1. 122 Part 1 - Guide
Figure 4-15. Close Project or Phase: Data Flow Diagram
• Project
charter
5.5
Validate
Scope
12.1
Plan
Procurement
Management
4.1
Develop
Project Charter
Project
Management
Plan
Project
Documents
Project
Documents
6. it
te
d
un
de
r
U.
S.
or
a
pp
li
ca
bl
e
co
py
ri
gh
t
la
w.
EBSCO Publishing : eBook Collection (EBSCOhost) - printed
on 3/13/2020 4:15 PM via YORKVILLE UNIV
AN: 1595320 ; Project Management Institute.; A Guide to the
Project Management Body of Knowledge (PMBOK® Guide)–
Sixth Edition
Account: s7439054
Directions: Each writing should be a multi-paragraph response,
but the quality of your answer is more important than the length
of your answer.
7. Discuss Robert Frost’s use of images such as walls that both
connect and separate (870), spire-like birches that allow him
both to ascend and to descend (876), and paths that lead him
both toward and away from where he ought to be in life (877).
A. Discuss why Mrs. Mallard really dies in Kate Chopin’s “The
Story of an Hour” (174).
· Discuss the characterization of Bartleby in Herman Melville’s
“Bartleby, The Scrivener” (406) and why Bartleby repeatedly
says, “I prefer not to.”
122 Part 1 - Guide
Figure 4-15. Close Project or Phase: Data Flow Diagram
• Project
charter
5.5
Validate
Scope
12.1
Plan
Procurement
Management
4.1
Develop
13. EBSCO Publishing : eBook Collection (EBSCOhost) - printed
on 3/13/2020 4:15 PM via YORKVILLE UNIV
AN: 1595320 ; Project Management Institute.; A Guide to the
Project Management Body of Knowledge (PMBOK® Guide)–
Sixth Edition
Account: s7439054
Quality Management Plan
Project Management Improvement Project
Example
Prepared By: Name1 - Project Manager
Position:
Project manager
Date:
January 27, 2006
Version No:
v1.0
Document Change Control
The following is the document control for revisions to this
document.
Version Number
Date of Issue
Author(s)
Brief Description of Change
0.9
11/15/05
Name1 - Project Manager
Phase 1 - Preliminary draft for Phase 1
14. 1.0
1/27/06
Name1 - Project Manager
Phase 1 & 2 – conform to new framework template, update for
Phase 2 deliverables
Definition
The following are definitions of terms, abbreviations and
acronyms used in this document.
Term
Definition
PMA
Project Management Advisor Web tool
Table Of Contents
11. Quality Management Approach
22. Quality Management Objectives
15. 33. Project Quality Control
64. Project Quality Assurance
75. Quality Team Roles & Responsibilities
96. Quality Tools
107. Quality Control and Assurance Problem Reporting Plan
118. Appendix
11Gap Resolution Targets
1. Quality Management Approach
The purpose for managing quality is to validate that the project
deliverables are completed with an acceptable level of quality.
Quality management assures the quality of the project
deliverables and the quality of the processes used to manage
and create the deliverables.
The quality management plan identifies these key components:
Objects of quality review
Quality Measure
Quality Evaluation Methods
Project Deliverables
Deliverable Quality Standards
Completeness and Correctness Criteria
Quality Control Activities
Project Processes
Process Quality Standards
Stakeholder Expectations
Quality Assurance Activities
The following is a brief explanation of each of the components
of the quality management plan.
Project Deliverables and Processes
The key project deliverables and processes subject to quality
review.
16. Deliverable
Quality Standards
and
Completeness and Correctness Criteria
The quality standards that are the “measures” used to determine
a successful outcome for a deliverable.
The completeness and correctness criteria describe when each
deliverable is complete and correct as defined by the customer.
Deliverables are evaluated against these criteria before they are
formally approved.
Process
Quality Standards
and
Stakeholder Expectations
The quality standards that are the “measures” used to determine
if project work processes are being followed.
