International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3371
An Execution of Building Information Modelling for Factories and
Warehouse Projects Construction in India – ETO India
Mr. Manoj Bhimalli1, Prof. A. N. Bhirud2, Prof.Dr. N.V. Khadake3
PG Student, M.E. CM, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi,
Pune.1
Assistant Professor, M.E. CM, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research
Wagholi, Pune2 ,
Professor & HOD, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi, Pune 3
-----------------------------------------------------------------------***----------------------------------------------------------------------
Abstract— Building information modelling is one of the
most promising breakthroughs in the architectural,
engineering, and construction (AEC) business (BIM). BIM
technology generates a precise digital depiction of a
building. When completed, the computer-generated model
will have exact geometry and vital data to aid in the design,
manufacture, and procurement of the structure. Many of the
functions necessary to model a building's lifetime are also
accommodated by BIM, setting the framework for new
construction capabilities as well as changes in project team
duties and interactions. BIM, when utilised properly, enables
a more collaborative and errorless design and construction
process, resulting in higher-quality buildings at lower costs
and shorter project schedules. This chapter begins with an
examination of existing building procedures and the
inefficiencies they involve. It then describes the technology
underpinning BIM as well as how to properly employ the
new business processes it provides throughout the lifespan of
a building. It concludes with a review of the many challenges
that may develop throughout the transition to BIM
technology.
Keyword: Building Information Modeling, Revit, AEC
Industry, BIM, Digital Modeling, Digital Construction, VDC,
Augmented Reality.
1. INTRODUCTION
A key issue throughout the building process is a lack of
coordination across varied professional backgrounds
among construction stakeholders and other relevant
parties. Rapid technology improvements, along with
severe rivalry in the construction market for improved
services, have sparked a fundamental shift toward the use
of new approaches in the building sector. BIM creates a
machine-readable digital representation of Industrial
shade data to improve design, construction, and operation
processes, as well as to improve Industrial shade lifecycle
functions. Despite technological developments, industry
adoption of BIM remains limited due to the risks and
obstacles involved with this transition. Sustainable
construction development is a worldwide issue.
Various concepts and methods to environmental
challenges have been created over the last decades,
including green Industrial shade certification (GBC) and
Industrial shade information modelling (BIM).
However, in order to drive more innovation and optimize
the process, an integrated approach is essential. Green
Industrial shade accreditation encourages the use of green
Industrial shade concepts. This new initiative intends to
enhance the purchase of environmentally friendly
industrial shades or infrastructure.
1.1. BIM in construction industry
BIM helps owners improve Industrial shade performance,
decrease financial risks, shorten project timelines, acquire
reliable and precise cost estimates, verify programme
compliance, and optimize facility administration and
maintenance. BIM increases Industrial shade design,
analysis, simulation, and checking from the standpoint of
an architect, and so offers a foundation for developing a
better conceptual design, consistent construction
documentation, and integration and communication
among disciplines. BIM applications for contractors
include constructability analysis and conflict detection,
quantity take-off and cost estimation, construction
planning and controlling, offsite fabrication, and
streamlined handover and commissioning.
1.2 Clash Detection
Clash detection is the basic need of every multidisciplinary
project in which a composite design must be evaluated for
conflicts. Clash Detection is a way of evaluating and
recognizing numerous interferences that usually occur
throughout the coordinating process of 3D models
developed in various current software applications such as
Revit Architectural, Revit Structural, and Revit MEP. 3D
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3372
models for various sorts such as structural, civil, and
architectural &MEP are used in BIM (Mechanical, Electrical
and Plumbing). When all of these different types of models
are combined to create a complete BIM model, there is a
chance that these elements will clash; in clash detection
test, it detects the clashes or mismatches between different
elements within 3D Industrial shade Information Model
before actual construction begins, and thus time
optimization in the construction schedule, cost reduction,
and change orders. Increase the efficiency of design and
construction projects by employing collision detection
applications in the AEC sector.
1.3 Need of Clash Detection
Organizations prepare for the execution stage by arranging
contracts with contractors, purchasing supplies,
guaranteeing proper coordination and assembly order of
the various systems of a project. When the contractor
receives the design drawings and everyone is on-site and
working, the most disputes are discovered. It compares
two-dimensional designs to detect conflict disputes
between specialist designs. Because specialty contributors,
such as structural engineers and MEP engineers, draught
their ideas separately, it is easy to spot incompatibilities
when comparing these designs on distinct drawings.
Contractors must ensure that structural elements,
plumbing, electrical lines, and other components are
properly detailed. If one of these clashes results in a
change order, the consequences include project delays,
design changes, material costs, and budget overruns. Using
BIM and the Clash Detection program, possible problems
to discovered in design or initial phases of engineering in
the design process and rectified with more effective
methods before construction begins.
2. OBJECTIVES
Revit Architecture software was used to generate a 3D
model of the apartment's architecture for this project.
Revit Structure software was used to design the structural
details for this Industrial shade, while Revit MEP software
was used to create the MEP (Mechanical, Electrical, and
Plumbing) services. And Microsoft Project had handled the
schedule (MSP). The architectural, structural, and service
models were integrated into Navisworks software to
discover conflicts between disciplines. The conflicts were
found and handled, and the 3D BIM model was updated to
reflect these resolutions. Finally, quantity analysis was
performed on this model before and after collision
detection.
[1] To create a Analyze Accuracy in Budget Planning
along with 4D & 5D depiction of the Industrial project
construction.
[2] To Reduce rework by implementing adequate
coordination, which results in cost and time savings.
[3] To provide a standardized and streamlined approach
for the conflict detection process.
3. LITERATURE SURVEY
“An Implementation of Building Information Modelling
for Industrial Projects Construction in India – ETO
India”: IJIRSET, Volume 11, Issue 2, February 2022 Mr.
