Project Quality Management
Project Quality Management includes the
processes and activities of the performing
organization that determines quality
policies, objectives, and responsibilities so
that the project will satisfy the needs for
which it was undertaken

3
Overview of the PQM
4
Plan Quality Management
5

Process of identifying quality requirements
and standards for the project and its
deliverables and documenting how the
project will demonstrate compliance with
quality requirements.
Plan Quality Management

INPUTS
1.Project management
plan
.2 Stakeholder register
.3 Risk register
.4 Requirements

documentation
.5 Enterprise
environmental
factors
.6 Organizational
process

TOOLS & TECHNIQUES
.1 Cost-benefit analysis

OUTPUTS

.2 Cost of quality

1 Quality management
plan

.3 Seven basic quality
tools

.2 Process improvement

.4 Benchmarking

plan

.5 Design of experiments

.3 Quality metrics

.6 Statistical sampling

.4 Quality checklists

.7 Additional quality

.5 Project documents

planning tools

updates

.8 Meetings
7

Plan Quality
Management: Inputs
8

 Project Management Plan
Scope baseline
Schedule baseline
Cost baseline
Other management plans






Stakeholder Register
Risk Register
Requirements Documentation
Enterprise Environmental Factors
Organizational Process Assets
9

Plan Quality Management:
Tools and Techniques
Cost-Benefit Analysis
10

A cost-benefit analysis for each quality
activity compares the cost of the quality step
to the expected benefit.
Cost of Quality (COQ)
11

Cost of
Conformance
Prevention Costs
(Build a quality
product)
• Training
• Document processes
• Equipment

Cost of nonConformance
Internal Failure Costs
(Failures found by the
project)
• Rework
• Scrap

• Time to do it right

Appraisal Costs

External Failure Costs

(Assess the quality)

(Failures found by the
customer)

• Testing

• Liabilities

• Destructive testing
loss

• Warranty work
• Lost business
Seven Basic Quality Tools
 Cause-and-effect
diagrams
 Flowcharts
 Checksheets
 Pareto diagrams
 Histograms
 Control charts
 Scatter diagrams
12
Cause-and-effect diagrams
13
Flow Charts
14
Checksheets
15
Pareto Diagrams
16
Histograms
17
Control Charts
18
Scatter Diagrams
19
Plan Quality Management: Tools and
Techniques
20






Benchmarking
Design of Experiments
Statistical Sampling
Additional Quality Planning Tools





Brainstorming
Force field analysis
Nominal group technique
Quality management and control tools

 Meetings
21

Plan Quality Management:
Outputs
Quality Management Plan : Outputs
22

 Quality Management Plan
 The quality management plan is a component of the project
management plan that describes how the organization’s quality
policies will be implemented.

 Process Improvement Plan





Process boundaries.
Process configuration.
Process metrics..
Targets for improved performance.
 Quality Management Plan :
Outputs
Quality Metrics
 A quality metric specifically describes a project or
product attribute and how the control quality
process will measure it.

Quality Checklists
 A checklist is a structured tool, usually componentspecific, used to verify that a set of required steps has
been performed

Project Documents Updates
 Stakeholder register
 Responsibility assignment matrix
 WBS and WBS Dictionary.
Perform Quality
Assurance
Perform Quality Assurance
Quality Assurance (QA) is concerned with establishing,
evaluating , improving and maintaining the quality of the
processes. Once processes are consistent, QA "assure" that the
same level of quality will be incorporated into each product
produced by that process by use of different tools and
techniques.
OUTPUTS
INPUTS
1. Quality management
plan
2 Process improvement
plan

