Construction Cost
Control
What is Cost
Management ?
 Cost management is a process involved in the
planning , estimation, budgeting and controlling cost
so that budget can be completed in estimated budget.
It is also considered a form of management
accounting that helps to identify future expenditures
in a business to reduce budget overages.
Why do we
ManageCost?
• Chart out team-based and task-based costs
• Monitor all costs and ensure that they remain aligned
with the forecasted budget
• Set hourly and task-based rates as necessary, in order
to stay on budget
• Keep track of actual productivity to accurately
estimate billable hours
Basic
Principles of
Cost
Managment
 Cash flow analysis determines the estimated annual costs and
benefits for a project and the resulting annual cash flow Too
many projects with high cash flow needs in the same year may
not be able to be supported which will impact profitability
 Tangible costs or benefits are those costs or benefits that an
organization can easily measure in rupees
 A task that was allocated 150,000 but actually costs
100,000 would have a tangible benefit of $50,000 if the
assets allocated are used for other projects
 Intangible costs or benefits are costs or benefits that are
difficult to measure in monetary terms
 Costs – resources used to research related areas of a
project but not billed to the project
 Benefits – goodwill, prestige, general statements of
improved productivity not easily translated in rupees
 Direct costs are costs that can be directly related to
production and services of the project
 Salaries, cost of hardware and software purchased
specifically for the project
 Indirect costs are costs that are not directly related to the
products or services of the project, but are indirectly related
to performing the project
 Cost of electricity, paper towels
 Sunk cost is money that has been spent in the past; when
deciding what projects to invest in or continue, you should
not include sunk costs
 To continue funding a failed project because a great
deal of money has already been spent on it is not a
valid way to decide on which projects to fund
 Sunk costs should be forgotten
 Learning curve theory states that when many items are produced
(or tasks are performed) repetitively, the unit cost of those items
decreases in a regular pattern as more units are produced (or more
tasks performed)
 Reserves are money included in a cost estimate to mitigate cost risk
by allowing for future situations that are difficult to predict
 Contingency reserves allow for future situations that may be
partially planned for (sometimes called known unknowns)
and are included in the project cost baseline
 Recruiting and training costs for expected personnel
turnover during a project
 Management reserves allow for future situations that are
unpredictable (sometimes called unknown unknowns)
 Extended absence of a manager; supplier goes out of
business
ProcessesTo
ControlCost COST ESTIMATING
COST BUDGETING
COST CONTROL
Aroughorderofmagnitude(ROM)estimateprovidesan
estimateofwhataprojectwillcost.
Alsoreferredtoasaballparkestimate,aguesstimate,a
swag,orabroadgauge.
Doneveryearlyinaproject,oftenthreeormoreyearsprior
toprojectcompletion,orevenbeforeaprojectisofficially
startedtohelpPMsmakeprojectselectiondecisions.
A cost estimate is the approximation of the cost of a
program, project, or operation. The cost estimate is the
product of the cost estimating process. The cost
estimate has a single total value and may have identifiable
component values.
What is Cost
Estimation ?
Types of
Estimation
Expert Judgement
This is probably the most
common way people get an
estimate. Talk to the men
and women with the best
hands-on experience and
understanding of the
project requirements. Just
make sure that everyone
has the same
understanding of what
needs to be delivered. And
try to find experts who will
actually be working on the
project.
Comparative or
analogous estimation
If your current project is
similar to past ones, take the
data from previous work and
extrapolate it to provide your
estimates for the new job.
Before proceeding, make
sure to check whether those
projects were successful!
Top-down
Using a high-level work
breakdown structure and data
from previous projects, you
can add estimates for each
project work item to determine
the overall effort and cost.
The top-down method lacks
detailed analysis, which
makes it best suited for a
quick first-pass at a
prospective project to assess
its viability.
Bottom-up
This method uses a detailed
work breakdown structure, and is
best for projects you’re
committed to. Each task is
estimated individually, and then
those estimates are rolled up to
give the higher-level numbers.
This process makes you think
about what’s required in order to
take a step back to see if the big
picture still makes sense. You’ll
receive more accurate results
than the top-down method, but
it’s also a greater investment of
time.
Thisisamorescientificmethodthatessentiallyauto-calculatesestimates
usingdetaileddatafrompreviousactivities.Let’ssayyouhavedatafrom
yourlastthreeofficenetworkinstallationprojects.Youcanusethistogeta
days-per-workstationvalueorsomethingsimilar.Youthenpluginthe
numberofworkstationsforyournewinstallationandoutpopthe
estimates.
Thiscanbeaquickmethodbutneedsrobustdatatofeedit.Andbecause
it’sallaboutthemath,it’shardtoadjustfortheenvironmental,politicaland
culturaldifferencesbetweenprojects.
Parametric model estimating