Stakeholder expectations describe when a project process is
effective as defined by the project stakeholders. An example is
the expectation to be regularly informed monthly of project
status.
Quality Control Activities
The quality control activities that monitor and verify that the
project deliverables meet defined quality standards.
Quality Assurance Activities
The quality assurance activities that monitor and verify that the
17. processes used to manage and create the deliverables are
followed and are effective.
2. Quality Management Objectives
The following are the quality objectives of the project that
reflect the overall intentions to be applied with regard to quality
throughout the project.
· Deliverables support improved project management
proficiency at DoIT
· Deliverables meet the requirements of DoIT leaders and
project managers
· Deliverables align with industry best practices for project
management and Web delivery
· Deliverables are easy to use
· Project practices conform to recommended project
management standards 3. Project Quality Control
The focus of quality control is on the deliverables of the
project. Quality control monitors project deliverables to verify
that the deliverables are of acceptable quality and are complete
and correct.
The following table identifies:
· The major deliverables of the project that will be tested for
satisfactory quality level.
· The quality standards and the correctness and completeness
criteria established for the project deliverable. Included are any
organizational standards that need to be followed.
· The quality control activities that will be executed to monitor
the quality of the deliverables.
· How often or when the quality control activity will be
18. performed.
Project Deliverable
Deliverable Quality Standards/
Completeness and Correctness Criteria
Quality Control Activity
Frequency/Interval
Framework
QC1. Conforms to expert commentary regarding clarity and
conciseness (95%)
Information mapping
Technical editor review
Core Team review
Review Team review
Weekly by topic
Weekly by topic .
Weekly by topic
Monthly
Framework
QC2. Aligned with industry best practices (90%)
Project Management Institute alignment per Project
Management Book of Knowledge, 3rd edition
Core Team review
Review Team review
Once during overall framework design
Weekly by topic
Monthly
Framework
QC3. Aligned with UW best practices (90%)
19. UW Office of Quality Improvement alignment per Symposium
2006 training and documentation
Review Team review
Once during overall framework design
Monthly
Framework
QC4. Apply prioritized changes per Review Team review
(95%)
Document, prioritize, publish change requests
Apply change requests per Project Management – Review Team
Commentary by Action (1/6/06) and update change control
documentation
Monthly
Weekly
Project Management Advisor (PMA)
QC5. Meets ease of use criteria (90%)
Establish & document evaluation criteria
Preliminary prototype feedback per criteria
Review Team review per criteria
Usability test per criteria
Once during initial prototype design
Weekly during prototype design
Monthly .
Once prior to each phase/interim version release conclusions
Project Management Advisor (PMA)
QC6. Meets UW Web accessibility standards per
http://www.wisc.edu/policy/wwwap.php
See: http://helpdesk.doit.wisc.edu/page.php?id=1157
(Phase 1 – 90%) (Phase 2 – 100%)
DoIT accessibility standards committee review
Once prior to each phase/interim version release
20. Project Management Advisor (PMA)
QC7. Supports cross-browser access per Help Desk
documentation http://helpdesk.doit.wisc.edu/page.php?id=3207
(Phase 1 – 90%) (Phase 2 – 100%)
Cross-browser test by Help Desk
Once prior to each phase/interim version release
Project Management Advisor (PMA)
QC8. Accurate incorporation of framework into PMA (100%)
Apply version control to all PMA changes (100%)
Routine framework developer audit of PMA
Weekly during each change cycle
Project Management Advisor (PMA)
QC9. Completeness and correctness of Web linking (100%)
Routine framework developer audit
Final go-live test
Monthly testing .
Once prior to each phase/interim version release
Project Management Workshop
QC10. Structured per good training standards (95%)
Delivery consultation by training provider
Biweekly during workshop design
Project Management Workshop
QC11. Accurate communication of framework (95%)
Core Team review
Biweekly during workshop development
Project Management Training Plan
QC12. Addresses all DoIT project management skill levels
(95%)
Group manager survey
Group manager review
Core Team review .
