SlideShare a Scribd company logo
1 of 50
Design	
  for	
  Reliability	
  
A	
  Roadmap	
  for	
  
Design	
  Robustness	
  
Moataz	
  Elheddeny	
  

©2014	
  ASQ	
  &	
  PresentaCon	
  Elheddeny	
  

hDp://reliabilitycalendar.org/
webinars/	
  
ASQ	
  Reliability	
  Division	
  
English	
  Webinar	
  Series	
  
One	
  of	
  the	
  monthly	
  webinars	
  
on	
  topics	
  of	
  interest	
  to	
  
reliability	
  engineers.	
  
To	
  view	
  recorded	
  webinar	
  (available	
  to	
  ASQ	
  Reliability	
  
Division	
  members	
  only)	
  visit	
  asq.org/reliability	
  
	
  
To	
  sign	
  up	
  for	
  the	
  free	
  and	
  available	
  to	
  anyone	
  live	
  
webinars	
  visit	
  reliabilitycalendar.org	
  and	
  select	
  English	
  
Webinars	
  to	
  find	
  links	
  to	
  register	
  for	
  upcoming	
  events	
  

hDp://reliabilitycalendar.org/
webinars/	
  
Design for Reliability:
A Roadmap for Design Robustness
Moataz Elheddeny, MBB
Sr. Systems Engineer
Siemens Healthcare
Agenda
Introduction
What is Design for Reliability
Reliability Requirements
Application/Usage Stresses
Failure Mode/Site/Mechanism
Reliability Verification
Summary
Vocabulary
Acronyms:
ALT – Accelerated Life Test
DFR – Design for Reliability
DOE – Design of Experiments
FMEA – Failure Mode and Effects Analysis
FRACAS – Failure Reporting and Corrective Action
System
HALT – Highly Accelerated Life Test
RPN – Risk Priority Number
SME – Subject Matter Expert
VOC – Voice of the Customer
Introduction
Design for Reliability,
What is Design for Reliability?
Design for Reliability Roadmap
Customer Requirements
Application/Usage Stresses
Failure Mode/Site/Mechanism
Verification
Design for Reliability (DFR)
What is Design for Reliability?
A discipline/roadmap that consists of different set of tools
and practices that are used during the product
development process.
Helps the organization identify, evaluate and address
reliability
risks,
improve
system
reliability,
and
consequently, meet customer requirements.
Design for Reliability (DFR)
How will the company benefit from implementing DFR
program?
Increase Customer Satisfaction
Increase Sales and Market Share
Optimize Warranty Periods
Minimize Replacement Parts Inventory
Reduce/Minimize Warranty Cost
Competitive edge
Company’s Reputation
DFR Roadmap
1. Reliability
Requirements

- Voice of the Customer (VOC)
- Benchmarking
- Best in Class

2. Application/
Usage Stresses

- Logistical Events
- Operational Events
- Operating Profiles

3. Failure Mode/
Site/Mechanism

4. Reliability
Verification

- Boundary/P-Diagram
- Lessons Learned
- FMEA
- Improvement and Verification Plan
- FRACAS
- Post Launch Reliability Monitoring
DFR Roadmap
1. Reliability
Requirements

- Voice of the Customer (VOC)
- Benchmarking
- Best in Class

2. Application/
Usage Stresses

- Logistical Events
- Operational Events
- Operating Profiles

3. Failure Mode/
Site/Mechanism

4. Reliability
Verification

- Boundary/P- Diagram
- Lessons Learned
- FMEA
- Improvement and Verification Plan
- FRACAS
- Post Launch Reliability Monitoring
Reliability Requirements
Why is it important to identify Reliability requirements
early in the development process?
To help the organization:
-

Identify critical components

-

Decide where to focus improvement efforts

-

Make the right decisions and trade-offs to meet customer
requirements.

-

Get a baseline measure of customer satisfaction to
measure improvement against

-

Identify key drivers of customer satisfaction
Reliability Requirements
Why do customers have different Reliability
requirements?
Reliability requirements could depend on,
Product Type:
Airplanes, cars, dishwashers and air conditioning units could all
have different reliability requirement

Application Type:
Hospitals, data centers, schools and offices could also have
different reliability requirement
Reliability Requirements
1.

Voice of the Customer (VOC)
Proactive VOC System:
Customer Interviews
Focus Groups
Surveys
Customer Visits
Reactive VOC System:
Service Calls
Customer Complaints
Claims
Web Page/Blogs
Product returns
Reliability Requirements
2.

Internal Benchmarking
Looking within the organization
Easier to collect and share data
Requires less resources
Limited data

3.

External Benchmarking / Best in Class
Gauging the organization against others
Benchmark companies who are doing the best possible
job
Set a goal of “As Good or Better”
Requires more resources
More difficult to collect data
DFR Roadmap
1. Reliability
Requirements

- Voice of the Customer (VOC)
- Benchmarking
- Best in Class

2. Application/
Usage Stresses

- Logistical Events
- Operational Events
- Operating Profiles

3. Failure Mode/
Site/Mechanism

4. Reliability
Verification

- Boundary/P-Diagram
- Lessons Learned
- FMEA
- Improvement and Verification Plan
- FRACAS
- Post Launch Reliability Monitoring
Application/Usage Stresses
Can we design a product without knowing what stresses
it will operate under?
Understanding the application/usage conditions of any system is a
crucial task for any reliability program.
To document application stresses, the following items need to be
identified:

1. Logistical & Operational Events
2. Operating Profiles/Usage Conditions
Application/Usage Stresses
1. Logistical & Operational Events
Describe all the events that the product will experience during its life
cycle, starting from the point it leaves the manufacturer final
inspection until the end of its useful life.
Application/Usage Stresses
1. Logistical & Operational Events
What are the possible environments and stresses for each event?
Application/Usage Stresses
2. Operating Profile/Usage Conditions
a. Available Data:
Multiple sources could be used to document available data. For
example:
Fleet Leader units
Weather database
Industry Standards
Lessons Learned
Application/Usage Stresses
2. Operating Profile/Usage Conditions
b. Design-Specific Data:
Develop test plans to document design-specific data. For example:
Motor temperature rise
Operational Vibration levels
Compressor oil viscosity during operation
DFR Roadmap
1. Reliability
Requirements

- Voice of the Customer (VOC)
- Benchmarking
- Best in Class

2. Application/
Usage Stresses

- Logistical Events
- Operational Events
- Operating Profiles

3. Failure Mode/
Site/Mechanism

4. Reliability
Verification

- Boundary/P Diagram
- Lessons Learned
- FMEA
- Improvement and Verification Plan
- FRACAS
- Post Launch Reliability Monitoring
Failure Mode/Site/Mechanism
1.

Boundary Diagram
Graphical tool aids the team to identify the system and
the elements outside its boundaries.
Some of those elements could become potential causes
(or effects) of system failure.
Failure Mode/Site/Mechanism
2.

Parameter Diagram
Provides a simplistic view of the system constrains and
the factors affecting its reliability
uncontrolled and could
contribute to system failure

Noise Factors
Piece to Piece

Change over time

Customer Usage

Environment

System Interaction

Torque

Corrosion

Duty Cycle

Temperature

Vibration

Input Signal
Control Signal

System
VFD

Ideal Function
Provide modulating signal to
control motor speed

material, energy, control

Control Factors
Enclosure type
controlled and their effects are
well understood

Failure Modes
No function (doesn't
provide modulating
signal)
error states
Failure Mode/Site/Mechanism
3. Lessons Learned
The process of documenting past learning to be used in
future projects
An effective tool to assist the team overcome some of the
challenges that other teams have experienced before
Some sources for Lessons Learned:
FRACAS
Tear down Analysis
Warranty
DFMEA
Fleet Leader
Corrective Action Database
Failure Mode/Site/Mechanism
3. Lessons Learned example
Design team is implementing a Variable Frequency Drive
to control motor speed
Lessons learned (from historical tear down analysis) shows
that motor bearing could fail due to shaft currents
Team used lessons learned to prevent future motor failures
by implementing a solution to ground/protect the bearings
Failure Mode/Site/Mechanism
4.

Design Failure Modes and Effects Analysis (DFMEA)
A risk assessment methodology to analyze different systems for
potential failure mode/site/mechanisms and their possible causes
Focuses on customer functional requirements
Includes failure modes caused by design weaknesses
Risks are weighted based on,

Severity
Occurrence
Detection
Actions will be based on the highest Risk Priority Number
RPN = Severity x Occurrence x Detection
Failure Mode/Site/Mechanism
4.

Design Failure Modes and Effects Analysis (DFMEA)
DFMEA requires a cross-functional team effort
Example:
Engineering
Manufacturing
Quality
Reliability
Materials
Subject Matter Experts (SMEs)

Product Management
Field Service
Failure Mode/Site/Mechanism
4.

Design Failure Modes and Effects Analysis (DFMEA)
DFMEA inputs could include:
Failure Mode/Site/Mechanism
4. Design Failure Modes and Effects Analysis (DFMEA)
Example:
Failure Mode/Site/Mechanism
4. Design Failure Modes and Effects Analysis (DFMEA)
DFMEA outputs
Improvement and Verification Plan
Process FMEA
Focuses on failure modes caused by process
weaknesses
Feeds into the Control Plan
DFMEA is a living document and is updated continuously,
using,
Test results
FRACAS
Field data
Etc.
DFR Roadmap
1. Reliability
Requirements

- Voice of the Customer (VOC)
- Benchmarking
- Best in Class

2. Application/
Usage Stresses

- Logistical Events
- Operational Events
- Operating Profiles

3. Failure Mode/
Site/Mechanism

4. Reliability
Verification

- Boundary/P Diagram
- Lessons Learned
- FMEA
- Improvement and Verification Plan
- FRACAS
- Post Launch Reliability Monitoring
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
Improvement and Verification plan is an output from
DFMEA, to address the identified risks
There are 2 primary questions to answer,
a.
What can we do to improve the design?
b.
How can we verify that the design meets the reliability
requirements?
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
a.

What can we do to improve the design?
Different design methods could be used to improve the
reliability
Examples:
-

De-rating
Redundancy
Reduce part count
Reduce Stress-Strength interference
Poka-Yoke
Design for Manufacturability
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
b.

How can we verify that the design meets the reliability
requirements?
Several verification methods/tests could be developed.
For example,
-

Tear Down Analysis
Design of Experiments
Vibration Test

- Material Analysis
- Salt Fog Test
- Field Trial
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
Highly Accelerated Life Test (HALT)
Identify operating/destructive limits and design weaknesses
Typical HALT test includes:
Cold Step Stress
Hot Step Stress
Thermal Shock
Vibration Step Stress
Thermal Shock/Vibration
combined
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
HALT example
A new Damper Actuator design is being qualified
HALT test was identified in the Reliability Verification Plan
Tear Down Analysis, for failed samples, shows:
1

2

Broken capacitor legs

Loose screws
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
HALT example cont.
Corrective actions were implemented
Verification HALT test was performed on new design
Tear down was performed on the new samples after test (no
issues were found)
Design changes increased the actuators robustness
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
Accelerated Life Test (ALT)
Used to quickly gain reliability results, by testing at various high
stress levels to speed the product failure
Could be used to test:
B vs. C (Better vs. Current)

Design 1 vs. Design 2
Supplier A vs. Supplier B
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
Accelerated Life Test (ALT)

ALT Types:
Quantitative ALT:
Life prediction
Correlate test stresses to operating stresses (Acceleration
Factor)
Typically requires 2 or more stress levels

Qualitative ALT:
No life prediction
Acceleration factor is unknown
Could be used when test capabilities are limited or if life
predictions are not required
e.g. verifying corrective action
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
Quantitative ALT example 1:
New motor insulation system is evaluated
DFMEA identified Insulation Thermal Degradation as a high risks
3 stress level ALT was developed to evaluate the Insulation
reliability
Reliability Improvement/Verification
1.