Costbudgetingisatooltoestimatethecostsornecessaryefforts
forprojects,workpackagesoractivitiesinprojectmanagement.Cost
budgetingincludestheestimationofcosts,settingafixedbudget,and
managingandcontrollingtheactualcosts(comparedtotheestimated
ones).Thecoststhenhavetobeallocatedtotheactivitiesorwork
packagesinaproject.Acarefullyimplementedscheduleandresource
planenablesamoreprecisecostbudgeting.
Cost
Budgeting
Functional Budgets
 It relates to any function of
the firm such as sales,
production, cash, etc.
Following budgets are
prepared in functional
budgets:
 Sales Budget
 Production Budget
 Material Budget
 Manufacturing Budget
 Administrative Cost Budget
 Plant Utilization Budget
 Capital Expenditure Budget
 Research and Development
Cost Budget
Master Budget or Summarized
Budget or Finalized Profit plan
 This budget is very useful for
the top management of the
company because it covers all
the information in a
summarized manner.
Types of
Budget
Cash Flow Budget
 A cash flow budget
examines the inflows and
outflows of cash in a
business on a day-to-day
basis. It predicts a
company's ability to take
in more money than it
pays out.
 Cash flow budgets also
suggest production
cycles and inventory
levels so that a
company's resources are
available for activity, not
sitting idle on warehouse
shelves.
Static Budget
 A static budget contains
elements where
expenditures remain
unchanged with variations
to sales levels. Overhead
costs represent one type
of static budget, but these
budgets aren't confined to
traditional overhead
expenses.
 This condition occurs
routinely in public and
nonprofit sectors, where
organizations or
departments are funded
largely by grants.
Cost
Controlling
 Cost control is the practice of identifying and reducing
business expenses to increase profits, and it starts with the
budgeting process. A business owner compares actual
results to the budget expectations, and if actual costs are
higher than planned, management takes action.
 Project cost control includes:
 Monitoring cost performance
 Ensuring that only appropriate project changes are
included in a revised cost baseline
 Informing project stakeholders of authorized changes
to the project that will affect costs
 Performance review meetings can be a powerful tool to help
control project costs
 Knowing you have to report on your progress is an
incentive for people to perform better
 Budgetary control, Standard costing, Inventory control,
Ratio analysis, Variance analysis
 Performance measurement is another important tool for cost
control
 There are many general accounting approaches for
measuring cost performance but earned value
management is a tool unique to project management
Earned
Value
Managment
 EVM is a project performance measurement technique
that integrates scope, time, and cost data
 Given a baseline (original plan plus approved
changes), you can determine how well the project is
meeting its goals
 You must enter actual information periodically to use
EVM
 Was a WBS item completed or approximately
how much of the work was completed
 Actual start and end dates
 Actual cost
Planned value (PV), formerly called the budgeted cost
of work scheduled (BCWS), also called the budget, is
that portion of the approved total cost estimate planned
to be spent on an activity during a given period
Actual cost (AC), formerly called actual cost of work
performed (ACWP), is the total of direct and indirect
costs incurred in accomplishing work on an activity
during a given period
Earned value (EV), formerly called the budgeted cost
of work performed (BCWP), is an estimate of the value
of the physical work actually completed
EV is based on the original planned costs for the
project or activity and the rate at which the team
is completing work on the project or activity to
date
Ways of Cost
Management
(Budgetary Control)
 Budgetary control is a system of controlling costs
which includes the preparation of budgets,
coordinating the departments and establishing
responsibilities, comparing actual performance
with the budgeted and acting upon results to
achieve maximum profitability.
 Process Of Budgetary Control
1. The objects are set by preparing budgets.
2. The business is divided into various responsibility centres for
preparing various budgets.
3. The actual figures are recorded.
4. The budgeted and actual figures are compared for studying the
performance of different cost centres.
5. If actual performance is less than the budgeted norms, a remedial
action is taken immediately.
Objectives
 To ensure planning for future by setting up various
budgets, the requirements and expected
performance of the enterprise are anticipated.
 To operate various cost centres and departments
with efficiency and economy.
 Elimination of wastes and increase in profitability.
 To anticipate capital expenditure for future.
 To centralise the control system.
 Correction of deviations from the established
standards.
 Fixation of responsibility of various individuals in
the organization.
Standard
Costing
 Standard Costing discloses the cost of deviations
from standards and clarifies these as to their
causes, so that management is immediately
informed of the sphere of operations in which
remedial action is necessary.
 Process Of Standard Costing :
 Ascertainment and use of Standard Costs;
 Recording the actual costs;
 Comparison of actual costs with standard costs in order to
find out the variance
 Analysis of variance