TOOLS & Techniques

.1 Change requests

1. Quality
management &

.2 Project management
plan

control tools

updates

3 Quality metrics

.2 Quality audits

.3 Project documents
updates

4 Quality control
measurements

.3 Process analysis

.4 Organizational process
assets

5 Project documents

updates
1. Quality Management and Control Tools

1. Affinity Diagrams
2. Process decision program charts
(PDPC)
3. Interrelationship digraphs
4. Tree diagrams
5. Prioritization matrices
6. Activity network diagrams
7. Matrix diagrams
I. Steps to Create Affinity Diagrams
It is an orderly extension of a structured brainstorming session to generate
ideas
STEP 1
Write each idea
on a separate
index card

STEP 2
Randomly place
each index card on
flat surface. Wall
board or flipchart

STEP 3

In silence, team
members move the
cards into
meaningful groups
until the group
stops moving the
cards.

STEP 4

As a team,
discuss and then
label each
category with a
title

STEP 5

As a team, discuss
Each category,
Using cause-and
Effect diagrams, if
needed.
II. Steps to Create PDPC
systematically identifies what might go wrong in a plan under development.
By using PDPC, you can either revise the plan to avoid the problems or be
ready with the best response when a problem occurs.

1

• Develop a tree diagram of the proposed plan

2

• For each task on the third level, brainstorm what could go wrong

3

• Review all the potential problems and eliminate any that are insignificant

4

• For each potential problem, brainstorm possible countermeasures

5

• Decide how practical each countermeasure is. Use criteria such as cost,
time required, ease of implementation and effectiveness. Mark impractical
countermeasures with an X and practical ones with an O.
III. How to Construct an Interrelationship Digraph
Show cause-and-effect relationships, and help analyze the natural links
between different aspects of a complex situation

2. Brainstorm
Ideas

1. Create a
Problem
Statement

3. Determine
Relationships
Between
Ideas

4. Analyze
the Diagram
IV. Tree diagrams and Prioritization Matrices
It is used to figure out all the various tasks that must be undertaken to achieve a
given objective
Prioritization Matrix
1
Unavailability of
Construction
Material

Scarcity of raw
materials

Shortage of funds
Delay of Bridge
Construction

Unfavorable
weather
conditions
Equipment
Damage

Equipment
Problems

Unavailabity of
equipment

2

3

4
1. Quality Management & Control Tools
VI. Activity network diagrams –used with
project scheduling methodologies
 Activity on arrow
 Activity on node
 Can be used for review technique
(PERT), critical path method (CPM) &
precedence diagramming method
(PDM).

VII. Matrix diagrams –used to perform data
analysis within the organizational structure
 show the strength of relationships between
factors, causes, and objectives that exist
between the rows and columns of matrix
Perform Quality Assurance: Tools &
Techniques
2.

Quality Audits




3.

Structured, independent process to determine if project
activities comply with organizational and project policies,
processes, and procedures.
can confirm the implementation of approved change requests
including updates, corrective actions, defect repairs, and
preventive actions.

Process Analysis



follows the steps outlined in the process improvement plan to
identify needed improvements.
examines problems experienced, constraints experienced, and
non-value-added activities identified during process operation.
Perform Quality Assurance: Outputs
 Change Requests
 used as input into the Perform Integrated Change Control process
 used to take
 corrective action,
 preventive action,
 to perform defect repair

 Project Management Plan Updates





Quality management plan
Scope management plan
Schedule management plan
Cost management plan

 Project Documents Updates
 Quality audit reports,
 Training plans
 Process documentation.

 Organizational Process Assets Updates
Perform Quality
Control
Control Quality
Control Quality is the process of monitoring and recording results
of executing the quality activities to assess performance and
recommend necessary changes
Perform Quality Control :Inputs

Project
management
plan

• The project management plan
contains the quality management
plan, which is used to control
quality

Quality Metrics

• A quality metric describes a project
or product attribute and how it will
be measured.

Quality Checklist

• Quality checklists are structured lists
that help to verify that the work of
the project and its deliverables fulfill
a set of requirements.
Perform Quality Control :Inputs

Work performance
data

• Work performance data is Planned vs.
actual technical performance, actual
schedule performance, and actual cost
performance.