Reliability Improvement/Verification Plan
Quantitative ALT example 2:
Field failures were reported for current motor
Tear down analysis shows motor corrosion
Better motor was developed, and a “SingleLevel” verification ALT was required
Acceleration Factor (AF) was calculated:
AF = Luse / LAccelerated
Reliability Improvement/Verification
2.

Failure Reporting and Corrective Action System
(FRACAS)
What happens when a failure occurs during testing?
FRACAS is the process of capturing, analyzing and
correcting failures that occur during product development
process
Failures could be design, process or supplier related
8D problem solving process to investigate/correct failures
Linked to the DFMEA and lessons learned
Reliability Improvement/Verification
3. Post Launch Reliability Monitoring
Launching the products doesn’t necessarily mean that the
project is complete.
Other post launch activities are required, as part of the
reliability verification plan:
a.
b.
c.

Field Monitor
Parts Return
Warranty Analysis

Data could be used as follows:

Update DFMEA
Design verification
Document Lessons Learned
Early Launch Containment
Reliability Improvement/Verification
3.

Post Launch Reliability Monitoring
a.

Field Monitor
Field monitoring is a unit verification test in the actual
application
Several critical parameters are monitored/measured for
several months
Data is analyzed regularly, and compared to preestablished criteria
Parameters measured could be:
Cycles
Temperature
Pressure
Etc.
Reliability Improvement/Verification
3.

Post Launch Reliability Monitoring
b.

Parts Return
Develop a program to return critical components that fail
in the field
Returned parts would be analyzed to identify failure
modes and causes
Data would be used to drive corrective actions and
document lessons learned for future projects
Reliability Improvement/Verification
Post Launch Reliability Monitoring
c.

Warranty Analysis
Monitoring and analyzing warranty data is used to
identify possible trends, compare 2 (or more) designs
and verify that customer reliability requirements are met
Different analysis tools could be use.
Examples:
Re liaSoft W eibull++ 7 - www. Relia Soft. com

Probability - Lognormal

Run/Trend Charts
SPC Charts
Hypothesis Testing
Weibull Analysis

99. 000

Proba bility-Lognorma l
230V GEN IData 1
Lognorma l-2P
RRX SRM MED F M
F =168/S=16142
Probability Line
230V GEN IIData 1
Lognorma l-2P
RRX SRM MED F M
F =6/S=5046
Probability Line

50. 000

Unreliability, F(t)

3.

10. 000
5. 000

1. 000
0. 500

0. 100
0. 050

0. 010
0. 100

1. 000

10. 000

T ime, (t)
230V GEN IDa ta 1: µ=10 .32 39, σ=3.29 11, ρ=0.991 0, Ζ=0.9 99 9
230V GEN IIDa ta 1: µ=10.819 5, σ=2.9784 , ρ=0 .9 974 , Ζ=0 .99 96

Moataz Elhedde ny
Tra ne
03/15/2012
11:00:10 AM
100. 000
DFR Improvements Example
Does DFR roadmap really work?
Team has followed the DFR roadmap to change system design
and ensure the reliability of the new system
Several design improvements were made and tested/verified
Post Launch Reliability Monitoring has confirmed that the new
design has reduced field failures by > 80%, over the old design

> 80% improvement
Summary
“Design for Reliability” process steps:
1.
2.
3.
4.

Understand the requirements
Document/Measure application stresses
Identify failure modes and develop a plan to eliminate them
Verify, Verify, Verify

Reliability is an essential part of any product
development process and should be integrated as early
in the program as possible. It could provide new
perspectives to the design.
Always include SMEs and cross-functional teams in
program activities (e.g. DFMEA, FRACAS, Test
Planning).
Where to Get More Information
-

-

-

Life Data Analysis Reference Book – Reliasoft
Accelerated Life Testing Data Analysis Book – Reliasoft
MIL STD-810F “Environmental Engineering Considerations and
Laboratory Tests”
Defence Standard 00-35(PART 4)/Issue 3 “Environmental Handbook
for Defence Materiel”
Design for Six Sigma Workshop – Ingersoll Rand 2010
Moataz Elheddeny
-

Experienced Six Sigma practitioner, with a broad experience in
Quality and Reliability methodologies. He has served in different
reliability and quality roles for different companies, including
Siemens Healthcare, Ingersoll Rand and Brunswick.

-

Some of his responsibilities include developing/improving Design
for Reliability programs, ensuring the reliability of new products and
developing reliability specifications and test plans for different
components/subsystems.