 After analysing the variance, appropriate action may be
taken where necessary.
Objectives
 After analysing the variance, appropriate action may be
taken where necessary.
 It helps to ascertain performance evaluation.
 It supplies the ways to utilise properly material, labour
and also overhead which will be economic in character.
 It also helps to motivate the employees of a firm to
improve their performance by setting up a ‘standard’.
 It also helps the management to supply necessary data
relating to cost element to submit quotations or to fix up
the selling price of a firm.
 It also helps the management to make proper valuations
of inventory (viz.,Work-in- progress, and finished
products).
 It acts as a control device to the management.
 It also helps the management to take various corrective
decisions viz., fixation of price, make-or-buy decisions
etc. which will be more beneficial to the firm.
Ratio
Analysis
 Ratio analysis is the process of determining and
interpreting numerical relationships based on
financial statements. A ratio is a statistical yardstick
that provides a measure of the relationship
between two variables or figures.
 Process of Ratio Analysis
 An analyst should decide the objectives of ratio analysis.
 Select th0 appropriate ratios on the basis of objectives of ratio
analysis.
 Calculation of the selected such ratios.
 Comparison of the calculated ratios with the ratios of the same
business concern in the past.
 Comparison of the calculated ratios with the same type of ratios of
other similar business concern.
 Comparison of the calculated ratios with the same type of ratios of
the industry to which the business concern belongs.
 Interpretation of the ratios.
Using
Software To
Assist in
Cosst
Managment
 Spreadsheets are a common tool for resource planning,
cost estimating, cost budgeting, and cost control
 Many companies use more sophisticated and centralized
financial applications software for cost information
 Project management software has many cost-related
features, especially enterprise PM software
 Several companies have developed methods to link data
between their project management software and their
main accounting systems
Advantages
of Cost
Coontrolling
 It helps the firm to improve its profitability and
competitiveness.
 It helps the firm in reducing its costs and thus
reduce its prices.
 It is indispensable for achieving greater
productivity.
 If the price of the product is stable and reasonable,
it can maintain higher sales and thusemployment
of work force
Disadvantages
Of Cost
Controlling
 Reduces the flexibility and process improvement in
a company.
 Restriction on innovation.
 Requirement of skillful personnel to set standards.
Features of
Cost
Controlling
 Cost reduction is not
concerned with setting
targets and standards. Cost
reduction is the finalresult in
the cost control process.
 Cost reduction aims at
improving the standards.
 It is continuous, dynamic and
innovative in nature, looking
always for measures and
alternativeto reduce costs.
 It is a corrective function.
 This is applicable to every
activity of the business.
 It adds thinking and analysis
to action at all levels of
management.
 Techniques of cost reduction
 Organization and methods
 Work study
 Material handling
 Automation
 Value analysis
RoleOf an
Architectin
CostControl
 The Architect to provide the Owner with a preliminary
estimate of construction costs at the end of the Schematic
Design Phase
 The Architect to provide the Owner with adjustments to its
preliminary estimate of construction costs at the end of the
Design Development and Construction Document Phases,
respectively.
 The Owner shall cooperate with the Architect in making
some adjustments.” The problems presented by this phrase
include the following:
 There are no boundaries for the “adjustments” necessary to
bring the Architect’s estimate of cost into line with the
Owner’s budget. That is to say, this is a totally open-ended
obligation;
 The amount of redesign work necessary to adjust the
Architect’s estimate is similarly open-ended notwithstanding
the potential mismatch of the Owner’s evolving program
with the Owner’s budgetary constraints; and
 The Architect is bound to provide redesign services for free
notwithstanding the fact that the estimate of the costs of
work may have increased due to factors that are totally
unrelated to the Architect’s services.
Role ofCivil
Engineer
 Planning starts even before the starting of project.This
phase is very important. Successfully completion of a project
and success of a project manager mostly depend on this
phase. In this phase a CPM selects the source of materials,
source of necessary equipment, justify the sub-contractors,
choose the project team, prepare project's budget, calculate
project's risk, etc.
 Risk management is the most difficult part of project
management. Civil engineer calculates the project risks
before starting the project though, there are many critical
risks can arise during project's life cycle.To mitigate these
risks without hampering the project's progress is another key
responsibility of a construction project manager.
 Suppose building materials price now is lower in the market
than the time of preparing budget.That doesn't mean you
can waste materials as you wish. So, cost management is the
procedure of choosing best quality materials with lowest
possible price and using them with minimum possible
wastage.
THANKYOU