Manoj Bhimalli, Prof. A. N. Bhirud
One of the most promising advances in the architectural,
engineering, and construction (AEC) industry is building
information modelling (BIM). BIM innovation makes a
carefully made correct virtual representation of a building.
When wrapped up, the computer-generated demonstrate
will incorporate exact geometry and critical information to
assist the building's development, fabricating, and
obtainment exercises. BIM moreover obliges numerous of
the assignments required to show a building's lifecycle,
laying the base work for modern development capabilities
as well as changes in extend group duties and connections.
When utilized accurately, BIM permits for a more
coordinates plan and development handle, coming about
in higher- quality buildings at costs viable and shorter
extend timelines. This chapter opens with a dialog of
current development forms, as well as the wasteful aspects
that these hones involve. It at that point goes on to portray
the innovation fundamental BIM as well as how to
successfully take utilize of the modern commerce forms it
offers all through a building's entire lifecycle. It wraps up
with a dialog of the various issues which will emerge
whereas transitioning to BIM innovation.
A review of tertiary BIM education for advanced
engineering communication with visualization:
Badrinath, Amarnath Chegu, Yun‐Tsui Chang, and Shang‐
Hsien Hsieh.
Presently a day, the engineering, designing and
development with an operation (AECO) industry is
persuaded to utilize graduates taught approximately
Building Data Modeling (BIM) instruments, procedures,
and forms, which offer assistance them to superior
collaborative visuals and information and data into their
ventures. In line with today’s AECO industry necessities
and government venture prerequisites, all-inclusive
dynamic BIM specialists and analysts are planning BIM
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3373
educating workflow and syllabus, educational program
and courses. These educationalists and analysts are
moreover creating arrangements to the impediments
confronted amid integration of BIM instruction into
mainland instruction frameworks (TESs). Be that as it may,
BIM analysts have taken few endeavors as of late to supply
a diagram of the level of BIM instruction over the world
through audit and investigation of the most recent
distributions related with BIM instruction in TESs.
Consequently, this ponders endeavors to fill this crevice by
giving an audit of the endeavors of around the world
dynamic instructors and specialists and analysts to teach
AECO understudies approximately BIM within the setting
of progressed innovative instruction with visualization.
A Preliminary Study on BIM Enabled Design Warning
Analysis in T3A Terminal of Chongqing Jiangbei
International Airport: Amarnath Chegu Badrinath1 , Yun-
Tsui Chang2 , Emerson Lin3 , Shang-Hsien Hsieh4 & Bin
Zhao5
Integrated design collaboration is one of the important
focus areas in the design phase of an Architecture,
Building, engineering development & Operation (AECO)
venture life cycle. Jumbled or no connect disciplinary
checks may cause development mistakes, revamps, fabric
wastage, extra alter orders, time, taken a toll overwhelms
and so on. Subsequently, it is crucial to diminish the plan
notices and improve the plan conveyance handle inside the
AECO extend life cycle. As of late, Building Data Modeling
(BIM) is considered as the one-of-a-kind and alluring
apparatus, procedure and handle for progressing the plan
conveyance prepare by worldwide AECO industry.
Analysts within the past have endeavored BIM empowered
plan caution investigation but less consideration was
drawn towards proactive rectify modeling methods, i.e. on
how to re-use the collected information for lessening the
plan coordination issues in up and coming plans. In this
investigate, we attempted a preparatory ponder on BIM
empowered plan blunders investigation. This think about
center on the BIM utilization inside the T3A terminal plan
improvement and integration handle (Development
timeline: 2012-2016) to move forward the T3B terminal
plan conveyance handle (development time: 2016-20).
Yield from this consider can be utilized for helping the plan
groups, i.e. 2D CAD & BIM groups related with Chongqing
Jiangbei Worldwide Airplane terminal venture, to make
strides their efficiency and their organizational BIM usage.
BIM IMPLEMENTATION IN DESIGN FIRMS. RISK-
RESPONSE STRATEGIES TO SUPPORT CHANGE
MANAGEMENT
41St IAHS WORLD CONGRESS, Sustainability and
Innovation for the Future 16th September 2016Albufeira,
Algarve, Portugal
This paper presents a inquire about extend which is being
carried out at Politecnico di Milano approximately the
subject of BIM usage in plan firms. The in general
development industry is confronting a transformation
approximately innovation & information and system setup
administration. Building Data Displaying (BIM) is both the
innovation and strategy obtaining this alter. Indeed, in
spite of the fact that benefits inferred from an sufficient
information and handle administration by utilizing BIM
are profoundly recognized and the innovation is quickly
developing, the pace of BIM selection within the Italian
setting is still moderate. The alter prepare includes various
challenges and many risks components, interrelated to
obstructions to overcome, got to be overseen: 1)
Administrative: adjust and onetime obtainment and PLM;
2) Social/cultural: Challenge in appropriation of unused
innovation and tall rate of Little and Medium Undertakings
(SMEs); 3) Specialized: ineffectual synchronization among
the distinctive program; 4) Organization: need of
government back as well as national benchmarks and
rules; 5) Prudent: tall venture prerequisites. Until
presently, numerous inquire about endeavors have been
concentrated on benefits, hence handle yields, determining
from BIM Usage - instep, small intrigued has been set in
mapping BIM inputs. The inquire about extend points to
fill up this crevice by overseeing BIM execution in plan
firms through the advancement of risk-response
methodologies. This investigate venture, which is still
progressing, is being conducted in two stages. The primary
one in which the conventional plan handle has been
broken down in phases and exercises, distinguishing, for
each of them, yields and included partners.