Approved Change
Requests

• As part of the Perform Integrated
Change Control process, a change log
update indicates that some changes are
approved and some are not.

Deliverables

•A deliverable is any unique and verifiable
product, result, or capability that results in
a validated deliverable required by the
project.
Perform Quality Control :Inputs

Project
Documents

Organizational
Process Assets

• Project documents may include
Agreements, Quality audit reports and
change logs , Training plans and
assessments and Process
documentation .

• The organizational process assets
includes the organization’s quality
standards and policies, guidelines,
reporting procedures and
communication policies.
Perform Quality Control: T&T

Seven Basic Quality Tools
The seven basic quality tools are illustrated earlier.

Statistical Sampling
Samples are selected and tested as defined in
the quality management plan.

Inspection
An inspection is the examination of a work
product to determine if it conforms to
documented standards.

Approved Change Requests Review
All approved change requests should be reviewed
to verify that they were implemented as approved.
Perform Quality Control :Outputs
Quality Control Measurements
Quality control measurements are the documented results of
control quality activities.

Verified Deliverables
A goal of the Control Quality process is to determine the
correctness of deliverables.

Work Performance Information
Work performance information is the performance data
collected

Validated Changes
Any changed or repaired items are inspected and will be either
accepted or rejected before notification of the decision is
provided.
Perform Quality Control :Outputs

Change Requests
If the recommended corrective or preventive actions or a
defect repair requires a change to the project management
plan, a change request should be initiated.

Project Management Plan Updates
Elements of the project management plan that may be
updated include Quality management plan , and Process
improvement plan

Project Documents Updates
Project documents is being updated

Organizational Process Assets Updates
Elements of the organizational process assets that may be
updated include Completed checklists and Lessons learned
documentation
References
 http://asq.org/learn-about-quality/new-managementplanning-tools/overview/process-decision-programchart.html
 http://www.health.state.mn.us/divs/opi/qi/toolbox/interrelatio
nshipdigraph.html
 http://asq.org/learn-about-quality/new-managementplanning-tools/overview/tree-diagram.html

More Related Content

What's hot (20)

The Principles of Quality Management
The Principles of Quality ManagementThe Principles of Quality Management
The Principles of Quality Management
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course
 
Quality awareness
Quality awarenessQuality awareness
Quality awareness
 
SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Training
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
 
Quality management
Quality managementQuality management
Quality management
 
Iatf 16949 training
Iatf 16949 trainingIatf 16949 training
Iatf 16949 training
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Onboarding Project Quality Induction
Onboarding Project Quality InductionOnboarding Project Quality Induction
Onboarding Project Quality Induction
 
Presentation Quality Management
Presentation Quality ManagementPresentation Quality Management
Presentation Quality Management
 
APQP
APQP APQP
APQP
 
APQP Training presentation
APQP Training  presentationAPQP Training  presentation
APQP Training presentation
 
Qms kick off meeting ppt
Qms kick off meeting pptQms kick off meeting ppt
Qms kick off meeting ppt
 
Quality Awareness Session.pptx
Quality Awareness Session.pptxQuality Awareness Session.pptx
Quality Awareness Session.pptx
 
Quality Management System - ISO 9001-2015
Quality Management System - ISO 9001-2015Quality Management System - ISO 9001-2015
Quality Management System - ISO 9001-2015
 
Quality Management Systems
Quality Management SystemsQuality Management Systems
Quality Management Systems
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Apqp
Apqp Apqp
Apqp
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & Control
 
Basic quality concepts(3)
Basic quality concepts(3)Basic quality concepts(3)
Basic quality concepts(3)
 

Viewers also liked

Quality manual-template-guidance-example
Quality manual-template-guidance-exampleQuality manual-template-guidance-example
Quality manual-template-guidance-examplejchibichabo
 
Quality management
Quality managementQuality management
Quality managementvishal patel
 