-

Education/Certifications:
-

Ph.D. candidate, Industrial Engineering – University of Tennessee
Certified Reliability Engineer – American Society for Quality
Six sigma Master Black Belt – Arizona State University

Linkedin:
www.linkedin.com/in/elheddeny/
-

More Related Content

What's hot

Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceDibyendu De
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
Fmea presentation
Fmea presentationFmea presentation
Fmea presentationMurat Terzi
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECAMichael Herman
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...博行 門眞
 
CMRP Exam Questions
CMRP Exam QuestionsCMRP Exam Questions
CMRP Exam Questionsjasper_61
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategygumma alsgier
 

What's hot (20)

Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 
KPI SMRP Presentation
KPI SMRP PresentationKPI SMRP Presentation
KPI SMRP Presentation
 
The 10 most common fmea mistakes
The 10 most common fmea mistakes The 10 most common fmea mistakes
The 10 most common fmea mistakes
 
Design for reliability
Design for reliabilityDesign for reliability
Design for reliability
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Rcm terminology and concepts
Rcm terminology and conceptsRcm terminology and concepts
Rcm terminology and concepts
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Fmea presentation
Fmea presentationFmea presentation
Fmea presentation
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECA
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 
Advanced Pfmea
Advanced PfmeaAdvanced Pfmea
Advanced Pfmea
 
CMRP Exam Questions
CMRP Exam QuestionsCMRP Exam Questions
CMRP Exam Questions
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 

Viewers also liked

Robust design and reliability engineering synergy webinar 2013 04 10
Robust design and reliability engineering synergy webinar   2013 04 10Robust design and reliability engineering synergy webinar   2013 04 10
Robust design and reliability engineering synergy webinar 2013 04 10ASQ Reliability Division
 
Design for reliability in automotive electronics
Design for reliability in automotive electronicsDesign for reliability in automotive electronics
Design for reliability in automotive electronicsGil Sharon
 
Design for Environment by Waqas Ali Tunio
Design for Environment by Waqas Ali TunioDesign for Environment by Waqas Ali Tunio
Design for Environment by Waqas Ali TunioWaqas Ali Tunio
 
Design for logistics
Design for logisticsDesign for logistics
Design for logisticsRichard Farr
 
Design For Environment: End Life of the Product
Design For Environment: End Life of the ProductDesign For Environment: End Life of the Product
Design For Environment: End Life of the ProductVimal Unexpectation
 
Design And Sustainability by Carlo Vezzoli 09.09.09
Design And Sustainability by Carlo Vezzoli 09.09.09Design And Sustainability by Carlo Vezzoli 09.09.09
Design And Sustainability by Carlo Vezzoli 09.09.09LeNS Africa
 
Supply chain at hewlett packard
Supply chain at hewlett packardSupply chain at hewlett packard
Supply chain at hewlett packardGaurav Singh
 
Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...
Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...
Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...Josh Levine
 
Design for Assembly (DFA)
Design for Assembly (DFA)Design for Assembly (DFA)
Design for Assembly (DFA)Richard Farr
 
Software Assurance: What Should We Do next? - Software Design for Reliability
Software Assurance: What Should We Do next?  - Software Design for ReliabilitySoftware Assurance: What Should We Do next?  - Software Design for Reliability
Software Assurance: What Should We Do next? - Software Design for ReliabilityIvica Crnkovic
 
Tom Hume - Design in the product lifecycle
Tom Hume - Design in the product lifecycleTom Hume - Design in the product lifecycle
Tom Hume - Design in the product lifecycleMobile Monday Amsterdam
 
Design for Reliability - Quality Reliabilty Conference 2013
Design for Reliability - Quality Reliabilty Conference 2013Design for Reliability - Quality Reliabilty Conference 2013
Design for Reliability - Quality Reliabilty Conference 2013Joel Mandel
 
Design collaboration
Design collaborationDesign collaboration
Design collaborationARUN K S
 
End of life complete product lifecycle design 2 powerpoint ppt slides.
End of life complete product lifecycle design 2 powerpoint ppt slides.End of life complete product lifecycle design 2 powerpoint ppt slides.
End of life complete product lifecycle design 2 powerpoint ppt slides.SlideTeam.net
 

Viewers also liked (20)

Robust design and reliability engineering synergy webinar 2013 04 10
Robust design and reliability engineering synergy webinar   2013 04 10Robust design and reliability engineering synergy webinar   2013 04 10
Robust design and reliability engineering synergy webinar 2013 04 10
 
Design for reliability in automotive electronics
Design for reliability in automotive electronicsDesign for reliability in automotive electronics
Design for reliability in automotive electronics
 
Design for-disassembly
Design for-disassemblyDesign for-disassembly
Design for-disassembly
 
Design for Environment by Waqas Ali Tunio
Design for Environment by Waqas Ali TunioDesign for Environment by Waqas Ali Tunio
Design for Environment by Waqas Ali Tunio
 
Design for logistics
Design for logisticsDesign for logistics
Design for logistics
 
Design For Environment: End Life of the Product
Design For Environment: End Life of the ProductDesign For Environment: End Life of the Product
Design For Environment: End Life of the Product
 
Design And Sustainability by Carlo Vezzoli 09.09.09
Design And Sustainability by Carlo Vezzoli 09.09.09Design And Sustainability by Carlo Vezzoli 09.09.09
Design And Sustainability by Carlo Vezzoli 09.09.09
 
Supply chain at hewlett packard
Supply chain at hewlett packardSupply chain at hewlett packard
Supply chain at hewlett packard
 
Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...
Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...
Usability vs Design – When Does One Trump the Other? AI (Alexander Interactiv...
 
