SlideShare a Scribd company logo
1 of 3
ANITHA VANGA
B Tech Mechanical Engineer
Mobile No: +91 9491669795
E-Mail ID: anithavanga555@gmail.com
CARRER OBJECTIVE:
I am looking forward for an opportunity in the field of Automotive Where I could
contribute my skills for the success of the Organization by taking challenging Assignments.
PROFESSIONAL SUMMARY:
Having 6 Years of experience in the areas of Engineering Services, ECM(Engineering Change
Management), NPI(New Product Introduction), BOM Creation, Virtual Assembly Process
Planning using CAPP+(Computer aided process planning) and PLM Team Center for Earth
Moving/Heavy/Light commercial vehicles.
PROJECT EXPERIENCE:
• Experience of working in Manufacturing Bill of Material (M-Bom) creation from the
Engineering BOM (E-Bom) in Team center by analyzing and referring 2D Drawings and
Computer Aided Process Planning.
• To review and analyze incoming Engineering changes using Engineering Change
Management (ECM).
• To plan and prepare new assembly sequence by analyzing and referring CAPP+
(Computer Aided Process Planning Plus tool) and suitable existing documentation and
updating the sequence of operations into Team center Vis-mockup.
• To create Visual aids (SWES) by using Team center and PRO-E Models and providing
assistance to the assembly operator in the production line.
• By analyzing latest changes in drawing and BOM, there by assigning appropriate torque
values and incorporating the same in assembly line as per standards.
• Experience of working in M-Bom Creation in Team center according to latest changes in
drawing.
• Analyzing the latest changes in drawing by (HVC) and updating the same in Assembly
Process Planning (CAPP+) tool.
• Routing of BOM from Drawings to Material control system
TOOLS AND TECHNICAL KNOWLEDGE
• Engineering Change Management (ECM)
• PLM (Team Center)
• Team-center Vis-mockup 10.1
• New Product Introduction.
• Computer Aided Process Planning (CAPP+)
• Material Control Systems (MCS)
• High Velocity Caterpillar Desktop (HVC)
WORK EXPERIENCE: Current Employer:
Automotive Robotics India Pvt Ltd. Designation: Senior Engineer-Manufacturing Services
Duration: Sep 2010 to till date.
Project: 1
Engineering Change Management:
Client: Caterpillar – USA (Greenville)
Role and Responsibilities include:
• Project involved Documentation of Engineering changes for Engine Assembly Line.
• Updating of the BOM (Bill of Material) as per the Product Definition.
• Updating of the total BOM as per the latest changes.
• Involved in analysis of Engineering Drawing Notices and checking Material control
systems for BOM releases and Modifying the Engine Assembly routings accordingly.
• Responsible for timely delivery of Job packets and implementation of changes according
to the Assembly schedule.
• To plan and prepare new assembly sequence by analyzing and referring suitable existing
documentation and updating the sequence of operations into CAPP+ (Computer Aided
Process Planning Plus tool).
• To modifying bill of materials (BOM) changes to trigger MCS. To plan and prepare new
assembly sequence by analyzing and referring suitable existing documentation and
updating the sequence of operations into CAPP+ (Computer Aided Process Planning Plus
tool).
• Involved in analysis of Engineering Drawing Notices, Engineering Change Notices (ECN)
and checking Material control systems for BOM releases and Modifying the Engine
Assembly routings accordingly.
• Responsible for timely delivery of Job packets and implementation of changes according
to the Assembly schedule.
Project: 2
Assembly Process Planning and Virtual Build:
Clienteles: TTTD (Track Type Tractor and Dozer),Caterpillar, East Peoria, Illinois, USA
Role and Responsibilities:
• Assembly process planning for different Track Type Tractors and NPI model, Pipe laying
tractors.
• Creation of MBOM (Manufacturing Bill of Material) in VPPA (Virtual Process Planning
for Assembly) from EBOM.
• Creating Assembly operations and Creation & Validation of Manufacturing Bill of
Material, establishing routings for Manufacturing in SAP Mach 1 environment.
• Understanding the various possible variations of the assembly components and
Establishing routings, methods, layouts, tools, methods documentation.
• Auditing the process sequence and making the required changes as per assembly line.
• Updating the Torque for operations which need to performed in Assembly line for proper
Quality.
• Creating the Visual aids for all operations to educate the assembler to ease Assembly.
• Responsible for Process planning, Torque Audit, creation of visual aids for NPI models.
• Root cause Analysis (RCA) and preventive actions when there is a dip in Quality and
Production.
Project: 3
Standard Work
Clienteles: Caterpillar – USA (Aurora, Fargo, Munci), Hosur, Thiruvallur.
Roles and Responsibilities include:
• Supporting assemblers to assembly NPI model in plant by referring SWES, Team-center
Vis-mockup and HVC.
• Creating Assembly sequence and assigning proper station numbers in order in Vismockup.
• Adding up all the groups in the respective operation numbers as defined by Assembly
Process planning.
• Discussion on the recommended Assembly sequence virtual issues and re sequenced
couple of Operations in Vis-mockup.
• To create Standard Work Element Sheet (SWES) for all sub-assemblies and main line
assemblies.
• Process Follow up for timely delivery and periodic visits to Caterpillar Plant.
• Handled a team of 8 Associates and was responsible for velocity and quality of work
submitted from Offshore.
• Project involved Documentation of Engineering changes for 988H Cab Assembly Line in
Plant.
• Documentation of Assembly Process for Earth moving Medium and Large Wheel Loaders
like 834K, 836K, 950L, 962L, 966L, 980L, 988K.
EDUCATIONAL QUALIFICATION:
• B.Tech (Mechanical Engineering) from R.V.R & J.C College of Engineering (ANU) with
75%. (2006 to 2010).
PERSONAL PROFILE:
Date of Birth: 16-JUN-1989; Language Proficiency: English, Hindi, and Telugu;
Marital status: Married.
Permanent Address: House no-8-3-234/44 , 3rd
Lane L.N. Nagar, Yousfguda, Hyderabad,
Pin-500045
DECLARATION:
I hereby declare that the information furnished above is true to the best of my knowledge.
Place:
Date:
ANITHA VANGA