More Related Content

What's hot

construction project planing
 construction project planing construction project planing
construction project planing
SANJEEV Wazir
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
Aditi Garg
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
NAVNEET KUMAR JHA
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
Guhan M
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
johnkirth1898
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
Xubitech
 
Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
efinancemanagement.com
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
Waleed Liaqat
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
A Makwana
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
akashpadole
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
Saravana murthy
 
Construction project management
Construction project managementConstruction project management
Construction project management
Senthil Kannan
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
Shahin MB
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
Simarpreet Singh
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
Manish Kandpal
 
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...Ahmad Samy M.Sc.
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
FahadHasan36
 

What's hot (20)

construction project planing
 construction project planing construction project planing
construction project planing
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 

Similar to Construction Cost Control

Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Kateri Manglicmot
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
sheryl90
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
sheryl90
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
mohamed elashri
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Hayat Denzi
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf
zohir khellouf
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
 
Project_cost_managment definition and tools
Project_cost_managment definition and toolsProject_cost_managment definition and tools
Project_cost_managment definition and tools
MaryMa75
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
Essam Lotffy, PMP®, CCP®
 
Hospital Management System Perfomance Assesment
Hospital Management System Perfomance AssesmentHospital Management System Perfomance Assesment
Hospital Management System Perfomance Assesment
Neelam Priya
 
Project Budget.pptx.ppt
Project Budget.pptx.pptProject Budget.pptx.ppt
Project Budget.pptx.ppt
DejeneTsegaye6
 
Budget and cost estimates - PMP/CAPM from PMI
Budget and cost estimates - PMP/CAPM from PMIBudget and cost estimates - PMP/CAPM from PMI
Budget and cost estimates - PMP/CAPM from PMI
Mudassir Iqbal
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
Imran Jamil
 
Budgeting and cost estimation
Budgeting and cost estimationBudgeting and cost estimation
Budgeting and cost estimation
Libra chudry
 
Presentation on Quality Management
Presentation on Quality ManagementPresentation on Quality Management
Presentation on Quality Management
Md. Masudur Rahman, PMP
 
Activity based costing
Activity based costingActivity based costing
Activity based costingPraveen Ojha
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
ssuser9d62d6
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
Waseem Siddique
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptx
Dr. ABEER KHALID MANSOUR
 

Similar to Construction Cost Control (20)

Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
Management accountIng
Management accountIngManagement accountIng
Management accountIng
 
Project_cost_managment definition and tools
Project_cost_managment definition and toolsProject_cost_managment definition and tools
Project_cost_managment definition and tools
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 
Hospital Management System Perfomance Assesment
Hospital Management System Perfomance AssesmentHospital Management System Perfomance Assesment
Hospital Management System Perfomance Assesment
 
Project Budget.pptx.ppt
Project Budget.pptx.pptProject Budget.pptx.ppt
Project Budget.pptx.ppt
 
Budget and cost estimates - PMP/CAPM from PMI
Budget and cost estimates - PMP/CAPM from PMIBudget and cost estimates - PMP/CAPM from PMI
Budget and cost estimates - PMP/CAPM from PMI
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Budgeting and cost estimation
Budgeting and cost estimationBudgeting and cost estimation
Budgeting and cost estimation
 
Presentation on Quality Management
Presentation on Quality ManagementPresentation on Quality Management
Presentation on Quality Management
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptx
 

More from Sunayana Miglani

Auroville: City Planning
Auroville: City PlanningAuroville: City Planning
Auroville: City Planning
Sunayana Miglani
 
