International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 893
RETROFITTING IN INDIAN RAILWAY STATIONS
(THROUGH CONCOURSE AND PLATFORM AREA)
Anukant vats1, Anil Bharti2
1B.Architecture Vth year scholar- Department of Architecture and Planning, Himgiri Zee University Dehradun, India
2Assistant professor - Department of Architecture and Planning, Himgiri Zee University Dehradun, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Along the fast changing urban scenario in modern terms of infrastructure, built-forms, social preferences as well as
sustainability needs Indian Railways has also been upfront in proposing schemes and possibilities for retrofitting of the present
railway stations. Major railway station in Indian has typically become hubs of transportnetwork duetotheirstrategiclocations in
cities. Their interiors spaces increasingly can serve various non-transports related functions like retail shops, cafe, restaurants,
supermarkets, clinics or even libraries, packed within a compact environment. The paper intends to understand appropriate
retrofitting in railway station concourse and platform area. The study highlights aspects like encouraging an architecturalvision
with a focus on the efficient movement of passengers in the concourse area, conveniencetransfersofarrival-departurepassengers,
passenger’s safety-security and comfort while maintaining the quality of design and a pleasant healthy environment for both
active- passive passengers of the railway station. The likely outcome of this paper will provide a framework to policymakers and
planners in retrofitting architectural detail in these two prime spaces of railway stations to achieve world-class standards.
Key Words: Retrofitting, Passengers-friendly, Interior designing, Passengers satisfaction, Aesthetic preferences
1. INTRODUCTION
When railways continue to remain the sole long means of travel for all who lived far away railway stations acted as the
gateways for cities. Although now it no longer acts as the city's primary gateways due to the riseofcarsandairtravel,butmost
of the travellers however consider rail as the important mean of travel. Indian railways owns andmanagesoneofthebroadest
railway networks of the world with over 64,000 Kilometres Route and 7,000 stations. The Indian railways carries more than
17.5 million passengers every day and some of the major railway stations handle 100-200millionpassengersperannum.Thus
to gather the flow of passengers at the railway station there are mainly two areas.
 1.1 Platform
A designated area used as anelevated strip for the movement of passengers along the railway coachestoboardthetrainandfor
alighting passenger to exit the platform area by it means. (As shown in figure 1)
Fig - 1: showing platform area
 1.2 Entrance lobby/Concourse(Connecting course)
A main entrance area that initially interacts with the boarding passengers ad provide general information , enquiry desks ,
unreserved waiting areas , modern amenities and access to various number of platforms at station by the mean of foot over
bridges . (As shown in figure 2).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 894
Fig-2: showing entrance lobby
Because of lack of passengers responsiveness and limited social perception, Indian railways haslostmarketshareinitsfreight
and passengers segment and the other constants for the adverse condition of railwaystationsareovercrowding,unauthorized
vending, lack of modern amenities, adverse condition of waiting lounges, access control, passengers guidance systemsthatall
result in an unpleasant stay for passengers and adversely affect their satisfaction with the Indian railway. Passenger’s
satisfaction with railway stations undoubtedly needed to be retrofitted for both active-passive passenger’s to get best pre-
travel expectations and post-travel experiences at the railway stations. The retrofitted station's areas will provide a tangible
impact on the general perception of passengers about rail travel and railway stations, provisionofadequate qualityofservices
with modern standards will help in delivering a passenger’s stay pleasant.
2. RELEVANCE OF STUDY
Favorable time spent by passengers on platforms to board the train remains thesignificantpartbecauseasa setofinformation
and facilities provided to the passengers at platforms develop essential pre-travel expectationsand post-travel experiencesso
it is necessary that amenities available must match passenger’s expectations to make their experience pleasant. Similarly, the
rest time spent by the traveller in the entrance lobby/concourse area also unexpectedlyresultinintensifyingthe experience of
the passengers at the railway stations. The concourse area is precisely the most significant part of the railway station as this
specific zone is initially approached by the passengers and execute a pivotal role for providing a connecting course for the
passengers from the approach road to the platforms and also to variousimportantstationfacilitylike(general waitinglounges,
ticket counters, modern amenities, enquiry counters, railway shops and food plazas) are located at this point of station. This
only place accommodates the maximum crowd over the railway stations.
3. EVOLUTION OF WATING AREAS
Time has observed an evolution of the railway stations and simultaneouslythe waiting spacesatthestationfromveryearlythe
Nineteenth Century model of the front building with elaborate brick detailscoupled withthemultiplelongplatformsshedwith
one foot over bridge (As shown in figure 3) through to modern compacted single structure forms. (As shown in figure 4) The
retrofitting of the internal spaces tended to provide the character to the railway stations (As shown in figure 5) as it must be
important to acknowledge the aspects of station design. The design approach with manuals and standards present as design
guidelines will result in providing better pre-travel expectations and post-travel experiences of the passengers at all the
waiting spaces (platforms, concourse). As apparent throughout the world, it is also essential to restyle, redevelop,renovate or
build the new railway stations in India to match the efficiency, facility, indoor character to revive the public perception (As
shown in figure 6) about Indian railway stations and to create a continued new modern language of Station Architecture in
India.
Fig-3: showing Charbagh railway station at Lucknow Fig-4: showing Beijing railway station at Shangai
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 895
Fig-5: showing Concourse/waiting area of Fig-6: showing proposal of Concourse area of Charbagh
King kross railway station at London railway station at Lucknow
4. PROBLEM INFOCUS AT INDIAN RAILWAY STATIONS
 4.1 PROBLEMS RELATED TO PLATFORM
Undesignated space for sitting at platforms
At some Indian railway station which merely handles the heavy footfall of passengers, the platform area tends to provide less
sitting area which result in improper sitting arrangements by the railways for passenger. The situation more over being
observed to be barrier for the boarding passenger because the passenger travelling through railway may carry heavy luggage
with them, which then encroach more area at platform along with passenger.(As shown in figure 7)
Fig- 5: showing improper arrangement of sitting
Poor facilities for differently disabled peoples at platform
It’s being faced as a common problem at in Indian railways stations as reported and however observed also that platform
designing is being very less friendly for disabled passengers and senior citizens. Due to overcrowding at platform many of
passengers of these kind somehow don’t find themselves able to board or alight the train in these conditions. (As shown in
figure 8)
Fig- 6: showing problem for disabled
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 896
Unauthorized entry of passengers at platforms
The maximum number of passengers using Indian railways are very irresponsive in following the rules set by the railways,
as in result many major problems like crossing of railway tracks at station, unauthorized entry of passenger’s from various
points in station premises which as is result tends to provide an environment of threat and safety issues to other users. (As
shown in figure 9)
Fig-9: showing unauthorized access
Sitting over stair case or near o other VCE’s (Vertical circulation equipment)
As in Indian railway stations the mean of vertical circulation provided to passengers are only stairs, ramp, foot over bridges
under pass and elevators/escalators at very less redeveloping station being used as a mean of vertical circulation at stations