More Related Content

What's hot

CAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCTCAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCTKhalid Tariq
 
Computer Aided Process Planning Poster
Computer Aided Process Planning PosterComputer Aided Process Planning Poster
Computer Aided Process Planning PosterJyotiraman De
 
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSJyotiraman De
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planningjashid41
 
Cad cam capp yasir 14 me-ind01
Cad cam capp yasir 14 me-ind01Cad cam capp yasir 14 me-ind01
Cad cam capp yasir 14 me-ind01Yasir Hashmi
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)Victor Al
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)KRUNAL RAVAL
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches chethan kumar
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches chethan kumar
 
Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Pratik Gandhi
 
TOGAF Classroom Series - M14 adm phases (requirements management)
TOGAF Classroom Series - M14 adm phases (requirements management)TOGAF Classroom Series - M14 adm phases (requirements management)
TOGAF Classroom Series - M14 adm phases (requirements management)Cuneyt Kaya
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATDTravis Lucas
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
TOGAF Classroom Series - M13 adm phases (g - h)
TOGAF Classroom Series - M13 adm phases (g - h)TOGAF Classroom Series - M13 adm phases (g - h)
TOGAF Classroom Series - M13 adm phases (g - h)Cuneyt Kaya
 
Computer control in process planning Unit 4 (ME CAD/CAM)
Computer control in process planning Unit 4 (ME CAD/CAM)Computer control in process planning Unit 4 (ME CAD/CAM)
Computer control in process planning Unit 4 (ME CAD/CAM)Avt Shubhash
 

What's hot (20)

CAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCTCAPP and Curriculum Management at HCT
CAPP and Curriculum Management at HCT
 
Computer Aided Process Planning Poster
Computer Aided Process Planning PosterComputer Aided Process Planning Poster
Computer Aided Process Planning Poster
 
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
 
Capp
CappCapp
Capp
 
Computer Aided Process Planning
Computer Aided Process PlanningComputer Aided Process Planning
Computer Aided Process Planning
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
 
Cad cam capp yasir 14 me-ind01
Cad cam capp yasir 14 me-ind01Cad cam capp yasir 14 me-ind01
Cad cam capp yasir 14 me-ind01
 
CAPP
CAPPCAPP
CAPP
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Resume.DOC
Resume.DOCResume.DOC
Resume.DOC
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)
 
TOGAF Classroom Series - M14 adm phases (requirements management)
TOGAF Classroom Series - M14 adm phases (requirements management)TOGAF Classroom Series - M14 adm phases (requirements management)
TOGAF Classroom Series - M14 adm phases (requirements management)
 
anchal
anchalanchal
anchal
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
TOGAF Classroom Series - M13 adm phases (g - h)
TOGAF Classroom Series - M13 adm phases (g - h)TOGAF Classroom Series - M13 adm phases (g - h)
TOGAF Classroom Series - M13 adm phases (g - h)
 