Dfma
DfmaDfma
Dfma
 
Design for Assembly (DFA)
Design for Assembly (DFA)Design for Assembly (DFA)
Design for Assembly (DFA)
 
Fracas - Failure Scene Investigation
Fracas - Failure Scene InvestigationFracas - Failure Scene Investigation
Fracas - Failure Scene Investigation
 
Df recycling
Df recyclingDf recycling
Df recycling
 
OOP 2014 - Lifecycle By Design
OOP 2014 - Lifecycle By DesignOOP 2014 - Lifecycle By Design
OOP 2014 - Lifecycle By Design
 
Software Assurance: What Should We Do next? - Software Design for Reliability
Software Assurance: What Should We Do next?  - Software Design for ReliabilitySoftware Assurance: What Should We Do next?  - Software Design for Reliability
Software Assurance: What Should We Do next? - Software Design for Reliability
 
Design Lifecycle
Design LifecycleDesign Lifecycle
Design Lifecycle
 
Tom Hume - Design in the product lifecycle
Tom Hume - Design in the product lifecycleTom Hume - Design in the product lifecycle
Tom Hume - Design in the product lifecycle
 
Design for Reliability - Quality Reliabilty Conference 2013
Design for Reliability - Quality Reliabilty Conference 2013Design for Reliability - Quality Reliabilty Conference 2013
Design for Reliability - Quality Reliabilty Conference 2013
 
Design collaboration
Design collaborationDesign collaboration
Design collaboration
 
End of life complete product lifecycle design 2 powerpoint ppt slides.
End of life complete product lifecycle design 2 powerpoint ppt slides.End of life complete product lifecycle design 2 powerpoint ppt slides.
End of life complete product lifecycle design 2 powerpoint ppt slides.
 

Similar to ASQ RD Webinar: Design for reliability a roadmap for design robustness

DFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCVDFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCVKamal Vora
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsLloyd's Register Energy
 
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualLuisa Polanco
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)Prashant Rasekar
 
PetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdf
PetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdfPetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdf
PetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdfPetroSync Global
 
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3Abbas (Bob) Youssef MBA, PhD
 
On the nature of FMECA... An introduction
On the nature of FMECA... An introductionOn the nature of FMECA... An introduction
On the nature of FMECA... An introductionMartGerrand
 
Sean carter dan_deans
Sean carter dan_deansSean carter dan_deans
Sean carter dan_deansNASAPMC
 
Performance testing reference model
Performance testing reference modelPerformance testing reference model
Performance testing reference modelEduards Salnikovs
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"Globe Testing
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
FMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthFMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthJing Jing Cheng
 

Similar to ASQ RD Webinar: Design for reliability a roadmap for design robustness (20)

Design & Process FMEA Manual
Design & Process FMEA ManualDesign & Process FMEA Manual
Design & Process FMEA Manual
 
LaFataResume16ddd
LaFataResume16dddLaFataResume16ddd
LaFataResume16ddd
 
DFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCVDFMEA DR & DVP 261113 KCV
DFMEA DR & DVP 261113 KCV
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
FMEA
FMEAFMEA
FMEA
 
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
Fmea basics
Fmea basicsFmea basics
Fmea basics
 
PetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdf
PetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdfPetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdf
PetroSync_-_Certified_Maintenance__Reliability_Professionals_2023 (1).pdf
 
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
Bob (ababs) Youssef FMEA Workshop Training at Hughes rev3
 
On the nature of FMECA... An introduction
On the nature of FMECA... An introductionOn the nature of FMECA... An introduction
On the nature of FMECA... An introduction
 
Sean carter dan_deans
Sean carter dan_deansSean carter dan_deans
Sean carter dan_deans
 
Performance testing reference model
Performance testing reference modelPerformance testing reference model
Performance testing reference model
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"Webinar "Gestión de la calidad en entornos SAP"
Webinar "Gestión de la calidad en entornos SAP"
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Df Maint Tutorial
Df Maint TutorialDf Maint Tutorial
Df Maint Tutorial
 
FMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthFMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and health
 
iiBA babok onapage
iiBA babok onapageiiBA babok onapage
iiBA babok onapage
 
FMEA
FMEAFMEA
FMEA
 

More from ASQ Reliability Division

A Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFA Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFASQ Reliability Division
 
Root Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin StewartRoot Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin StewartASQ Reliability Division
 
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...ASQ Reliability Division
 
Efficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin YangEfficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin YangASQ Reliability Division
 
Reliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry GuoReliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry GuoASQ Reliability Division
 
Reliability Division Webinar Series - Innovation: Quality for Tomorrow
Reliability Division Webinar Series -  Innovation: Quality for TomorrowReliability Division Webinar Series -  Innovation: Quality for Tomorrow
Reliability Division Webinar Series - Innovation: Quality for TomorrowASQ Reliability Division
 
Impact of censored data on reliability analysis
Impact of censored data on reliability analysisImpact of censored data on reliability analysis
Impact of censored data on reliability analysisASQ Reliability Division
 
A multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modesA multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modesASQ Reliability Division
 
ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ Reliability Division
 
Data Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability ImprovementData Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability ImprovementASQ Reliability Division
 
A Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software EngineeringA Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software EngineeringASQ Reliability Division
 
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...ASQ Reliability Division
 
Comparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging SystemsComparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging SystemsASQ Reliability Division
 
2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecasting2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecastingASQ Reliability Division
 
Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7ASQ Reliability Division
 

More from ASQ Reliability Division (20)

On Duty Cycle Concept in Reliability
On Duty Cycle Concept in ReliabilityOn Duty Cycle Concept in Reliability
On Duty Cycle Concept in Reliability
 
A Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFA Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTF
 
Thermodynamic Reliability
Thermodynamic  ReliabilityThermodynamic  Reliability
Thermodynamic Reliability
 
Root Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin StewartRoot Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin Stewart
 
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
 
Efficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin YangEfficient Reliability Demonstration Tests - by Guangbin Yang
Efficient Reliability Demonstration Tests - by Guangbin Yang
 
Reliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry GuoReliability Modeling Using Degradation Data - by Harry Guo
Reliability Modeling Using Degradation Data - by Harry Guo
 