Quality manual for small and medium companies
Quality manual for small and medium companiesQuality manual for small and medium companies
Quality manual for small and medium companiesbillwillis66
 
What Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So ImportantWhat Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So Importantquality_management
 
Software quality management plan
Software quality management planSoftware quality management plan
Software quality management planselinasimpson1501
 
Department Objectives
Department ObjectivesDepartment Objectives
Department Objectivesjoe3242
 
ISO 15189:2007 Quality Manual
ISO 15189:2007 Quality ManualISO 15189:2007 Quality Manual
ISO 15189:2007 Quality ManualBilal Al-kadri
 
Presentation on Establishing Quality Objectives
Presentation on Establishing Quality ObjectivesPresentation on Establishing Quality Objectives
Presentation on Establishing Quality ObjectivesErum Farooqi
 
Quality Assurance in Hospitals
Quality Assurance in HospitalsQuality Assurance in Hospitals
Quality Assurance in HospitalsNc Das
 

Viewers also liked (13)

Quality manual-template-guidance-example
Quality manual-template-guidance-exampleQuality manual-template-guidance-example
Quality manual-template-guidance-example
 
Quality management
Quality managementQuality management
Quality management
 
Quality manual for small and medium companies
Quality manual for small and medium companiesQuality manual for small and medium companies
Quality manual for small and medium companies
 
Quality Manual
Quality ManualQuality Manual
Quality Manual
 
What Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So ImportantWhat Makes a Quality Management Plan So Important
What Makes a Quality Management Plan So Important
 
Quality principles and concepts
Quality principles and conceptsQuality principles and concepts
Quality principles and concepts
 
Software quality management plan
Software quality management planSoftware quality management plan
Software quality management plan
 
Department Objectives
Department ObjectivesDepartment Objectives
Department Objectives
 
WP3 Quality Management Plan
WP3 Quality Management PlanWP3 Quality Management Plan
WP3 Quality Management Plan
 
5 Steps to your Quality Manual
5 Steps to your Quality Manual5 Steps to your Quality Manual
5 Steps to your Quality Manual
 
ISO 15189:2007 Quality Manual
ISO 15189:2007 Quality ManualISO 15189:2007 Quality Manual
ISO 15189:2007 Quality Manual
 
Presentation on Establishing Quality Objectives
Presentation on Establishing Quality ObjectivesPresentation on Establishing Quality Objectives
Presentation on Establishing Quality Objectives
 
Quality Assurance in Hospitals
Quality Assurance in HospitalsQuality Assurance in Hospitals
Quality Assurance in Hospitals
 

Similar to Quality management slides

Quality assurance
Quality assuranceQuality assurance
Quality assuranceSahil Shah
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
8.1 Plan Quality Management
8.1 Plan Quality Management8.1 Plan Quality Management
8.1 Plan Quality ManagementDavidMcLachlan1
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Agus Suhanto
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagementDhamo daran
 
Quality in project management
Quality in project management Quality in project management
Quality in project management Zeeshan Azhar
 
Topic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdfTopic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdfHuyNguyen657394
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management OverviewDavidMcLachlan1
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docxRAJU852744
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Managementmzedan
 
projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxHamzaKhawar4
 
Project quality management
Project quality managementProject quality management
Project quality managementsyeda zoya mehdi
 

Similar to Quality management slides (20)

Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
8.2 Manage Quality
8.2 Manage Quality8.2 Manage Quality
8.2 Manage Quality
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
8.1 Plan Quality Management
8.1 Plan Quality Management8.1 Plan Quality Management
8.1 Plan Quality Management
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6
 
8.3 Control Quality
8.3 Control Quality8.3 Control Quality
8.3 Control Quality
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Quality in project management
Quality in project management Quality in project management
Quality in project management
 