these particles are also being utilized as a sitting space which create problem for travelling passenger to board their train by
these kind of encounters between alighting and boarding passengers (As shown in figure 10)
Fig-10: showing unauthorized sitting
Overcrowding at platform by the misconduct of potters and misbehaviour of public
Due to peak hours, heavy footfall at some major railway stations, improper sitting arrangements the platforms get under
the condition of overcrowding and encroachments raised by the passengers. (As shown in figure 11)
Fig-7: showing overcrowding at platform
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 897
 4.2 PROBLEMS RELATED TO CONCOURSE/ENTRANCE LOBBY
Unintended accumulation of passengers at entrance lobby
As the main entrance lobby is one of the space where the passengers find multiple facilities and amenities provided by the
railway station the passengers avail maximum services and move towards waiting area or towardsplatformsbutsomehowas
observed and reported many of the passenger use the entrance lobby as a waiting area and portray a poor image of Indian
railway stations with accumulation of passengers unintendedly at entrance lobby which in result don’t provide clear-
unobstructed routes for the boarding passengers hence the flow of movement of boarding and alighting passenger is very
necessary for the least gathering of passenger’s at entrance lobby .(As shown in figure 12)
Fig-8: showing unintended accumulation
Improper sitting arrangements for the visitors
There are very limited sittings at the waiting area may be due lack of space, budget or infrastructures etc. which result in
creating improper and necessarily required sitting spaces hence the passengers uses the floor of the waiting area to waituntil
they boards the train. (As shown in figure 13)
Fig-9: Improper sitting at entrance hall
Unreserved booking counters – (insufficient space for Passengers)
The basic principle of designing a railway station is generally on the bases of the foot fall of passenger, future extension to
railway station , number of foot fall in peak time . Hence on these considerations the calculation of space required by a
passenger at station is being set to provide a circulation space to every passenger but at unreserved booking counter
arrangements made not fulfil the standards and result in in sufficient space for passengers.(As shown in figure 14 )
Fig-10 showing overcrowding at booking counters
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 898
Apart from these problems some other common problems that arise at the platformsandentrancelobby/concoursearedueto
lack of infrastructure facility especially for differently abled, lack in security measures which result in access controls of the
passengers towards the platforms, poor sanitation, improper maintenance of electronic equipment and sanitary particles. In
order to get out of these problems the passengers look forward to the Indian railways to ensure the quality service for the
themselves, conveyance for both boarding and alighting passengers and so also the Indian railway look forward towards the
passengers to cooperate with the railways to maintain the stations area cleans and hygienic and to obey the rules set by the
Indian railways. So how the possible solution for the productivity of railway station andpassengerssatisfactionwillcome
out.
5. PROBLEM INFOCUS AT INDIAN RAILWAY STATIONS
The maximum area of the stations are being used by the public, thereforetheseveral assumptionareformulatedtounderstand
the mental attitude of the passengers on platform and on entrance lobby few of them are listed below for boarding and
alighting passengers .
• 5.1 BOARDING PASSENGERS
 Passengers want quick and nearest approach to the entrance of railway station.
 They only gets indicated by the signage provided over the platforms to the prescribed point after the entrance at the
railway stations.
 Passengers could be of any coach class whether having reservation or not.
 May be need to rush because of his late arrival at station so, passengers need quick access to the platform.
 Prefer to stay close to the platform entrance they used.
 At the platform area the boarding passengers may not need refreshment stalls and use dustbins.
• 5.2 ALIGHTING PASSENGERS
 As the arrival and departure of the train may be delayed the passengers find the waiting areas.
 He/she shall leave the train in the area that enables passengers to minimise the walking distance to exit platform.
 Change the platform side more often if high densities pedestrian is in front of passengers.
 More often to boarding passengers spent lesser time over station area.
Over all these assumptions of the passengers behaviourattherailway stationandpassenger’ssatisfactionsurvey report
the strategically and technological solution for the retrofitting of the railway stations is being based.
6. PLATFORMS
6.1 PROVISION OF VCE
There should be adequate provisions of (vertical circulation equipment’s) such as stairs, ramps, travelators, escalators,liftfor
both disabled and normal passengers .For the disable passenger provision of wheelchairlift,sothatthedisablepassengerscan
use it and access to the exit gates .This wheelchair lifts are available in various form and it may move circular, straight etc. (As
shown in figure 15). Another option of vertical movement for disable passengers has been work outinjapanwithintroduction
of escalator with integrated mobile platform whenitsrequiredthreestepsjointogetherandprovidea movingplatformssource
(https://www.accessible-japan.com/wheelchair-accessible-travel-in-japan-general-information)(Asshowninfigure16).There
should be minimum 4 exit with 100 meter maximum travel time on 600 meter platform and an architecturally preferred
minimum 2.640 m clear distance to any obstruction such as a VCE from the platform edge. This distance includes the .609 m
wide platform safety edge, 1.725 m clear passage for customers circulating along the platform length and a .13 m buffer zone
along the length of the obstruction. As per WCS manual and standard 2009
.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 899
Fig-15: showing movement through wheel chair lift Fig-16: showing movement through escalator lift
Fig-17: showing inward accumulation of rain water
Fig-19: showing level difference
6.2 CANOPY, ROOFING OF PLATFORMS
Generally in Indian railway system there is normal roofingofasbestoscementsheetovertheplatformsupportedbytheframed
section which does not provide any architectural appearance and not act as a rain water accumulator .As in present scenarios
only the platforms were meant to be covered, tracks are open to sky which result in unhygienic condition at tracks by adverse
weather conditions and birds waste etc. Thus to improve the aesthetic character of the platform area the light weight and a
durable solution of roof covering in all-weather condition such as acrylic sheets, aluminum compositepanels,fiber-reinforced
plastic sheet, P.V.C coated fabric or membrane which will be aesthetically appealingandthesupportingcolumnscouldwork as
a duct for the rain water pit rechargers. (As shown in figure 17 and 18)
6.3 ELEVATED STRIPS (RAMP)
As in Indian railway system the level of the railway coaches
remain to be elevated from the level of the platform which
result in level difference of 350mm which causes difficulty
for physical handicapped passengers to access the rail coach, (As
shown in figure 19 ) Thus partially a designated ramp or the
elevated strip for the disable passenger with a landing of 800 mm
to access the railway coach without the help of any other people
could come out a solution for the redeveloping station and must
be provided only in front of the disabled coach at each platform
Fig-18: showing collection of rain water through outward
flow
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 900
Fig-20: showing proposal of ramp in plan Figure-21: showing proposal of ramp in elevation
Fig-23 Fig-24
so as this whole will provide a particular space for disable to alight or board the train easily. This area must be specific and
nearest to the any VCE’s that could be accessible by disable passenger (As shown in figure 20 and 21).
6.4 ARCHITECTURAL ELEMENTS AT PLATFORMS, FLOOR AND CEILING
The designer elements at platforms could be brought by aestheticallyappealingfinish material forfloorandceiling, variationin
floor pattern, multiple entertainment option for departing passengersatplatform,creativedesignpatternonstairs,livedisplay
of train moment on platform, instalment of fibre optic lighting system, smart furniture along the platforms, interactive