21. Sponsor review
Once during plan design
Once prior to plan publication
Monthly during plan development
Monthly during plan development
Resolve project management gaps per Appendix A
QA13. Gaps resolved per Appendix A (100%)
Assessment and reporting of satisfactory gap resolution
Once per project phase completion4. Project Quality Assurance
The focus of quality assurance is on the processes used in the
project. Quality assurance ensures that project processes are
used effectively to produce quality project deliverables.
The following table identifies:
· The project processes subject to quality assurance.
· The quality standards and stakeholder expectations for that
process.
· The quality assurance activity – such as a quality audit or
reviews - that will be executed to monitor that project processes
are properly followed.
· How often or when the quality assurance activity will be
performed.
Project Process
Process Quality Standards/
Stakeholder Expectations
Quality Assurance Activity
Frequency/Interval
QA1. Develop/refine project charter
QA2. Develop/refine project plan
QA3. Execute and control project per project plan
QA4. Approve each project stage
22. QA5. Close project with post project review
100% compliance with framework
100% compliance with framework
95% compliance with framework
100% compliance with framework
100% compliance with framework
Audit charter updates by phase
Audit plan content and updates, project priorities, and task
estimation
Audit the following project activities:
· Quality
· Communications
· Project progress
Audit stage checkpoints
Audit project reviews by phase
Once per project phase
Once per project phase
Weekly
Monthly
Monthly
Once per project phase/stage
Once per project phase
5. Quality Team Roles & Responsibilities
The following identifies the quality-related responsibilities of
the project team and lists specific quality responsibilities.
Project Team Role
Assigned Resource
Quality Control and Quality Assurance Responsibilities
23. Executive Sponsor .
Project Sponsor
Name3 - Executive Sponsor .
Name2 - Project Sponsor
QA4: Approve each project stage per framework checkpoints
QA1, QA2, QA3, QA5: Assess practice of project management
framework activities
QC13: Assess satisfactory resolution of project management
gaps
Project Manager
Name1 - Project Manager
QA3: Assure practice of quality control measures and
communications in project plan
QC1, QC2, QC5: Assure framework and PMA reviews by Core
Team, Review Team, usability testers, Web accessibility testers,
cross-browser testers
QC1, QC2, QC5: Communicate prioritized changes per Review
Team review
QC3, QC4: Assure deliverables meet broad set of UW and
DoIT project manager requirements
QC12: Assure training plan addresses all DoIT project
management skill levels
QC13: Assure project management gap resolution
Lead Framework Developer
Phase 1 – Name4
Phase 2 – Name5
QC6: Confirm PMA meets Web accessibility standards
24. QC7: Confirm PMA provides cross-browser access
QC8, QC9: Test PMA for accurate delivery of framework and
completeness of linking
Core Team Member
Name1 - Project Manager, Name4, Name6, Name5
QC4: Prioritize changes per Review Team review
QC11: Assure workshop accurately delivers framework
Technical Editor
Name7
QC1: Edit framework to assure it is clear and concise
Web Accessibility Committee
DoIT committee
QC6: Test PMA for Web accessibility
Cross-Browser Testers
DoIT Help Desk
QC7: Test PMA for cross-browser support
Training Consultant
Name8
QC10: Assure workshop structured per good training standards
6. Quality Tools
The following lists the tools to be used to support quality
management implementation and the purpose or use of the tool.
Tool Name
Tool Purpose/Use
Project Management Advisor
Document the project management framework stages and
activities to be applied to this project
Project Management Framework Templates
Document the project management deliverables to be produced
by this project
My Webspace Phased Deliverables Directories
Directory structure used for version control of framework and
25. PMA
My Webspace Phased Review Team Feedback Directories
Directory structure used for comments and change requirements
from the Review Team and the Usability testers
Web Accessibility Testing Tool: Bobby
Used to test PMA compliance with Web accessibility standards.
DoIT Help Desk Browser Testing Standards
Used to test PMA compliance with Web browser support
standards.7. Quality Control and Assurance Problem Reporting
Plan
Quality was managed rigorously but informally during Phase 1.
