INTRODUCTION
A resource is any entity that contributes to the accomplishment of project
activities like
Personnel
Equipment
Materials
Money
Time
WHAT AND WHY WE NEED RESOURCE
IDENTIFACTION
Once the Work Breakdown Structure (WBS) has
been applied and the project activities have been
identified, you are ready to identify the types (labor,
equipment, material) and quantities of the resources
needed to implement the project.
STEPS FOR IDENTIFICATION OFSTEPS FOR IDENTIFICATION OF
RESOURCERESOURCE
In order to identify the resource requirements the following steps should be
followed:
Review the project scope and activities/ tasks list
In order to identify the project’s requirements for people, equipment
and material resources.
Gather historical information
from old project files, databases and from people who have worked
on similar projects, regarding what types and numbers of resources were
required for performing similar work on previous projects, as well as the
duration of the relative tasks.
IDENTIFY THE RESOURCE TYPES AND
QUANTITIES NEEDED.
Once you have collected all the necessary information, identify the
types of resources and the quantities needed for each.
The duration of most tasks is also influenced by the capabilities
and experience of the resources assigned to them.
As you collect information about the project in hand and other
similar projects, continue to refine the duration estimates for the project
tasks. The accuracy of the duration estimates is closely related to the
accuracy of your resource requirements
Measurement of resources
LABOUR:
 The quantity of a labour resources is measured by
using the term Full Time Equivalent.
One FTE indicates one person that will work 8hrs per
day for 5 days per week.
Respectively 0.5 indicates one person that will spent
half of the full time in the project.
MATERIAL AND EQUIPMENT
The quantity of material resources is defined using
the appropriate measurement units for each material.
For example, 50 m of cable, 5 tn of cement, 50 kg of
plastic paint, etc., and the equipments are measured in
numbers. Example :2 dozers,2 cranes.
UTILISATION OF RESOURCES
Resource allocation
Resource leveling
Time-limited resource consideration
Resource-limited resource consideration
RESOURCE ALLOCATION
Resource allocation, also called resource loading, is
concerned with assigning the required number of
those resources identified in the previous step to each
activity identified in the plan.
 More than one type of resource may be attributed to
a specific activity
RESOURCE LEVELLING
Resource leveling is the process that ensures resource
demand does not exceed resource availability.
The ideal scenario would be a build up of resource usage at
the beginning of the project and a reduction at the end of the
project.
However, the approach to resource leveling will also depend
on whether resources are dedicated to a particular project or
shared across several projects and whether there is a need to
keep all resources fully utilized.
TIME-LIMITED RESOURCE CONSIDERATION
In this case emphasis will be placed on completing
the project within a specified time.
This time will usually have been determined by
network analysis.
Adjustments in the timing of any activity,and the
resources required at a given time,must be
undertaken within the float available.
RESOURCE-LIMITED RESOURCE
CONSIDERATION
In this case the project must be completed with the
resources available even if this means extending the
project duration.
If the total resource demand exceeds the resource
availability at any time then some of the activities
must be delayed until there is sufficient resource
availability.
For level resources EST,LST and SLACK will be used.
10.resources measurement and its utilization

More Related Content

What's hot

Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
COEPD HR
 
Cost analysis of Project
Cost analysis of ProjectCost analysis of Project
Cost analysis of Project
Pravin176
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
Manit Agarwal
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
Sunayana Miglani
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Cost management
Cost managementCost management
Cost management
Abhi Kalyan
 
An introduction to project management: Learning the basics
An introduction to project management:  Learning the basicsAn introduction to project management:  Learning the basics
An introduction to project management: Learning the basics
Paul Di Gangi
 
4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)  4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)
Dania Abdel-aziz
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveyinggeddolan
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 
Equipment management
Equipment managementEquipment management
Equipment management
KHUSHBU SHAH
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Shrikant Kate
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
DavidMcLachlan1
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
S.Vijaya Bhaskar
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction
Dr Fereidoun Dejahang
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
Wajahat Ali
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
A Makwana
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
akashpadole
 
Evolution of project management
Evolution of project managementEvolution of project management
Evolution of project management
Aswin prakash i , Xantus Technologies
 

What's hot (20)

Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Cost analysis of Project
Cost analysis of ProjectCost analysis of Project
Cost analysis of Project
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Cost management
Cost managementCost management
Cost management
 
An introduction to project management: Learning the basics
An introduction to project management:  Learning the basicsAn introduction to project management:  Learning the basics
An introduction to project management: Learning the basics
 
4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)  4.1. triple constraints (time, scope, cost)
4.1. triple constraints (time, scope, cost)
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Equipment management
Equipment managementEquipment management
Equipment management
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
 
Ch6 resources
Ch6 resourcesCh6 resources
Ch6 resources
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Evolution of project management
Evolution of project managementEvolution of project management
Evolution of project management
 