terminals at platforms which should be intuitive and easily accessible by all groups of passengers.
Logroño high-speed train station Tianjin West Station Bijlmer Station
Location: Logroño, Spain Location: Tianjin, China Location: Amsterdam,
Architect: Abalos+Sentkiewicz Architect: von Gerkan, Marg The Netherlands
Arquitectos Architect: Grimshaw
These following figure represent the architectural interaction to the railway station platform by the retrofitting of newmaterials
under redevelopment of these station such as use of artificial lights, open-ended spaces, sky light, diagrid structure, space frames,
interrelation between conventional building material and advance P.V.C-prefab materials which result out in extensive beautiful
livable space for the passengers at railway stations. (As shown in figure 22, 23, and 24)
Fig-22
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 901
7. CONCOURSE
7.1 SEGREGATION OF ARRIVAL AND DEPARTURE AREA
Arrival and departure concourses should be centrally located below or above the platforms respectively for complete
segregation of arriving and departing passengers so that lesser interaction between incoming and outgoing passengers (As
shown in figure 25). This is needed to be necessary provided on newly developed railway station and on the station to be
redeveloped solution could be by expanding width of present foot over bridges which will act as a departure concourse
connecting main entrance to platforms (As shown in figure 26 ).
7.2 CLEAR AND UNOBSTRUCTED ROUTES
From the concourse areas to the platforms by the mean of elevated air passages by providing clear unobstructed route with
clear visibility to signage of particular platforms with distinctive exit gate from every elevated air passage to particular
platforms which will result in early division of the passengers flow for designated platform from their particular exit gate
provided at each elevated air passages (As shown in figure 27)
7.3 INTERIOR ELEMENTS AT CONCOURSE/ENTRANCE LOBBY
The concourse area should be retrofitted by interior elements such as passengers information systems, seating lounges ,
lighting, advertising, handrails, MOR (Ministry ofrailway)shops-kiosks,maximumamountofnatural lightfeasiblefromfaçade,
wall and ceiling finishes which do not create echo and further enable an environment that allows all public announcementsto
be audible to people everywhere during the peak hour, digital signage’s which are easy to be adjustable as if any change in
arrival or departure of train, provision of various vertical circulation elements (VCE) like escalators ,travelators , lifts,
Fig-25: showing proposal for new railway stations Fig-26: showing proposal for redeveloping railway stations
Fig-11: showing movement of passengers towards platform
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 902
introduction of Biophilic spaces inside the station area which will resultinhealthyandliveableenvironmentinsidethestation
area.( As shown in figure 28 )
7.4 INTERIOR ELEMENTS AT CONCOURSE/ENTRANCE LOBBY
To avoid the condition of overcrowding hence segregation of the flow of departing passengers is needed to be providedbythe
division of the railway stations mainly into three zone. (As shown in figure 29) which will providepassengersa sequencedand
linear flow within reach to all needs of passengers while travelling.
Fig-13: showing division of station in mainly 3 zone
7.5 ACCESS CONTROL
As the safety and security are the very important concern for any public building thus restriction to the unauthorized entry in
the railway stations should be controlled by division of station in threecategories 1.Entry/Exit2.Unpaidarea3.Paidarea(As
shown in figure 30) .The adequate provision of security gates beforeeachentranceto unpaid-paidarea atwhichsecuritycabin,
luggage scanner machine and metal detector points must be provided with CCTV cameras. The entry for paid area could be
accessible through the flap barriers by the QR codes provided over the passengers train ticket or token that could replace the
Fig-12: showing interior elements of concourse area
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 903
manual platform ticketing system thus it must necessary for all passengers accessing the paidarea it will reducetheunwanted
passengers over the paid area and platforms (As shown in figure 31)
8. CONCLUSION
As the railway part a significant and essential role in the preferred mode of transportation from very early 1800 hundred till
21st century both the railway administration and station has undergone into various possible interchanges by modern time
which undoubtedly resulted in the integration of railway system with innovative and ideal technologies to collaboratively
develop the enhanced experience and satisfaction of the passengersbettertowardsrailways.Hencemanydevelopedcountries
have implemented this modern language of Station architecture very early and served as a benchmark of the modern World
class station above the more initial language of station architecture used in India, so the Indian railway program has also
started to adopt precisely the modern language, constants of the world-class station and look forward to providing the
pleasantest railway experience to the passengers by enhancing amenities, innovative development of iconic structure with
adapting character of the cities, seeking positive customer experience andapartfromthisthecommercial utilizationofsurplus
land of the railway under the (PPP) preferred mode of development i.e. public-private partnership, hence the innovative
contribution of the architects, developers, designers will work out as a more satisfactory and improved transportationsystem
and better passengers experience. The challenges for the designer or architectsarenotonlytoprovidea spaceaccordingto the
standards of the railways though it should further erect an iconicarchitectural building whichmustbe user-friendly andsatisfy
the expectation of the passengers. Design elements and strategies as discussed in a paper like retrofittingofinterior space will
create a more pleasing station environment and will work in recreating the tarnished image of the Indianrailwayssystemand
railway stations.
“You lose the knowledge behind when you start chasing for the best
gather knowledge that you can get around you and then come out with the
best from it”
REFERENCES
1. Ministry of railways (railway board) government of India development of world class stations through public private
partnership Manual for standards and specifications for railway stations June 2009.
2. Public private partnership in urban rail systems manual of specifications and standards.
3. Smart station in smart cities (UIC) international union of railways.
4. Passengers satisfaction survey report and benchmarking of performance standards Indian railways institute of
transport management Lucknow July 2012
Fig-15: showing division of passengers into
categories at station
Fig-14: showing entry through flap barriers
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 904
5. R.Gangwar “Framework for Structuring Public Private Partnerships in railways,” Case Studies on transport Policy,
Elsevier, 2014, and Proceedings of the Conference on Transportation Planning and implementation Methodologies for
Developing Countries (TPMDC), Indian Institute of Technology Bombay, Mumbai, December 2012.
6. Railway Stations – Layout Manual 2017-04-24 English version 2018-02-20 Swedish transport administration
www.trafikverket.se
7. Ar. Shweta Choudhary* and Dr. Satish Pipralia Architectural Perception for redevelopment of Railway termini
8. Indian Railways Stations Re-development Project IRSDC (Indian railways )
9. Rohit anand and Prof. Dr. Sanjay gupta Productivity of railway stations case study: New Delhi railway station
10. Ernst Bosina, ETH Zürich, Mark Meeder, ETH Zürich, Ulrich Weidmann, ETH Zürich ,Conference paper STRC 2017
Pedestrian flows on railway platforms
11. New Design and Developments at railway coach factory kapurthala (Indian railways)
12. Railway Stations – Layout Manual 2017-04-24 English version 2018-02-20 swedish Transport administration
www.trafikverket.se
13. Ksenija N. Stevanović, Milena V. Stevanović New directions in the design of railways stations
14. Vincent Moug1, Selby Coxon2 an analysis of station infrastructure design to improve accessibility between the
platform and suburban train carriages.
15. http://irsdc.in
16. http://www.rdso.indianrailways.gov.in/
17. https://ircep.gov.in/Documents.html
18. http://www.indianrailways.gov.in/railwayboard/

