MEENU KUMARI
Mobile: 09654211822, 9555644522 Email: 84meenu@gmail.com
Seeking assignments in Project Management, Maintenance operations, Erection & Commissioning,
Automation (DCS) for Instrumentation with a growth oriented organisation of repute.
PROFESSIONAL SYNOPSIS
• An engineering diploma with extensive experience of 8 years in Project Management of
Instrumentation & Control, Maintenance Operations, Erection & Commissioning activities.
• (2012-till date) Presently working as Asst. Engineer with M/s JAYPEE in PEG. (project
engineering group) for Project Execution and coordination in engineering for 2 x 660MW,
Super Critical Thermal Power Plant at Nigeria (in M.P.).
• (2007 – 2009) Working as an Asst. Engineer (instrumentation) with M/s JAYPEE (Jaiprakash
associates Ltd) and looking after DCS system (ABB DCS)
• (2010 – 2011) Working as an Asst. Engineer (instrumentation) with M/s JAYPEE (Jaiprakash
also working as a shift Incharge in 28MW Captive Power Plant with steam Turbine & worked
on Siemens DCS (SPPA-T-1000).
• Familiar with field instrument like Pressure transmitter, temp. Transmitter etc.
• Familiar with ABB drives (ACS800, DCS800) and Siemens SPPA T1000 DCS system.
• Serving as Asst. Engineer (Instrumentation) with M/s JAYPEE Group (JAYPEE Cement Ltd)
and looking after DCS System 6 Million Ton Cement Plant.
• Proficient in managing the design & detail engineering of DCS systems, Instrumentation used
in equipment. Sound knowledge of Function Block Logic, associated integration with HMI.
• Expertise in handling the complete operations & maintenance (Preventive /
Breakdown/Shutdown) Entailing Planning, Resource Utilization, Maintenance & Manpower
Management.
• Familiar with Instrumentation Lab. Also works on SAP PM (Module).
ORGANISATIONAL EXPERIENCE
Reasonability
• Project Engineering for Main Plant and BOP
• Project Execution and coordination with Project consultant, Project site and Main
plant & BOP vendors.
• Coordination for supply of equipment/material at site.
Industrial Exposure
• Company: JAIPRAKASH ASSOCIATES LIMITED, NOIDA
CORE COMPETENCIES
Project Planning and Execution
• Planning, scoping, estimation, tracking & implementation of project plans within preset budgets and
deadlines.
• Coordinating projects for the set up facilities with accountability for strategic utilization & deployment
of available resources to achieve organizational objectives.
• Planning and implementing activities related to major shutdowns.
• Identifying cost effective vendors for various inputs in the projects and procurement of material after
determining quality and ensuring adherence to pre-set standards.
• Tracing any mistakes in engineering Drawing & document (like P&ID, flow diagram Data sheets, GA ,
instrument hook-up diagram , interconnection schedule etc.) and finalised it.
• Preparing instrument cable Schedule, JB schedule, interconnection schedule.
Instrumentation & Control
• Detailed engineering, system engineering, instrument sizing and preparation of instrument data sheets,
specifications, layouts, loop drawings & logic diagrams.
• Managing the commissioning of process control equipments to ensure smooth operations.
Operations & Maintenance
• Planning and effecting preventive maintenance schedules of various machineries and instruments to
increase machine up time/ equipment reliability; thereby accomplishing planned production targets.
• Proactively identify areas of obstruction/ breakdowns and take steps to rectify the equipments through
application of trouble shooting tools.
• Coordinating material / spare parts planning related activities, encompassing identification of vendors,
requirement specification & offer evaluation.
• Executing cost saving and energy saving techniques / measures and modifications to achieve substantial
reduction in O&M expenditures and work within the budget.
• Imparting continuous on job training to the workforce for accomplishing greater operational
effectiveness.
Erection and Commissioning
• Control system (DCS and PLC) of ABB 800xA.
