A Review Study on Methods of Tunneling in Hard Rocks
Chirag J. Shah1
Hiren A. Rathod2
1
M. E. Student (Construction Management) 2
Assistant professor
1, 2
Civil Engineering Department
1, 2
S.N.P.I.T. & R.C, Umrakh, Bardoli, Gujarat, India.
Abstract— This article presents a review on the different
methodologies that are used for tunnels excavations in hard
rocks in present era. Growing needs for modern
transportation and utility networks have increased the
demand for a more extensive and elaborate use of
underground space or through high mountains / hills. As a
result, more projects have to be completed in various ground
conditions and one of which is more challenging is to carry
out excavation work in hard rocks. Significant technological
advances have rendered these projects possible, but have
also given rise to new challenges as many of these projects
have to be completed in difficult conditions, with very strict
environmental constraints, particularly in urban areas where
the potential impact of tunneling on existing structures is a
major concern. This paper addresses the main aspects of
tunneling and underground works performed in hard rocks.
A summary is presented of the more recent advances and
widely adopted techniques in these regards.
Key words: Hard rock, Excavation, Tunnel Boring Machines
(TBM)
I. INTRODUCTION
Tunnel is an underground passage through a mountain,
beneath a city or under a waterway or tunnels are enclosed
roadways, railways, waterways, etc. with vehicle, trains,
ships, etc. access that is restricted to portals regardless of
type of structure or method of construction. Tunnels are
structures that can require special design considerations that
may include lighting, ventilation, fire protection systems,
and emergency egress capacity, as documented in design
standards or based on the owner’s determination.
Tunnelling can be define as ”the continuous
excavation of a hole through the earth’s crust”. The portion
where the work is carried out while its construction is called
the face (heading) and all efforts are made in advancing this
face as fast as possible till the end of tunnel is reached. The
man at the face are called heading crew. The heading crew
is supplied with fresh air, compressed air, water, explosives,
drills, mucking and hauling equipment, support and other
accessories. Tunnel excavation produces a re-distribution of
stresses in the rock and a tendency for closure of the void
produces a tendency counteracted by the tunnel support
shell.
Modern tunneling work is best regarded as the
repetition of a cycle comprising of number of operations and
each operation makes a contribution in the controlled
advance of a tunnel face. It is essential that tunnel works
should be organised on a scientific basis. Factors such as
size of the tunnel and the quality of rock will influence
details, but the basic order of progressing in all types of
tunnels (whether large or small or whether hard or soft), is
to:
 Excavate
 Dispose of the muck and
 Line the excavated ground
II. WORLD WIDE SCENARIOS
Some of the examples of carrying out challenging work of
tunnel construction through hard rock are highlighted over
here. The 1036 m long Eupalinos water supply tunnel was
built in 530 BC on the Greek island of Samos. This is the
first known tunnel to have been built from two portals and
the two drives met with a very small error.
The oldest underground sections of the London
underground were built using the cut-and-cover method in
the 1860s, and opened in January 1863. What are now
the metropolitan, Hammersmith & city and circle lines were
the first to prove the success of a metro or subway system.
Thikri tunnel length 800 meters, shape of tunnel d-
shape, internal diameter 6.0 meter, longitudinal gradient is 1
in 2500, rock cover 14 metres to 44 metres [>3d as per IS
code], existing G.L. (at entrance) is 224.015, existing G.L.
(at exit) is 221.695, invert level (at entrance) 203.671, invert
level (at exit) 203.349, general geology hard rock strata with
RQD value > 75%, method used was drill blast method.
Veligonda tunnel length is about 19.2 km. The
TBM method of tunneling was used on the Veligonda
project. The bore diameter and segment diameters were 10.0
m and 9.2 m respectively. The whole of the Veligonda
tunnel geology has been given an expected RQD value of
between 61 and 75 which remains firmly within the Rock
class-II category.
Ghatkopar high level Tunnel, Mumbai was
constructed for the purpose of Sewage. Geology of soil was
Massive & Weathered Basalt. Length of tunnel was 2600 m
& its Diameter was 3065 mm. TBM method was used with
machine type Single Shield TBM. Support system used was
Segmental Lining.
III. PURPOSE & IMPORTANCE
Tunnels are the underground passages which are constructed
without distributing the ground surface. They may be
constructed through hills, below the ground, streams, etc.,
for various purposes which may be summarized as follows
along with its importance as compared to other means of
conveyance:
 To provide passage for roads and railway tracks, access
to mines, conduits for water, etc.
 Tunnels protect the railway track, highway, sewer line,
oil line, etc., from weathering effects such as rain, snow
and other elements.
 Tunnels also protect them during war time from
destruction due to bombarding.
A Review Study on Methods of Tunnelling in Hard Rocks
(IJSRD/Vol. 1/Issue 8/2013/0007)
All rights reserved by www.ijsrd.com 1552
 Tunnels have proved cheaper for crossing the mountain
or river than open cut or bridges.
 The use of tunnel under a river bed is often economical
and convenient than providing a bridge over the river.
 The cost of maintenance of a tunnel is lesser as
compared to a bridge or a heavy open cut.
In most congested urban areas, underground railway or
highway is the best alternative to provide the means of
transportation. Also in soft ground it seems to be cheaper
than open cut due to possibility of a large numbers of slips.
Tunnels reduce the length of railway line in a circuitous
route to reach the other side of the hill. In busy and
congested cities due to scarcity of load, tunnels are used for
providing underground system, which provide rapid and un-
obstructed transportation.
IV. METHODS OF TUNNELLING
GENERALA.
Tunnelling in hard rock is safe, easy and the cost of
maintenance of tunnel is also very less. Many of the primary
rocks which are categorized under the hard rocks are
granite, feldspar, basalt, et. all.
Various methods used for the excavation purpose
in such types of rocks are:
 Full face method.
 Heading and bench method.
 Drift method.
 Pilot tunnel method.
 Drill & Blast method.
 Hard TBM method.
 Cut-Cover method.
 Immersed tube method.
