International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 550
Cost and Time Optimization for Construction of Residential Building by
Clash detection in Building Information Model(BIM)
Bhamre Gaurav Shyamkant1,Ashwini Patil2,Smita Pataskar3
1Pursuing ME Construction Management, D.Y. Patil College of Engineering, Akurdi, Pune,
gauravsbhamre@gmail.com
2Assistant Professor, D.Y. Patil College of Engineering, Akurdi, Pune - meashwini2013@gmail.com
3Assistant Professor, D.Y. Patil College of Engineering, Akurdi, Pune- pgcivilcm@gmail.com
----------------------------------------------------------------------------***-------------------------------------------------------------------------
Abstract - Building Information Modelling(BIM) has
recently emerged as a highly efficient solution for
information management in Architecture, Engineering
and Construction(AEC) industry. Clash detection tool is
an application of BIM which is used for the coordination
of building systems within 3D building models. This
paper gives a brief introduction about Clash detection in
BIM. The prime objective of this research is to identify
the extent of cost optimization and time optimization for
the construction of residential building using BIM
Coordination (Clash Detection). This research involves
the case study of a residential building constructed using
conventional methods of building information
management. The scope of utilization of BIM
Coordination for the project under consideration was
identified from the acquired data. This research also
focuses on simplifying and standardizing the process of
BIM coordination using Autodesk Navisworks.
Keywords – AEC, BIM, Coordination, Clash Detection,
Standardization, Cost optimization, Methodology, Scope.
I. Introduction
BIM:
Building Information Modelling (BIM) is process that
supports virtual design and construction methodologies
putting all team members together throughout the entire
design and construction process and beyond to the
operations in maintenance of the building, during its
working life. Typically, BIM is one holistic process using
real-time, intellectual modelling software effectively
working in 3D, 4D (3D + time), and 5D (4D + cost) to
improve productivity, to save money and time in the
design and construction phases, and to reduce operating
costs after construction.
Necessity of BIM:
It is also important to highlight the increasing necessity
of BIM, and its overall cost-effectiveness. When it comes
to the decision-making process, no tool outperforms BIM
in clarity of purpose and scope. Each week in the owners’
meeting, we observed a communication process that was
primarily dependent on oral exchange among meeting
participants supported by 2D text and graphics. When
the digital drawings are brought out though, a decision is
often made in only minutes. As projects become
increasingly complex, BIM becomes more and more
necessary for all participants to understand what is
taking place. It could also be argued that the financial
savings of efficient decision-making and fewer project
changes will cover the cost of maintaining an accurate
model. It is likely that complete BIM services will pay for
itself over the life of a project. It is for these reasons that
this major qualifying project recommends a gradual
investment in BIM technology for all applications in
Construction Project Management.
II. Clash Detection
Clash:
A clash occurs when elements of different models occupy
the same space. A clash may be geometric (for example,
pipes passing through walls), schedule based (when
different aspects of work that are supposed to be
sequential are scheduled to occur together or in
reverse), or changes/updates not made to drawings.
There are 3 main types of clashes that clash detection
seeks out:
1. Hard Clash: when two objects pass through each
other. Most BIM modelling software eliminate the
likelihood for this using clash detection rules based
on embedded object data.
2. Soft Clash: work to detect clashes which occur when
objects encroach into geometric tolerances for other
objects (for example, a building being modelled too
close to a high tension wire).
3. 4D/Workflow Clash: clash resolves scheduling
clashes and abnormalities as well as delivery clashes
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 551
(for example, work crews arriving when there is no
equipment on site)
Features of Clash Detection:
1. Clash detection helps in effective identification,
inspection and reporting of interferences in a project
model.
2. It is used for checking completed/ongoing work and
reduces the risk of human error during model
inspections.
3. Clash detection is necessary because several models
(structural, MEP, etc) are integrated into one main
BIM model.
4. With clash detection, mistakes which normally
would have been discovered on the site (with high
cost and schedule implications when corrected at
that stage) can now be seen in the office even before
anyone sets foot on the site.
5. BIM even makes clash detection possible for objects
within objects (a steel rod completely immersed
inside a concrete wall)
BIM Software Available for Clash Detection:
1. BIM modelling design software:
Clash detection within this is limited as it can only
work on models created by the software(proprietary
models.) For example, when you try to place a slab
on a set of walls that do not make contact with each
other in Revit, the software notifies you of a clash.
2. BIM Integration tools that perform clash detection:
Used to detect clashes between different non-
proprietary software (software from different
companies). Alterations, though, have to be carried
out in the software in which the clashing part of the
model is created. For example, after integrating all
the models into a BIM modelling software like Revit,
and carrying out clash detection with Navisworks, a
mistake made by the Structural Engineer using
Orion will involve having the structural Engineer
make the changes in Orion before reintegrating into
Revit. Examples of this type of Clash detection
