification
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 10
11. Step 2 – Assembly and Tightening Specification
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 11
12. Step 2A – Special Connection Types, Calculations
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 12
13. Step 2A – Special Connection Types, Heat Exchangers
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 13
14. Step 3 – Tools and procedure
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 14
15. Step 4 – Joint Integrity review
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 15
16. Step 5 – Unique Joint ID
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 16
17. Step 6 – Workpack control
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 17
18. Step7 – Records and Exports
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 18
19. Step 8 – Confirm Assembly, Tightening and Test
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 19
20. Make it easier to identify– Link to drawings
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 20
21. Step 9 – Produce Reports and Evidence.
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 21
22. • Workflow Manager - data management for up to 250
joints
• Workflow Manager Plus - data management for up to
1,000 joints
• Data Manager - data management across multiple
projects/assets
• Graphics Manager - import/export drawings & link
flange ID’s to P&ID and Isometrics
• Interface Manager - interface with client systems inc:
ERP, Construction Management and Completion
Step 10 – Make it a Way of Life!
INDEPENDENT BOLTED JOINT INTEGRITY CONSULTANTS I INTELLIGENT SCALABLE SOFTWARE SOLUTIONS I www.AssetFiftyFive.com I SLIDE 22
Integrity iQ™ Software Suite
28. TorqueFit-up
Construction
Contractor
Engineering
ASME
Requirements/
Specifications
– design it
– buy it
- Install it
• POQR
• MDR
• AVL
• Preservation
Flange Design/
Pipe Spec
• Material
• Finish
• Tolerances
• Lubricant
• Bolt
• Gasket
• 3D Design
• ISO’s
• Audits/Assessment/
Surveillance end-to-end
• MDR
• Design Verification
100%
Inspection
IFC
Work Packages
Requirements
Procurement
• AVL
• Certification/
Performance
• PO Management
• Contracts
Engineering
• Qualified
• Calibration
• Contract
language
• Procedure
• Inspection %
• Qualified
• Contract
language
• Procedure
• Inspection %
Work
Preparation
• Design
Validation
• Receiving
• Inspection
Site Execution
Operate
• ASME 31.3
• ASME 31.4
• ASME PCC-1
• ASME SA193
• ANSI 16.4
PFD P&ID
Procurement
Knowledge/
Competency
People
Commission/Ops
Materials
Receiving
Materials
Management
Fit-up
Contractor
Torqueing
Contractor
Leak Test/
Commission
Commissioning Operations
HandoverHandover
Construction
Quality
28
Flange Management
An End To End Spectrum
MultipleContractors
• How to resolve
leaking flange
Specifications
not sent
tosupplier
notpart ofPO 1
Incorrect
nuts &bolts
used 5
Fitups done
incorrectly 2
Torqueing
done
incorrectly 3
Contractors
didnothave
Competent personnel 4
29. SO WHAT TO DO NEXT?
Register for and Attend Our Seminar Next Week
July 30th Woodland’s Texas Chamber of Commerce
July 31st Lake Charles Louisiana’s Holiday Inn Express
We will Provide You
Additional Details on Developments in the Codes and Standards that can Help You
Training on the Principles of ASME’s PCC-1
Training on Essential Elements of Developing a Flange Management System
A Month’s Free Trial of Asset55’s Integrity IQ - Bolting Management Software
Or
Ask for a Quotation on
Personalized In-House Training
Engineering Support for Implementing Return to Service from an Outage or Turnaround
Boots on the Ground Quality Control Support of Third Party Contractor and In-house Personnel
Specialized Mechanical and Metallurgical Engineering Support with Problem Solving
Integrity IQ Software and Services
30. Please feel free to get in touch should you have any questions
Robert Noble
Technical Director, Asset55
T : + 44 (0)7525 848 436
E : Robert.Noble@AssetFiftyFive.com
W : www.AssetFiftyFive.com
Edwin Merrick
President and Principal Consultant, Augustus
T : + 1 (832)591 0557
E : EAMerrick@TheAugustusGroup.com
W : www.theaugustusgroup.net
Thank You
Rev 1.1 02.12.14
Call Chelsea Williams
@ +1 (281) 537-06860
Editor's Notes
Potential problems within the spectrum:
BP Specifications not sent to supplier not part of PO - No POQR, SPEC not attached to PO
Incorrect nuts and bolts used - Bolts not correctly identified for function (hi-temp, structural, pressure retaining), No standard colorization identification; incorrect gasket, incorrect lubricant.
Fit ups done incorrectly - Joint brought together were mis-aligned and leaked – no notification to BP during assembly – leaked in operations
Torqueing done incorrectly - Bolts over torqued do to personnel not reading torque specification given as part of work pack
Contractors did not have competent personnel - Per BP and ASME PCC-1 both Fit up contractor and Torqueing Contractors did not have trained & experienced (competent) personnel.