Some of the above listed techniques are conventional and
not covered under the scope of this paper; only few of the
techniques which are predominantly adopted worldwide and
have its importance in excavation through hard rocks as
compared to other are prescribed here with its brief
introduction, procedure, merits and demerits.
Drill & Blast Method of TunnellingB.
Modern Drill and Blast excavation for civil projects consists
the basic approach of:
 To drill a pattern of small holes,
 Load them with explosives,
 Then detonate those explosives
Fig.1: Drill & Blast Method
Hence, creating an opening in the rock. The blasted and
broken rock (muck) is then removed and the rock surface is
supported so that the whole process can be repeated as many
times as necessary to advance the desired opening in the
rock.
Procedure:
1) Drilling
The drilling should be ensuring minimum overbreak and use
of least amount of explosive per unit volume of excavation.
Holes are drilled by using pneumatically operated rock drills
in conjunction with pneumatic pushers or drifters mounted
on column bars or drill carriages as may be found suitable.
The size of drill bits used should be such that the diameter
of the hole will be about 6 mm greater than the diameter of
explosive cartridge to be inserted.
2) Blasting
a) Explosives:
Blasting explosives are divided into two classes: high
explosives and low explosives. Gelignites, Gelatines and
Dynamites are the examples of high explosives, whereas,
Black powder is low explosive. Most commonly, high
explosives are used for tunnelling operations. The strength
of these explosive is expressed as a percentage of strength of
the blasting gelatine which is the most powerful commercial
explosive. The following explosive are used in tunnelling:
 Blasting gelatine used for blasting very hard and tough
rocks. This is fully water proof and can also be used in
wet locations.
 Special gelatine 9% to 40% is selected to suit the rock
requirements.
 Ammonia dynamite is available in strength from 15% to
60% used for soft rock.
 Semi-gelatine is bulkier than other varieties and come
in 45% to 60% strength.
b) Detonators:
There are primarily two types of detonators namely, Lead
azide aluminium detonator and electric detonators. Lead
azide aluminium detonators are used in conjunction with
safety fuses and give efficient detonation with all types of
blasting explosives. The electric detonators are suitable for
singles or simultaneous firing in series or parallel.
c) Detonating Fuse:
It contains a high explosive core with a water proof
covering. It is used for shooting a large number of holes in
one blast. It is denoted by the use of one or two blasting
caps securely attached alongside it.
d) Primer:
It is the cartridge containing the detonator. The primer is
supplied with the explosive and is attached with the
explosive. It is denoted by Prima cord, which is a high
explosive use.
e) Circuit Testers:
To test an electric detonator, it should be placed inside an
iron pot or tube to guard against accidental explosion.
3) Loading & Stemming
Loading means charging the drill holes. Before loading,
each hole is blown out with a high pressure air jet to remove
loose cuttings and water. Then, primer cartridge is gently
placed into drill hole next to the bottom. A full cartridge is
inserted first, tamped well into bottom, then the primer is
inserted with the end containing detonator pointing towards
A Review Study on Methods of Tunnelling in Hard Rocks
(IJSRD/Vol. 1/Issue 8/2013/0007)
All rights reserved by www.ijsrd.com 1553
the bottom of drill hole. Both the primer and next placed
cartridge are tamped lightly with a wooden rod. When the
tamping material is being inserted, the leading wires or
safety fuse should be held to one side, to facilitate the action
of the tamping rod and prevent damage to fuse.
The remaining portion of the drill hole is filled with
an inert material and tightly tamped by wooden rod. Soft
rolled plugs of clay, damp mixture of sand and clay or a
rubber plug with a wooden core may be used as inert
material.
4) Firing
a) Firing by Safety Fuse:
After charging or loading the holes, personnel and
everything liable to injury must be placed to a safe distance.
When necessary, the blast may be covered with rope
blasting mats or a heavily weighted blanket of scrub. Special
fuse-lighter should be used for ignition.
b) Firing by Electricity:
Before attempting to connect up an electric circuit, it should
be ensured that the main cables are intact and that the
exploder is working correctly and capable of supplying
sufficient current to fire the number of charges in the circuit.
No naked wire should be left touching the ground. Also, the
exploder is not connected to the firing circuit until all men
have left the danger area and signal to fire has been given.
5) Inspection & Handling Misfire
After completion of firing, the site is examined by the
foreman before he gives the all-clear signal. If a misfire has
occurred, no person shall approach the site for one hour if
safety fuse was used or 15 minute, if electrically fired.
Misfires may occur due to improper primers, use of non-
water resistance explosive in wet condition or improper
loading.
Immediately after the smoke is cleared away from
a blast, inspection is carried out by a competent and
experienced tunnel foreman. All loose rock is removed
carefully by barring to ensure that the access to the face is
safe.
Merits:
 Potential environmental impacts in terms of noise, dust
and visual on sensitive receives are significantly
reduced and are restricted to those located near the
tunnel portal;
 Compared with the cut-and-cover approach, quantity of
C&D materials generated would be much reduced;
 Compared with the cut-and-cover approach, disturbance
to local traffic and associated environmental impacts
would be much reduced;
 Blasting would significantly reduce the duration of
vibration, though the vibration level would be higher
compared with bored tunnelling;
Demerits:
 Potential hazard associated with establishment of a
temporary magazine site for overnight storage of
explosives shall be addressed through avoiding
populated areas in the site selection process.
 There is a high risk of over breaking the tunnel profile
and damaging the surrounding rock
 High levels of noise and vibration make this unsuitable
for an urban area.
Cut Cover Method of TunnellingC.
Cut and cover tunneling is a common and well-proven
technique for constructing shallow tunnels. The method can
accommodate changes in tunnel width and non-uniform
shapes. Cut and cover is a simple method of construction for
shallow tunnels where a trench is excavated and roofed over
with an overhead support system strong enough to carry the