software include Navisworks and Solibri.
III. Methodology
Clash detection with Navisworks software:
Navisworks provides a platform for integrating all of the
trades, even those with different 3D programs, into one
system in order to build a comprehensive and
interactive, three dimensional model of each project we
perform.
Navisworks predicts clashes by combining all of the
trades in the virtual world, allowing us to revise plans
and schedules to resolve conflicts before construction
begins. This saves thousands of man hours that would be
spent working through these issues in the field. Doing it
right the first time, with a comprehensive 3D
representation of the project, preserves valuable
resources of time and money.
With Navisworks, a 3D model of the entire project is
given a virtual walk through. Trades that can be
integrated include:
 Mechanical
 Plumbing
 Medical Gas Systems
 Chilled and Hot Water Piping
 Steam and Steam Condensate Piping
 Air Handling Equipment and Chillers
 Electrical Conduit and Cable Trays
 Electrical Lighting Components
 Structural Beams and Columns
 Fire Suppressions Systems
Figure 1
Figure 2
Work-Flow:
1. Perform clash detection tests against specified
geometry to help find and resolve conflicts.
2. Check as-built laser-scan data against 3D designs.
3. Open current clash in many original design
software applications.
4. View clashes in context with geometry in the model
and in relation to other clashes.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 552
5. Make all nonclashing items transparent to more
easily locate clashes in the model.
6. Move between clash results to maintain orientation
in the model.
7. Create Hard, Clearance, and Duplicate clash tests to
support multiple coordination scenarios.
8. Analyze space and time by linking clash tests to 4D
simulations and object animations.
Clash detection with BIM 360 Glue:
1. Find Clashes.
Select the models to compare for the clash analysis.
2. View Clash Results.
Identify problem areas by grouping the results
associated with specific models.
3. Add a Clash Mark-up
Annotate clash results with text or linear mark-ups.
4. Send Clash Notifications.
For each individual clash or group of clashes, you
can send notifications to inform project members so
that the conflicts are addressed.
5. Resolve Clashes.
Review and resolve clashes in their authoring tool
with Clash Pinpoint or using drag and drop.
IV. Scope of work
1. To build a BIM Architectural, structural and services
model, coordinate between all the services, model
the interiors and coordinate that with the other
disciplines
2. The Architectural, structural and services models
were imported into Navisworks software to identify
Implementation
Data Analysis
Cost Analysis Time Anlysis
Data Processing
Defining building Priorities Defining Clash Rules Processing Clash Tests
Model Preparation/ Data integration
Integrating all building models in Navisworks Integrating all building models in BIM 360 GLUE
Data Collection
Collecting working drawings
Revit/CAD model different
building systems(MEP,
Structural, Architectural)
Schedules (MSP)
Prerequisites
Learning Softwares (Revit, Navisworks, MSP) Onsite training/Internship
Field Survey
Companies Providing BIM services BIM projects in Pune/Maharashtra
Literature Survey
Current implementation of BIM Significance of Clash Detection
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 553
the clashes among various disciplines. The clashes
were identified, resolved and the 3D BIM model was
updated to incorporate these resolved clashes.
3. Carry out clash detection in BIM 360 Glue.
4. To study the clash reports.
5. To provide the simplified and standardized solution
for clash detection process.
V. Results
1. Cost optimization in project scheduling and
Execution.
2. Quality management reports.
3. Calculating the efficiency of clash detection
software such as Naisworks and BIM 360 glue.
4. Implementation for Indian conditions.
VI. Conclusion
1. The first thing that should be done by Navisworks
users before they go ahead with conducting a clash
test is to effectively set up the elements or items
that they would like to compare during clash
detection in the Batch tab.
2. This can be done by accessing clash detective tool
from where Batch tab can be accessed by
Navisworks users.
3. Elements of a model are compared with the
elements of another model so that if they are
clashing with each other it can be identified in the
clash detection process.
4. One of the most important tasks of Navisworks
users is to effectively recognize the clashes and then
group them according to their similarity.
5. When clashes are grouped together according to
their potential to create obstacles for AEC
professionals in construction, it becomes easy for
them to understand the nature of the clashes.
VII. References
1. Clash Detection - A New Tool in Project
Management: Pranav Bhagwat, Rahul Shinde, 2016
IJSRSET | Volume 2 | Issue 4 | Print ISSN: 23951990
2. Root causes of clashes in building information
models:Iris D. Tommeleinand Sepide Gholami
3. Exploring the High-efficiency Clash Detection
between Architecture and Structure:
Wang Guangbin, Lei Wei and Duan Xuru, 2011
International Conference on Information
Management and Engineering (ICIME 2011),
Singapore
4. IFC-based clash detection for the open-source
BIMserver: P. van den Helm, M Böhms & L van Berlo
TNO Built Environment and Geosciences, NL
5. A Review of Building Information Modeling (BIM)
for Construction Industry: N. S. Chougule, Prof. B. A.
Konnur, International Journal of Innovative
Research in Advanced Engineering (IJIRAE) Issue 4,
Volume 2 (April 2015).
6. Implementing building information modelling
(BIM) at AEC firms in India: Aarti Nanajkar, A Paper
Submitted to the Graduate Faculty of the North
Dakota State University.
7. Scope of Building Information Modelling (BIM) in
India: J. Vinoth Kumar and Mahua Mukherjee,
Department of Architecture and Planning, Indian
Institute of Technology, Roorkee, India. Journal of
Engineering Science and Technology Review 2 (1)
(2009)165-16