Quality management mod
Quality management modQuality management mod
Quality management mod
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Topic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdfTopic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdf
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management Overview
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptx
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project managment 7
Project managment  7Project managment  7
Project managment 7
 

Recently uploaded

THE BEST IPTV in GERMANY for 2024: IPTVreel
THE BEST IPTV in  GERMANY for 2024: IPTVreelTHE BEST IPTV in  GERMANY for 2024: IPTVreel
THE BEST IPTV in GERMANY for 2024: IPTVreelreely ones
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastUXDXConf
 
Buy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdfBuy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdfEasyPrinterHelp
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...CzechDreamin
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FIDO Alliance
 
Connecting the Dots in Product Design at KAYAK
Connecting the Dots in Product Design at KAYAKConnecting the Dots in Product Design at KAYAK
Connecting the Dots in Product Design at KAYAKUXDXConf
 
The UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, OcadoThe UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, OcadoUXDXConf
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty SecureFemke de Vroome
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxJennifer Lim
 
Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyJohn Staveley
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераMark Opanasiuk
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfFIDO Alliance
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekCzechDreamin
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...FIDO Alliance
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxDavid Michel
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2DianaGray10
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutesconfluent
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsStefano
 

Recently uploaded (20)

THE BEST IPTV in GERMANY for 2024: IPTVreel
THE BEST IPTV in  GERMANY for 2024: IPTVreelTHE BEST IPTV in  GERMANY for 2024: IPTVreel
THE BEST IPTV in GERMANY for 2024: IPTVreel
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
Buy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdfBuy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdf
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
 
Connecting the Dots in Product Design at KAYAK
Connecting the Dots in Product Design at KAYAKConnecting the Dots in Product Design at KAYAK
Connecting the Dots in Product Design at KAYAK
 
The UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, OcadoThe UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, Ocado
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John Staveley
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. Startups
 