load of what is to be built above the tunnel.
Fig. 2: Cut Cover Method
Procedure:
1) Excavation and support
The initial “cut” is undertaken to facilitate the tunnel
construction. This uses similar technology to road cuttings.
Prior to excavation, buried utilities and services crossing the
route have to be protected, temporarily raised or
permanently diverted to avoid the tunnel alignment where
possible. For gravity sewers this may involve pump
installation. The cut is constructed in a number of ways,
depending on the support requirements of the ground. In
hard rock this may be vertical walls supported by rock bolts
and sprayed concrete, in soft rocks and soils stable slopes
may be created by constructing benches. If surface space is
restricted, or the disturbance caused by construction needs to
be minimized, then retaining walls can be used to stabilise
the excavation. These may be permanent, incorporated into
the final structure or temporary and removed or abandoned
after the tunnel structure has been completed.
2) Tunnel fabrication
Once a stable open cut has been constructed, the tunnel
structure is fabricated in the trench. This structure is
generally constructed from reinforced concrete using large
tunnel forms. As considerable materials and excavated fill
storage is required this operation requires a significant work
site.
3) Reinstatement
After construction, fill is used to reinstate the ground
surface. Where possible this fill may be reserved material
from the trench excavation. Additional fill may be required
to assist with compaction and drainage, or if the trench
material is unsuitable. Reinstatement may be to the original
topography and land use. In some cases this offers the
opportunity to improve surface conditions, such as utility
and drainage improvements or local road upgrades.
Demerits:
 More dust and noise impact may arise, though these can
be mitigated through implementation of sufficient
control measures;
A Review Study on Methods of Tunnelling in Hard Rocks
(IJSRD/Vol. 1/Issue 8/2013/0007)
All rights reserved by www.ijsrd.com 1554
 Temporary decks are often installed before bulk
excavation to minimise the associated environment
impacts;
 Larger quantity of C&D materials would be generated
from the excavation works, requiring proper handling
and disposal.
Hard TBM Method of TunnellingD.
In hard rock, either shielded or open-type TBMs can be
used. All types of hard rock TBMs excavate rock using disc
cutters mounted in the cutter head. The disc cutters create
compressive stress fractures in the rock, causing it to chip
away from the rock in front of the machine, called the tunnel
face. The excavated rock, known as muck, is transferred
through openings in the cutter head to a belt conveyor,
where it runs through the machine to a system of conveyors
or muck cars for removal from the tunnel.
Procedure:
1) Excavation Advance:
The cutting head is rotated against the ground to commence
cutting
 Thrust is applied by the rams or side gripper pads in the
drive section to assist cutting and maintain face pressure
 Cutting and advance continues until enough space is
created in the tail shield to construct the next lining ring
the gap between the ground and the previous lining ring
is grouted as it leaves the tail shield.
Fig. 3: Excavation Advance
Fig. 4: Lining erection
2) Lining erection:
 The thrust rams are withdrawn into the drive section
leaving clear space for the erection of the lining
 Each segment forming the lining is maneuvered into
position and bolted together to form a completed lining
ring the thrust rams are then reengaged to commence
the next excavation cycle
Merits:
 Potential environmental impacts in terms of noise, dust
and visual on sensitive receives are significantly
reduced and are restricted to those located near the
launching and retrieval shafts;
 Compared with the cut-and-cover approach, disturbance
to local traffic and associated environmental impacts
would be much reduced;
 Compared with the cut-and-cover approach, quantity of
C&D materials generated would be much reduced
Demerits:
 The major disadvantage is the upfront capital cost.
TBMs are expensive to construct, difficult to transport,
require significant backup systems and power.
 Their applicability is limited to long tunnels where the
high rates of advance and tunnel quality can offset their
high capital cost.
V. CONCLUSION
Referring to the various literatures mentioned below and the
contents mentioned above in the paper the importance of
tunneling can be clearly understood as compared to other
means of conveyance such as bridges, open cuts, etc. i.e.
through tunnels we can get many benefits such as low
maintenance cost, no need for acquiring the land & it can be
used in any type of area such as in congested cities. Also
referring to many recent methodologies in tunnels we found
that most suitable method was the method using TBM.
Though it is very costlier than all other methods, but it also
has many advantages compared to others like it is easier in
operation, very fast, can be used in any ground conditions
depending on cutterhead with little modifications, perfection
of work, safety etc.
ACKNOWLEDGMENT
The authors are thankfully acknowledge to Mr. J. N. Patel,
Chairman Vidyabharti Trust, Mr. K. N. Patel, Hon.
Secretary, Vidyabharti Trust, Dr. H. R. Patel, Director, Dr.
J. A. Shah, Principal, S.N.P.I.T. & R.C., Umrakh, Bardoli,
Gujarat, India for their motivational & infrastructural
supports to carry out this research, Dr. Neeraj D. Sharma,
HOD Civil Department, SNPIT & RC, Umrakh.
REFERENCES
[1] Doctoral thesis at NTNU , Hard Rock Tunnelling
[2] “Fracturing Excavation Method for Hard Rock
Tunnelling” By: Fon Drill & FASE Method.
[3] “Tunnelling in Rocks – Present Technology & Future
Challenges” By: ZHAO Jian, Inaugural lecture, May
2007.
[4] S. Seetharaman “Tunnel & Airport Engineering”
Umesh Publication.
[5] Tunnel wikipedia.
[6] Tunnel Boring Machine (TBM) in action in Kuala
Lumpur & Robbins Hard Rock Disc Cutters,
youtube.com.
[7] IS: 5878 ( Part 111) – 1972: Underground Excavation
Soft Strata.
[8] “Construction safety in hard rock tunnelling” By: Dr.
Zhou Yingxin Programme Manager (Underground
A Review Study on Methods of Tunnelling in Hard Rocks
(IJSRD/Vol. 1/Issue 8/2013/0007)
All rights reserved by www.ijsrd.com 1555
Technology & Rock Engineering), Defence Science &
Technology Agency.
[9] “Tunnelling in Rocks – Present Technology & Future
Challenges” By: ZHAO Jian, Inaugural lecture, May
2007.
[10]Engineering Survey System for TBM (Tunnel Boring
Machine) Tunnel Construction, By: Andrew Hung
Shing Lee, Hong Kong.
[11]“Tunnel Boring Machines”, IMIA Working Group
Paper WGP 60 (09) Tunnel Boring Machines.

