Bim Enabled Ipd

2,526 views

Published on

Published in: Technology, Business

Bim Enabled Ipd

  1. 1. BIM-Enabled IPD <ul><li>Laura Handler Sarah Vekasy, AIA </li></ul><ul><li>Virtual Construction Manager Associate </li></ul>
  2. 2. Our Three Steps 1 2 3 Building Information Model Virtual Design & Construction Integrated Project Delivery
  3. 3. IPD is like…
  4. 4. IPD is like…
  5. 5. IPD IS…
  6. 6. We Won’t Focus On IPD Contract Principles, But… Profit Pooling & Shared Risk Shared Success Criteria Rated by an Independent Judge Partners Covenant - Zero Litigation
  7. 7. The Integrated Team
  8. 8. Here’s Our Focus: Modeling Goals Shared Revit Model = Shared Revit File s NavisWorks Manage BIM Management Direct From Model Fabrication LEED/Sustainability Analysis Quantities Extracted from the Model Schedule “Infused” in the Model
  9. 9. It All Starts With the BEP
  10. 10. Selecting BIM Leads
  11. 11. <ul><li>Autodesk BIM Portfolio: </li></ul><ul><li>Revit Architecture 2009 </li></ul><ul><li>Revit MEP 2009 </li></ul><ul><li>Navisworks Manage </li></ul><ul><li>Quantity Takeoff (QTO) </li></ul><ul><li>Design Review (DWF) </li></ul><ul><li>Inventor </li></ul><ul><li>Buzzsaw </li></ul>Software Selection 3 rd Party Software: CAD Duct CAD Pipe Hydro CAD Wood WAP Document Locator
  12. 12. Revit Standards: File Nomenclature
  13. 13. Revit Standards: Phases
  14. 14. Revit Standards: Worksets
  15. 15. Revit Standards: Parameters
  16. 16. Revit Standards: Materials
  17. 17. Model Location & Access Design Construction: Architecture Engineering Construction Architecture Engineering Construction Subcontractors FTP VPN Live VPN Live VPN Live
  18. 18. Enough planning, let’s start design…
  19. 19. Design: Options
  20. 20. Design : Costing
  21. 21. Design: Communicating
  22. 22. Design: Co-Locating
  23. 23. Design: Advanced Bill of Materials
  24. 24. Programming Wall-Splitting Design Layout KlingStubbins Tocci KlingStubbins Tocci Design: Model Collaboration
  25. 25. Design: Documentation
  26. 26. Design: Communicating
  27. 27. Design: Communicating
  28. 28. Design Documentation Fabrication Installation MEP: (Lack of?) Model Collaboration
  29. 29. MEP: Design
  30. 30. MEP: Model Transfers
  31. 31. Architect Builder Mechanical Engineer HVAC Sub Electrical Engineer MEP: Co-Locating
  32. 32. MEP: Co-Locating
  33. 33. MEP: Costing
  34. 34. Coordination: Clash Detection
  35. 35. Coordination: Clash Detection
  36. 36. Coordination: Documentation
  37. 37. Coordination: Documentation
  38. 38. Millwork: Design
  39. 39. Millwork: Costing
  40. 40. Millwork: Fabrication Model
  41. 41. Millwork: Fabrication Model
  42. 42. Millwork: Fabrication Model
  43. 43. Millwork: Fabrication
  44. 44. Millwork: Co-Locating
  45. 45. Millwork: Co-Locating
  46. 46. Millwork: Co-Locating
  47. 47. Execution: Communicating Design
  48. 48. Execution: Communicating Detail
  49. 49. Execution: Visualization
  50. 50. Execution: Visualization
  51. 51. Execution: Visualization
  52. 52. Execution: Visualization
  53. 53. Execution: Co-Locating
  54. 54. Execution: Co-Locating
  55. 55. Barriers to IPD . Letting lawyers lead
  56. 56. Barriers to IPD . Caged thinking
  57. 57. Barriers . Drawings are the deliverable
  58. 58. Barriers . Failure to engage means & methods
  59. 59. Barriers . Lack of sensitivity
  60. 60. Barriers . Failed Handoffs
  61. 61. Barriers . Patience is (not) a virtue
  62. 62. Barriers . Indecision Kills
  63. 63. MasterBuilder 2.0
  64. 64. Laura Handler Sarah Vekasy, AIA [email_address] [email_address]

×