Viewers also liked

Fast track construction of elvated roads in metro
Fast  track construction of elvated roads in metroFast  track construction of elvated roads in metro
Fast track construction of elvated roads in metro
Selva Prakash
 
MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIES
Selva Prakash
 
Productivity of human resources
Productivity of human resourcesProductivity of human resources
Productivity of human resources
Selva Prakash
 
04.development & operation of human resources
04.development & operation of human resources04.development & operation of human resources
04.development & operation of human resources
Selva Prakash
 
Impact strength in concrete test
Impact strength in concrete testImpact strength in concrete test
Impact strength in concrete test
Selva Prakash
 
Advanced concrete technology 3
Advanced concrete technology 3Advanced concrete technology 3
Advanced concrete technology 3
Selva Prakash
 
SERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETESERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETE
Selva Prakash
 
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Selva Prakash
 
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test ResultPredicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Monjurul Shuvo
 
Construction Management Project
Construction Management ProjectConstruction Management Project
Construction Management Project
Muhammad Umar Hayat
 
Flexural strength in concrete test
Flexural strength in concrete test Flexural strength in concrete test
Flexural strength in concrete test
Selva Prakash
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
NAVNEET KUMAR JHA
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
Selva Prakash
 
Engineering drawing
Engineering  drawing Engineering  drawing
Engineering drawing
Selva Prakash
 
Compressive strength of the concrete
Compressive strength of the concreteCompressive strength of the concrete
Compressive strength of the concrete
reboundhammer
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
Selva Prakash
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concrete
Selva Prakash
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies
Capterra
 
Chemical attack on concrete
Chemical attack on concreteChemical attack on concrete
Chemical attack on concrete
Crispus Brightstone
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
MECandPMV
 

Viewers also liked (20)

Fast track construction of elvated roads in metro
Fast  track construction of elvated roads in metroFast  track construction of elvated roads in metro
Fast track construction of elvated roads in metro
 
MAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIESMAINTENANCE AND REPAIR STRATEGIES
MAINTENANCE AND REPAIR STRATEGIES
 
Productivity of human resources
Productivity of human resourcesProductivity of human resources
Productivity of human resources
 
04.development & operation of human resources
04.development & operation of human resources04.development & operation of human resources
04.development & operation of human resources
 
Impact strength in concrete test
Impact strength in concrete testImpact strength in concrete test
Impact strength in concrete test
 
Advanced concrete technology 3
Advanced concrete technology 3Advanced concrete technology 3
Advanced concrete technology 3
 
SERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETESERVICEABILITY OF CONCRETE
SERVICEABILITY OF CONCRETE
 
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
 
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test ResultPredicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
 
Construction Management Project
Construction Management ProjectConstruction Management Project
Construction Management Project
 
Flexural strength in concrete test
Flexural strength in concrete test Flexural strength in concrete test
Flexural strength in concrete test
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
Engineering drawing
Engineering  drawing Engineering  drawing
Engineering drawing
 
Compressive strength of the concrete
Compressive strength of the concreteCompressive strength of the concrete
Compressive strength of the concrete
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concrete
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies
 
Chemical attack on concrete
Chemical attack on concreteChemical attack on concrete
Chemical attack on concrete
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
 

Similar to 10.resources measurement and its utilization

Anjali pgdm2-1504-resource planning
Anjali pgdm2-1504-resource planningAnjali pgdm2-1504-resource planning
Anjali pgdm2-1504-resource planning
Anjali Mehta
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
A Makwana
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project ResourcesToyin Osunlaja
 
The Ultimate Guide To Project Resources Management
The Ultimate Guide To Project Resources ManagementThe Ultimate Guide To Project Resources Management
The Ultimate Guide To Project Resources Management
Orangescrum
 
Project Management
Project ManagementProject Management
Project Management
Mr A
 
Discussion Project Resource PlanningResource planning is a .docx
Discussion Project Resource PlanningResource planning is a .docxDiscussion Project Resource PlanningResource planning is a .docx
Discussion Project Resource PlanningResource planning is a .docx
stelzriedemarla
 
Allocating resources
Allocating resourcesAllocating resources
Allocating resources
Snigdha Vashishth
 
H03302058066
H03302058066H03302058066
H03302058066
theijes
 
L12-Project Management (2018-2019) (1).pdf
L12-Project Management (2018-2019) (1).pdfL12-Project Management (2018-2019) (1).pdf
L12-Project Management (2018-2019) (1).pdf
roaaalfakeeh4444
 
Foro #1 integrative project lll
Foro #1 integrative project lllForo #1 integrative project lll
Foro #1 integrative project lll
Lorena Tapia
 
Resource management
Resource managementResource management
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
DejeneTsegaye6
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
dmdk12
 