More Related Content

What's hot

1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
Bhalchandra Tankkar
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
VATSAL PATEL
 
Tunneling
Tunneling Tunneling
Tunneling
ila vamsi krishna
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
kamariya keyur
 
Method Statement D Wall
Method Statement D WallMethod Statement D Wall
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
Aglaia Connect
 
Tunnel engineering
Tunnel engineeringTunnel engineering
Tunnel engineering
Vinod Shikhare
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
rutuldave
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
Adil Shaikh
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
Durgesh Kumar Yadav
 
Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Hamed Zarei
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
Ghanashyam Prajapati
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
MD AMANULLAH
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Tunnelling
TunnellingTunnelling
Tunnelling
Usama Zia
 
Grouting n gunintung
Grouting n gunintungGrouting n gunintung
Tunnel Boring Machines
Tunnel Boring Machines  Tunnel Boring Machines
Different grout injection methods
Different grout injection methodsDifferent grout injection methods
Different grout injection methods
BMC Microfine
 

What's hot (20)

1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Tunneling
Tunneling Tunneling
Tunneling
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Method Statement D Wall
Method Statement D WallMethod Statement D Wall
Method Statement D Wall
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Tunnel engineering
Tunnel engineeringTunnel engineering
Tunnel engineering
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Tbm
TbmTbm
Tbm
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Submerged tunnel ppt
Submerged tunnel pptSubmerged tunnel ppt
Submerged tunnel ppt
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Grouting n gunintung
Grouting n gunintungGrouting n gunintung
Grouting n gunintung
 
Tunnel Boring Machines
Tunnel Boring Machines  Tunnel Boring Machines
Tunnel Boring Machines
 
Different grout injection methods
Different grout injection methodsDifferent grout injection methods
Different grout injection methods
 

Viewers also liked

The tunnel powerpoint
The tunnel powerpointThe tunnel powerpoint
The tunnel powerpointishict
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harboursLatif Hyder Wadho
 
Accomplish It With Core: Sliders Galleries + More
Accomplish It With Core: Sliders Galleries + MoreAccomplish It With Core: Sliders Galleries + More
Accomplish It With Core: Sliders Galleries + More
Andy Stratton
 
Stangers capability2013
Stangers capability2013Stangers capability2013
Stangers capability2013David Wylie
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Hamed Zarei
 
Hi tech tunnel.ppt
Hi tech tunnel.pptHi tech tunnel.ppt
Hi tech tunnel.pptVipul Sharma
 
tunneling & its effects
tunneling & its effectstunneling & its effects
tunneling & its effects
Budarapu Venkat Pranay
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
Shashank Gaurav
 
Secondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating ProcedureSecondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating ProcedureCollins Sikanyika
 
Railway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracksRailway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracks
Nabaraj Poudel
 
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingChallenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
IEI GSC
 
Control system objective type questions
Control system objective type questionsControl system objective type questions
Control system objective type questions
nag16489
 
Indian Railways and HRM
Indian Railways and HRMIndian Railways and HRM
Indian Railways and HRMMeet0071
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machine
Naquiakhter
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbourLatif Hyder Wadho
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industry
IEI GSC
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classificationLatif Hyder Wadho
 
River engineering
River engineeringRiver engineering
River engineering
Sandra4Smiley
 

Viewers also liked (20)

Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
The tunnel powerpoint
The tunnel powerpointThe tunnel powerpoint
The tunnel powerpoint
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
Accomplish It With Core: Sliders Galleries + More
Accomplish It With Core: Sliders Galleries + MoreAccomplish It With Core: Sliders Galleries + More
Accomplish It With Core: Sliders Galleries + More
 
Stangers capability2013
Stangers capability2013Stangers capability2013
Stangers capability2013
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
Hi tech tunnel.ppt
Hi tech tunnel.pptHi tech tunnel.ppt
Hi tech tunnel.ppt
 
tunneling & its effects
tunneling & its effectstunneling & its effects
tunneling & its effects
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Secondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating ProcedureSecondary Blasting Standard Operating Procedure
Secondary Blasting Standard Operating Procedure
 
Railway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracksRailway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracks
 
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of TunnellingChallenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
Challenges of Tunneling-- A Peep Into The Exciting World of Tunnelling
 
Control system objective type questions
Control system objective type questionsControl system objective type questions
Control system objective type questions
 
Indian Railways and HRM
Indian Railways and HRMIndian Railways and HRM
Indian Railways and HRM
 
Quarrying
QuarryingQuarrying
Quarrying
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machine
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
Presentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industryPresentation on The Use of automation in construction industry
Presentation on The Use of automation in construction industry
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
River engineering
River engineeringRiver engineering
River engineering
 

Similar to A Review Study on Methods of Tunneling in Hard Rocks

Lecture 6 p
Lecture 6 pLecture 6 p
Tunnelling
TunnellingTunnelling
Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)
Mayur Rahangdale
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
Sahl Buhary
 
Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
Priya Sarita Mane
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
Mansimishra351962
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
IJMER
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
jamali husain
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
Vinay Vb
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
Prof. A.Balasubramanian
 
Trenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportTrenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar Report
AkshathaBhandary
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
SubratDash37
 
Types of Drilling
Types of Drilling Types of Drilling
Types of Drilling
ZAIDHASANKHAN1
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
Ujwal Ujwal
 
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
IJERA Editor
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
AlexASquare1
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
AlexASquare1
 
Experimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pierExperimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pier
eSAT Publishing House
 
Experimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pierExperimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pier
eSAT Journals
 

Similar to A Review Study on Methods of Tunneling in Hard Rocks (20)

Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
Effect Of Water On Slope Stability And Investigation Of ΝΝw Drainage Techniqu...
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Trenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportTrenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar Report
 
RMT Group5 presentation.pptx
RMT Group5 presentation.pptxRMT Group5 presentation.pptx
RMT Group5 presentation.pptx
 
Types of Drilling
Types of Drilling Types of Drilling
Types of Drilling
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
Construction Time Analysis For Different Steps In Drill-And-Blast Method Of H...
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Experimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pierExperimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pier
 
Experimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pierExperimental study on effect of slot level on local scour around bridge pier
Experimental study on effect of slot level on local scour around bridge pier
 

More from ijsrd.com

IoT Enabled Smart Grid
IoT Enabled Smart GridIoT Enabled Smart Grid
IoT Enabled Smart Grid
ijsrd.com
 
A Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of ThingsA Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of Things
ijsrd.com
 
IoT for Everyday Life
IoT for Everyday LifeIoT for Everyday Life
IoT for Everyday Life
ijsrd.com
 
Study on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOTStudy on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOT
ijsrd.com
 
Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...
ijsrd.com
 
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
ijsrd.com
 
A Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's LifeA Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's Life
ijsrd.com
 
Pedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language LearningPedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language Learning
ijsrd.com
 
Virtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation SystemVirtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation System
ijsrd.com
 
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
ijsrd.com
 
Understanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart RefrigeratorUnderstanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart Refrigerator
ijsrd.com
 
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
ijsrd.com
 
A Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processingA Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processing
ijsrd.com
 
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web LogsWeb Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
ijsrd.com
 
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEMAPPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
ijsrd.com
 
Making model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point TrackingMaking model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point Tracking
ijsrd.com
 
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
ijsrd.com
 
Study and Review on Various Current Comparators
Study and Review on Various Current ComparatorsStudy and Review on Various Current Comparators
Study and Review on Various Current Comparators
ijsrd.com
 
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
ijsrd.com
 
Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.
ijsrd.com
 

More from ijsrd.com (20)

IoT Enabled Smart Grid
IoT Enabled Smart GridIoT Enabled Smart Grid
IoT Enabled Smart Grid
 
A Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of ThingsA Survey Report on : Security & Challenges in Internet of Things
A Survey Report on : Security & Challenges in Internet of Things
 
IoT for Everyday Life
IoT for Everyday LifeIoT for Everyday Life
IoT for Everyday Life
 
Study on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOTStudy on Issues in Managing and Protecting Data of IOT
Study on Issues in Managing and Protecting Data of IOT
 
Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...Interactive Technologies for Improving Quality of Education to Build Collabor...
Interactive Technologies for Improving Quality of Education to Build Collabor...
 
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...Internet of Things - Paradigm Shift of Future Internet Application for Specia...
Internet of Things - Paradigm Shift of Future Internet Application for Specia...
 
A Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's LifeA Study of the Adverse Effects of IoT on Student's Life
A Study of the Adverse Effects of IoT on Student's Life
 
Pedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language LearningPedagogy for Effective use of ICT in English Language Learning
Pedagogy for Effective use of ICT in English Language Learning
 
Virtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation SystemVirtual Eye - Smart Traffic Navigation System
Virtual Eye - Smart Traffic Navigation System
 
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...Ontological Model of Educational Programs in Computer Science (Bachelor and M...
Ontological Model of Educational Programs in Computer Science (Bachelor and M...
 
Understanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart RefrigeratorUnderstanding IoT Management for Smart Refrigerator
Understanding IoT Management for Smart Refrigerator
 
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
DESIGN AND ANALYSIS OF DOUBLE WISHBONE SUSPENSION SYSTEM USING FINITE ELEMENT...
 
A Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processingA Review: Microwave Energy for materials processing
A Review: Microwave Energy for materials processing
 
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web LogsWeb Usage Mining: A Survey on User's Navigation Pattern from Web Logs
Web Usage Mining: A Survey on User's Navigation Pattern from Web Logs
 
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEMAPPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
APPLICATION OF STATCOM to IMPROVED DYNAMIC PERFORMANCE OF POWER SYSTEM
 
Making model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point TrackingMaking model of dual axis solar tracking with Maximum Power Point Tracking
Making model of dual axis solar tracking with Maximum Power Point Tracking
 
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
A REVIEW PAPER ON PERFORMANCE AND EMISSION TEST OF 4 STROKE DIESEL ENGINE USI...
 
Study and Review on Various Current Comparators
Study and Review on Various Current ComparatorsStudy and Review on Various Current Comparators
Study and Review on Various Current Comparators
 
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
Reducing Silicon Real Estate and Switching Activity Using Low Power Test Patt...
 
Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.Defending Reactive Jammers in WSN using a Trigger Identification Service.
Defending Reactive Jammers in WSN using a Trigger Identification Service.
 