More Related Content

What's hot

Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Gargee Ghosh
 
Flexible digital approach to airport terminal design
Flexible digital approach to airport terminal designFlexible digital approach to airport terminal design
Flexible digital approach to airport terminal design
Sarah Shuchi
 
BUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATIONBUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATION
Shankar Sarkar
 

What's hot (20)

Study On Monorail Sky Train Passenger Landing Facilities
Study On Monorail Sky Train Passenger Landing FacilitiesStudy On Monorail Sky Train Passenger Landing Facilities
Study On Monorail Sky Train Passenger Landing Facilities
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Turnaround strategies for the Indian Railways
Turnaround strategies for the Indian RailwaysTurnaround strategies for the Indian Railways
Turnaround strategies for the Indian Railways
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
 
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
 
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTHINDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
INDIAN RAILWAYS TRAINING REPORT BY AMEYA VASHISHTH
 
Telecommunication line training report Indian Railways
Telecommunication line training report Indian RailwaysTelecommunication line training report Indian Railways
Telecommunication line training report Indian Railways
 
Next generation train positioning system
Next generation train positioning system  Next generation train positioning system
Next generation train positioning system
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
 
Manual de tecnoloxia
Manual de tecnoloxiaManual de tecnoloxia
Manual de tecnoloxia
 
Failure Reporting and Vendor performance management system using Python tech...
Failure Reporting and  Vendor performance management system using Python tech...Failure Reporting and  Vendor performance management system using Python tech...
Failure Reporting and Vendor performance management system using Python tech...
 
Training and development @Delhi metro
Training and development @Delhi metroTraining and development @Delhi metro
Training and development @Delhi metro
 
Flexible digital approach to airport terminal design
Flexible digital approach to airport terminal designFlexible digital approach to airport terminal design
Flexible digital approach to airport terminal design
 
Dmrc and l&t tranning report
Dmrc and l&t tranning reportDmrc and l&t tranning report
Dmrc and l&t tranning report
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
 
The roles of ICT in driverless, automated railway operations
The roles of ICT in driverless, automated railway operationsThe roles of ICT in driverless, automated railway operations
The roles of ICT in driverless, automated railway operations
 
BUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATIONBUS DEPOT DESIGN PRESENTATION
BUS DEPOT DESIGN PRESENTATION
 
Transportation and Traffic Engineering Dr. Sheriff El-Badawy ( Introduction )
Transportation and Traffic Engineering Dr. Sheriff El-Badawy ( Introduction )Transportation and Traffic Engineering Dr. Sheriff El-Badawy ( Introduction )
Transportation and Traffic Engineering Dr. Sheriff El-Badawy ( Introduction )
 

