With today`s modern machinery it is essential to audit the machines at frequent intervals to get the best productivity and Yarn Quality in Spinning Mills.This has been practiced by WINSYS SMC at Spinning mills.
2. What is an Audit
Machinery maintenance System audit
What we derive out of Systematic Machinery
Maintenance Audit
Online and Offline audits
Equipments that facilitate Online audits
7. PLAYS A VITAL ROLE TO
Minimise ADD vs EDD variance
Realise the best out of Machinery
Attain Maximum Utilisation
Achieve consistency in YQ
Control/Reduce Manufacturing cost
Train the Workforce
8. A Mill commits EDD for 20 feet container of 40S
CK to Korea by 6TH
July.One Unilap feeding to
the respective combers broke down for 14
Hours on July 1st
.
WHAT HAPPENS TO DELIVERY ADHERENCE?
9. Trumac Cards are supposed to give 99%
Cleaning efficiency.
Varioclean is supposed to give 40% cleaning
efficiency
LC 300A Card 5m CV shd be below 2%
RSB 851 shd run at 400 mpm conveniently for
combed counts with 1m CV below 0.6
HOW TO ACHIEVE THESE LEVELS ALWAYS?
10. NEW RING FRAME SHOULD RUN AT 98.8 %
UTILISATION
AUTOCONER SHOULD RUN AT 96%
UTILISATION
MODERN CARDS (0.5 CRORE) SHOULD BE
RUN AT 96% UTILISATION
WHICH SYSTEM HELPS TO ATTAIN THESE
LEVELS……
11. SPLICE STRENGTH SHOULD BE ABOVE 90%
CV OF IMPERFECTIONS SHOULD NOT
EXCEED 7.5%
CLEARER CUTS SHOULD NOT EXCEED +10
PER LAC METERS
WHAT IS TO BE DONE….???????
12. 3 % of Turn over is allotted for Repairs and
Maintenance
0.5 % Deviation means 14.5 lacs for 25000
spindles on 100s CW
Can we exercise control thro any system for for strict
adherence to budgeted amount?
13. COST OF THE SPARE
COST OF PRODUCTION LOSS
COST OF SUBSEQUENT MACHINERY
CHANGES
BEYOND ABOVE,
LOSS OF A CUSTOMER FOREVER
14. ROUTINE MAINTENANCE
ORGANISED MANUFACTURERS GIVE
RECOMMENDED SCHEDULES
MILLS HAVE TO DEVELOP FOR MACHINERY
FROM UNORGANISED SECTOR
HAS IT BEEN DEVELOPED?
HAS IT BEEN IN LINE WITH
REQUIREMENTS?
15. REDUCES WEAR OF THE PARTS
DEPENDS ON LOAD,HEAT,NATURE OF
ENVIRONMENT,TYPE OF DRIVE etc
CARE ON STORAGE SYSTEMS
RATIONALISATION OF LUBRICANTS
SHELF LIFE OF LUBRICANTS
17. CHECK MAINTENANCE SCHEDULES AND
LUBRICATION SHEDULE WHETHER,
IT IS IN LINE WITH MANUFACTURERER`S
RECOMMENDATION?
IT IS IN LINE WITH INDUSTRY`S BEST
PRACTICES?
30. BEATER QUALITY
LATTICE PIN QUALITY
LATTICE BOWL AND DRIVE SHAFT
QUALITY OF UNDERGRID
CRITICAL SETTINGS INSPECTIO
(MILLS STDS VS ACTUAL)
31. CHECK CYLINDER AND DOFFER FOR
LAND
CHECK FLAT TOPS /STATIONARY FLATS
FOR STRAIGHTENING OF WIRES
CHECK LICKERIN FOR BENT /BROKEN
WIRES
32. CHECK MOTE /TRASH KNIVES FOR
SHARPNESS
CHECK BASIC SETTINGS FOR
AUTOLEVELERS
CHECK CRITICAL SETTINGS
33. TOP ROLLER WEIGHTING SYSTEMS
TOP ROLLER SADDLE QUALITY
LAP SELVEDGE QUALITY
34. CONDITION OF UNICOMB AND TOP
COMBS
CONDITION OF DET ROLL AND DRAFT
ROLL WEIGHTING SYSTEMS
NIPPER BITE
35. TOP ROLLER WEIGHTING/SADDLE
LATERAL PLAY IN DRIVE
BRAKING EFFICIENCY
PRESSURE LEVELS
CARBON IMPRESSION OF ROLLER
SETTINGS
36. TOP ROLLER PRESSURE VARIATION
BUILDER MOTION FUNCTION
ALIGNMENT OF ROVING GUIDES
APRON TENSION
37. TRAVERSE MOVEMENT
SPINDLE CENTERING
RING RAIL LEVEL
RING RAIL MOVEMENT
TAPE TENSION
BOBBIN HOLDER SPRINGS UNIFORMITY
38. YARN PATH IN COMPACT ZONE
SUCTION CONSISTENCY BETWEEN
SECTIONS
COMPACTING SPARES CONDITION
39. CONDITION OF DRUMS
SPLICE CUTTERS
SPLICER COMPONENTS
BALCON SETTINGS/MOVEMENTS
PACKAGE DENSITY CHECKS
40. LEAF GAUGE
MASTER Pr. GAUGE
NILOMETER
ENSURE TIMELY CALIBRATION OF TOOLS
AND GAUGES
41. NOT TO BE STEROTYPED
CHECK LISTS-REVIEW PERIODICALLY
CHANGE AUDITORS PERIODICALLY
LINK CUSTOMER COMPLAINTS
CHANGE OF M/CY NEEDS CHANGE OF
FORMAT
HELPS IN SELECTING THE RIGHT TYPE OF
VENDORS
42. EXTENT TO WHICH PLANNED ACTIVITIES
ARE REALISED AND THE PLANNED
ACTIVITIES ARE CARRIED OUT
44. INQUISITIVE – Should Probe
PROFESSIONAL-Fair and report only based on
facts collected
PRINCIPLED-Open and Transparent approach
POSITIVE-Every discrepancy is an opportunity
for Improvement
45. YARN CLEARERS OF TODAY HAVE ALARM
SETTINGS FEATURE
ALARMS CAN BE SET FOR COPS HAVING
DEFECTS BEYOND SET LIMITS
REJECTED COPS CAN BE ANALYSED FOR
HISTORY
46. COPS FROM A RINGFRAME CAN BE FED
TO AUTOCONERS WITH PRESET ALARM
LIMITS
COPS WILL BEAR THE SPINDLE NUMBER
OF THE RINGFRAME
RUN THESE COPS WITH PRESET ALARM
LIMITS
47. ALARM LIMITS CAN BE SET FOR
CV OF IMPERFECTIONS
IMPERFECTIONS
CLUSTER FAULTS(PEARL CHAIN)
HAIRINESS/SFI
48. Spindlewise defects can be identified and
Clearers help for thoro auditing of Prior
Machinery on a periodical basis
DIFFICULTIES:Spindle numbering and
doffing.Can be practiced.Few Mills have
exclusive empties for this purpose.
49. Auditing of Maintenance activity is essential
To assess Buffing activity mills use Rogue
Soindle analysis immediately after Buffing.
50. Next Level of MMA is TPM
TOTAL PRODUCTIVE MAINTENANCE