Reliability Division Webinar Series - Innovation: Quality for Tomorrow
Reliability Division Webinar Series -  Innovation: Quality for TomorrowReliability Division Webinar Series -  Innovation: Quality for Tomorrow
Reliability Division Webinar Series - Innovation: Quality for Tomorrow
 
Impact of censored data on reliability analysis
Impact of censored data on reliability analysisImpact of censored data on reliability analysis
Impact of censored data on reliability analysis
 
An introduction to weibull analysis
An introduction to weibull analysisAn introduction to weibull analysis
An introduction to weibull analysis
 
A multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modesA multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modes
 
Reliably Solving Intractable Problems
Reliably Solving Intractable ProblemsReliably Solving Intractable Problems
Reliably Solving Intractable Problems
 
Reliably producing breakthroughs
Reliably producing breakthroughsReliably producing breakthroughs
Reliably producing breakthroughs
 
ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process
 
Data Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability ImprovementData Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability Improvement
 
A Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software EngineeringA Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software Engineering
 
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...
 
Comparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging SystemsComparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging Systems
 
2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecasting2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecasting
 
Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7
 

Recently uploaded

SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Recently uploaded (20)

SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

ASQ RD Webinar: Design for reliability a roadmap for design robustness

  • 1. Design  for  Reliability   A  Roadmap  for   Design  Robustness   Moataz  Elheddeny   ©2014  ASQ  &  PresentaCon  Elheddeny   hDp://reliabilitycalendar.org/ webinars/  
  • 2. ASQ  Reliability  Division   English  Webinar  Series   One  of  the  monthly  webinars   on  topics  of  interest  to   reliability  engineers.   To  view  recorded  webinar  (available  to  ASQ  Reliability   Division  members  only)  visit  asq.org/reliability     To  sign  up  for  the  free  and  available  to  anyone  live   webinars  visit  reliabilitycalendar.org  and  select  English   Webinars  to  find  links  to  register  for  upcoming  events   hDp://reliabilitycalendar.org/ webinars/  
  • 3. Design for Reliability: A Roadmap for Design Robustness Moataz Elheddeny, MBB Sr. Systems Engineer Siemens Healthcare
  • 4. Agenda Introduction What is Design for Reliability Reliability Requirements Application/Usage Stresses Failure Mode/Site/Mechanism Reliability Verification Summary
  • 5. Vocabulary Acronyms: ALT – Accelerated Life Test DFR – Design for Reliability DOE – Design of Experiments FMEA – Failure Mode and Effects Analysis FRACAS – Failure Reporting and Corrective Action System HALT – Highly Accelerated Life Test RPN – Risk Priority Number SME – Subject Matter Expert VOC – Voice of the Customer
  • 6. Introduction Design for Reliability, What is Design for Reliability? Design for Reliability Roadmap Customer Requirements Application/Usage Stresses Failure Mode/Site/Mechanism Verification
  • 7. Design for Reliability (DFR) What is Design for Reliability? A discipline/roadmap that consists of different set of tools and practices that are used during the product development process. Helps the organization identify, evaluate and address reliability risks, improve system reliability, and consequently, meet customer requirements.
  • 8. Design for Reliability (DFR) How will the company benefit from implementing DFR program? Increase Customer Satisfaction Increase Sales and Market Share Optimize Warranty Periods Minimize Replacement Parts Inventory Reduce/Minimize Warranty Cost Competitive edge Company’s Reputation
  • 9. DFR Roadmap 1. Reliability Requirements - Voice of the Customer (VOC) - Benchmarking - Best in Class 2. Application/ Usage Stresses - Logistical Events - Operational Events - Operating Profiles 3. Failure Mode/ Site/Mechanism 4. Reliability Verification - Boundary/P-Diagram - Lessons Learned - FMEA - Improvement and Verification Plan - FRACAS - Post Launch Reliability Monitoring
  • 10. DFR Roadmap 1. Reliability Requirements - Voice of the Customer (VOC) - Benchmarking - Best in Class 2. Application/ Usage Stresses - Logistical Events - Operational Events - Operating Profiles 3. Failure Mode/ Site/Mechanism 4. Reliability Verification - Boundary/P- Diagram - Lessons Learned - FMEA - Improvement and Verification Plan - FRACAS - Post Launch Reliability Monitoring
  • 11. Reliability Requirements Why is it important to identify Reliability requirements early in the development process? To help the organization: - Identify critical components - Decide where to focus improvement efforts - Make the right decisions and trade-offs to meet customer requirements. - Get a baseline measure of customer satisfaction to measure improvement against - Identify key drivers of customer satisfaction
  • 12. Reliability Requirements Why do customers have different Reliability requirements? Reliability requirements could depend on, Product Type: Airplanes, cars, dishwashers and air conditioning units could all have different reliability requirement Application Type: Hospitals, data centers, schools and offices could also have different reliability requirement
  • 13. Reliability Requirements 1. Voice of the Customer (VOC) Proactive VOC System: Customer Interviews Focus Groups Surveys Customer Visits Reactive VOC System: Service Calls Customer Complaints Claims Web Page/Blogs Product returns
  • 14. Reliability Requirements 2. Internal Benchmarking Looking within the organization Easier to collect and share data Requires less resources Limited data 3. External Benchmarking / Best in Class Gauging the organization against others Benchmark companies who are doing the best possible job Set a goal of “As Good or Better” Requires more resources More difficult to collect data