Quality management slides

  • 2. Group Members  Saba Afaq  Plan Quality Management  Saba Mehboob  Perform Quality Assurance  Reeha Noor  Perform Quality Control
  • 3. Project Quality Management Project Quality Management includes the processes and activities of the performing organization that determines quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken 3
  • 5. Plan Quality Management 5 Process of identifying quality requirements and standards for the project and its deliverables and documenting how the project will demonstrate compliance with quality requirements.
  • 6. Plan Quality Management INPUTS 1.Project management plan .2 Stakeholder register .3 Risk register .4 Requirements documentation .5 Enterprise environmental factors .6 Organizational process TOOLS & TECHNIQUES .1 Cost-benefit analysis OUTPUTS .2 Cost of quality 1 Quality management plan .3 Seven basic quality tools .2 Process improvement .4 Benchmarking plan .5 Design of experiments .3 Quality metrics .6 Statistical sampling .4 Quality checklists .7 Additional quality .5 Project documents planning tools updates .8 Meetings
  • 8. 8  Project Management Plan Scope baseline Schedule baseline Cost baseline Other management plans      Stakeholder Register Risk Register Requirements Documentation Enterprise Environmental Factors Organizational Process Assets
  • 10. Cost-Benefit Analysis 10 A cost-benefit analysis for each quality activity compares the cost of the quality step to the expected benefit.
  • 11. Cost of Quality (COQ) 11 Cost of Conformance Prevention Costs (Build a quality product) • Training • Document processes • Equipment Cost of nonConformance Internal Failure Costs (Failures found by the project) • Rework • Scrap • Time to do it right Appraisal Costs External Failure Costs (Assess the quality) (Failures found by the customer) • Testing • Liabilities • Destructive testing loss • Warranty work • Lost business
  • 12. Seven Basic Quality Tools  Cause-and-effect diagrams  Flowcharts  Checksheets  Pareto diagrams  Histograms  Control charts  Scatter diagrams 12
  • 20. Plan Quality Management: Tools and Techniques 20     Benchmarking Design of Experiments Statistical Sampling Additional Quality Planning Tools     Brainstorming Force field analysis Nominal group technique Quality management and control tools  Meetings
  • 22. Quality Management Plan : Outputs 22  Quality Management Plan  The quality management plan is a component of the project management plan that describes how the organization’s quality policies will be implemented.  Process Improvement Plan     Process boundaries. Process configuration. Process metrics.. Targets for improved performance.
  • 23.  Quality Management Plan : Outputs Quality Metrics  A quality metric specifically describes a project or product attribute and how the control quality process will measure it. Quality Checklists  A checklist is a structured tool, usually componentspecific, used to verify that a set of required steps has been performed Project Documents Updates  Stakeholder register  Responsibility assignment matrix  WBS and WBS Dictionary.
  • 25. Perform Quality Assurance Quality Assurance (QA) is concerned with establishing, evaluating , improving and maintaining the quality of the processes. Once processes are consistent, QA "assure" that the same level of quality will be incorporated into each product produced by that process by use of different tools and techniques. OUTPUTS INPUTS 1. Quality management plan 2 Process improvement plan TOOLS & Techniques .1 Change requests 1. Quality management & .2 Project management plan control tools updates 3 Quality metrics .2 Quality audits .3 Project documents updates 4 Quality control measurements .3 Process analysis .4 Organizational process assets 5 Project documents updates
  • 26. 1. Quality Management and Control Tools 1. Affinity Diagrams 2. Process decision program charts (PDPC) 3. Interrelationship digraphs 4. Tree diagrams 5. Prioritization matrices 6. Activity network diagrams 7. Matrix diagrams
  • 27. I. Steps to Create Affinity Diagrams It is an orderly extension of a structured brainstorming session to generate ideas STEP 1 Write each idea on a separate index card STEP 2 Randomly place each index card on flat surface. Wall board or flipchart STEP 3 In silence, team members move the cards into meaningful groups until the group stops moving the cards. STEP 4 As a team, discuss and then label each category with a title STEP 5 As a team, discuss Each category, Using cause-and Effect diagrams, if needed.
  • 28. II. Steps to Create PDPC systematically identifies what might go wrong in a plan under development. By using PDPC, you can either revise the plan to avoid the problems or be ready with the best response when a problem occurs. 1 • Develop a tree diagram of the proposed plan 2 • For each task on the third level, brainstorm what could go wrong 3 • Review all the potential problems and eliminate any that are insignificant 4 • For each potential problem, brainstorm possible countermeasures 5 • Decide how practical each countermeasure is. Use criteria such as cost, time required, ease of implementation and effectiveness. Mark impractical countermeasures with an X and practical ones with an O.
  • 29. III. How to Construct an Interrelationship Digraph Show cause-and-effect relationships, and help analyze the natural links between different aspects of a complex situation 2. Brainstorm Ideas 1. Create a Problem Statement 3. Determine Relationships Between Ideas 4. Analyze the Diagram
  • 30. IV. Tree diagrams and Prioritization Matrices It is used to figure out all the various tasks that must be undertaken to achieve a given objective Prioritization Matrix 1 Unavailability of Construction Material Scarcity of raw materials Shortage of funds Delay of Bridge Construction Unfavorable weather conditions Equipment Damage Equipment Problems Unavailabity of equipment 2 3 4