RESEARCH ON BUILDING INFORMATION MODEL (BIM)
TECHNOLOGY: Tianqi Yang1* and Lihui Liao
In this paper we may take a logical definition of the BIM;
portrays the BIM six most successful and specialized
characteristics; pointed out the pith of BIM innovation; the
paper puts forward nine develop BIM innovation standard
BIM innovation; portrays the improvement apparatuses
and execution achievability of the specialized course of
other innovation integration and advancement; to appear
the development of BIM life cycle administration
procedures and strategies based on two measurements;
from subjective and quantitative BIM innovation and
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3374
vitality utilization examination instruments are
illustrations of advantageous combination; to center
consideration on the focal points of BIM innovation,
cleverly green and feasible plan issues; expansion of
related innovation for direction and dialog; at last, the
application prospect of BIM innovation in China Designing
hone is talked about. At display, from the by and large
point of view, improvement and application of building
data show (BIM) innovation begins late in our nation,
development strategies, the scale isn't idealize, framework
and innovation arrangement, laws and directions
framework has however to be set up; localization of single
key specialized saves and coordinates specialized
framework of building a body of inquire about and
application are required to advance extend, the concept of
BIM plan needs encourage direction, Bim and mechanical
participation and trade at domestic and overseas to be in
full swing, the popularization and application of BIM
Technology, still ought to reinforce the purposeful
publicity, energetically bolster, effectively advance. I stand
within the enormous information, cloud computing data
unused time and cleverly society cusp, bear BIM
Innovation dispersal, enablers verifiable mission.
4. PROBLEM STATEMENT
To determine the applications and benefits of BIM, the
industrial shade, at Dodballapur industrial area in north
Bangalore shed project was chosen. Having mezzanine
floor for office usage, and 1 shed has 2 parts with different
temperature one is ambient, and one is 18 degrees
centigrade. The facility getting used for automobile parts
manufacturing for German automobile company. Building
has planned and constructed with using 3d model and
Construction documentation was extracted from 3d model
and other details regarding the construction project are
provided below.
4.1 DATA COLLECTION –
1. Name of Construction Company: FSIPL, Pune.
2. Location of the Project: KAIDB, Dodballapur,
Banglore.
3. GMAP – Lat: Long: 13.260774977662916,
77.5644935979936
4. Industrial shade Type: Industrial shade
5. Number of Stories: PEB with Utility Area.
6. Number of Phases 1
7. Name of the Project Head: Mr. Aniruddha
Kshirsagar
8. Created Project Charter – Scope of Project,
Baseline Schedule, Communication Matrix,
Conceptual Project development plan. Existing
Site Condition, Possible risk assessment.
9. Software Usage – Sketchup, Revit, Navisworks,
MS Project, MS Office, BIM 360.
Fig 1 FSIPL, Pune
5. RESEARCH METHODOLOGY –
The BIM strategy looks for to coordinated forms and
experts included in designing assignments by working on
stages with facilitated and brilliantly 3D virtual models.
BIM has incredible potential for basic building companies
(SEC) and tackles their most striking issues.
Basically, in BIM implementation project phases are
similar – like Initiation, Planning, Execution, Monitoring &
controlling, Closure for Engineering development. Afterall
this engineering process we use that model for different
BIM uses.
Below mentioned work flow followed from start to end of
this Project.
1. Creation of 2D and 3D (Conceptual & BIM)
2. Clash Detection
3. Integration & Coordination
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3375
4. 4D Planning & controlling
5. 5D Cost Estimation
6. Implementation for different BIM uses
(Construction Usage)
5.1 Detailed method BIM project for execution
6. ANALYSIS
BIM has an excellent visualization tool. It represented the
Industrial shade in three dimensions (3D). The
construction manager will give renderings, walkthroughs,
estimating, and sequencing of the model during the
Industrial shade phase of the project to better express the
notion of BIM in 3D perspective. Visualization improves
comprehension of the finished output of Industrial
shadow. It detracts from the process of pulling together
several standard 2D views to produce the intricacies of a
3D image. One of the most fundamental applications of
BIM is the use of 3D modelling to produce a depiction of
the structure. The designs are made in three dimensions,
which adds perspective of Industrial shadow to the picture
as well as the ability to exhibit numerous viewpoints and
angles. When compared to two-dimensional graphics, this
delivers greater clarity and ease of use. BIM software
generates 3D models, albeit the LOD in each model varies.
Building Data Modeling is the source of computerized
change within the AEC industry. The method of BIM usage
empowers real-time collaboration and plan modifications
for minimizing superfluous issues among the partners.
Excelize encourages Engineering, Building and
Development clients in creating the idealize BIM workflow
in all ventures.
Fig 2 AutoCAD Plan
Fig 3 Modeling in Sketchup
Fig 4 Detailing in Sketchup
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3376
Fig 5 Detailing in Revit
Fig 6 Detailing in Revit
6.1 Analysis - ETO Project – Baseline Plan
Fig 6 Baseline VS Actual Track in MS Project
6.2 Material Take off -
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3377
7. RESULT & DISCUSSION
 Cost savings: - Diminish human mistakes that can
lead to extend delays as well as dreary or re-examined
documentation. Moreover, we might control the
modifications.
 More Efficient / Effective Projects Engineering
& designing - By utilizing BIM, designers can begin
planning the building early, which implies
development can moreover take put early. Improved
workflow moreover speeds up the method as each
group part is working from the same set of models. •
For case, an designer might choose to have certain
parts of the extend pre-assembled in bulk utilizing
mechanical autonomy. This permits the development
group to simply secure the pieces in put when they
arrive on location which spares a part of time.
 Improved Communications - BIM moves forward
communication between all parties included in a
venture counting temporary workers, originators,
clients, and designers who all play a imperative part
within the process. The reason for this is often since
BIM depends on a ‘single source of truth’ which
implies each piece of data relating to costs, models,
and plan notes are put away and available from a
central area. This gives everybody with full
perceivability of the venture and guarantees they are
working in couple. It’s a true form of collaboration that
makes a difference to dispose of any
miscommunication so that all parties can discover the
leading arrangement.