More Related Content

What's hot

How BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectHow BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectJacob Ostwald
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipdmarybk
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group reportSyafiq Zariful
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slidesDoreen Yeo
 
iBIM value to Data Center from design to operate
iBIM  value to Data Center from  design to operateiBIM  value to Data Center from  design to operate
iBIM value to Data Center from design to operateStephen Au
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation SlideLee Pei Gie
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group AssignmentHaziq1511
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application ReportShze Hwa Lee
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentationSyafiq Zariful
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesShze Hwa Lee
 
Evolution of cadcamcae techonology and value to the industry v1.compressed
Evolution of cadcamcae techonology and value to the industry v1.compressedEvolution of cadcamcae techonology and value to the industry v1.compressed
Evolution of cadcamcae techonology and value to the industry v1.compressedStephen Au
 
Software Application
Software ApplicationSoftware Application
Software Applicationkohwenqi
 
Hendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquium
Hendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquiumHendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquium
Hendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquiumGijs Derks
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 

What's hot (20)

How BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction projectHow BIM is able to optimise the design phase of a construction project
How BIM is able to optimise the design phase of a construction project
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipd
 
AW201502hr Article_For Sharing
AW201502hr Article_For SharingAW201502hr Article_For Sharing
AW201502hr Article_For Sharing
 