Beginning with the initiation of Phase 2, this project will
manage quality according to this quality management plan. The
project manager will monitor quality and report exceptions to
the executive sponsor and the project sponsor as part of monthly
status reporting, or more frequently if conditions warrant.
The following logs will be used to itemize, document and track
to closure items reported through quality management activities.
Quality Control Log
Exception ID Number
Review Date
Deliverable Reviewed
Findings
Resolution
Resolution Date
QC-Exc-1
QC-Exc-2
26. Quality Assurance Log
Exception ID Number
Review Date
Process Reviewed
Findings
Resolution
Resolution Date
QA-Exc-1
QA-Exc-2
27. 8. Appendix
Gap Resolution Targets
DoIT conducted a study in 2005 to assess gaps in DoIT’s
project management practices. Appendix A summarizes gap
findings and identifies the targeted Project Management
Improvement project phase for resolving each gap. See
Appendix B for the gap assessment report.
Table 1 lists each gap and identifies (1) the means to progress
toward resolution of the gap via the project management
framework and (2) a targeted phase for resolution. Tables 2 and
3 summarize the gaps targeted for resolution in Phases 1 and 2,
respectively. Table4 summarize the gaps targeted for resolution
in Phases 3 and beyond. Target dates for completion of project
phases are specified in the project plan.
In general, the framework alone will not resolve gaps. Rather,
organizational implementation of the framework is necessary,
including implementation of appropriate tools and training as
well as adjustment of thinking and culture to align with the
framework. This is reflected in the targeted phase for
resolution, which often is later than the expected completion of
the indicated framework components.
For each phase of the project management improvement project,
the project manager will plan, execute, and control progress
toward resolution of gaps as specified below. The project
sponsor and project manager will assess and report satisfactory
resolution of these gaps as part of the acceptance checkpoint at
the end of each project phase.
Table 1 – Gap Resolution Plan by Category
This table itemizes all gaps identified in the 2005 study and
maps the resolution plan the project management framework and
a project phase for framework implementation.
Gap Category
Gap
28. Project Management Framework Stage
Project Management Framework Activity
Project Management Improvement Phase
Cross-Unit Leadership
1. Inadequate assessment of interdependences between projects
in terms of resource allocation and customer impact
1 - Conceptualize
Strategic Alignment
3+
2. Inadequate controls on project definition, launch, and impact
on other projects
1 - Conceptualize
Strategic Alignment
3+
3. Inadequate controls on project priority setting
1 - Conceptualize
Strategic Alignment
3+
4. Inadequate controls for major project commitments,
timelines, and interdependences
1 - Conceptualize
Strategic Alignment
3+
Unit Leadership
1. Inadequate setting of project’s rationale and strategic goals
1 - Conceptualize
Strategic Alignment
2-3
2. Inadequate explicit communications of project’s rational and
strategic goals
1 - Conceptualize 2 - Initiate
Communication Management
29. 2-3
3. Inadequate controls identifying and verifying customer need
1 - Conceptualize 2 - Initiate
Scope Management
Requirements Management
2-3
4. Inadequate controls identifying and verifying sponsor support
1 - Conceptualize 2 - Initiate
Role Management
2
5. Inadequate working relationship with customers during
project phases
All
Role Management
Communication Management
2
Project Management Culture
1. Inadequate control for unit leaders to determine which
projects need or do not need formal project management
1 - Conceptualize
Role Management
2
Project Management Culture (cont.)
2. Inadequate control for determining skill levels needed for
project manager
1 - Conceptualize 2 - Initiate
Role Management
2
3. Project Managers do not necessarily have formal project
management training
30. All
All
2
4. Lack of processes for project initiation, go/no-go, move from
project to production
All
Checkpoints
1-2
5. Need for project management process
All
All
1
6. Need for decision and process strategies
All
All
1
7. Inadequate pricing strategy for customers
2 - Initiate 3 - Plan
Budget Management
2
8. Need for a “Project Management Apprentice Program”
All
All
2
9. Distribution of templates designed as helpful approaches
All
All
2
10. Need for customers to participate in functional requirements
31. workshops
2 - Initiate
Scope Management
Requirements Management
Role Management
2
Table 2 – Targeted Gap Resolution for Phase 1
This table summarizes the gaps targeted for resolution at the
conclusion of Phase 1.