Patrick Geddes
Patrick GeddesPatrick Geddes
Patrick Geddes
Sunayana Miglani
 
Aerated Autoclave Concrete
Aerated Autoclave ConcreteAerated Autoclave Concrete
Aerated Autoclave Concrete
Sunayana Miglani
 
CPWD Guidelines: Barrier Free Environment
CPWD Guidelines: Barrier Free EnvironmentCPWD Guidelines: Barrier Free Environment
CPWD Guidelines: Barrier Free Environment
Sunayana Miglani
 
Literature Study of Hotels
Literature Study of HotelsLiterature Study of Hotels
Literature Study of Hotels
Sunayana Miglani
 
Elements and Principles of Design
Elements and Principles of DesignElements and Principles of Design
Elements and Principles of Design
Sunayana Miglani
 
Northern Europe - Vernacular Architecture
Northern Europe - Vernacular ArchitectureNorthern Europe - Vernacular Architecture
Northern Europe - Vernacular Architecture
Sunayana Miglani
 
National Building Code : Building Services
National Building Code : Building ServicesNational Building Code : Building Services
National Building Code : Building Services
Sunayana Miglani
 
Le meridian china
Le meridian chinaLe meridian china
Le meridian china
Sunayana Miglani
 
Steel railing : Market Survey
Steel railing : Market Survey Steel railing : Market Survey
Steel railing : Market Survey
Sunayana Miglani
 
Baroque architecture
Baroque architectureBaroque architecture
Baroque architecture
Sunayana Miglani
 
Rain water harvesting
Rain water harvesting  Rain water harvesting
Rain water harvesting
Sunayana Miglani
 
Furniture during Greek period
Furniture during Greek periodFurniture during Greek period
Furniture during Greek period
Sunayana Miglani
 
Petrol Pump : Standards and Case Study
Petrol Pump : Standards and Case StudyPetrol Pump : Standards and Case Study
Petrol Pump : Standards and Case Study
Sunayana Miglani
 
Flooring Types and Techniques
Flooring Types and TechniquesFlooring Types and Techniques
Flooring Types and Techniques
Sunayana Miglani
 
Liyuan middle school
Liyuan middle schoolLiyuan middle school
Liyuan middle school
Sunayana Miglani
 
Cold and dry climate
Cold and dry climate Cold and dry climate
Cold and dry climate
Sunayana Miglani
 
The eyes have it english
The eyes have it  englishThe eyes have it  english
The eyes have it english
Sunayana Miglani
 

More from Sunayana Miglani (18)

Auroville: City Planning
Auroville: City PlanningAuroville: City Planning
Auroville: City Planning
 
Patrick Geddes
Patrick GeddesPatrick Geddes
Patrick Geddes
 
Aerated Autoclave Concrete
Aerated Autoclave ConcreteAerated Autoclave Concrete
Aerated Autoclave Concrete
 
CPWD Guidelines: Barrier Free Environment
CPWD Guidelines: Barrier Free EnvironmentCPWD Guidelines: Barrier Free Environment
CPWD Guidelines: Barrier Free Environment
 
Literature Study of Hotels
Literature Study of HotelsLiterature Study of Hotels
Literature Study of Hotels
 
Elements and Principles of Design
Elements and Principles of DesignElements and Principles of Design
Elements and Principles of Design
 
Northern Europe - Vernacular Architecture
Northern Europe - Vernacular ArchitectureNorthern Europe - Vernacular Architecture
Northern Europe - Vernacular Architecture
 
National Building Code : Building Services
National Building Code : Building ServicesNational Building Code : Building Services
National Building Code : Building Services
 
Le meridian china
Le meridian chinaLe meridian china
Le meridian china
 
Steel railing : Market Survey
Steel railing : Market Survey Steel railing : Market Survey
Steel railing : Market Survey
 
Baroque architecture
Baroque architectureBaroque architecture
Baroque architecture
 
Rain water harvesting
Rain water harvesting  Rain water harvesting
Rain water harvesting
 
Furniture during Greek period
Furniture during Greek periodFurniture during Greek period
Furniture during Greek period
 
Petrol Pump : Standards and Case Study
Petrol Pump : Standards and Case StudyPetrol Pump : Standards and Case Study
Petrol Pump : Standards and Case Study
 
Flooring Types and Techniques
Flooring Types and TechniquesFlooring Types and Techniques
Flooring Types and Techniques
 