  • 15. DFR Roadmap 1. Reliability Requirements - Voice of the Customer (VOC) - Benchmarking - Best in Class 2. Application/ Usage Stresses - Logistical Events - Operational Events - Operating Profiles 3. Failure Mode/ Site/Mechanism 4. Reliability Verification - Boundary/P-Diagram - Lessons Learned - FMEA - Improvement and Verification Plan - FRACAS - Post Launch Reliability Monitoring
  • 16. Application/Usage Stresses Can we design a product without knowing what stresses it will operate under? Understanding the application/usage conditions of any system is a crucial task for any reliability program. To document application stresses, the following items need to be identified: 1. Logistical & Operational Events 2. Operating Profiles/Usage Conditions
  • 17. Application/Usage Stresses 1. Logistical & Operational Events Describe all the events that the product will experience during its life cycle, starting from the point it leaves the manufacturer final inspection until the end of its useful life.
  • 18. Application/Usage Stresses 1. Logistical & Operational Events What are the possible environments and stresses for each event?
  • 19. Application/Usage Stresses 2. Operating Profile/Usage Conditions a. Available Data: Multiple sources could be used to document available data. For example: Fleet Leader units Weather database Industry Standards Lessons Learned
  • 20. Application/Usage Stresses 2. Operating Profile/Usage Conditions b. Design-Specific Data: Develop test plans to document design-specific data. For example: Motor temperature rise Operational Vibration levels Compressor oil viscosity during operation
  • 21. DFR Roadmap 1. Reliability Requirements - Voice of the Customer (VOC) - Benchmarking - Best in Class 2. Application/ Usage Stresses - Logistical Events - Operational Events - Operating Profiles 3. Failure Mode/ Site/Mechanism 4. Reliability Verification - Boundary/P Diagram - Lessons Learned - FMEA - Improvement and Verification Plan - FRACAS - Post Launch Reliability Monitoring
  • 22. Failure Mode/Site/Mechanism 1. Boundary Diagram Graphical tool aids the team to identify the system and the elements outside its boundaries. Some of those elements could become potential causes (or effects) of system failure.
  • 23. Failure Mode/Site/Mechanism 2. Parameter Diagram Provides a simplistic view of the system constrains and the factors affecting its reliability uncontrolled and could contribute to system failure Noise Factors Piece to Piece Change over time Customer Usage Environment System Interaction Torque Corrosion Duty Cycle Temperature Vibration Input Signal Control Signal System VFD Ideal Function Provide modulating signal to control motor speed material, energy, control Control Factors Enclosure type controlled and their effects are well understood Failure Modes No function (doesn't provide modulating signal) error states
  • 24. Failure Mode/Site/Mechanism 3. Lessons Learned The process of documenting past learning to be used in future projects An effective tool to assist the team overcome some of the challenges that other teams have experienced before Some sources for Lessons Learned: FRACAS Tear down Analysis Warranty DFMEA Fleet Leader Corrective Action Database
  • 25. Failure Mode/Site/Mechanism 3. Lessons Learned example Design team is implementing a Variable Frequency Drive to control motor speed Lessons learned (from historical tear down analysis) shows that motor bearing could fail due to shaft currents Team used lessons learned to prevent future motor failures by implementing a solution to ground/protect the bearings
  • 26. Failure Mode/Site/Mechanism 4. Design Failure Modes and Effects Analysis (DFMEA) A risk assessment methodology to analyze different systems for potential failure mode/site/mechanisms and their possible causes Focuses on customer functional requirements Includes failure modes caused by design weaknesses Risks are weighted based on, Severity Occurrence Detection Actions will be based on the highest Risk Priority Number RPN = Severity x Occurrence x Detection
  • 27. Failure Mode/Site/Mechanism 4. Design Failure Modes and Effects Analysis (DFMEA) DFMEA requires a cross-functional team effort Example: Engineering Manufacturing Quality Reliability Materials Subject Matter Experts (SMEs) Product Management Field Service
  • 28. Failure Mode/Site/Mechanism 4. Design Failure Modes and Effects Analysis (DFMEA) DFMEA inputs could include:
  • 29. Failure Mode/Site/Mechanism 4. Design Failure Modes and Effects Analysis (DFMEA) Example:
  • 30. Failure Mode/Site/Mechanism 4. Design Failure Modes and Effects Analysis (DFMEA) DFMEA outputs Improvement and Verification Plan Process FMEA Focuses on failure modes caused by process weaknesses Feeds into the Control Plan DFMEA is a living document and is updated continuously, using, Test results FRACAS Field data Etc.
  • 31. DFR Roadmap 1. Reliability Requirements - Voice of the Customer (VOC) - Benchmarking - Best in Class 2. Application/ Usage Stresses - Logistical Events - Operational Events - Operating Profiles 3. Failure Mode/ Site/Mechanism 4. Reliability Verification - Boundary/P Diagram - Lessons Learned - FMEA - Improvement and Verification Plan - FRACAS - Post Launch Reliability Monitoring
  • 32. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan Improvement and Verification plan is an output from DFMEA, to address the identified risks There are 2 primary questions to answer, a. What can we do to improve the design? b. How can we verify that the design meets the reliability requirements?
  • 33. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan a. What can we do to improve the design? Different design methods could be used to improve the reliability Examples: - De-rating Redundancy Reduce part count Reduce Stress-Strength interference Poka-Yoke Design for Manufacturability
  • 34. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan b. How can we verify that the design meets the reliability requirements? Several verification methods/tests could be developed. For example, - Tear Down Analysis Design of Experiments Vibration Test - Material Analysis - Salt Fog Test - Field Trial
  • 35. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan Highly Accelerated Life Test (HALT) Identify operating/destructive limits and design weaknesses Typical HALT test includes: Cold Step Stress Hot Step Stress Thermal Shock Vibration Step Stress Thermal Shock/Vibration combined