Similar to IRJET- Retrofitting in Indian Railway Stations (Through Concourse and Platform Area)

Similar to IRJET- Retrofitting in Indian Railway Stations (Through Concourse and Platform Area) (20)

IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
 
IRJET- Proposal of Curvo Cable Car as an Alternative Means of Public Transpor...
IRJET- Proposal of Curvo Cable Car as an Alternative Means of Public Transpor...IRJET- Proposal of Curvo Cable Car as an Alternative Means of Public Transpor...
IRJET- Proposal of Curvo Cable Car as an Alternative Means of Public Transpor...
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
 
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATIONDEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET- Automatic Metro Train to Shuttle Between Two Stations   IRJET- Automatic Metro Train to Shuttle Between Two Stations
IRJET- Automatic Metro Train to Shuttle Between Two Stations
 
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
IRJET- A Case Study on Weaving Capacity Under Heterogeneous Traffic Condition...
 
IRJET- Review Paper on “Fabrication of Smart Railway Crossing”
IRJET- Review Paper on “Fabrication of Smart Railway Crossing”IRJET- Review Paper on “Fabrication of Smart Railway Crossing”
IRJET- Review Paper on “Fabrication of Smart Railway Crossing”
 
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi MetroIRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
IRJET- Study and Analysis of Balanced Cantilever Bridge at Kochi Metro
 
High Speed Tilting Train Technology
High Speed Tilting Train TechnologyHigh Speed Tilting Train Technology
High Speed Tilting Train Technology
 
Nagpur Metro Indicator
Nagpur Metro IndicatorNagpur Metro Indicator
Nagpur Metro Indicator
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested area
 
IRJET- Railway Reservation and Route Optimization System with Implementation
IRJET-  	  Railway Reservation and Route Optimization System with ImplementationIRJET-  	  Railway Reservation and Route Optimization System with Implementation
IRJET- Railway Reservation and Route Optimization System with Implementation
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
A Review Paper on Design & Development of Train Staircase Mechanism for Easy ...
A Review Paper on Design & Development of Train Staircase Mechanism for Easy ...A Review Paper on Design & Development of Train Staircase Mechanism for Easy ...
A Review Paper on Design & Development of Train Staircase Mechanism for Easy ...
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
PLANNING FOR FACILITY NEEDS IN TRAIN STATION BASED ON COMPARISON OF CONNECTIN...
PLANNING FOR FACILITY NEEDS IN TRAIN STATION BASED ON COMPARISON OF CONNECTIN...PLANNING FOR FACILITY NEEDS IN TRAIN STATION BASED ON COMPARISON OF CONNECTIN...
PLANNING FOR FACILITY NEEDS IN TRAIN STATION BASED ON COMPARISON OF CONNECTIN...
 
Capacity Analysis of Signalized Intersection in Urban Areas
Capacity Analysis of Signalized Intersection in Urban AreasCapacity Analysis of Signalized Intersection in Urban Areas
Capacity Analysis of Signalized Intersection in Urban Areas
 

More from IRJET Journal

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 

IRJET- Retrofitting in Indian Railway Stations (Through Concourse and Platform Area)