 Faster and Easier Prefabrication and Modular
Construction- By utilizing BIM computer program,
you'll make nitty gritty generation models that can at
that point be pre-fabricated off location. By planning,
enumerating, and building pieces off site in a
controlled environment you'll be able progress
productivity while diminishing squander, work, and
fabric costs. This too spares you and your group
important time as these segments can effectively be
collected. As well as, modelers have more openings to
plan secluded pieces of engineering that can be fitted
together and incorporate complex resistance
calculations. This spares temporary workers time and
assets on location as they are not building pieces from
scratch.
 High Quality Results – It made strides Extend plan
exactness with regard to Budget arranging, blunder
free Development documentation, incline
communication, tends to less wastage in development
stage since we have advanced show some time
recently progressing to begin real development
execution.
8. CONCLUSION
 Especially during building and renovation phases,
dynamic updates empower real-time insights about a
building. If you change X variable in a BIM plan, it
updates Y and Z affected systems, to show a true-to-
form model of what those changes look like and what
they mean for facilities as whole. This intuitive action-
reaction relationship cuts down on the guesswork of
modifying facilities.
 Using collision detection algorithms helps to reduce
coordination errors and human errors, resulting in
excellent model accuracy. As a consequence, re-
building will be avoided.
 Navisworks customers should first set up the
components or items that they wish to compare
during collision detection under the Batch tab before
starting with a conflict test.
 Navisworks users may accomplish this by heading to
the conflict detective tool and selecting the Batch tab.
One of the most important tasks for Navisworks users
is to detect and arrange disagreements based on
commonalities.
 When AEC professionals in construction are placed
together based on their potential to cause barriers, it
is simpler for them to grasp the nature of conflicts.
 Using BIM technology reduced the total cost of the
project throughout the building stage by assisting in
the successful identification, inspection, and reporting
of a project model.
9. REFERENCES –
[1] “An Implementation of Building Information
Modelling for Industrial Projects Construction in
India – ETO India”: IJIRSET, Volume 11, Issue 2,
February 2022 Mr. Manoj Bhimalli, Prof. A. N.
Bhirud
[2] BIM IMPLEMENTATION IN DESIGN FIRMS. RISK-
RESPONSESTRATEGIES TO SUPPORT CHANGE
MANAGEMENT: Marcella Bonanomi, Giancarlo
Paganin and Cinzia Talamo. 41St IAHS WORLD
CONGRESS, Sustainability and Innovation for the
Future 16th September 2016 Albufeira, Algarve,
Portugal
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3378
[3] Badrinath, Amarnath Chegu, Yun‐Tsui Chang, and
Shang‐Hsien Hsieh. "A review of tertiary BIM
education for advanced engineering
communication with visualization." Visualization
in Engineering 4, no. 1 (2016): 1-17.
[4] Ayer, Steven K., J. Cribbs, J. D. Hailer, and A. D.
Chasey. "Best practices and lessons learned in BIM
project execution planning in construction
education." In Proceedings of 9th BIM Academic
Symposium and Job Task Analysis Review,
Washington, DC, pp. 167-174. 2015.
[5] Badrinath, A., Chang, Y., Lin, E., Hsien, S., & Zhao, B.
(2016). A preliminary study on BIM enabled
design warning analysis in T3A Terminal of
Chongqing Jiangbei International Airport.
In Proceedings of the International Conference on
Computing in Civil and Building Engineering
(ICCCBE) (pp. 485-491).
[6] Yang, Tianqi, and Lihui Liao. "Research on building
information model (BIM) technology." 世界建筑 5,
no. 1 (2017): 1-7.
[7] G. Carbonari, S. Stravoravdis, C. Gausden, “BIM
implementation for existing Industrial shades for
facilities management: A framework and two case
studies”, Volume: 149, 2015.
[8] Yu-Cheng Lin, Yu Chih Su, “Developing mobile and
BIM based integrated visual facility maintenance
management system”, Volume:2013, August 2013.
[9] N. A. H. Hadzaman, R. Tukin, A. H. Nawawi,
“Industrial shade information modelling the
impact of project attribute towards client demand
in BIM based project”, Volume: 149, 2015.
[10] Anderson O. Akponeware, Zulfiker A. Adamu,
“Clash detection or clash avoidance? an
investigation into coordination problems in 3D
BIM”, August 2017.
[11] S. S. Walunjkar, “Improve the productivity of
Industrial shade construction project using clash
detection application in BIM”, Volume: 04, March
2017.
[12] Bahriye Ilhan, Hakan Yaman, “BIM and
sustainability concept in construction project: a
case study”, 2016.
[13] Timothy O. Olawumi, Dani al W. M. Chan,
“Beneficial factors of integrating information
modelling and sustainability practises in
construction project”, January 2018.
[14] Iris D. Tommelein, Sepide Gholami, “Root causes
of clashes in Industrial shade information
models”, 2017.
[15] Ahmed Elmaraghy, Hans Voordijk, Mohamed
Marzouk, “An exploration of BIM and lean
interaction optimizing demolition projects”, IGLC-
26, July 2018.
[16] Olugbenga O. Akinade, Saheed O. Ajayi,
Muhammad Bilal, “Designing construction waste
using BIM technology: stakeholders’ expectations
for industry deployment”, 2018.
[17] Tomohiro Fukuda, Kazuki Yokoi, Noboyoshi
Yabuki, “An indoor thermal environment design
system for renovation using augmented reality”,
May 2018.
[18] Jack C. P. Cheng, Luren Y. H. Ma, “A BIM based
system for demolition and renovation waste
estimation and planning”, 2013.
[19] Antonio Galiano-Garrigos, Maria Dolores
Andujar-Montoya, “Industrial shade information
modelling in operation and maintenance at the
university of Alicante”, 2018.