Software report
Software reportSoftware report
Software report
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
 
iBIM value to Data Center from design to operate
iBIM  value to Data Center from  design to operateiBIM  value to Data Center from  design to operate
iBIM value to Data Center from design to operate
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Evolution of cadcamcae techonology and value to the industry v1.compressed
Evolution of cadcamcae techonology and value to the industry v1.compressedEvolution of cadcamcae techonology and value to the industry v1.compressed
Evolution of cadcamcae techonology and value to the industry v1.compressed
 
Software Application
Software ApplicationSoftware Application
Software Application
 
Hendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquium
Hendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquiumHendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquium
Hendriks Bouw en Ontwikkeling about BIM @ BEM Next colloquium
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Similar to Cost and Time Savings from BIM Clash Detection

STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...IRJET Journal
 
Software app slides
Software app slidesSoftware app slides
Software app slidesahmong4
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group reportlohwenjun
 
STUDY OF BUILDING INFORMATION MODELING PROCESS
STUDY OF BUILDING INFORMATION MODELING PROCESSSTUDY OF BUILDING INFORMATION MODELING PROCESS
STUDY OF BUILDING INFORMATION MODELING PROCESSIRJET Journal
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGIRJET Journal
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...IRJET Journal
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
A Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementA Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementCrystal Sanchez
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital constructionBIMLABS GLOBAL
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementIRJET Journal
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDFSandy .
 

Similar to Cost and Time Savings from BIM Clash Detection (20)

STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
STUDY OF BUILDING INFORMATION MODELING PROCESS
STUDY OF BUILDING INFORMATION MODELING PROCESSSTUDY OF BUILDING INFORMATION MODELING PROCESS
STUDY OF BUILDING INFORMATION MODELING PROCESS
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
A Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementA Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project Management
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project Management
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Cost and Time Savings from BIM Clash Detection