• Handling the erection & commissioning of various plant equipments to enhance capacity and
productivity of the plant.
• Testing the new equipments and ensuring their operability at desired capacity.
• Troubleshooting technical problems arising in the system.
Quality Control
• Implementing latest quality tools and executing process enhancement projects.
• Identifying areas of quality failures and take steps to rectify the system.
Team Management
• Leading, motivating and training the employees to improve their operational efficiency.
• Organising training internal / external programmes based on the training need analysis to elevate the
skills & productivity of employees.
MAJOR PROJECTS HANDLED
Have successfully handled the commissioning and maintenance of the following -
• Designing of Control system with Cement Plant control layout as Input / output
assignments, hardware selection, implementation of required logics, graphics &
cable schedules.
• Installation & Commissioning of ABB 800xA and PLC.
• Complete project planning, erection & commissioning of Cement Plant System
with control logic, graphics building and cable schedule etc.
• Complete control system with Local and Universal Control networks and
Network Interface Module between them for peer-to-peer communication.
• Different instruments: Smart Temperature and Pressure Transmitters, Differential
Pressure Transmitter, Inductive / Capacitive Proximity, Level Sensor, Ultrasonic
Level Sensors, Pressure Switches, Speed Monitoring Equipment etc.
• Prepare Interconnection Schedule of field instruments.
EDUCATION
DEGREE/BOARD
YEAR INSTITUTE MARKS
Three year diploma, Electronics
Engg.(BTEUP)
2006 Government Girls Polytechnic
VARANASI
73.2%
TECHNICAL SKILLS
Operating System Windows 2003/2007, SAP, ERP
Others Microprocessor, Industrial instrumentation
TRAINING
• ABB 800XA DCS system at Jaypee Rewa Nagar Training Institute, Rewa in 2007.
PERSONAL DETAILS
MEENU KUMARI
D/O LATE BIPUL BIHARI
DOB. 10/01/1984
MARITAL STATUS: married
NATIONALITY: INDIAN
LANGUAGE: HINDI,ENGLISH,
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the
responsibility for the correctness of the above-mentioned particulars.
Place: Noida (MEENU KUMARI)

Meenu Resume

  • 1.
    MEENU KUMARI Mobile: 09654211822,9555644522 Email: 84meenu@gmail.com Seeking assignments in Project Management, Maintenance operations, Erection & Commissioning, Automation (DCS) for Instrumentation with a growth oriented organisation of repute. PROFESSIONAL SYNOPSIS • An engineering diploma with extensive experience of 8 years in Project Management of Instrumentation & Control, Maintenance Operations, Erection & Commissioning activities. • (2012-till date) Presently working as Asst. Engineer with M/s JAYPEE in PEG. (project engineering group) for Project Execution and coordination in engineering for 2 x 660MW, Super Critical Thermal Power Plant at Nigeria (in M.P.). • (2007 – 2009) Working as an Asst. Engineer (instrumentation) with M/s JAYPEE (Jaiprakash associates Ltd) and looking after DCS system (ABB DCS) • (2010 – 2011) Working as an Asst. Engineer (instrumentation) with M/s JAYPEE (Jaiprakash also working as a shift Incharge in 28MW Captive Power Plant with steam Turbine & worked on Siemens DCS (SPPA-T-1000). • Familiar with field instrument like Pressure transmitter, temp. Transmitter etc. • Familiar with ABB drives (ACS800, DCS800) and Siemens SPPA T1000 DCS system. • Serving as Asst. Engineer (Instrumentation) with M/s JAYPEE Group (JAYPEE Cement Ltd) and looking after DCS System 6 Million Ton Cement Plant. • Proficient in managing the design & detail engineering of DCS systems, Instrumentation used in equipment. Sound knowledge of Function Block Logic, associated integration with HMI. • Expertise in handling the complete operations & maintenance (Preventive / Breakdown/Shutdown) Entailing Planning, Resource Utilization, Maintenance & Manpower Management. • Familiar with Instrumentation Lab. Also works on SAP PM (Module). ORGANISATIONAL EXPERIENCE Reasonability • Project Engineering for Main Plant and BOP • Project Execution and coordination with Project consultant, Project site and Main plant & BOP vendors. • Coordination for supply of equipment/material at site. Industrial Exposure • Company: JAIPRAKASH ASSOCIATES LIMITED, NOIDA CORE COMPETENCIES Project Planning and Execution • Planning, scoping, estimation, tracking & implementation of project plans within preset budgets and deadlines.