Gap Category
Gap
Framework Stage
Framework Activity
Improvement Phase
Project Management Culture
5. Need for project management process
All
All
1
6. Need for decision and process strategies
All
All
1
4. Lack of processes for project initiation, go/no-go, move from
project to production
All
Checkpoints
1-2
Table 3 – Targeted Gap Resolution for Phase 2
This table summarizes the gaps targeted for resolution at the
32. conclusion of Phase 2.
Gap Category
Gap
Framework Stage
Framework Activity
Improvement Phase
Unit Leadership
1. Inadequate setting of project’s rationale and strategic goals
1 - Conceptualize
Strategic Alignment
2-3
2. Inadequate explicit communications of project’s rational and
strategic goals
1 - Conceptualize 2 - Initiate
Communication Management
2-3
3. Inadequate controls identifying and verifying customer need
1 - Conceptualize 2 - Initiate
Scope Management
Requirements Management
2-3
4. Inadequate controls identifying and verifying sponsor support
1 - Conceptualize 2 - Initiate
Role Management
2
5. Inadequate working relationship with customers during
project phases
All
Role Management
33. Communication Management
2
Project Management Culture
1. Inadequate control for unit leaders to determine which
projects need or do not need formal project management
1 - Conceptualize
Role Management
2
2. Inadequate control for determining skill levels needed for
project manager
1 - Conceptualize 2 - Initiate
Role Management
2
3. Project Managers do not necessarily have formal project
management training
All
All
2
4. Lack of processes for project initiation, go/no-go, move from
project to production
All
Checkpoints
1-2
7. Inadequate pricing strategy for customers
2 - Initiate 3 - Plan
Budget Management
2
8. Need for a “Project Management Apprentice Program”
All
All
2
34. Project Management Culture (cont.)
9. Distribution of templates designed as helpful approaches
All
All
2
10. Need for customers to participate in functional requirements
workshops
2 - Initiate
Scope Management
Requirements Management
Role Management
2
Table 4 – Targeted Gap Resolution for Phase 3 and Beyond
This table summarizes the gaps targeted for resolution at the
conclusion of Phase 3 and beyond.
Gap Category
Gap
Framework Stage
Framework Activity
Improvement Phase
Cross-Unit Leadership
1. Inadequate assessment of interdependences between projects
in terms of resource allocation and customer impact
1 - Conceptualize
Strategic Alignment
3+
2. Inadequate controls on project definition, launch, and impact
on other projects
1 - Conceptualize
Strategic Alignment
3+
35. 3. Inadequate controls on project priority setting
1 - Conceptualize
Strategic Alignment
3+
4. Inadequate controls for major project commitments,
timelines, and interdependences
1 - Conceptualize
Strategic Alignment
3+
Unit Leadership
1. Inadequate setting of project’s rationale and strategic goals
1 - Conceptualize
Strategic Alignment
2-3
2. Inadequate explicit communications of project’s rational and
strategic goals
1 - Conceptualize 2 - Initiate
Communication Management
2-3
3. Inadequate controls identifying and verifying customer need
1 - Conceptualize 2 - Initiate
Scope Management
Requirements Management
2-3
Disclaimer
This example is based on a real project. However, this version
is changed to present full examples of Quality Management Plan
components as described in the DoIT Project Management
Framework. This example is not a true representation of the
36. Quality Management Plan for the Project Management
Improvement project.