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 550 Cost and Time Optimization for Construction of Residential Building by Clash detection in Building Information Model(BIM) Bhamre Gaurav Shyamkant1,Ashwini Patil2,Smita Pataskar3 1Pursuing ME Construction Management, D.Y. Patil College of Engineering, Akurdi, Pune, gauravsbhamre@gmail.com 2Assistant Professor, D.Y. Patil College of Engineering, Akurdi, Pune - meashwini2013@gmail.com 3Assistant Professor, D.Y. Patil College of Engineering, Akurdi, Pune- pgcivilcm@gmail.com ----------------------------------------------------------------------------***------------------------------------------------------------------------- Abstract - Building Information Modelling(BIM) has recently emerged as a highly efficient solution for information management in Architecture, Engineering and Construction(AEC) industry. Clash detection tool is an application of BIM which is used for the coordination of building systems within 3D building models. This paper gives a brief introduction about Clash detection in BIM. The prime objective of this research is to identify the extent of cost optimization and time optimization for the construction of residential building using BIM Coordination (Clash Detection). This research involves the case study of a residential building constructed using conventional methods of building information management. The scope of utilization of BIM Coordination for the project under consideration was identified from the acquired data. This research also focuses on simplifying and standardizing the process of BIM coordination using Autodesk Navisworks. Keywords – AEC, BIM, Coordination, Clash Detection, Standardization, Cost optimization, Methodology, Scope. I. Introduction BIM: Building Information Modelling (BIM) is process that supports virtual design and construction methodologies putting all team members together throughout the entire design and construction process and beyond to the operations in maintenance of the building, during its working life. Typically, BIM is one holistic process using real-time, intellectual modelling software effectively working in 3D, 4D (3D + time), and 5D (4D + cost) to improve productivity, to save money and time in the design and construction phases, and to reduce operating costs after construction. Necessity of BIM: It is also important to highlight the increasing necessity of BIM, and its overall cost-effectiveness. When it comes to the decision-making process, no tool outperforms BIM in clarity of purpose and scope. Each week in the owners’ meeting, we observed a communication process that was primarily dependent on oral exchange among meeting participants supported by 2D text and graphics. When the digital drawings are brought out though, a decision is often made in only minutes. As projects become increasingly complex, BIM becomes more and more necessary for all participants to understand what is taking place. It could also be argued that the financial savings of efficient decision-making and fewer project changes will cover the cost of maintaining an accurate model. It is likely that complete BIM services will pay for itself over the life of a project. It is for these reasons that this major qualifying project recommends a gradual investment in BIM technology for all applications in Construction Project Management. II. Clash Detection Clash: A clash occurs when elements of different models occupy the same space. A clash may be geometric (for example, pipes passing through walls), schedule based (when different aspects of work that are supposed to be sequential are scheduled to occur together or in reverse), or changes/updates not made to drawings. There are 3 main types of clashes that clash detection seeks out: 1. Hard Clash: when two objects pass through each other. Most BIM modelling software eliminate the likelihood for this using clash detection rules based on embedded object data. 2. Soft Clash: work to detect clashes which occur when objects encroach into geometric tolerances for other objects (for example, a building being modelled too close to a high tension wire). 3. 4D/Workflow Clash: clash resolves scheduling clashes and abnormalities as well as delivery clashes
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 551 (for example, work crews arriving when there is no equipment on site) Features of Clash Detection: 1. Clash detection helps in effective identification, inspection and reporting of interferences in a project model. 2. It is used for checking completed/ongoing work and reduces the risk of human error during model inspections. 3. Clash detection is necessary because several models (structural, MEP, etc) are integrated into one main BIM model. 4. With clash detection, mistakes which normally would have been discovered on the site (with high cost and schedule implications when corrected at that stage) can now be seen in the office even before anyone sets foot on the site. 5. BIM even makes clash detection possible for objects within objects (a steel rod completely immersed inside a concrete wall) BIM Software Available for Clash Detection: 1. BIM modelling design software: Clash detection within this is limited as it can only work on models created by the software(proprietary models.) For example, when you try to place a slab on a set of walls that do not make contact with each other in Revit, the software notifies you of a clash. 