Recently uploaded

Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

A Review Study on Methods of Tunneling in Hard Rocks

  • 1. IJSRD - International Journal for Scientific Research & Development| Vol. 1, Issue 8, 2013 | ISSN (online): 2321-0613 All rights reserved by www.ijsrd.com 1551 A Review Study on Methods of Tunneling in Hard Rocks Chirag J. Shah1 Hiren A. Rathod2 1 M. E. Student (Construction Management) 2 Assistant professor 1, 2 Civil Engineering Department 1, 2 S.N.P.I.T. & R.C, Umrakh, Bardoli, Gujarat, India. Abstract— This article presents a review on the different methodologies that are used for tunnels excavations in hard rocks in present era. Growing needs for modern transportation and utility networks have increased the demand for a more extensive and elaborate use of underground space or through high mountains / hills. As a result, more projects have to be completed in various ground conditions and one of which is more challenging is to carry out excavation work in hard rocks. Significant technological advances have rendered these projects possible, but have also given rise to new challenges as many of these projects have to be completed in difficult conditions, with very strict environmental constraints, particularly in urban areas where the potential impact of tunneling on existing structures is a major concern. This paper addresses the main aspects of tunneling and underground works performed in hard rocks. A summary is presented of the more recent advances and widely adopted techniques in these regards. Key words: Hard rock, Excavation, Tunnel Boring Machines (TBM) I. INTRODUCTION Tunnel is an underground passage through a mountain, beneath a city or under a waterway or tunnels are enclosed roadways, railways, waterways, etc. with vehicle, trains, ships, etc. access that is restricted to portals regardless of type of structure or method of construction. Tunnels are structures that can require special design considerations that may include lighting, ventilation, fire protection systems, and emergency egress capacity, as documented in design standards or based on the owner’s determination. Tunnelling can be define as ”the continuous excavation of a hole through the earth’s crust”. The portion where the work is carried out while its construction is called the face (heading) and all efforts are made in advancing this face as fast as possible till the end of tunnel is reached. The man at the face are called heading crew. The heading crew is supplied with fresh air, compressed air, water, explosives, drills, mucking and hauling equipment, support and other accessories. Tunnel excavation produces a re-distribution of stresses in the rock and a tendency for closure of the void produces a tendency counteracted by the tunnel support shell. Modern tunneling work is best regarded as the repetition of a cycle comprising of number of operations and each operation makes a contribution in the controlled advance of a tunnel face. It is essential that tunnel works should be organised on a scientific basis. Factors such as size of the tunnel and the quality of rock will influence details, but the basic order of progressing in all types of tunnels (whether large or small or whether hard or soft), is to:  Excavate  Dispose of the muck and  Line the excavated ground II. WORLD WIDE SCENARIOS Some of the examples of carrying out challenging work of tunnel construction through hard rock are highlighted over here. The 1036 m long Eupalinos water supply tunnel was built in 530 BC on the Greek island of Samos. This is the first known tunnel to have been built from two portals and the two drives met with a very small error. The oldest underground sections of the London underground were built using the cut-and-cover method in the 1860s, and opened in January 1863. What are now the metropolitan, Hammersmith & city and circle lines were the first to prove the success of a metro or subway system. Thikri tunnel length 800 meters, shape of tunnel d- shape, internal diameter 6.0 meter, longitudinal gradient is 1 in 2500, rock cover 14 metres to 44 metres [>3d as per IS code], existing G.L. (at entrance) is 224.015, existing G.L. (at exit) is 221.695, invert level (at entrance) 203.671, invert level (at exit) 203.349, general geology hard rock strata with RQD value > 75%, method used was drill blast method. Veligonda tunnel length is about 19.2 km. The TBM method of tunneling was used on the Veligonda project. The bore diameter and segment diameters were 10.0 m and 9.2 m respectively. The whole of the Veligonda tunnel geology has been given an expected RQD value of between 61 and 75 which remains firmly within the Rock class-II category. Ghatkopar high level Tunnel, Mumbai was constructed for the purpose of Sewage. Geology of soil was Massive & Weathered Basalt. Length of tunnel was 2600 m & its Diameter was 3065 mm. TBM method was used with machine type Single Shield TBM. Support system used was Segmental Lining. III. PURPOSE & IMPORTANCE Tunnels are the underground passages which are constructed without distributing the ground surface. They may be constructed through hills, below the ground, streams, etc., for various purposes which may be summarized as follows along with its importance as compared to other means of conveyance:  To provide passage for roads and railway tracks, access to mines, conduits for water, etc.  Tunnels protect the railway track, highway, sewer line, oil line, etc., from weathering effects such as rain, snow and other elements.  Tunnels also protect them during war time from destruction due to bombarding.
  • 2. A Review Study on Methods of Tunnelling in Hard Rocks (IJSRD/Vol. 1/Issue 8/2013/0007) All rights reserved by www.ijsrd.com 1552  Tunnels have proved cheaper for crossing the mountain or river than open cut or bridges.  The use of tunnel under a river bed is often economical and convenient than providing a bridge over the river.  The cost of maintenance of a tunnel is lesser as compared to a bridge or a heavy open cut. In most congested urban areas, underground railway or highway is the best alternative to provide the means of transportation. Also in soft ground it seems to be cheaper than open cut due to possibility of a large numbers of slips. Tunnels reduce the length of railway line in a circuitous route to reach the other side of the hill. In busy and congested cities due to scarcity of load, tunnels are used for providing underground system, which provide rapid and un- obstructed transportation. IV. METHODS OF TUNNELLING GENERALA. Tunnelling in hard rock is safe, easy and the cost of maintenance of tunnel is also very less. Many of the primary rocks which are categorized under the hard rocks are granite, feldspar, basalt, et. all. Various methods used for the excavation purpose in such types of rocks are:  Full face method.  