Liyuan middle school
Liyuan middle schoolLiyuan middle school
Liyuan middle school
 
Cold and dry climate
Cold and dry climate Cold and dry climate
Cold and dry climate
 
The eyes have it english
The eyes have it  englishThe eyes have it  english
The eyes have it english
 

Recently uploaded

Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
AbhimanyuSinha9
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
yhkoc
 
Investigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_CrimesInvestigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_Crimes
StarCompliance.io
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
ewymefz
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
ewymefz
 
Jpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization SampleJpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization Sample
James Polillo
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
ewymefz
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
TravisMalana
 
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
vcaxypu
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
Oppotus
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
ewymefz
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Subhajit Sahu
 
一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单
ocavb
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
nscud
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Linda486226
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
haila53
 
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
axoqas
 
Business update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMIBusiness update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMI
AlejandraGmez176757
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
ArpitMalhotra16
 

Recently uploaded (20)

Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
 
Investigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_CrimesInvestigate & Recover / StarCompliance.io / Crypto_Crimes
Investigate & Recover / StarCompliance.io / Crypto_Crimes
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
 
Jpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization SampleJpolillo Amazon PPC - Bid Optimization Sample
Jpolillo Amazon PPC - Bid Optimization Sample
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
 
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
 
一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
 
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
 
Business update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMIBusiness update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMI
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
 