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 893 RETROFITTING IN INDIAN RAILWAY STATIONS (THROUGH CONCOURSE AND PLATFORM AREA) Anukant vats1, Anil Bharti2 1B.Architecture Vth year scholar- Department of Architecture and Planning, Himgiri Zee University Dehradun, India 2Assistant professor - Department of Architecture and Planning, Himgiri Zee University Dehradun, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Along the fast changing urban scenario in modern terms of infrastructure, built-forms, social preferences as well as sustainability needs Indian Railways has also been upfront in proposing schemes and possibilities for retrofitting of the present railway stations. Major railway station in Indian has typically become hubs of transportnetwork duetotheirstrategiclocations in cities. Their interiors spaces increasingly can serve various non-transports related functions like retail shops, cafe, restaurants, supermarkets, clinics or even libraries, packed within a compact environment. The paper intends to understand appropriate retrofitting in railway station concourse and platform area. The study highlights aspects like encouraging an architecturalvision with a focus on the efficient movement of passengers in the concourse area, conveniencetransfersofarrival-departurepassengers, passenger’s safety-security and comfort while maintaining the quality of design and a pleasant healthy environment for both active- passive passengers of the railway station. The likely outcome of this paper will provide a framework to policymakers and planners in retrofitting architectural detail in these two prime spaces of railway stations to achieve world-class standards. Key Words: Retrofitting, Passengers-friendly, Interior designing, Passengers satisfaction, Aesthetic preferences 1. INTRODUCTION When railways continue to remain the sole long means of travel for all who lived far away railway stations acted as the gateways for cities. Although now it no longer acts as the city's primary gateways due to the riseofcarsandairtravel,butmost of the travellers however consider rail as the important mean of travel. Indian railways owns andmanagesoneofthebroadest railway networks of the world with over 64,000 Kilometres Route and 7,000 stations. The Indian railways carries more than 17.5 million passengers every day and some of the major railway stations handle 100-200millionpassengersperannum.Thus to gather the flow of passengers at the railway station there are mainly two areas.  1.1 Platform A designated area used as anelevated strip for the movement of passengers along the railway coachestoboardthetrainandfor alighting passenger to exit the platform area by it means. (As shown in figure 1) Fig - 1: showing platform area  1.2 Entrance lobby/Concourse(Connecting course) A main entrance area that initially interacts with the boarding passengers ad provide general information , enquiry desks , unreserved waiting areas , modern amenities and access to various number of platforms at station by the mean of foot over bridges . (As shown in figure 2).
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 894 Fig-2: showing entrance lobby Because of lack of passengers responsiveness and limited social perception, Indian railways haslostmarketshareinitsfreight and passengers segment and the other constants for the adverse condition of railwaystationsareovercrowding,unauthorized vending, lack of modern amenities, adverse condition of waiting lounges, access control, passengers guidance systemsthatall result in an unpleasant stay for passengers and adversely affect their satisfaction with the Indian railway. Passenger’s satisfaction with railway stations undoubtedly needed to be retrofitted for both active-passive passenger’s to get best pre- travel expectations and post-travel experiences at the railway stations. The retrofitted station's areas will provide a tangible impact on the general perception of passengers about rail travel and railway stations, provisionofadequate qualityofservices with modern standards will help in delivering a passenger’s stay pleasant. 2. RELEVANCE OF STUDY Favorable time spent by passengers on platforms to board the train remains thesignificantpartbecauseasa setofinformation and facilities provided to the passengers at platforms develop essential pre-travel expectationsand post-travel experiencesso it is necessary that amenities available must match passenger’s expectations to make their experience pleasant. Similarly, the rest time spent by the traveller in the entrance lobby/concourse area also unexpectedlyresultinintensifyingthe experience of the passengers at the railway stations. The concourse area is precisely the most significant part of the railway station as this specific zone is initially approached by the passengers and execute a pivotal role for providing a connecting course for the passengers from the approach road to the platforms and also to variousimportantstationfacilitylike(general waitinglounges, ticket counters, modern amenities, enquiry counters, railway shops and food plazas) are located at this point of station. This only place accommodates the maximum crowd over the railway stations. 3. EVOLUTION OF WATING AREAS Time has observed an evolution of the railway stations and simultaneouslythe waiting spacesatthestationfromveryearlythe Nineteenth Century model of the front building with elaborate brick detailscoupled withthemultiplelongplatformsshedwith one foot over bridge (As shown in figure 3) through to modern compacted single structure forms. (As shown in figure 4) The retrofitting of the internal spaces tended to provide the character to the railway stations (As shown in figure 5) as it must be important to acknowledge the aspects of station design. The design approach with manuals and standards present as design guidelines will result in providing better pre-travel expectations and post-travel experiences of the passengers at all the waiting spaces (platforms, concourse). As apparent throughout the world, it is also essential to restyle, redevelop,renovate or build the new railway stations in India to match the efficiency, facility, indoor character to revive the public perception (As shown in figure 6) about Indian railway stations and to create a continued new modern language of Station Architecture in India. Fig-3: showing Charbagh railway station at Lucknow Fig-4: showing Beijing railway station at Shangai
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 895 Fig-5: showing Concourse/waiting area of Fig-6: showing proposal of Concourse area of Charbagh King kross railway station at London railway station at Lucknow 4. PROBLEM INFOCUS AT INDIAN RAILWAY STATIONS  4.1 PROBLEMS RELATED TO PLATFORM Undesignated space for sitting at platforms At some Indian railway station which merely handles the heavy footfall of passengers, the platform area tends to provide less sitting area which result in improper sitting arrangements by the railways for passenger. The situation more over being observed to be barrier for the boarding passenger because the passenger travelling through railway may carry heavy luggage with them, which then encroach more area at platform along with passenger.(As shown in figure 7) Fig- 5: showing improper arrangement of sitting Poor facilities for differently disabled peoples at platform It’s being faced as a common problem at in Indian railways stations as reported and however observed also that platform designing is being very less friendly for disabled passengers and senior citizens. Due to overcrowding at platform many of passengers of these kind somehow don’t find themselves able to board or alight the train in these conditions. (As shown in figure 8) Fig- 6: showing problem for disabled
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 896 Unauthorized entry of passengers at platforms The maximum number of passengers using Indian railways are very irresponsive in following the rules set by the railways, as in result many major problems like crossing of railway tracks at station, unauthorized entry of passenger’s from various points in station premises which as is result tends to provide an environment of threat and safety issues to other users. (As shown in figure 9) Fig-9: showing unauthorized access Sitting over stair case or near o other VCE’s (Vertical circulation equipment) As in Indian railway stations the mean of vertical circulation provided to passengers are only stairs, ramp, foot over bridges under pass and elevators/escalators at very less redeveloping station being used as a mean of vertical circulation at stations these particles are also being utilized as a sitting space which create problem for travelling passenger to board their train by these kind of encounters between alighting and boarding passengers (As shown in figure 10) Fig-10: showing unauthorized sitting Overcrowding at platform by the misconduct of potters and misbehaviour of public Due to peak hours, heavy footfall at some major railway stations, improper sitting arrangements the platforms get under the condition of overcrowding and encroachments raised by the passengers. (As shown in figure 11) Fig-7: showing overcrowding at platform