[20] Hossain Md Aslam, Haron Ahmad Tarmizi,
“Intelligent BIM record model for effective asset
management of constructed facility”, 2018

More Related Content

Similar to An Execution of Building Information Modelling for Factories and Warehouse Projects Construction in India – ETO India

Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...IRJET Journal
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM UTHM
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGIRJET Journal
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET Journal
 
Building Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisBuilding Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisIRJET Journal
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...IRJET Journal
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...IRJET Journal
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?Anees Ur Rehman
 
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdfBIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdfLPU / IITB / KM
 
What you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxWhat you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxeubanksnefen
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...IRJET Journal
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group reportlohwenjun
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DYee Len Wan
 

Similar to An Execution of Building Information Modelling for Factories and Warehouse Projects Construction in India – ETO India (20)

BIM Assignment.doc
BIM Assignment.docBIM Assignment.doc
BIM Assignment.doc
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
 
Building Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisBuilding Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability Analysis
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?
 
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdfBIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Bim
BimBim
Bim
 
What you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docxWhat you have1) Draft word file2) Feedbacks and comments3) .docx
What you have1) Draft word file2) Feedbacks and comments3) .docx
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 

An Execution of Building Information Modelling for Factories and Warehouse Projects Construction in India – ETO India

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3371 An Execution of Building Information Modelling for Factories and Warehouse Projects Construction in India – ETO India Mr. Manoj Bhimalli1, Prof. A. N. Bhirud2, Prof.Dr. N.V. Khadake3 PG Student, M.E. CM, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi, Pune.1 Assistant Professor, M.E. CM, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi, Pune2 , Professor & HOD, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi, Pune 3 -----------------------------------------------------------------------***---------------------------------------------------------------------- Abstract— Building information modelling is one of the most promising breakthroughs in the architectural, engineering, and construction (AEC) business (BIM). BIM technology generates a precise digital depiction of a building. When completed, the computer-generated model will have exact geometry and vital data to aid in the design, manufacture, and procurement of the structure. Many of the functions necessary to model a building's lifetime are also accommodated by BIM, setting the framework for new construction capabilities as well as changes in project team duties and interactions. BIM, when utilised properly, enables a more collaborative and errorless design and construction process, resulting in higher-quality buildings at lower costs and shorter project schedules. This chapter begins with an examination of existing building procedures and the inefficiencies they involve. It then describes the technology underpinning BIM as well as how to properly employ the new business processes it provides throughout the lifespan of a building. It concludes with a review of the many challenges that may develop throughout the transition to BIM technology. Keyword: Building Information Modeling, Revit, AEC Industry, BIM, Digital Modeling, Digital Construction, VDC, Augmented Reality. 1. INTRODUCTION A key issue throughout the building process is a lack of coordination across varied professional backgrounds among construction stakeholders and other relevant parties. Rapid technology improvements, along with severe rivalry in the construction market for improved services, have sparked a fundamental shift toward the use of new approaches in the building sector. BIM creates a machine-readable digital representation of Industrial shade data to improve design, construction, and operation processes, as well as to improve Industrial shade lifecycle functions. Despite technological developments, industry adoption of BIM remains limited due to the risks and obstacles involved with this transition. Sustainable construction development is a worldwide issue. Various concepts and methods to environmental challenges have been created over the last decades, including green Industrial shade certification (GBC) and Industrial shade information modelling (BIM). However, in order to drive more innovation and optimize the process, an integrated approach is essential. Green Industrial shade accreditation encourages the use of green Industrial shade concepts. This new initiative intends to enhance the purchase of environmentally friendly industrial shades or infrastructure. 1.1. BIM in construction industry BIM helps owners improve Industrial shade performance, decrease financial risks, shorten project timelines, acquire reliable and precise cost estimates, verify programme compliance, and optimize facility administration and maintenance. BIM increases Industrial shade design, analysis, simulation, and checking from the standpoint of an architect, and so offers a foundation for developing a better conceptual design, consistent construction documentation, and integration and communication among disciplines. BIM applications for contractors include constructability analysis and conflict detection, quantity take-off and cost estimation, construction planning and controlling, offsite fabrication, and streamlined handover and commissioning. 1.2 Clash Detection Clash detection is the basic need of every multidisciplinary project in which a composite design must be evaluated for conflicts. Clash Detection is a way of evaluating and recognizing numerous interferences that usually occur throughout the coordinating process of 3D models developed in various current software applications such as Revit Architectural, Revit Structural, and Revit MEP. 3D