Example - Project Management Improvement Project – Quality
Management Plan, v1.0.1
Page ii
Running head: PROJECT SCOPE STATEMENT 1
PROJECT SCOPE STATEMENT 6
Individual Term Project Part 2
Shannon Brain
Yorkville University
BUSI 3623 Project Planning Essentials
February 1, 2020
37. Project Scope Statement
1. The project name: Family House Construction Project
2. The project charter
This project focuses on designing, developing, and completing a
detached house for a family in Toronto, Ontario. The house
shall be constructed in full compliance with the City Planning
Regulations, as well as the recommended construction safety
standards. As part of the construction process, the road to the
building will be planned and will be wholly surfaced. Moreover,
potable water will be piped from the mains municipality water
supply. The piped water will be connected by designing a canal
to the front of the plot or site. Once complete, electric power
connection will be linked to the house from the mains supply.
3. The project owner, sponsors, and stakeholders
The project is owned by Dominic Schwab, a businessman based
in Toronto. Manning is the client whose house should be
completed. The key stakeholders of the project include:
employees, who include architect, engineer, trade contractor, as
well as material suppliers. While the project is fully owned by
the client, it is partly sponsored by the Ministry of Municipal
Affairs and Housing, partly sponsors the development of decent
housing for the low- and middle class societies.
4. Problem Statement
The housing crisis among the low- and middle-class populations
is increasingly becoming a major concern for both Federal and
Provincial Governments. In the last five years, The Canada and
US has witnessed an upsurge in shanty houses. The
mushrooming of slums across different towns and cities is
38. indicative of the increase in the number of low- and middle-
income people who cannot afford decent housing (Fields &
Hodkinson, 2018). Moreover, government regulators and
authorities are concerned with the need to prevent rental homes
from being converted to market-rate housing or demolished to
keep them affordable and available to low-income households.
Policymakers also seek to develop interventions that can
increase access to affordable housing facilities for low-income
families.
5. The project goals and objectives
Goals
a) To complete a five-bedroom house for a family within 6
months.
b) To develop a high-quality house.
Objectives
a. To assess the site and determine the housing needs for the
family
b. To examine the budget for each item and resources
c. To design the foundation and complete the building
d. To conduct quality and safety assessment of the completed
building
e. To connect water and electricity to the completed house
6. The project requirements
Requirements are the resources and activities that will be
needed to complete the project. Determining the project
requirements is a critical step in determining what the project
team can use to successfully implement the construction project
(Sokowski, 2015). The key requirements for the project will
include:
a. Labor requirements
b. Financial requirements
c. Construction equipment
d. Construction machines
e. Building materials
7. The project deliverables
Project deliverables refer to the outputs that should be
39. completed upon closure of the project. It is the task of the
project manager to determine, track, and manage project
deliverables for each task that has been assigned (Moustafaev,
2014). For this particular construction project, the list of project
deliverables includes:
a. Engineering project reports
b. Product quality checks report
c. Design documents
d. Proposals
e. Drawing
f. House assessment report
g. The completed family house
h. Power connection
i. Water connection
j. Progress Reports
8. The project non-goals (what is out of scope)
The purpose of the project will be to complete a 5-bedroom
family house. As such, there are various items that will be out
of the scope for the project. Examples of items that will be out
of scope include:
a. Fencing the construction site
b. Furnishing the house
c. Landscaping the compound
9. Milestones
Activity
From
To
1
Requirements Analysis
February 2, 2020
February 10, 2020
2
Surveying and preparing the site
February 11, 2020
February 25, 2020
40. 3
Designing the structural components
February 26, 2020
February 29, 2020
4
Constructing foundation
March 1, 2020
March 10, 2020
5
Electrical system installation
March 11, 2020
March 22, 2020
6
Roadway surfacing
March 23, 2020
March 31, 2020
7
Fitting the windows doors
April 1, 2020
April 10, 2020
8
Obtain inspection approvals
April 20, 2020
April 24, 2020
10. Cost estimates
Item
Cost (CAD)
1
Labor Costs
$150,000
2
Construction equipment and machines
50,000
3
Purchasing building materials
41. 250,000
4
Purchasing windows
5,000
5
Purchasing doors
5,000
6
Installing electric power
20,000
7
Water pipe connections
20,000
TOTAL
$500,000
References
Fields, D. J., & Hodkinson, S. N. (2018). Housing policy in
crisis: An international perspective.