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 897  4.2 PROBLEMS RELATED TO CONCOURSE/ENTRANCE LOBBY Unintended accumulation of passengers at entrance lobby As the main entrance lobby is one of the space where the passengers find multiple facilities and amenities provided by the railway station the passengers avail maximum services and move towards waiting area or towardsplatformsbutsomehowas observed and reported many of the passenger use the entrance lobby as a waiting area and portray a poor image of Indian railway stations with accumulation of passengers unintendedly at entrance lobby which in result don’t provide clear- unobstructed routes for the boarding passengers hence the flow of movement of boarding and alighting passenger is very necessary for the least gathering of passenger’s at entrance lobby .(As shown in figure 12) Fig-8: showing unintended accumulation Improper sitting arrangements for the visitors There are very limited sittings at the waiting area may be due lack of space, budget or infrastructures etc. which result in creating improper and necessarily required sitting spaces hence the passengers uses the floor of the waiting area to waituntil they boards the train. (As shown in figure 13) Fig-9: Improper sitting at entrance hall Unreserved booking counters – (insufficient space for Passengers) The basic principle of designing a railway station is generally on the bases of the foot fall of passenger, future extension to railway station , number of foot fall in peak time . Hence on these considerations the calculation of space required by a passenger at station is being set to provide a circulation space to every passenger but at unreserved booking counter arrangements made not fulfil the standards and result in in sufficient space for passengers.(As shown in figure 14 ) Fig-10 showing overcrowding at booking counters
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 898 Apart from these problems some other common problems that arise at the platformsandentrancelobby/concoursearedueto lack of infrastructure facility especially for differently abled, lack in security measures which result in access controls of the passengers towards the platforms, poor sanitation, improper maintenance of electronic equipment and sanitary particles. In order to get out of these problems the passengers look forward to the Indian railways to ensure the quality service for the themselves, conveyance for both boarding and alighting passengers and so also the Indian railway look forward towards the passengers to cooperate with the railways to maintain the stations area cleans and hygienic and to obey the rules set by the Indian railways. So how the possible solution for the productivity of railway station andpassengerssatisfactionwillcome out. 5. PROBLEM INFOCUS AT INDIAN RAILWAY STATIONS The maximum area of the stations are being used by the public, thereforetheseveral assumptionareformulatedtounderstand the mental attitude of the passengers on platform and on entrance lobby few of them are listed below for boarding and alighting passengers . • 5.1 BOARDING PASSENGERS  Passengers want quick and nearest approach to the entrance of railway station.  They only gets indicated by the signage provided over the platforms to the prescribed point after the entrance at the railway stations.  Passengers could be of any coach class whether having reservation or not.  May be need to rush because of his late arrival at station so, passengers need quick access to the platform.  Prefer to stay close to the platform entrance they used.  At the platform area the boarding passengers may not need refreshment stalls and use dustbins. • 5.2 ALIGHTING PASSENGERS  As the arrival and departure of the train may be delayed the passengers find the waiting areas.  He/she shall leave the train in the area that enables passengers to minimise the walking distance to exit platform.  Change the platform side more often if high densities pedestrian is in front of passengers.  More often to boarding passengers spent lesser time over station area. Over all these assumptions of the passengers behaviourattherailway stationandpassenger’ssatisfactionsurvey report the strategically and technological solution for the retrofitting of the railway stations is being based. 6. PLATFORMS 6.1 PROVISION OF VCE There should be adequate provisions of (vertical circulation equipment’s) such as stairs, ramps, travelators, escalators,liftfor both disabled and normal passengers .For the disable passenger provision of wheelchairlift,sothatthedisablepassengerscan use it and access to the exit gates .This wheelchair lifts are available in various form and it may move circular, straight etc. (As shown in figure 15). Another option of vertical movement for disable passengers has been work outinjapanwithintroduction of escalator with integrated mobile platform whenitsrequiredthreestepsjointogetherandprovidea movingplatformssource (https://www.accessible-japan.com/wheelchair-accessible-travel-in-japan-general-information)(Asshowninfigure16).There should be minimum 4 exit with 100 meter maximum travel time on 600 meter platform and an architecturally preferred minimum 2.640 m clear distance to any obstruction such as a VCE from the platform edge. This distance includes the .609 m wide platform safety edge, 1.725 m clear passage for customers circulating along the platform length and a .13 m buffer zone along the length of the obstruction. As per WCS manual and standard 2009 .
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 899 Fig-15: showing movement through wheel chair lift Fig-16: showing movement through escalator lift Fig-17: showing inward accumulation of rain water Fig-19: showing level difference 6.2 CANOPY, ROOFING OF PLATFORMS Generally in Indian railway system there is normal roofingofasbestoscementsheetovertheplatformsupportedbytheframed section which does not provide any architectural appearance and not act as a rain water accumulator .As in present scenarios only the platforms were meant to be covered, tracks are open to sky which result in unhygienic condition at tracks by adverse weather conditions and birds waste etc. Thus to improve the aesthetic character of the platform area the light weight and a durable solution of roof covering in all-weather condition such as acrylic sheets, aluminum compositepanels,fiber-reinforced plastic sheet, P.V.C coated fabric or membrane which will be aesthetically appealingandthesupportingcolumnscouldwork as a duct for the rain water pit rechargers. (As shown in figure 17 and 18) 6.3 ELEVATED STRIPS (RAMP) As in Indian railway system the level of the railway coaches remain to be elevated from the level of the platform which result in level difference of 350mm which causes difficulty for physical handicapped passengers to access the rail coach, (As shown in figure 19 ) Thus partially a designated ramp or the elevated strip for the disable passenger with a landing of 800 mm to access the railway coach without the help of any other people could come out a solution for the redeveloping station and must be provided only in front of the disabled coach at each platform Fig-18: showing collection of rain water through outward flow