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3372 models for various sorts such as structural, civil, and architectural &MEP are used in BIM (Mechanical, Electrical and Plumbing). When all of these different types of models are combined to create a complete BIM model, there is a chance that these elements will clash; in clash detection test, it detects the clashes or mismatches between different elements within 3D Industrial shade Information Model before actual construction begins, and thus time optimization in the construction schedule, cost reduction, and change orders. Increase the efficiency of design and construction projects by employing collision detection applications in the AEC sector. 1.3 Need of Clash Detection Organizations prepare for the execution stage by arranging contracts with contractors, purchasing supplies, guaranteeing proper coordination and assembly order of the various systems of a project. When the contractor receives the design drawings and everyone is on-site and working, the most disputes are discovered. It compares two-dimensional designs to detect conflict disputes between specialist designs. Because specialty contributors, such as structural engineers and MEP engineers, draught their ideas separately, it is easy to spot incompatibilities when comparing these designs on distinct drawings. Contractors must ensure that structural elements, plumbing, electrical lines, and other components are properly detailed. If one of these clashes results in a change order, the consequences include project delays, design changes, material costs, and budget overruns. Using BIM and the Clash Detection program, possible problems to discovered in design or initial phases of engineering in the design process and rectified with more effective methods before construction begins. 2. OBJECTIVES Revit Architecture software was used to generate a 3D model of the apartment's architecture for this project. Revit Structure software was used to design the structural details for this Industrial shade, while Revit MEP software was used to create the MEP (Mechanical, Electrical, and Plumbing) services. And Microsoft Project had handled the schedule (MSP). The architectural, structural, and service models were integrated into Navisworks software to discover conflicts between disciplines. The conflicts were found and handled, and the 3D BIM model was updated to reflect these resolutions. Finally, quantity analysis was performed on this model before and after collision detection. [1] To create a Analyze Accuracy in Budget Planning along with 4D & 5D depiction of the Industrial project construction. [2] To Reduce rework by implementing adequate coordination, which results in cost and time savings. [3] To provide a standardized and streamlined approach for the conflict detection process. 3. LITERATURE SURVEY “An Implementation of Building Information Modelling for Industrial Projects Construction in India – ETO India”: IJIRSET, Volume 11, Issue 2, February 2022 Mr. Manoj Bhimalli, Prof. A. N. Bhirud One of the most promising advances in the architectural, engineering, and construction (AEC) industry is building information modelling (BIM). BIM innovation makes a carefully made correct virtual representation of a building. When wrapped up, the computer-generated demonstrate will incorporate exact geometry and critical information to assist the building's development, fabricating, and obtainment exercises. BIM moreover obliges numerous of the assignments required to show a building's lifecycle, laying the base work for modern development capabilities as well as changes in extend group duties and connections. When utilized accurately, BIM permits for a more coordinates plan and development handle, coming about in higher- quality buildings at costs viable and shorter extend timelines. This chapter opens with a dialog of current development forms, as well as the wasteful aspects that these hones involve. It at that point goes on to portray the innovation fundamental BIM as well as how to successfully take utilize of the modern commerce forms it offers all through a building's entire lifecycle. It wraps up with a dialog of the various issues which will emerge whereas transitioning to BIM innovation. A review of tertiary BIM education for advanced engineering communication with visualization: Badrinath, Amarnath Chegu, Yun‐Tsui Chang, and Shang‐ Hsien Hsieh. Presently a day, the engineering, designing and development with an operation (AECO) industry is persuaded to utilize graduates taught approximately Building Data Modeling (BIM) instruments, procedures, and forms, which offer assistance them to superior collaborative visuals and information and data into their ventures. In line with today’s AECO industry necessities and government venture prerequisites, all-inclusive dynamic BIM specialists and analysts are planning BIM
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3373 educating workflow and syllabus, educational program and courses. These educationalists and analysts are moreover creating arrangements to the impediments confronted amid integration of BIM instruction into mainland instruction frameworks (TESs). Be that as it may, BIM analysts have taken few endeavors as of late to supply a diagram of the level of BIM instruction over the world through audit and investigation of the most recent distributions related with BIM instruction in TESs. Consequently, this ponders endeavors to fill this crevice by giving an audit of the endeavors of around the world dynamic instructors and specialists and analysts to teach AECO understudies approximately BIM within the setting of progressed innovative instruction with visualization. A Preliminary Study on BIM Enabled Design Warning Analysis in T3A Terminal of Chongqing Jiangbei International Airport: Amarnath Chegu Badrinath1 , Yun- Tsui Chang2 , Emerson Lin3 , Shang-Hsien Hsieh4 & Bin Zhao5 Integrated design collaboration is one of the important focus areas in the design phase of an Architecture, Building, engineering development & Operation (AECO) venture life cycle. Jumbled or no connect disciplinary checks may cause development mistakes, revamps, fabric wastage, extra alter orders, time, taken a toll overwhelms and so on. Subsequently, it is crucial to diminish the plan notices and improve the plan conveyance handle inside the AECO extend life cycle. As of late, Building Data Modeling (BIM) is considered as the one-of-a-kind and alluring apparatus, procedure and handle for progressing the plan conveyance prepare by worldwide AECO industry. Analysts within the past have endeavored BIM empowered plan caution investigation but less consideration was drawn towards proactive rectify modeling methods, i.e. on how to re-use the collected information for lessening the plan coordination issues in up and coming plans. In this investigate, we attempted a preparatory ponder on BIM empowered plan blunders investigation. This think about center on the BIM utilization inside the T3A terminal plan improvement and integration handle (Development timeline: 2012-2016) to move forward the T3B terminal plan conveyance handle (development time: 2016-20). Yield from this consider can be utilized for helping the plan groups, i.e. 2D CAD & BIM groups related with Chongqing Jiangbei Worldwide Airplane terminal venture, to make strides their efficiency and their organizational BIM usage. BIM IMPLEMENTATION IN DESIGN FIRMS. RISK- RESPONSE STRATEGIES TO SUPPORT CHANGE MANAGEMENT 41St IAHS WORLD CONGRESS, Sustainability and Innovation for the Future 16th September 2016Albufeira, Algarve, Portugal This paper presents a inquire about extend which is being carried out at Politecnico di Milano approximately the subject of BIM usage in plan firms. The in general development industry is confronting