Construction Cost Control

  • 2. What is Cost Management ?  Cost management is a process involved in the planning , estimation, budgeting and controlling cost so that budget can be completed in estimated budget. It is also considered a form of management accounting that helps to identify future expenditures in a business to reduce budget overages.
  • 3. Why do we ManageCost? • Chart out team-based and task-based costs • Monitor all costs and ensure that they remain aligned with the forecasted budget • Set hourly and task-based rates as necessary, in order to stay on budget • Keep track of actual productivity to accurately estimate billable hours
  • 4. Basic Principles of Cost Managment  Cash flow analysis determines the estimated annual costs and benefits for a project and the resulting annual cash flow Too many projects with high cash flow needs in the same year may not be able to be supported which will impact profitability  Tangible costs or benefits are those costs or benefits that an organization can easily measure in rupees  A task that was allocated 150,000 but actually costs 100,000 would have a tangible benefit of $50,000 if the assets allocated are used for other projects  Intangible costs or benefits are costs or benefits that are difficult to measure in monetary terms  Costs – resources used to research related areas of a project but not billed to the project  Benefits – goodwill, prestige, general statements of improved productivity not easily translated in rupees
  • 5.  Direct costs are costs that can be directly related to production and services of the project  Salaries, cost of hardware and software purchased specifically for the project  Indirect costs are costs that are not directly related to the products or services of the project, but are indirectly related to performing the project  Cost of electricity, paper towels  Sunk cost is money that has been spent in the past; when deciding what projects to invest in or continue, you should not include sunk costs  To continue funding a failed project because a great deal of money has already been spent on it is not a valid way to decide on which projects to fund  Sunk costs should be forgotten
  • 6.  Learning curve theory states that when many items are produced (or tasks are performed) repetitively, the unit cost of those items decreases in a regular pattern as more units are produced (or more tasks performed)  Reserves are money included in a cost estimate to mitigate cost risk by allowing for future situations that are difficult to predict  Contingency reserves allow for future situations that may be partially planned for (sometimes called known unknowns) and are included in the project cost baseline  Recruiting and training costs for expected personnel turnover during a project  Management reserves allow for future situations that are unpredictable (sometimes called unknown unknowns)  Extended absence of a manager; supplier goes out of business
  • 8. Aroughorderofmagnitude(ROM)estimateprovidesan estimateofwhataprojectwillcost. Alsoreferredtoasaballparkestimate,aguesstimate,a swag,orabroadgauge. Doneveryearlyinaproject,oftenthreeormoreyearsprior toprojectcompletion,orevenbeforeaprojectisofficially startedtohelpPMsmakeprojectselectiondecisions. A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. What is Cost Estimation ?
  • 9. Types of Estimation Expert Judgement This is probably the most common way people get an estimate. Talk to the men and women with the best hands-on experience and understanding of the project requirements. Just make sure that everyone has the same understanding of what needs to be delivered. And try to find experts who will actually be working on the project. Comparative or analogous estimation If your current project is similar to past ones, take the data from previous work and extrapolate it to provide your estimates for the new job. Before proceeding, make sure to check whether those projects were successful!
  • 10. Top-down Using a high-level work breakdown structure and data from previous projects, you can add estimates for each project work item to determine the overall effort and cost. The top-down method lacks detailed analysis, which makes it best suited for a quick first-pass at a prospective project to assess its viability. Bottom-up This method uses a detailed work breakdown structure, and is best for projects you’re committed to. Each task is estimated individually, and then those estimates are rolled up to give the higher-level numbers. This process makes you think about what’s required in order to take a step back to see if the big picture still makes sense. You’ll receive more accurate results than the top-down method, but it’s also a greater investment of time.
  • 12.
  • 14. Functional Budgets  It relates to any function of the firm such as sales, production, cash, etc. Following budgets are prepared in functional budgets:  Sales Budget  Production Budget  Material Budget  Manufacturing Budget  Administrative Cost Budget  Plant Utilization Budget  Capital Expenditure Budget  Research and Development Cost Budget Master Budget or Summarized Budget or Finalized Profit plan  This budget is very useful for the top management of the company because it covers all the information in a summarized manner. Types of Budget
  • 15. Cash Flow Budget  A cash flow budget examines the inflows and outflows of cash in a business on a day-to-day basis. It predicts a company's ability to take in more money than it pays out.  Cash flow budgets also suggest production cycles and inventory levels so that a company's resources are available for activity, not sitting idle on warehouse shelves. Static Budget  A static budget contains elements where expenditures remain unchanged with variations to sales levels. Overhead costs represent one type of static budget, but these budgets aren't confined to traditional overhead expenses.  This condition occurs routinely in public and nonprofit sectors, where organizations or departments are funded largely by grants.
  • 16. Cost Controlling  Cost control is the practice of identifying and reducing business expenses to increase profits, and it starts with the budgeting process. A business owner compares actual results to the budget expectations, and if actual costs are higher than planned, management takes action.  Project cost control includes:  Monitoring cost performance  Ensuring that only appropriate project changes are included in a revised cost baseline  Informing project stakeholders of authorized changes to the project that will affect costs
  • 17.  Performance review meetings can be a powerful tool to help control project costs  Knowing you have to report on your progress is an incentive for people to perform better  Budgetary control, Standard costing, Inventory control, Ratio analysis, Variance analysis  Performance measurement is another important tool for cost control  There are many general accounting approaches for measuring cost performance but earned value management is a tool unique to project management
  • 18. Earned Value Managment  EVM is a project performance measurement technique that integrates scope, time, and cost data  Given a baseline (original plan plus approved changes), you can determine how well the project is meeting its goals  You must enter actual information periodically to use EVM  Was a WBS item completed or approximately how much of the work was completed  Actual start and end dates  Actual cost