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
HIMADRI BANERJI
 
Certificate IV Project Management - Activity Duration Estimating (Inputs)
Certificate IV Project Management - Activity Duration Estimating (Inputs)Certificate IV Project Management - Activity Duration Estimating (Inputs)
Certificate IV Project Management - Activity Duration Estimating (Inputs)
danieljohn810
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
Dr. Mahmoud Al-Naimi
 
ABIJU_Software _project _scheduling.pptx
ABIJU_Software _project _scheduling.pptxABIJU_Software _project _scheduling.pptx
ABIJU_Software _project _scheduling.pptx
BVimala1
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
Imran Jamil
 
RESOURCE_MANAGEMENT_pptx.pptx
RESOURCE_MANAGEMENT_pptx.pptxRESOURCE_MANAGEMENT_pptx.pptx
RESOURCE_MANAGEMENT_pptx.pptx
DelamanChibuikeEjekw
 

Similar to 10.resources measurement and its utilization (20)

Anjali pgdm2-1504-resource planning
Anjali pgdm2-1504-resource planningAnjali pgdm2-1504-resource planning
Anjali pgdm2-1504-resource planning
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project Resources
 
The Ultimate Guide To Project Resources Management
The Ultimate Guide To Project Resources ManagementThe Ultimate Guide To Project Resources Management
The Ultimate Guide To Project Resources Management
 
Project Management
Project ManagementProject Management
Project Management
 
Discussion Project Resource PlanningResource planning is a .docx
Discussion Project Resource PlanningResource planning is a .docxDiscussion Project Resource PlanningResource planning is a .docx
Discussion Project Resource PlanningResource planning is a .docx
 
Allocating resources
Allocating resourcesAllocating resources
Allocating resources
 
H03302058066
H03302058066H03302058066
H03302058066
 
L12-Project Management (2018-2019) (1).pdf
L12-Project Management (2018-2019) (1).pdfL12-Project Management (2018-2019) (1).pdf
L12-Project Management (2018-2019) (1).pdf
 
Session 7 4th edition PMP
Session 7 4th edition PMPSession 7 4th edition PMP
Session 7 4th edition PMP
 
Foro #1 integrative project lll
Foro #1 integrative project lllForo #1 integrative project lll
Foro #1 integrative project lll
 
Resource management
Resource managementResource management
Resource management
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
Project Management Series By Himadri Banerji: The New Frontiers From Himadri ...
 
Certificate IV Project Management - Activity Duration Estimating (Inputs)
Certificate IV Project Management - Activity Duration Estimating (Inputs)Certificate IV Project Management - Activity Duration Estimating (Inputs)
Certificate IV Project Management - Activity Duration Estimating (Inputs)
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
ABIJU_Software _project _scheduling.pptx
ABIJU_Software _project _scheduling.pptxABIJU_Software _project _scheduling.pptx
ABIJU_Software _project _scheduling.pptx
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
RESOURCE_MANAGEMENT_pptx.pptx
RESOURCE_MANAGEMENT_pptx.pptxRESOURCE_MANAGEMENT_pptx.pptx
RESOURCE_MANAGEMENT_pptx.pptx
 

More from Selva Prakash

Design of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netDesign of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.net
Selva Prakash
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone Safety
Selva Prakash
 
safety and health programs
safety and health programssafety and health programs
safety and health programs
Selva Prakash
 
staffing ,recruitment and selection
staffing ,recruitment and selectionstaffing ,recruitment and selection
staffing ,recruitment and selection
Selva Prakash
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
Selva Prakash
 
DESIGN METHODLOGY
DESIGN METHODLOGYDESIGN METHODLOGY
DESIGN METHODLOGY
Selva Prakash
 
Green Technologies for Buildings
Green Technologies for  BuildingsGreen Technologies for  Buildings
Green Technologies for Buildings
Selva Prakash
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
Selva Prakash
 
Burj khalifa
Burj  khalifaBurj  khalifa
Burj khalifa
Selva Prakash
 
Engineering drawing graphics
Engineering drawing graphics Engineering drawing graphics
Engineering drawing graphics
Selva Prakash
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
Selva Prakash
 
Bond strenth
Bond strenthBond strenth
Bond strenth
Selva Prakash
 
Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009 Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009
Selva Prakash
 
Advanced concrete technology 2
Advanced concrete technology 2 Advanced concrete technology 2
Advanced concrete technology 2
Selva Prakash
 
Advanced concrete technology
Advanced concrete technologyAdvanced concrete technology
Advanced concrete technology
Selva Prakash
 
Hydraulics & hydraulic machinery
Hydraulics & hydraulic machineryHydraulics & hydraulic machinery
Hydraulics & hydraulic machinery
Selva Prakash
 
Organisation information
Organisation  informationOrganisation  information
Organisation information
Selva Prakash
 

More from Selva Prakash (17)