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 900 Fig-20: showing proposal of ramp in plan Figure-21: showing proposal of ramp in elevation Fig-23 Fig-24 so as this whole will provide a particular space for disable to alight or board the train easily. This area must be specific and nearest to the any VCE’s that could be accessible by disable passenger (As shown in figure 20 and 21). 6.4 ARCHITECTURAL ELEMENTS AT PLATFORMS, FLOOR AND CEILING The designer elements at platforms could be brought by aestheticallyappealingfinish material forfloorandceiling, variationin floor pattern, multiple entertainment option for departing passengersatplatform,creativedesignpatternonstairs,livedisplay of train moment on platform, instalment of fibre optic lighting system, smart furniture along the platforms, interactive terminals at platforms which should be intuitive and easily accessible by all groups of passengers. Logroño high-speed train station Tianjin West Station Bijlmer Station Location: Logroño, Spain Location: Tianjin, China Location: Amsterdam, Architect: Abalos+Sentkiewicz Architect: von Gerkan, Marg The Netherlands Arquitectos Architect: Grimshaw These following figure represent the architectural interaction to the railway station platform by the retrofitting of newmaterials under redevelopment of these station such as use of artificial lights, open-ended spaces, sky light, diagrid structure, space frames, interrelation between conventional building material and advance P.V.C-prefab materials which result out in extensive beautiful livable space for the passengers at railway stations. (As shown in figure 22, 23, and 24) Fig-22
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 901 7. CONCOURSE 7.1 SEGREGATION OF ARRIVAL AND DEPARTURE AREA Arrival and departure concourses should be centrally located below or above the platforms respectively for complete segregation of arriving and departing passengers so that lesser interaction between incoming and outgoing passengers (As shown in figure 25). This is needed to be necessary provided on newly developed railway station and on the station to be redeveloped solution could be by expanding width of present foot over bridges which will act as a departure concourse connecting main entrance to platforms (As shown in figure 26 ). 7.2 CLEAR AND UNOBSTRUCTED ROUTES From the concourse areas to the platforms by the mean of elevated air passages by providing clear unobstructed route with clear visibility to signage of particular platforms with distinctive exit gate from every elevated air passage to particular platforms which will result in early division of the passengers flow for designated platform from their particular exit gate provided at each elevated air passages (As shown in figure 27) 7.3 INTERIOR ELEMENTS AT CONCOURSE/ENTRANCE LOBBY The concourse area should be retrofitted by interior elements such as passengers information systems, seating lounges , lighting, advertising, handrails, MOR (Ministry ofrailway)shops-kiosks,maximumamountofnatural lightfeasiblefromfaçade, wall and ceiling finishes which do not create echo and further enable an environment that allows all public announcementsto be audible to people everywhere during the peak hour, digital signage’s which are easy to be adjustable as if any change in arrival or departure of train, provision of various vertical circulation elements (VCE) like escalators ,travelators , lifts, Fig-25: showing proposal for new railway stations Fig-26: showing proposal for redeveloping railway stations Fig-11: showing movement of passengers towards platform
  • 10. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 902 introduction of Biophilic spaces inside the station area which will resultinhealthyandliveableenvironmentinsidethestation area.( As shown in figure 28 ) 7.4 INTERIOR ELEMENTS AT CONCOURSE/ENTRANCE LOBBY To avoid the condition of overcrowding hence segregation of the flow of departing passengers is needed to be providedbythe division of the railway stations mainly into three zone. (As shown in figure 29) which will providepassengersa sequencedand linear flow within reach to all needs of passengers while travelling. Fig-13: showing division of station in mainly 3 zone 7.5 ACCESS CONTROL As the safety and security are the very important concern for any public building thus restriction to the unauthorized entry in the railway stations should be controlled by division of station in threecategories 1.Entry/Exit2.Unpaidarea3.Paidarea(As shown in figure 30) .The adequate provision of security gates beforeeachentranceto unpaid-paidarea atwhichsecuritycabin, luggage scanner machine and metal detector points must be provided with CCTV cameras. The entry for paid area could be accessible through the flap barriers by the QR codes provided over the passengers train ticket or token that could replace the Fig-12: showing interior elements of concourse area
  • 11. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 903 manual platform ticketing system thus it must necessary for all passengers accessing the paidarea it will reducetheunwanted passengers over the paid area and platforms (As shown in figure 31) 8. CONCLUSION As the railway part a significant and essential role in the preferred mode of transportation from very early 1800 hundred till 21st century both the railway administration and station has undergone into various possible interchanges by modern time which undoubtedly resulted in the integration of railway system with innovative and ideal technologies to collaboratively develop the enhanced experience and satisfaction of the passengersbettertowardsrailways.Hencemanydevelopedcountries have implemented this modern language of Station architecture very early and served as a benchmark of the modern World class station above the more initial language of station architecture used in India, so the Indian railway program has also started to adopt precisely the modern language, constants of the world-class station and look forward to providing the pleasantest railway experience to the passengers by enhancing amenities, innovative development of iconic structure with adapting character of the cities, seeking positive customer experience andapartfromthisthecommercial utilizationofsurplus land of the railway under the (PPP) preferred mode of development i.e. public-private partnership, hence the innovative contribution of the architects, developers, designers will work out as a more satisfactory and improved transportationsystem and better passengers experience. The challenges for the designer or architectsarenotonlytoprovidea spaceaccordingto the standards of the railways though it should further erect an iconicarchitectural building whichmustbe user-friendly andsatisfy the expectation of the passengers. Design elements and strategies as discussed in a paper like retrofittingofinterior space will create a more pleasing station environment and will work in recreating the tarnished image of the Indianrailwayssystemand railway stations. “You lose the knowledge behind when you start chasing for the best gather knowledge that you can get around you and then come out with the best from it” REFERENCES 1. Ministry of railways (railway board) government of India development of world class stations through public private partnership Manual for standards and specifications for railway stations June 2009. 2. Public private partnership in urban rail systems manual of specifications and standards. 3. Smart station in smart cities (UIC) international union of railways. 4. Passengers satisfaction survey report and benchmarking of performance standards Indian railways institute of transport management Lucknow July 2012 Fig-15: showing division of passengers into categories at station Fig-14: showing entry through flap barriers
  • 12. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 904 5. R.Gangwar “Framework for Structuring Public Private Partnerships in railways,” Case Studies on transport Policy, Elsevier, 2014, and Proceedings of the Conference on Transportation Planning and implementation Methodologies for Developing Countries (TPMDC), Indian Institute of Technology Bombay, Mumbai, December 2012. 6. Railway Stations – Layout Manual 2017-04-24 English version 2018-02-20 Swedish transport administration www.trafikverket.se 7. Ar. Shweta Choudhary* and Dr. Satish Pipralia Architectural Perception for redevelopment of Railway termini 8. Indian Railways Stations Re-development Project IRSDC (Indian railways ) 9. Rohit anand and Prof. Dr. Sanjay gupta Productivity of railway stations case study: New Delhi railway station 10. Ernst Bosina, ETH Zürich, Mark Meeder, ETH Zürich, Ulrich Weidmann, ETH Zürich ,Conference paper STRC 2017 Pedestrian flows on railway platforms 11. New Design and Developments at railway coach factory kapurthala (Indian railways) 12. Railway Stations – Layout Manual 2017-04-24 English version 2018-02-20 swedish Transport administration www.trafikverket.se 13. Ksenija N. Stevanović, Milena V. Stevanović New directions in the design of railways stations 14. Vincent Moug1, Selby Coxon2 an analysis of station infrastructure design to improve accessibility between the platform and suburban train carriages. 15. http://irsdc.in 16. http://www.rdso.indianrailways.gov.in/ 17. https://ircep.gov.in/Documents.html 18. http://www.indianrailways.gov.in/railwayboard/