Heading and bench method.  Drift method.  Pilot tunnel method.  Drill & Blast method.  Hard TBM method.  Cut-Cover method.  Immersed tube method. Some of the above listed techniques are conventional and not covered under the scope of this paper; only few of the techniques which are predominantly adopted worldwide and have its importance in excavation through hard rocks as compared to other are prescribed here with its brief introduction, procedure, merits and demerits. Drill & Blast Method of TunnellingB. Modern Drill and Blast excavation for civil projects consists the basic approach of:  To drill a pattern of small holes,  Load them with explosives,  Then detonate those explosives Fig.1: Drill & Blast Method Hence, creating an opening in the rock. The blasted and broken rock (muck) is then removed and the rock surface is supported so that the whole process can be repeated as many times as necessary to advance the desired opening in the rock. Procedure: 1) Drilling The drilling should be ensuring minimum overbreak and use of least amount of explosive per unit volume of excavation. Holes are drilled by using pneumatically operated rock drills in conjunction with pneumatic pushers or drifters mounted on column bars or drill carriages as may be found suitable. The size of drill bits used should be such that the diameter of the hole will be about 6 mm greater than the diameter of explosive cartridge to be inserted. 2) Blasting a) Explosives: Blasting explosives are divided into two classes: high explosives and low explosives. Gelignites, Gelatines and Dynamites are the examples of high explosives, whereas, Black powder is low explosive. Most commonly, high explosives are used for tunnelling operations. The strength of these explosive is expressed as a percentage of strength of the blasting gelatine which is the most powerful commercial explosive. The following explosive are used in tunnelling:  Blasting gelatine used for blasting very hard and tough rocks. This is fully water proof and can also be used in wet locations.  Special gelatine 9% to 40% is selected to suit the rock requirements.  Ammonia dynamite is available in strength from 15% to 60% used for soft rock.  Semi-gelatine is bulkier than other varieties and come in 45% to 60% strength. b) Detonators: There are primarily two types of detonators namely, Lead azide aluminium detonator and electric detonators. Lead azide aluminium detonators are used in conjunction with safety fuses and give efficient detonation with all types of blasting explosives. The electric detonators are suitable for singles or simultaneous firing in series or parallel. c) Detonating Fuse: It contains a high explosive core with a water proof covering. It is used for shooting a large number of holes in one blast. It is denoted by the use of one or two blasting caps securely attached alongside it. d) Primer: It is the cartridge containing the detonator. The primer is supplied with the explosive and is attached with the explosive. It is denoted by Prima cord, which is a high explosive use. e) Circuit Testers: To test an electric detonator, it should be placed inside an iron pot or tube to guard against accidental explosion. 3) Loading & Stemming Loading means charging the drill holes. Before loading, each hole is blown out with a high pressure air jet to remove loose cuttings and water. Then, primer cartridge is gently placed into drill hole next to the bottom. A full cartridge is inserted first, tamped well into bottom, then the primer is inserted with the end containing detonator pointing towards
  • 3. A Review Study on Methods of Tunnelling in Hard Rocks (IJSRD/Vol. 1/Issue 8/2013/0007) All rights reserved by www.ijsrd.com 1553 the bottom of drill hole. Both the primer and next placed cartridge are tamped lightly with a wooden rod. When the tamping material is being inserted, the leading wires or safety fuse should be held to one side, to facilitate the action of the tamping rod and prevent damage to fuse. The remaining portion of the drill hole is filled with an inert material and tightly tamped by wooden rod. Soft rolled plugs of clay, damp mixture of sand and clay or a rubber plug with a wooden core may be used as inert material. 4) Firing a) Firing by Safety Fuse: After charging or loading the holes, personnel and everything liable to injury must be placed to a safe distance. When necessary, the blast may be covered with rope blasting mats or a heavily weighted blanket of scrub. Special fuse-lighter should be used for ignition. b) Firing by Electricity: Before attempting to connect up an electric circuit, it should be ensured that the main cables are intact and that the exploder is working correctly and capable of supplying sufficient current to fire the number of charges in the circuit. No naked wire should be left touching the ground. Also, the exploder is not connected to the firing circuit until all men have left the danger area and signal to fire has been given. 5) Inspection & Handling Misfire After completion of firing, the site is examined by the foreman before he gives the all-clear signal. If a misfire has occurred, no person shall approach the site for one hour if safety fuse was used or 15 minute, if electrically fired. Misfires may occur due to improper primers, use of non- water resistance explosive in wet condition or improper loading. Immediately after the smoke is cleared away from a blast, inspection is carried out by a competent and experienced tunnel foreman. All loose rock is removed carefully by barring to ensure that the access to the face is safe. Merits:  Potential environmental impacts in terms of noise, dust and visual on sensitive receives are significantly reduced and are restricted to those located near the tunnel portal;  Compared with the cut-and-cover approach, quantity of C&D materials generated would be much reduced;  Compared with the cut-and-cover approach, disturbance to local traffic and associated environmental impacts would be much reduced;  Blasting would significantly reduce the duration of vibration, though the vibration level would be higher compared with bored tunnelling; Demerits:  Potential hazard associated with establishment of a temporary magazine site for overnight storage of explosives shall be addressed through avoiding populated areas in the site selection process.  