2. BIM Integration tools that perform clash detection: Used to detect clashes between different non- proprietary software (software from different companies). Alterations, though, have to be carried out in the software in which the clashing part of the model is created. For example, after integrating all the models into a BIM modelling software like Revit, and carrying out clash detection with Navisworks, a mistake made by the Structural Engineer using Orion will involve having the structural Engineer make the changes in Orion before reintegrating into Revit. Examples of this type of Clash detection software include Navisworks and Solibri. III. Methodology Clash detection with Navisworks software: Navisworks provides a platform for integrating all of the trades, even those with different 3D programs, into one system in order to build a comprehensive and interactive, three dimensional model of each project we perform. Navisworks predicts clashes by combining all of the trades in the virtual world, allowing us to revise plans and schedules to resolve conflicts before construction begins. This saves thousands of man hours that would be spent working through these issues in the field. Doing it right the first time, with a comprehensive 3D representation of the project, preserves valuable resources of time and money. With Navisworks, a 3D model of the entire project is given a virtual walk through. Trades that can be integrated include:  Mechanical  Plumbing  Medical Gas Systems  Chilled and Hot Water Piping  Steam and Steam Condensate Piping  Air Handling Equipment and Chillers  Electrical Conduit and Cable Trays  Electrical Lighting Components  Structural Beams and Columns  Fire Suppressions Systems Figure 1 Figure 2 Work-Flow: 1. Perform clash detection tests against specified geometry to help find and resolve conflicts. 2. Check as-built laser-scan data against 3D designs. 3. Open current clash in many original design software applications. 4. View clashes in context with geometry in the model and in relation to other clashes.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 552 5. Make all nonclashing items transparent to more easily locate clashes in the model. 6. Move between clash results to maintain orientation in the model. 7. Create Hard, Clearance, and Duplicate clash tests to support multiple coordination scenarios. 8. Analyze space and time by linking clash tests to 4D simulations and object animations. Clash detection with BIM 360 Glue: 1. Find Clashes. Select the models to compare for the clash analysis. 2. View Clash Results. Identify problem areas by grouping the results associated with specific models. 3. Add a Clash Mark-up Annotate clash results with text or linear mark-ups. 4. Send Clash Notifications. For each individual clash or group of clashes, you can send notifications to inform project members so that the conflicts are addressed. 5. Resolve Clashes. Review and resolve clashes in their authoring tool with Clash Pinpoint or using drag and drop. IV. Scope of work 1. To build a BIM Architectural, structural and services model, coordinate between all the services, model the interiors and coordinate that with the other disciplines 2. The Architectural, structural and services models were imported into Navisworks software to identify Implementation Data Analysis Cost Analysis Time Anlysis Data Processing Defining building Priorities Defining Clash Rules Processing Clash Tests Model Preparation/ Data integration Integrating all building models in Navisworks Integrating all building models in BIM 360 GLUE Data Collection Collecting working drawings Revit/CAD model different building systems(MEP, Structural, Architectural) Schedules (MSP) Prerequisites Learning Softwares (Revit, Navisworks, MSP) Onsite training/Internship Field Survey Companies Providing BIM services BIM projects in Pune/Maharashtra Literature Survey Current implementation of BIM Significance of Clash Detection
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 01 | Jan -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 553 the clashes among various disciplines. The clashes were identified, resolved and the 3D BIM model was updated to incorporate these resolved clashes. 3. Carry out clash detection in BIM 360 Glue. 4. To study the clash reports. 5. To provide the simplified and standardized solution for clash detection process. V. Results 1. Cost optimization in project scheduling and Execution. 2. Quality management reports. 3. Calculating the efficiency of clash detection software such as Naisworks and BIM 360 glue. 4. Implementation for Indian conditions. VI. Conclusion 1. The first thing that should be done by Navisworks users before they go ahead with conducting a clash test is to effectively set up the elements or items that they would like to compare during clash detection in the Batch tab. 2. This can be done by accessing clash detective tool from where Batch tab can be accessed by Navisworks users. 3. Elements of a model are compared with the elements of another model so that if they are clashing with each other it can be identified in the clash detection process. 4. One of the most important tasks of Navisworks users is to effectively recognize the clashes and then group them according to their similarity. 5. When clashes are grouped together according to their potential to create obstacles for AEC professionals in construction, it becomes easy for them to understand the nature of the clashes. VII. References 1. Clash Detection - A New Tool in Project Management: Pranav Bhagwat, Rahul Shinde, 2016 IJSRSET | Volume 2 | Issue 4 | Print ISSN: 23951990 2. Root causes of clashes in building information models:Iris D. Tommeleinand Sepide Gholami 3. Exploring the High-efficiency Clash Detection between Architecture and Structure: Wang Guangbin, Lei Wei and Duan Xuru, 2011 International Conference on Information Management and Engineering (ICIME 2011), Singapore 4. IFC-based clash detection for the open-source BIMserver: P. van den Helm, M Böhms & L van Berlo TNO Built Environment and Geosciences, NL 5. A Review of Building Information Modeling (BIM) for Construction Industry: N. S. Chougule, Prof. B. A. Konnur, International Journal of Innovative Research in Advanced Engineering (IJIRAE) Issue 4, Volume 2 (April 2015). 6. Implementing building information modelling (BIM) at AEC firms in India: Aarti Nanajkar, A Paper Submitted to the Graduate Faculty of the North Dakota State University. 7. Scope of Building Information Modelling (BIM) in India: J. Vinoth Kumar and Mahua Mukherjee, Department of Architecture and Planning, Indian Institute of Technology, Roorkee, India. Journal of Engineering Science and Technology Review 2 (1) (2009)165-16