Journal of Housing Policy Debate, 28 (1), 1-5.
"Ministry of Municipal Affairs and Housing."
www.ontario.ca/page/ministry-municipal-affairs-housing.
Moustafaev, J. (2014). Project scope management: A practical
guide to requirements for
engineering, product, construction, IT and enterprise projects.
New York: Auerbach
Publications.
Sokowski, D. (2015). Mastering Project Management
Integration and Scope: A Framework for
Strategizing and Defining Project Objectives and Deliverables.
New York: FT Press.
42. Sheet3Project NameFamily House ProjectProject #141Project
Manager's NameJoseph DunhillSponsor0Project Timeframe6
Months Updated2.2.2020Project StagesWBS CodeTask/
Deliverables DependenciesStatus
Author: Options are:
Open
Closed
Effort HoursNeeds/ Requirements Assessment1Site
InvestigationID #1Complete422Detailed Planning#2Not
Complete433Identifying Labor
Requirements#3Complete674Identifying Machine and
Technology Requirements#4Not Complete875Assessing
Financial Needs/ Requirements#5Complete306Determining the
Time Needed#5Complete307Assessing the Building materials
Requirements#6Complete30 Design and Analysis8Detailed
Design#7Complete309Architectural
Design#8Complete3010Drawing the Plan#9Not
Complete30Development Phase11Preparation of site#10Not
Complete3512Relocating services#11Not Complete3513Piling
(stakes)#12Not Complete3514Constructing foundation#13Not
Complete3515Erecting pylons#14Not Complete4616Filling the
concretes#15Not Complete4617Assessing the building materials
Requirements#16Complete4518Detailed
design#17Complete4719Architectural
design#18Complete4920Drawing the plan#19Not
Complete5021Design approval#20Not Complete50Completion
and Implementation22Preparation of site#21Not
Complete5223Relocating services#22Not Complete5424Piling
(stakes)#23Not Complete5625Constructing foundation#24Not
Complete5826Erecting pylons#25Not
Complete59Testing27Filling the concretes#26Not
Complete6128Assessing the building materials
requirements#27Complete6329Detailed
design#28Complete6530Architectural
design#29Complete67Repair and Maintenance31Drawing the
43. plan#30Not Complete6832Preparation of site#31Not
Complete7033Relocating services#32Not Complete7234Piling
(stakes)#33Not Complete74
IntroIndividual Term Project Part 3Shannon BrainYorkville
UniversityBUSI 3623 Project Planning Essentials16-Feb-20
BudgetFamily House Construction PlanProject Owner: Joseph
ManningBudget$500,000Requirement AnaylsisPlanned
Actual(+/-)CommentsEngineering project
reports$145,000.00123,000.00$22,000.00Product quality checks
report$3,000.003,200.00-$200.00Additional reports requested
Design documents$5,000.004,850.00$150.00
Proposals$1,000.001,250.00-$250.00Updated
quoteDrawings$1,000.001,100.00-$100.00Customer
changesSurvey/Prepare Site$7,500.006,250.00$1,250.00Design
structural components$5,000.006,000.00-$1,000.00Customer
changesHouse assessment
report$2,000.001,100.00$900.00Install
Foundation$75,000.0082,000.00-$7,000.00Rework
cementFrame$25,000.0023,750.00$1,250.00Roof
install$50,000.0047,000.00$3,000.00Window/Doors$50,000.005
0,000.00$0.00 Power
connection$10,000.0010,000.00$0.00Water
connection$12,000.0013,500.00-$1,500.00Change in
scopeProgress Reports$1,000.002,500.00-$1,500.00Additional
reports requestedDrywall install$7,000.009,000.00-
$2,000.00Additional labourTrim$3,000.003,200.00-
$200.00Paint$5,000.004,400.00$600.00Floor install
$20,000.0018,000.00$2,000.00Kitchen
Install$40,000.0042,000.00-$2,000.00Added FeaturesBathroom
install$20,000.0026,009.00-$6,009.00Added FeaturesGrade
Yard$10,000.0026,000.00-$16,000.00Driveway addedBuild
Inspection$2,500.002,200.00$300.00Total$500,000.00$506,309.