a transformation approximately innovation & information and system setup administration. Building Data Displaying (BIM) is both the innovation and strategy obtaining this alter. Indeed, in spite of the fact that benefits inferred from an sufficient information and handle administration by utilizing BIM are profoundly recognized and the innovation is quickly developing, the pace of BIM selection within the Italian setting is still moderate. The alter prepare includes various challenges and many risks components, interrelated to obstructions to overcome, got to be overseen: 1) Administrative: adjust and onetime obtainment and PLM; 2) Social/cultural: Challenge in appropriation of unused innovation and tall rate of Little and Medium Undertakings (SMEs); 3) Specialized: ineffectual synchronization among the distinctive program; 4) Organization: need of government back as well as national benchmarks and rules; 5) Prudent: tall venture prerequisites. Until presently, numerous inquire about endeavors have been concentrated on benefits, hence handle yields, determining from BIM Usage - instep, small intrigued has been set in mapping BIM inputs. The inquire about extend points to fill up this crevice by overseeing BIM execution in plan firms through the advancement of risk-response methodologies. This investigate venture, which is still progressing, is being conducted in two stages. The primary one in which the conventional plan handle has been broken down in phases and exercises, distinguishing, for each of them, yields and included partners. RESEARCH ON BUILDING INFORMATION MODEL (BIM) TECHNOLOGY: Tianqi Yang1* and Lihui Liao In this paper we may take a logical definition of the BIM; portrays the BIM six most successful and specialized characteristics; pointed out the pith of BIM innovation; the paper puts forward nine develop BIM innovation standard BIM innovation; portrays the improvement apparatuses and execution achievability of the specialized course of other innovation integration and advancement; to appear the development of BIM life cycle administration procedures and strategies based on two measurements; from subjective and quantitative BIM innovation and
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3374 vitality utilization examination instruments are illustrations of advantageous combination; to center consideration on the focal points of BIM innovation, cleverly green and feasible plan issues; expansion of related innovation for direction and dialog; at last, the application prospect of BIM innovation in China Designing hone is talked about. At display, from the by and large point of view, improvement and application of building data show (BIM) innovation begins late in our nation, development strategies, the scale isn't idealize, framework and innovation arrangement, laws and directions framework has however to be set up; localization of single key specialized saves and coordinates specialized framework of building a body of inquire about and application are required to advance extend, the concept of BIM plan needs encourage direction, Bim and mechanical participation and trade at domestic and overseas to be in full swing, the popularization and application of BIM Technology, still ought to reinforce the purposeful publicity, energetically bolster, effectively advance. I stand within the enormous information, cloud computing data unused time and cleverly society cusp, bear BIM Innovation dispersal, enablers verifiable mission. 4. PROBLEM STATEMENT To determine the applications and benefits of BIM, the industrial shade, at Dodballapur industrial area in north Bangalore shed project was chosen. Having mezzanine floor for office usage, and 1 shed has 2 parts with different temperature one is ambient, and one is 18 degrees centigrade. The facility getting used for automobile parts manufacturing for German automobile company. Building has planned and constructed with using 3d model and Construction documentation was extracted from 3d model and other details regarding the construction project are provided below. 4.1 DATA COLLECTION – 1. Name of Construction Company: FSIPL, Pune. 2. Location of the Project: KAIDB, Dodballapur, Banglore. 3. GMAP – Lat: Long: 13.260774977662916, 77.5644935979936 4. Industrial shade Type: Industrial shade 5. Number of Stories: PEB with Utility Area. 6. Number of Phases 1 7. Name of the Project Head: Mr. Aniruddha Kshirsagar 8. Created Project Charter – Scope of Project, Baseline Schedule, Communication Matrix, Conceptual Project development plan. Existing Site Condition, Possible risk assessment. 9. Software Usage – Sketchup, Revit, Navisworks, MS Project, MS Office, BIM 360. Fig 1 FSIPL, Pune 5. RESEARCH METHODOLOGY – The BIM strategy looks for to coordinated forms and experts included in designing assignments by working on stages with facilitated and brilliantly 3D virtual models. BIM has incredible potential for basic building companies (SEC) and tackles their most striking issues. Basically, in BIM implementation project phases are similar – like Initiation, Planning, Execution, Monitoring & controlling, Closure for Engineering development. Afterall this engineering process we use that model for different BIM uses. Below mentioned work flow followed from start to end of this Project. 1. Creation of 2D and 3D (Conceptual & BIM) 2. Clash Detection 3. Integration & Coordination
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3375 4. 4D Planning & controlling 5. 5D Cost Estimation 6. Implementation for different BIM uses (Construction Usage) 5.1 Detailed method BIM project for execution 6. ANALYSIS BIM has an excellent visualization tool. It represented the Industrial shade in three dimensions (3D). The construction manager will give renderings, walkthroughs, estimating, and sequencing of the model during the Industrial shade phase of the project to better express the notion of BIM in 3D perspective. Visualization improves comprehension of the finished output of Industrial shadow. It detracts from the process of pulling together several standard 2D views to produce the intricacies of a 3D image. One of the most fundamental applications of BIM is the use of 3D modelling to produce a depiction of the structure. The designs are made in three dimensions, which adds perspective of Industrial shadow to the picture as well as the ability to exhibit numerous viewpoints and angles. When compared to two-dimensional graphics, this delivers greater clarity and ease of use. BIM software generates 3D models, albeit the LOD in each model varies. Building Data Modeling is the source of computerized change within the AEC industry. The method of BIM usage empowers real-time collaboration and plan modifications for minimizing superfluous issues among the partners. Excelize encourages Engineering, Building and Development clients in creating the idealize BIM workflow in all ventures. Fig 2 AutoCAD Plan Fig 3 Modeling in Sketchup Fig 4 Detailing in Sketchup
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3376 Fig 5 Detailing in Revit Fig 6 Detailing in Revit 6.1 Analysis - ETO Project – Baseline Plan Fig 6 Baseline VS Actual Track in MS Project 6.2 Material Take off -