Computer control in process planning Unit 4 (ME CAD/CAM)
Computer control in process planning Unit 4 (ME CAD/CAM)Computer control in process planning Unit 4 (ME CAD/CAM)
Computer control in process planning Unit 4 (ME CAD/CAM)
 

Similar to Anitha Vanga

SridharOmmi_Resume
SridharOmmi_ResumeSridharOmmi_Resume
SridharOmmi_ResumeSridhar Ommi
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE NotesAbhay Gore
 
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 Corporation
 
Manas ranjan ray_resume
Manas ranjan ray_resumeManas ranjan ray_resume
Manas ranjan ray_resumeManas Ray
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniquesMohamad Sahiedan
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier
 
Optimization_model_of the propsed kiiraEV assembly lineprstn
Optimization_model_of the propsed kiiraEV assembly lineprstnOptimization_model_of the propsed kiiraEV assembly lineprstn
Optimization_model_of the propsed kiiraEV assembly lineprstnRonald Kayiwa
 

Similar to Anitha Vanga (20)

Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
SridharOmmi_Resume
SridharOmmi_ResumeSridharOmmi_Resume
SridharOmmi_Resume
 
Anilkumar
AnilkumarAnilkumar
Anilkumar
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
TEST 2.pptx
TEST 2.pptxTEST 2.pptx
TEST 2.pptx
 
TEST 2.pdf
TEST 2.pdfTEST 2.pdf
TEST 2.pdf
 
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing.
 
Manas ranjan ray_resume
Manas ranjan ray_resumeManas ranjan ray_resume
Manas ranjan ray_resume
 
Michael Olinski Resume
Michael Olinski ResumeMichael Olinski Resume
Michael Olinski Resume
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniques
 
Resume-steer
Resume-steerResume-steer
Resume-steer
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_Aerospace
 
Vinod Kumar CV
Vinod Kumar CVVinod Kumar CV
Vinod Kumar CV
 
Bhushan Bhapkar-CV
Bhushan Bhapkar-CVBhushan Bhapkar-CV
Bhushan Bhapkar-CV
 
Optimization_model_of the propsed kiiraEV assembly lineprstn
Optimization_model_of the propsed kiiraEV assembly lineprstnOptimization_model_of the propsed kiiraEV assembly lineprstn
Optimization_model_of the propsed kiiraEV assembly lineprstn
 