  • 2.
    • Coordinating projectsfor the set up facilities with accountability for strategic utilization & deployment of available resources to achieve organizational objectives. • Planning and implementing activities related to major shutdowns. • Identifying cost effective vendors for various inputs in the projects and procurement of material after determining quality and ensuring adherence to pre-set standards. • Tracing any mistakes in engineering Drawing & document (like P&ID, flow diagram Data sheets, GA , instrument hook-up diagram , interconnection schedule etc.) and finalised it. • Preparing instrument cable Schedule, JB schedule, interconnection schedule. Instrumentation & Control • Detailed engineering, system engineering, instrument sizing and preparation of instrument data sheets, specifications, layouts, loop drawings & logic diagrams. • Managing the commissioning of process control equipments to ensure smooth operations. Operations & Maintenance • Planning and effecting preventive maintenance schedules of various machineries and instruments to increase machine up time/ equipment reliability; thereby accomplishing planned production targets. • Proactively identify areas of obstruction/ breakdowns and take steps to rectify the equipments through application of trouble shooting tools. • Coordinating material / spare parts planning related activities, encompassing identification of vendors, requirement specification & offer evaluation. • Executing cost saving and energy saving techniques / measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget. • Imparting continuous on job training to the workforce for accomplishing greater operational effectiveness. Erection and Commissioning • Control system (DCS and PLC) of ABB 800xA. • Handling the erection & commissioning of various plant equipments to enhance capacity and productivity of the plant. • Testing the new equipments and ensuring their operability at desired capacity. • Troubleshooting technical problems arising in the system. Quality Control • Implementing latest quality tools and executing process enhancement projects. • Identifying areas of quality failures and take steps to rectify the system. Team Management • Leading, motivating and training the employees to improve their operational efficiency. • Organising training internal / external programmes based on the training need analysis to elevate the skills & productivity of employees. MAJOR PROJECTS HANDLED Have successfully handled the commissioning and maintenance of the following - • Designing of Control system with Cement Plant control layout as Input / output assignments, hardware selection, implementation of required logics, graphics & cable schedules. • Installation & Commissioning of ABB 800xA and PLC. • Complete project planning, erection & commissioning of Cement Plant System with control logic, graphics building and cable schedule etc.
  • 3.
    • Complete controlsystem with Local and Universal Control networks and Network Interface Module between them for peer-to-peer communication. • Different instruments: Smart Temperature and Pressure Transmitters, Differential Pressure Transmitter, Inductive / Capacitive Proximity, Level Sensor, Ultrasonic Level Sensors, Pressure Switches, Speed Monitoring Equipment etc. • Prepare Interconnection Schedule of field instruments. EDUCATION DEGREE/BOARD YEAR INSTITUTE MARKS Three year diploma, Electronics Engg.(BTEUP) 2006 Government Girls Polytechnic VARANASI 73.2% TECHNICAL SKILLS Operating System Windows 2003/2007, SAP, ERP Others Microprocessor, Industrial instrumentation TRAINING • ABB 800XA DCS system at Jaypee Rewa Nagar Training Institute, Rewa in 2007. PERSONAL DETAILS MEENU KUMARI D/O LATE BIPUL BIHARI DOB. 10/01/1984 MARITAL STATUS: married NATIONALITY: INDIAN LANGUAGE: HINDI,ENGLISH, I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Place: Noida (MEENU KUMARI)