  • 36. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan HALT example A new Damper Actuator design is being qualified HALT test was identified in the Reliability Verification Plan Tear Down Analysis, for failed samples, shows: 1 2 Broken capacitor legs Loose screws
  • 37. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan HALT example cont. Corrective actions were implemented Verification HALT test was performed on new design Tear down was performed on the new samples after test (no issues were found) Design changes increased the actuators robustness
  • 38. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan Accelerated Life Test (ALT) Used to quickly gain reliability results, by testing at various high stress levels to speed the product failure Could be used to test: B vs. C (Better vs. Current) Design 1 vs. Design 2 Supplier A vs. Supplier B
  • 39. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan Accelerated Life Test (ALT) ALT Types: Quantitative ALT: Life prediction Correlate test stresses to operating stresses (Acceleration Factor) Typically requires 2 or more stress levels Qualitative ALT: No life prediction Acceleration factor is unknown Could be used when test capabilities are limited or if life predictions are not required e.g. verifying corrective action
  • 40. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan Quantitative ALT example 1: New motor insulation system is evaluated DFMEA identified Insulation Thermal Degradation as a high risks 3 stress level ALT was developed to evaluate the Insulation reliability
  • 41. Reliability Improvement/Verification 1. Reliability Improvement/Verification Plan Quantitative ALT example 2: Field failures were reported for current motor Tear down analysis shows motor corrosion Better motor was developed, and a “SingleLevel” verification ALT was required Acceleration Factor (AF) was calculated: AF = Luse / LAccelerated
  • 42. Reliability Improvement/Verification 2. Failure Reporting and Corrective Action System (FRACAS) What happens when a failure occurs during testing? FRACAS is the process of capturing, analyzing and correcting failures that occur during product development process Failures could be design, process or supplier related 8D problem solving process to investigate/correct failures Linked to the DFMEA and lessons learned
  • 43. Reliability Improvement/Verification 3. Post Launch Reliability Monitoring Launching the products doesn’t necessarily mean that the project is complete. Other post launch activities are required, as part of the reliability verification plan: a. b. c. Field Monitor Parts Return Warranty Analysis Data could be used as follows: Update DFMEA Design verification Document Lessons Learned Early Launch Containment
  • 44. Reliability Improvement/Verification 3. Post Launch Reliability Monitoring a. Field Monitor Field monitoring is a unit verification test in the actual application Several critical parameters are monitored/measured for several months Data is analyzed regularly, and compared to preestablished criteria Parameters measured could be: Cycles Temperature Pressure Etc.
  • 45. Reliability Improvement/Verification 3. Post Launch Reliability Monitoring b. Parts Return Develop a program to return critical components that fail in the field Returned parts would be analyzed to identify failure modes and causes Data would be used to drive corrective actions and document lessons learned for future projects
  • 46. Reliability Improvement/Verification Post Launch Reliability Monitoring c. Warranty Analysis Monitoring and analyzing warranty data is used to identify possible trends, compare 2 (or more) designs and verify that customer reliability requirements are met Different analysis tools could be use. Examples: Re liaSoft W eibull++ 7 - www. Relia Soft. com Probability - Lognormal Run/Trend Charts SPC Charts Hypothesis Testing Weibull Analysis 99. 000 Proba bility-Lognorma l 230V GEN IData 1 Lognorma l-2P RRX SRM MED F M F =168/S=16142 Probability Line 230V GEN IIData 1 Lognorma l-2P RRX SRM MED F M F =6/S=5046 Probability Line 50. 000 Unreliability, F(t) 3. 10. 000 5. 000 1. 000 0. 500 0. 100 0. 050 0. 010 0. 100 1. 000 10. 000 T ime, (t) 230V GEN IDa ta 1: µ=10 .32 39, σ=3.29 11, ρ=0.991 0, Ζ=0.9 99 9 230V GEN IIDa ta 1: µ=10.819 5, σ=2.9784 , ρ=0 .9 974 , Ζ=0 .99 96 Moataz Elhedde ny Tra ne 03/15/2012 11:00:10 AM 100. 000
  • 47. DFR Improvements Example Does DFR roadmap really work? Team has followed the DFR roadmap to change system design and ensure the reliability of the new system Several design improvements were made and tested/verified Post Launch Reliability Monitoring has confirmed that the new design has reduced field failures by > 80%, over the old design > 80% improvement
  • 48. Summary “Design for Reliability” process steps: 1. 2. 3. 4. Understand the requirements Document/Measure application stresses Identify failure modes and develop a plan to eliminate them Verify, Verify, Verify Reliability is an essential part of any product development process and should be integrated as early in the program as possible. It could provide new perspectives to the design. Always include SMEs and cross-functional teams in program activities (e.g. DFMEA, FRACAS, Test Planning).
  • 49. Where to Get More Information - - - Life Data Analysis Reference Book – Reliasoft Accelerated Life Testing Data Analysis Book – Reliasoft MIL STD-810F “Environmental Engineering Considerations and Laboratory Tests” Defence Standard 00-35(PART 4)/Issue 3 “Environmental Handbook for Defence Materiel” Design for Six Sigma Workshop – Ingersoll Rand 2010
  • 50. Moataz Elheddeny - Experienced Six Sigma practitioner, with a broad experience in Quality and Reliability methodologies. He has served in different reliability and quality roles for different companies, including Siemens Healthcare, Ingersoll Rand and Brunswick. - Some of his responsibilities include developing/improving Design for Reliability programs, ensuring the reliability of new products and developing reliability specifications and test plans for different components/subsystems. - Education/Certifications: - Ph.D. candidate, Industrial Engineering – University of Tennessee Certified Reliability Engineer – American Society for Quality Six sigma Master Black Belt – Arizona State University Linkedin: www.linkedin.com/in/elheddeny/ -