00-$6,309.00Result : Over Budget
Gantt TimelineCreate a Gantt Chart in this worksheet.
Enter title of this project in cell B1.
44. Legend title is in cell I1.
Information about how to use this worksheet, including
instructions for screen readers and the author of this workbook
is in the About worksheet.
Continue navigating down column A to hear further
instructions.Family House Construction ProjectLegend:Enter
Company Name in cell B2.
A legend is in cells I2 through AC2.Family House Construction
ProjectOn TrackLow RiskMed RiskHigh RiskUnassignedEnter
the name of the Project Lead in cell B3. Enter the Project Start
date in cell F3 or allow the sample formula to find the smallest
date value from the Gantt Data table.
Project Start Date: label is in cell D3.Joseph ManningProject
Start Date:1/1/20A Scrolling Increment is in cell F4.
Months for the dates in row 5 are displayed starting in cells I4
through cell BL4.
Do not modify these cells. They are auto updated based on the
project start date in cell F3.Scrolling
Increment:0JanuaryFebruaryCells I5 through BL5 contain the
day number of the month for the Month represented in the cell
block above each date cell and are auto calculated.
Do not modify these cells.
Today's date is outlined in Red (hex #AD3815) from today's
date in row 5 through the entire date column to the end of the
project
schedule.123456789101112131415161718192021222324252627
2829303112345678910111213141516171819202122232425A
scrollbar is in cells I6 through BL6. The increment for paging
through the data is defined as 2 pages at a time and can be
configured in the settings for the control bar.
To jump forward or backward in the timeline, enter a value of 0
or higher in cell F4.
A value of 0 takes you to the beginning of the chart.This row
contains headers for the project schedule that follows below
them.
Navigate from B7 through BL7 to hear the content. The first
45. letter of each day of the week for the date above that heading,
starts in cell I7 and continues through cell BL7.
All project timeline charting is auto generated based on the
category, start date and number of days entered in the
Milestones table.Milestone DescriptionCategoryAssigned
ToProgressStartNo.
DaysColumn1WTFSSMTWTFSSMTWTFSSMTWTFSSMTWTF
SSMTWTFSSMTWTFSSMTWTFSSMTDo not delete this row.
This row is hidden to preserve a formula that is used to
highlight the current day within the project schedule.
Requirement AnaylsisMilestoneT Smith100%1/11/208Enter
Project information starting in cell B9 through cell G9.
Sample data is in cells B9 through G33.
Enter Milestone Description, select a Category from the drop-
down list, assign someone to the item, enter the progress, start
date and number of days for the task to start charting.
The next instruction is in cell A34.Engineering project
reportsOn TrackT Smith59%2/14/192Product quality checks
reportGoalA Solce75%3/13/203 Design documentsOn TrackA
Solce100%1/1/2030 ProposalsLow RiskT
Smith90%3/10/2010DrawingsMilestoneA
Solce100%1/22/201411111111111111Survey/Prepare
SiteMilestoneJ Baker100%2/5/207Design
structura;ComponentnsDesign structural componentsMilestoneJ
Baker100%1/29/2010House assessment
reportMilestoneJbaker100%3/19/206Install
FoundationMilestoneJ Baker75%2/14/2014FrameOn TrackL
Coal0%2/28/2014Roof installOn TrackL
Coal0%3/6/207Window/DoorsMilestoneGraybar0%3/13/204
Power connectionOn TrackC Docker0%3/14/207Water
connectionOn TrackL Coal0%3/14/207Progress ReportsLow
RiskT Smith0%3/19/2011Drywall installOn TrackJ
Baker0%3/23/2014TrimOn TrackJ Baker0%4/6/207PaintOn
TrackJ Baker0%4/7/2014Floor install GoalJ
Baker0%4/20/2021Kitchen InstallGoalJ
Baker0%5/12/205Bathroom installLow RiskJ