Design of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.netDesign of-steel-structures bhavakkati- by easy engineering.net
Design of-steel-structures bhavakkati- by easy engineering.net
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone Safety
 
safety and health programs
safety and health programssafety and health programs
safety and health programs
 
staffing ,recruitment and selection
staffing ,recruitment and selectionstaffing ,recruitment and selection
staffing ,recruitment and selection
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
DESIGN METHODLOGY
DESIGN METHODLOGYDESIGN METHODLOGY
DESIGN METHODLOGY
 
Green Technologies for Buildings
Green Technologies for  BuildingsGreen Technologies for  Buildings
Green Technologies for Buildings
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Burj khalifa
Burj  khalifaBurj  khalifa
Burj khalifa
 
Engineering drawing graphics
Engineering drawing graphics Engineering drawing graphics
Engineering drawing graphics
 
Compressive strength in concrete test
Compressive strength in concrete testCompressive strength in concrete test
Compressive strength in concrete test
 
Bond strenth
Bond strenthBond strenth
Bond strenth
 
Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009 Comparision of is 10262 1982 & 2009
Comparision of is 10262 1982 & 2009
 
Advanced concrete technology 2
Advanced concrete technology 2 Advanced concrete technology 2
Advanced concrete technology 2
 
Advanced concrete technology
Advanced concrete technologyAdvanced concrete technology
Advanced concrete technology
 
Hydraulics & hydraulic machinery
Hydraulics & hydraulic machineryHydraulics & hydraulic machinery
Hydraulics & hydraulic machinery
 
Organisation information
Organisation  informationOrganisation  information
Organisation information
 

Recently uploaded

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 

Recently uploaded (20)

Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 

10.resources measurement and its utilization

  • 1. Resources measurement and its utilization By SELVAPRAKASH
  • 2. INTRODUCTION A resource is any entity that contributes to the accomplishment of project activities like Personnel Equipment Materials Money Time
  • 3. WHAT AND WHY WE NEED RESOURCE IDENTIFACTION Once the Work Breakdown Structure (WBS) has been applied and the project activities have been identified, you are ready to identify the types (labor, equipment, material) and quantities of the resources needed to implement the project.
  • 4. STEPS FOR IDENTIFICATION OFSTEPS FOR IDENTIFICATION OF RESOURCERESOURCE In order to identify the resource requirements the following steps should be followed: Review the project scope and activities/ tasks list In order to identify the project’s requirements for people, equipment and material resources. Gather historical information from old project files, databases and from people who have worked on similar projects, regarding what types and numbers of resources were required for performing similar work on previous projects, as well as the duration of the relative tasks.
  • 5. IDENTIFY THE RESOURCE TYPES AND QUANTITIES NEEDED. Once you have collected all the necessary information, identify the types of resources and the quantities needed for each. The duration of most tasks is also influenced by the capabilities and experience of the resources assigned to them. As you collect information about the project in hand and other similar projects, continue to refine the duration estimates for the project tasks. The accuracy of the duration estimates is closely related to the accuracy of your resource requirements
  • 6. Measurement of resources LABOUR:  The quantity of a labour resources is measured by using the term Full Time Equivalent. One FTE indicates one person that will work 8hrs per day for 5 days per week. Respectively 0.5 indicates one person that will spent half of the full time in the project.
  • 7. MATERIAL AND EQUIPMENT The quantity of material resources is defined using the appropriate measurement units for each material. For example, 50 m of cable, 5 tn of cement, 50 kg of plastic paint, etc., and the equipments are measured in numbers. Example :2 dozers,2 cranes.
  • 8. UTILISATION OF RESOURCES Resource allocation Resource leveling Time-limited resource consideration Resource-limited resource consideration
  • 9. RESOURCE ALLOCATION Resource allocation, also called resource loading, is concerned with assigning the required number of those resources identified in the previous step to each activity identified in the plan.  More than one type of resource may be attributed to a specific activity
  • 10. RESOURCE LEVELLING Resource leveling is the process that ensures resource demand does not exceed resource availability. The ideal scenario would be a build up of resource usage at the beginning of the project and a reduction at the end of the project. However, the approach to resource leveling will also depend on whether resources are dedicated to a particular project or shared across several projects and whether there is a need to keep all resources fully utilized.
  • 11.
  • 12. TIME-LIMITED RESOURCE CONSIDERATION In this case emphasis will be placed on completing the project within a specified time. This time will usually have been determined by network analysis. Adjustments in the timing of any activity,and the resources required at a given time,must be undertaken within the float available.
  • 13. RESOURCE-LIMITED RESOURCE CONSIDERATION In this case the project must be completed with the resources available even if this means extending the project duration. If the total resource demand exceeds the resource availability at any time then some of the activities must be delayed until there is sufficient resource availability. For level resources EST,LST and SLACK will be used.