There is a high risk of over breaking the tunnel profile and damaging the surrounding rock  High levels of noise and vibration make this unsuitable for an urban area. Cut Cover Method of TunnellingC. Cut and cover tunneling is a common and well-proven technique for constructing shallow tunnels. The method can accommodate changes in tunnel width and non-uniform shapes. Cut and cover is a simple method of construction for shallow tunnels where a trench is excavated and roofed over with an overhead support system strong enough to carry the load of what is to be built above the tunnel. Fig. 2: Cut Cover Method Procedure: 1) Excavation and support The initial “cut” is undertaken to facilitate the tunnel construction. This uses similar technology to road cuttings. Prior to excavation, buried utilities and services crossing the route have to be protected, temporarily raised or permanently diverted to avoid the tunnel alignment where possible. For gravity sewers this may involve pump installation. The cut is constructed in a number of ways, depending on the support requirements of the ground. In hard rock this may be vertical walls supported by rock bolts and sprayed concrete, in soft rocks and soils stable slopes may be created by constructing benches. If surface space is restricted, or the disturbance caused by construction needs to be minimized, then retaining walls can be used to stabilise the excavation. These may be permanent, incorporated into the final structure or temporary and removed or abandoned after the tunnel structure has been completed. 2) Tunnel fabrication Once a stable open cut has been constructed, the tunnel structure is fabricated in the trench. This structure is generally constructed from reinforced concrete using large tunnel forms. As considerable materials and excavated fill storage is required this operation requires a significant work site. 3) Reinstatement After construction, fill is used to reinstate the ground surface. Where possible this fill may be reserved material from the trench excavation. Additional fill may be required to assist with compaction and drainage, or if the trench material is unsuitable. Reinstatement may be to the original topography and land use. In some cases this offers the opportunity to improve surface conditions, such as utility and drainage improvements or local road upgrades. Demerits:  More dust and noise impact may arise, though these can be mitigated through implementation of sufficient control measures;
  • 4. A Review Study on Methods of Tunnelling in Hard Rocks (IJSRD/Vol. 1/Issue 8/2013/0007) All rights reserved by www.ijsrd.com 1554  Temporary decks are often installed before bulk excavation to minimise the associated environment impacts;  Larger quantity of C&D materials would be generated from the excavation works, requiring proper handling and disposal. Hard TBM Method of TunnellingD. In hard rock, either shielded or open-type TBMs can be used. All types of hard rock TBMs excavate rock using disc cutters mounted in the cutter head. The disc cutters create compressive stress fractures in the rock, causing it to chip away from the rock in front of the machine, called the tunnel face. The excavated rock, known as muck, is transferred through openings in the cutter head to a belt conveyor, where it runs through the machine to a system of conveyors or muck cars for removal from the tunnel. Procedure: 1) Excavation Advance: The cutting head is rotated against the ground to commence cutting  Thrust is applied by the rams or side gripper pads in the drive section to assist cutting and maintain face pressure  Cutting and advance continues until enough space is created in the tail shield to construct the next lining ring the gap between the ground and the previous lining ring is grouted as it leaves the tail shield. Fig. 3: Excavation Advance Fig. 4: Lining erection 2) Lining erection:  The thrust rams are withdrawn into the drive section leaving clear space for the erection of the lining  Each segment forming the lining is maneuvered into position and bolted together to form a completed lining ring the thrust rams are then reengaged to commence the next excavation cycle Merits:  Potential environmental impacts in terms of noise, dust and visual on sensitive receives are significantly reduced and are restricted to those located near the launching and retrieval shafts;  Compared with the cut-and-cover approach, disturbance to local traffic and associated environmental impacts would be much reduced;  Compared with the cut-and-cover approach, quantity of C&D materials generated would be much reduced Demerits:  The major disadvantage is the upfront capital cost. TBMs are expensive to construct, difficult to transport, require significant backup systems and power.  Their applicability is limited to long tunnels where the high rates of advance and tunnel quality can offset their high capital cost. V. CONCLUSION Referring to the various literatures mentioned below and the contents mentioned above in the paper the importance of tunneling can be clearly understood as compared to other means of conveyance such as bridges, open cuts, etc. i.e. through tunnels we can get many benefits such as low maintenance cost, no need for acquiring the land & it can be used in any type of area such as in congested cities. Also referring to many recent methodologies in tunnels we found that most suitable method was the method using TBM. Though it is very costlier than all other methods, but it also has many advantages compared to others like it is easier in operation, very fast, can be used in any ground conditions depending on cutterhead with little modifications, perfection of work, safety etc. ACKNOWLEDGMENT The authors are thankfully acknowledge to Mr. J. N. Patel, Chairman Vidyabharti Trust, Mr. K. N. Patel, Hon. Secretary, Vidyabharti Trust, Dr. H. R. Patel, Director, Dr. J. A. Shah, Principal, S.N.P.I.T. & R.C., Umrakh, Bardoli, Gujarat, India for their motivational & infrastructural supports to carry out this research, Dr. Neeraj D. Sharma, HOD Civil Department, SNPIT & RC, Umrakh. REFERENCES [1] Doctoral thesis at NTNU , Hard Rock Tunnelling [2] “Fracturing Excavation Method for Hard Rock Tunnelling” By: Fon Drill & FASE Method. [3] “Tunnelling in Rocks – Present Technology & Future Challenges” By: ZHAO Jian, Inaugural lecture, May 2007. [4] S. Seetharaman “Tunnel & Airport Engineering” Umesh Publication. [5] Tunnel wikipedia. [6] Tunnel Boring Machine (TBM) in action in Kuala Lumpur & Robbins Hard Rock Disc Cutters, youtube.com. [7] IS: 5878 ( Part 111) – 1972: Underground Excavation Soft Strata. [8] “Construction safety in hard rock tunnelling” By: Dr. Zhou Yingxin Programme Manager (Underground
  • 5. A Review Study on Methods of Tunnelling in Hard Rocks (IJSRD/Vol. 1/Issue 8/2013/0007) All rights reserved by www.ijsrd.com 1555 Technology & Rock Engineering), Defence Science & Technology Agency. [9] “Tunnelling in Rocks – Present Technology & Future Challenges” By: ZHAO Jian, Inaugural lecture, May 2007. [10]Engineering Survey System for TBM (Tunnel Boring Machine) Tunnel Construction, By: Andrew Hung Shing Lee, Hong Kong. [11]“Tunnel Boring Machines”, IMIA Working Group Paper WGP 60 (09) Tunnel Boring Machines.