Resume
ResumeResume
Resume
 
Atul_T_Biradar_CV
Atul_T_Biradar_CVAtul_T_Biradar_CV
Atul_T_Biradar_CV
 
cv_chandrashetty
cv_chandrashettycv_chandrashetty
cv_chandrashetty
 

Anitha Vanga

  • 1. ANITHA VANGA B Tech Mechanical Engineer Mobile No: +91 9491669795 E-Mail ID: anithavanga555@gmail.com CARRER OBJECTIVE: I am looking forward for an opportunity in the field of Automotive Where I could contribute my skills for the success of the Organization by taking challenging Assignments. PROFESSIONAL SUMMARY: Having 6 Years of experience in the areas of Engineering Services, ECM(Engineering Change Management), NPI(New Product Introduction), BOM Creation, Virtual Assembly Process Planning using CAPP+(Computer aided process planning) and PLM Team Center for Earth Moving/Heavy/Light commercial vehicles. PROJECT EXPERIENCE: • Experience of working in Manufacturing Bill of Material (M-Bom) creation from the Engineering BOM (E-Bom) in Team center by analyzing and referring 2D Drawings and Computer Aided Process Planning. • To review and analyze incoming Engineering changes using Engineering Change Management (ECM). • To plan and prepare new assembly sequence by analyzing and referring CAPP+ (Computer Aided Process Planning Plus tool) and suitable existing documentation and updating the sequence of operations into Team center Vis-mockup. • To create Visual aids (SWES) by using Team center and PRO-E Models and providing assistance to the assembly operator in the production line. • By analyzing latest changes in drawing and BOM, there by assigning appropriate torque values and incorporating the same in assembly line as per standards. • Experience of working in M-Bom Creation in Team center according to latest changes in drawing. • Analyzing the latest changes in drawing by (HVC) and updating the same in Assembly Process Planning (CAPP+) tool. • Routing of BOM from Drawings to Material control system TOOLS AND TECHNICAL KNOWLEDGE • Engineering Change Management (ECM) • PLM (Team Center) • Team-center Vis-mockup 10.1 • New Product Introduction. • Computer Aided Process Planning (CAPP+) • Material Control Systems (MCS) • High Velocity Caterpillar Desktop (HVC)
  • 2. WORK EXPERIENCE: Current Employer: Automotive Robotics India Pvt Ltd. Designation: Senior Engineer-Manufacturing Services Duration: Sep 2010 to till date. Project: 1 Engineering Change Management: Client: Caterpillar – USA (Greenville) Role and Responsibilities include: • Project involved Documentation of Engineering changes for Engine Assembly Line. • Updating of the BOM (Bill of Material) as per the Product Definition. • Updating of the total BOM as per the latest changes. • Involved in analysis of Engineering Drawing Notices and checking Material control systems for BOM releases and Modifying the Engine Assembly routings accordingly. • Responsible for timely delivery of Job packets and implementation of changes according to the Assembly schedule. • To plan and prepare new assembly sequence by analyzing and referring suitable existing documentation and updating the sequence of operations into CAPP+ (Computer Aided Process Planning Plus tool). • To modifying bill of materials (BOM) changes to trigger MCS. To plan and prepare new assembly sequence by analyzing and referring suitable existing documentation and updating the sequence of operations into CAPP+ (Computer Aided Process Planning Plus tool). • Involved in analysis of Engineering Drawing Notices, Engineering Change Notices (ECN) and checking Material control systems for BOM releases and Modifying the Engine Assembly routings accordingly. • Responsible for timely delivery of Job packets and implementation of changes according to the Assembly schedule. Project: 2 Assembly Process Planning and Virtual Build: Clienteles: TTTD (Track Type Tractor and Dozer),Caterpillar, East Peoria, Illinois, USA Role and Responsibilities: • Assembly process planning for different Track Type Tractors and NPI model, Pipe laying tractors. • Creation of MBOM (Manufacturing Bill of Material) in VPPA (Virtual Process Planning for Assembly) from EBOM. • Creating Assembly operations and Creation & Validation of Manufacturing Bill of Material, establishing routings for Manufacturing in SAP Mach 1 environment. • Understanding the various possible variations of the assembly components and Establishing routings, methods, layouts, tools, methods documentation. • Auditing the process sequence and making the required changes as per assembly line. • Updating the Torque for operations which need to performed in Assembly line for proper Quality. • Creating the Visual aids for all operations to educate the assembler to ease Assembly. • Responsible for Process planning, Torque Audit, creation of visual aids for NPI models.
  • 3. • Root cause Analysis (RCA) and preventive actions when there is a dip in Quality and Production. Project: 3 Standard Work Clienteles: Caterpillar – USA (Aurora, Fargo, Munci), Hosur, Thiruvallur. Roles and Responsibilities include: • Supporting assemblers to assembly NPI model in plant by referring SWES, Team-center Vis-mockup and HVC. • Creating Assembly sequence and assigning proper station numbers in order in Vismockup. • Adding up all the groups in the respective operation numbers as defined by Assembly Process planning. • Discussion on the recommended Assembly sequence virtual issues and re sequenced couple of Operations in Vis-mockup. • To create Standard Work Element Sheet (SWES) for all sub-assemblies and main line assemblies. • Process Follow up for timely delivery and periodic visits to Caterpillar Plant. • Handled a team of 8 Associates and was responsible for velocity and quality of work submitted from Offshore. • Project involved Documentation of Engineering changes for 988H Cab Assembly Line in Plant. • Documentation of Assembly Process for Earth moving Medium and Large Wheel Loaders like 834K, 836K, 950L, 962L, 966L, 980L, 988K. EDUCATIONAL QUALIFICATION: • B.Tech (Mechanical Engineering) from R.V.R & J.C College of Engineering (ANU) with 75%. (2006 to 2010). PERSONAL PROFILE: Date of Birth: 16-JUN-1989; Language Proficiency: English, Hindi, and Telugu; Marital status: Married. Permanent Address: House no-8-3-234/44 , 3rd Lane L.N. Nagar, Yousfguda, Hyderabad, Pin-500045 DECLARATION: I hereby declare that the information furnished above is true to the best of my knowledge. Place: Date: ANITHA VANGA