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3377 7. RESULT & DISCUSSION  Cost savings: - Diminish human mistakes that can lead to extend delays as well as dreary or re-examined documentation. Moreover, we might control the modifications.  More Efficient / Effective Projects Engineering & designing - By utilizing BIM, designers can begin planning the building early, which implies development can moreover take put early. Improved workflow moreover speeds up the method as each group part is working from the same set of models. • For case, an designer might choose to have certain parts of the extend pre-assembled in bulk utilizing mechanical autonomy. This permits the development group to simply secure the pieces in put when they arrive on location which spares a part of time.  Improved Communications - BIM moves forward communication between all parties included in a venture counting temporary workers, originators, clients, and designers who all play a imperative part within the process. The reason for this is often since BIM depends on a ‘single source of truth’ which implies each piece of data relating to costs, models, and plan notes are put away and available from a central area. This gives everybody with full perceivability of the venture and guarantees they are working in couple. It’s a true form of collaboration that makes a difference to dispose of any miscommunication so that all parties can discover the leading arrangement.  Faster and Easier Prefabrication and Modular Construction- By utilizing BIM computer program, you'll make nitty gritty generation models that can at that point be pre-fabricated off location. By planning, enumerating, and building pieces off site in a controlled environment you'll be able progress productivity while diminishing squander, work, and fabric costs. This too spares you and your group important time as these segments can effectively be collected. As well as, modelers have more openings to plan secluded pieces of engineering that can be fitted together and incorporate complex resistance calculations. This spares temporary workers time and assets on location as they are not building pieces from scratch.  High Quality Results – It made strides Extend plan exactness with regard to Budget arranging, blunder free Development documentation, incline communication, tends to less wastage in development stage since we have advanced show some time recently progressing to begin real development execution. 8. CONCLUSION  Especially during building and renovation phases, dynamic updates empower real-time insights about a building. If you change X variable in a BIM plan, it updates Y and Z affected systems, to show a true-to- form model of what those changes look like and what they mean for facilities as whole. This intuitive action- reaction relationship cuts down on the guesswork of modifying facilities.  Using collision detection algorithms helps to reduce coordination errors and human errors, resulting in excellent model accuracy. As a consequence, re- building will be avoided.  Navisworks customers should first set up the components or items that they wish to compare during collision detection under the Batch tab before starting with a conflict test.  Navisworks users may accomplish this by heading to the conflict detective tool and selecting the Batch tab. One of the most important tasks for Navisworks users is to detect and arrange disagreements based on commonalities.  When AEC professionals in construction are placed together based on their potential to cause barriers, it is simpler for them to grasp the nature of conflicts.  Using BIM technology reduced the total cost of the project throughout the building stage by assisting in the successful identification, inspection, and reporting of a project model. 9. REFERENCES – [1] “An Implementation of Building Information Modelling for Industrial Projects Construction in India – ETO India”: IJIRSET, Volume 11, Issue 2, February 2022 Mr. Manoj Bhimalli, Prof. A. N. Bhirud [2] BIM IMPLEMENTATION IN DESIGN FIRMS. RISK- RESPONSESTRATEGIES TO SUPPORT CHANGE MANAGEMENT: Marcella Bonanomi, Giancarlo Paganin and Cinzia Talamo. 41St IAHS WORLD CONGRESS, Sustainability and Innovation for the Future 16th September 2016 Albufeira, Algarve, Portugal
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3378 [3] Badrinath, Amarnath Chegu, Yun‐Tsui Chang, and Shang‐Hsien Hsieh. "A review of tertiary BIM education for advanced engineering communication with visualization." Visualization in Engineering 4, no. 1 (2016): 1-17. [4] Ayer, Steven K., J. Cribbs, J. D. Hailer, and A. D. Chasey. "Best practices and lessons learned in BIM project execution planning in construction education." In Proceedings of 9th BIM Academic Symposium and Job Task Analysis Review, Washington, DC, pp. 167-174. 2015. [5] Badrinath, A., Chang, Y., Lin, E., Hsien, S., & Zhao, B. (2016). A preliminary study on BIM enabled design warning analysis in T3A Terminal of Chongqing Jiangbei International Airport. In Proceedings of the International Conference on Computing in Civil and Building Engineering (ICCCBE) (pp. 485-491). [6] Yang, Tianqi, and Lihui Liao. "Research on building information model (BIM) technology." 世界建筑 5, no. 1 (2017): 1-7. [7] G. Carbonari, S. Stravoravdis, C. Gausden, “BIM implementation for existing Industrial shades for facilities management: A framework and two case studies”, Volume: 149, 2015. [8] Yu-Cheng Lin, Yu Chih Su, “Developing mobile and BIM based integrated visual facility maintenance management system”, Volume:2013, August 2013. [9] N. A. H. Hadzaman, R. Tukin, A. H. Nawawi, “Industrial shade information modelling the impact of project attribute towards client demand in BIM based project”, Volume: 149, 2015. [10] Anderson O. Akponeware, Zulfiker A. Adamu, “Clash detection or clash avoidance? an investigation into coordination problems in 3D BIM”, August 2017. [11] S. S. Walunjkar, “Improve the productivity of Industrial shade construction project using clash detection application in BIM”, Volume: 04, March 2017. [12] Bahriye Ilhan, Hakan Yaman, “BIM and sustainability concept in construction project: a case study”, 2016. [13] Timothy O. Olawumi, Dani al W. M. Chan, “Beneficial factors of integrating information modelling and sustainability practises in construction project”, January 2018. [14] Iris D. Tommelein, Sepide Gholami, “Root causes of clashes in Industrial shade information models”, 2017. [15] Ahmed Elmaraghy, Hans Voordijk, Mohamed Marzouk, “An exploration of BIM and lean interaction optimizing demolition projects”, IGLC- 26, July 2018. [16] Olugbenga O. Akinade, Saheed O. Ajayi, Muhammad Bilal, “Designing construction waste using BIM technology: stakeholders’ expectations for industry deployment”, 2018. [17] Tomohiro Fukuda, Kazuki Yokoi, Noboyoshi Yabuki, “An indoor thermal environment design system for renovation using augmented reality”, May 2018. [18] Jack C. P. Cheng, Luren Y. H. Ma, “A BIM based system for demolition and renovation waste estimation and planning”, 2013. [19] Antonio Galiano-Garrigos, Maria Dolores Andujar-Montoya, “Industrial shade information modelling in operation and maintenance at the university of Alicante”, 2018. [20] Hossain Md Aslam, Haron Ahmad Tarmizi, “Intelligent BIM record model for effective asset management of constructed facility”, 2018