  • 31. 1. Quality Management & Control Tools VI. Activity network diagrams –used with project scheduling methodologies  Activity on arrow  Activity on node  Can be used for review technique (PERT), critical path method (CPM) & precedence diagramming method (PDM). VII. Matrix diagrams –used to perform data analysis within the organizational structure  show the strength of relationships between factors, causes, and objectives that exist between the rows and columns of matrix
  • 32. Perform Quality Assurance: Tools & Techniques 2. Quality Audits   3. Structured, independent process to determine if project activities comply with organizational and project policies, processes, and procedures. can confirm the implementation of approved change requests including updates, corrective actions, defect repairs, and preventive actions. Process Analysis   follows the steps outlined in the process improvement plan to identify needed improvements. examines problems experienced, constraints experienced, and non-value-added activities identified during process operation.
  • 33. Perform Quality Assurance: Outputs  Change Requests  used as input into the Perform Integrated Change Control process  used to take  corrective action,  preventive action,  to perform defect repair  Project Management Plan Updates     Quality management plan Scope management plan Schedule management plan Cost management plan  Project Documents Updates  Quality audit reports,  Training plans  Process documentation.  Organizational Process Assets Updates
  • 35. Control Quality Control Quality is the process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes
  • 36. Perform Quality Control :Inputs Project management plan • The project management plan contains the quality management plan, which is used to control quality Quality Metrics • A quality metric describes a project or product attribute and how it will be measured. Quality Checklist • Quality checklists are structured lists that help to verify that the work of the project and its deliverables fulfill a set of requirements.
  • 37. Perform Quality Control :Inputs Work performance data • Work performance data is Planned vs. actual technical performance, actual schedule performance, and actual cost performance. Approved Change Requests • As part of the Perform Integrated Change Control process, a change log update indicates that some changes are approved and some are not. Deliverables •A deliverable is any unique and verifiable product, result, or capability that results in a validated deliverable required by the project.
  • 38. Perform Quality Control :Inputs Project Documents Organizational Process Assets • Project documents may include Agreements, Quality audit reports and change logs , Training plans and assessments and Process documentation . • The organizational process assets includes the organization’s quality standards and policies, guidelines, reporting procedures and communication policies.
  • 39. Perform Quality Control: T&T Seven Basic Quality Tools The seven basic quality tools are illustrated earlier. Statistical Sampling Samples are selected and tested as defined in the quality management plan. Inspection An inspection is the examination of a work product to determine if it conforms to documented standards. Approved Change Requests Review All approved change requests should be reviewed to verify that they were implemented as approved.
  • 40. Perform Quality Control :Outputs Quality Control Measurements Quality control measurements are the documented results of control quality activities. Verified Deliverables A goal of the Control Quality process is to determine the correctness of deliverables. Work Performance Information Work performance information is the performance data collected Validated Changes Any changed or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided.
  • 41. Perform Quality Control :Outputs Change Requests If the recommended corrective or preventive actions or a defect repair requires a change to the project management plan, a change request should be initiated. Project Management Plan Updates Elements of the project management plan that may be updated include Quality management plan , and Process improvement plan Project Documents Updates Project documents is being updated Organizational Process Assets Updates Elements of the organizational process assets that may be updated include Completed checklists and Lessons learned documentation

Editor's Notes

  1. Quality management plan provides the scope and schedule for performing audit and inspection activities. Process Improvement Plan provides information about which processes needs to be improves and how they should be improved.Quality Metrics provide the baseline for measuring the processes that needs to be control, Here they will be helpful in audit and process analysis.QC Measurements are used to evaluate o/p against specified requirements. They can also be used to compare the process for creating the measurements and validating actual measurements to determine the level of accuracy.Project Documents for configuration management
  2. A Tree Diagram is a chart that begins with one central item and then branches into more and keeps branching until the line of inquiry begun with the central item is exhausted.
  3. When to Use PDPCBefore implementing a plan, especially when the plan is large and complex.When the plan must be completed on schedule.When the price of failure is high.
  4. It is a chart that begins with one central item and then branches into more and keeps branching until the line of inquiry begun with the central item is exhaustedWhen to Use a Tree Diagram When an issue is known or being addressed in broad generalities and you must move to specific details, such as when developing logical steps to achieve an objective. When developing actions to carry out a solution or other plan. When analyzing processes in detail. When probing for the root cause of a problem. When evaluating implementation issues for several potential solutions. After an affinity diagram or relations diagram has uncovered key issues. As a communication tool, to explain details to others.