  • 19. Planned value (PV), formerly called the budgeted cost of work scheduled (BCWS), also called the budget, is that portion of the approved total cost estimate planned to be spent on an activity during a given period Actual cost (AC), formerly called actual cost of work performed (ACWP), is the total of direct and indirect costs incurred in accomplishing work on an activity during a given period Earned value (EV), formerly called the budgeted cost of work performed (BCWP), is an estimate of the value of the physical work actually completed EV is based on the original planned costs for the project or activity and the rate at which the team is completing work on the project or activity to date
  • 20. Ways of Cost Management (Budgetary Control)  Budgetary control is a system of controlling costs which includes the preparation of budgets, coordinating the departments and establishing responsibilities, comparing actual performance with the budgeted and acting upon results to achieve maximum profitability.  Process Of Budgetary Control 1. The objects are set by preparing budgets. 2. The business is divided into various responsibility centres for preparing various budgets. 3. The actual figures are recorded. 4. The budgeted and actual figures are compared for studying the performance of different cost centres. 5. If actual performance is less than the budgeted norms, a remedial action is taken immediately.
  • 21. Objectives  To ensure planning for future by setting up various budgets, the requirements and expected performance of the enterprise are anticipated.  To operate various cost centres and departments with efficiency and economy.  Elimination of wastes and increase in profitability.  To anticipate capital expenditure for future.  To centralise the control system.  Correction of deviations from the established standards.  Fixation of responsibility of various individuals in the organization.
  • 22. Standard Costing  Standard Costing discloses the cost of deviations from standards and clarifies these as to their causes, so that management is immediately informed of the sphere of operations in which remedial action is necessary.  Process Of Standard Costing :  Ascertainment and use of Standard Costs;  Recording the actual costs;  Comparison of actual costs with standard costs in order to find out the variance  Analysis of variance  After analysing the variance, appropriate action may be taken where necessary.
  • 23. Objectives  After analysing the variance, appropriate action may be taken where necessary.  It helps to ascertain performance evaluation.  It supplies the ways to utilise properly material, labour and also overhead which will be economic in character.  It also helps to motivate the employees of a firm to improve their performance by setting up a ‘standard’.  It also helps the management to supply necessary data relating to cost element to submit quotations or to fix up the selling price of a firm.  It also helps the management to make proper valuations of inventory (viz.,Work-in- progress, and finished products).  It acts as a control device to the management.  It also helps the management to take various corrective decisions viz., fixation of price, make-or-buy decisions etc. which will be more beneficial to the firm.
  • 24. Ratio Analysis  Ratio analysis is the process of determining and interpreting numerical relationships based on financial statements. A ratio is a statistical yardstick that provides a measure of the relationship between two variables or figures.  Process of Ratio Analysis  An analyst should decide the objectives of ratio analysis.  Select th0 appropriate ratios on the basis of objectives of ratio analysis.  Calculation of the selected such ratios.  Comparison of the calculated ratios with the ratios of the same business concern in the past.  Comparison of the calculated ratios with the same type of ratios of other similar business concern.  Comparison of the calculated ratios with the same type of ratios of the industry to which the business concern belongs.  Interpretation of the ratios.
  • 25. Using Software To Assist in Cosst Managment  Spreadsheets are a common tool for resource planning, cost estimating, cost budgeting, and cost control  Many companies use more sophisticated and centralized financial applications software for cost information  Project management software has many cost-related features, especially enterprise PM software  Several companies have developed methods to link data between their project management software and their main accounting systems
  • 26. Advantages of Cost Coontrolling  It helps the firm to improve its profitability and competitiveness.  It helps the firm in reducing its costs and thus reduce its prices.  It is indispensable for achieving greater productivity.  If the price of the product is stable and reasonable, it can maintain higher sales and thusemployment of work force
  • 27. Disadvantages Of Cost Controlling  Reduces the flexibility and process improvement in a company.  Restriction on innovation.  Requirement of skillful personnel to set standards.
  • 28. Features of Cost Controlling  Cost reduction is not concerned with setting targets and standards. Cost reduction is the finalresult in the cost control process.  Cost reduction aims at improving the standards.  It is continuous, dynamic and innovative in nature, looking always for measures and alternativeto reduce costs.  It is a corrective function.  This is applicable to every activity of the business.  It adds thinking and analysis to action at all levels of management.  Techniques of cost reduction  Organization and methods  Work study  Material handling  Automation  Value analysis
  • 29. RoleOf an Architectin CostControl  The Architect to provide the Owner with a preliminary estimate of construction costs at the end of the Schematic Design Phase  The Architect to provide the Owner with adjustments to its preliminary estimate of construction costs at the end of the Design Development and Construction Document Phases, respectively.  The Owner shall cooperate with the Architect in making some adjustments.” The problems presented by this phrase include the following:  There are no boundaries for the “adjustments” necessary to bring the Architect’s estimate of cost into line with the Owner’s budget. That is to say, this is a totally open-ended obligation;  The amount of redesign work necessary to adjust the Architect’s estimate is similarly open-ended notwithstanding the potential mismatch of the Owner’s evolving program with the Owner’s budgetary constraints; and  The Architect is bound to provide redesign services for free notwithstanding the fact that the estimate of the costs of work may have increased due to factors that are totally unrelated to the Architect’s services.
  • 30. Role ofCivil Engineer  Planning starts even before the starting of project.This phase is very important. Successfully completion of a project and success of a project manager mostly depend on this phase. In this phase a CPM selects the source of materials, source of necessary equipment, justify the sub-contractors, choose the project team, prepare project's budget, calculate project's risk, etc.  Risk management is the most difficult part of project management. Civil engineer calculates the project risks before starting the project though, there are many critical risks can arise during project's life cycle.To mitigate these risks without hampering the project's progress is another key responsibility of a construction project manager.  Suppose building materials price now is lower in the market than the time of preparing budget.That doesn't mean you can waste materials as you wish. So, cost management is the procedure of choosing best quality materials with lowest possible price and using them with minimum possible wastage.