SlideShare a Scribd company logo
1 of 7
Download to read offline
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 466
Air Shower Controller System
Vishvesh Jhatakia1, Narendra Solanki2, Vikas Yadav 3, Parth Chauhan4
1
Student, Dept. of Electronics and communication Engineering, Silver Oak University, Ahmedabad, Gujarat, India
2
Head of Dept. of Electronics and communication Engineering, Azista Industries Pvt. Ltd. , Ahmedabad, Gujarat,
India
3-4
Asst. Prof., Dept. of Electronics and communication Engineering, Silver Oak University, Ahmedabad, Gujarat,
India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Air shower for clean room framework with gathering and knockdown design. Get together and knockdown
design implies that air showers are framed from alarger part of essential parts with standard determination insize. The air
shower has two principal cases, a top case and abase case.
The cases above and underneath are two square shapes equal.Each equal cylinder has two right triangle cases and one isosceles
triangle case. By orchestrating these two top and base cases, an air shower with an octagonal shape or passagetype can be
make.
This gives greater adaptability to the quantity of individualsentering or leaving the air shower, and an increment orreduction
in the quantity of gadgets introduced may relyuponthe volume of business. In the meantime, the space design forthe air shower
is movable.
Key Words: I2C, DIO, CLK
1. INTRODUCTION
An ordinary air shower ought to just be consolidated insidethe plan of a designed cleanroom "passage framework." Forthe
motivations behind our conversations, "section framework" ought to be characterized as a very much planned garmenting
region integrating appropriate class recognizable proof, article of clothing stockpiling, and garmenting methods, with the
general objective being the avoidance of particulate entering the cleanroom on articles of clothing, or because of the
garmenting system. An Air shower is characterize as a disconnected chamber furnishedwith an independent blower and
engine, interlocking entryways, stack/ulna filtration, and a recycling fumes framework. The highlights, capacities, and
advantages of anair shower section framework rely generally upon its legitimate plan and use. This paper concentrates. To
a greatextent on the airshower and itslegitimate plan to guaranteeit conveys a functional and monetary advantage.
The contentions of the allies and pundits of the utilization of air showers, as well as of late distributed test reports will
inspected. The expected elements of an appropriately planned air shower will be talked about alongside the functional
utilization of an air shower, inside anappropriately planned "passage framework", and the legitimate utilization of the air
shower to upgradeadequacy.A definitive objective being to separatemost extreme worthfrom its establishment.
Our undertaking is Air Shower Control and Monitor Systemthat can be accustomed to tidying up space to eliminate dustor
Nanoparticle in our body. Air shower serves to compelling lessen impurities from people and materials preceding their
entrance into the cleanroom. Air Shower Control and Monitor framework there are utilized in temperature and dampness
sensor, microcontroller and microchip, controlling framework by AC drive, Galvanic Isolation(Opto - Coupler), attractive
switch, Timer and counter, Electric high power Relay.
1.1 JUSTIFICATION
Air showers are specific encased waiting rooms which are consolidated as doorways of cleanrooms andothercontrolled
conditions to decrease molecule contamination. Air showersuse high-pressure, HEPA-or ULPA-separated air to eliminatedust,
sinewy build up and different impurities from facultyorarticle surfaces. The powerful "purging" of surfaces precedingentering
cleanconditions diminishesthe quantityofairborneparticulates presented.
Whenappropriately integrated into cleanroomconfiguration,air showers give an ISO-arranged change vestibule to guarantee
the tidiness of the ordered cleanroom. Airshowersare normally positioned between a gowning region and cleanroom; after
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 467
specialists wear suitable attire and individual defensive gear, they enter the shower so the compressed air spouts eliminate
any leftover particles fromcoveralls. When the program cycle is finished, clients exit outthrough a subsequent entryway, into
the cleanroom. Air showers (or air burrows) may likewise be set between cleanrooms of various ISO evaluations.
1.2 LITERATURE REVIEW
A cleanroom air shower furnishes our item and our workers with an additional a layer of security from any destructive
pollutants or particles that could advance into your cleanroom. One occasion of an excessive amount of particulate can
bring about a demolished bunch of drugs or a failing piece of electrical hardware. An air shower capacities to keep these
significant issues from occurring. They are additionally an accommodating suggestion to representatives about the
significance of staying without particulate. Besides, in case a representative was not so cautious as they ought to have been
while wearing an outfit,an air shower will assist with guaranteeing that any additional particulate is scour off prior to
entering a foreignsubstance free space. [2].
Results from surface molecule tests show thatair showerssuccessfully eliminate particulate on ruined/utilizedarticlesof
clothing. Normal molecule decrease was between 56% (polyester) to 62 percent (Gortex), successful in eliminatingtainting
of 0.3 microns and bigger. Air showers are a successful apparatus in keeping tainting from moving into the cleanroom
during the section interaction. Assuming piece of clothing use is more huge than one change for each passage into the
cleanroom, an air shower will be a powerfulinstrument to eliminate tainting from pieces of clothing andcontrol defilement
from entering the cleanroom. Without acleanse and stay time, an air shower's importance in controlling the movement of
particles-eliminated from ruined pieces of clothingfrom entering thecleanroomwillbefundamentally diminished. [3].
2. FLOW CHART
The Air Shower Control and monitor system is based on a microcontroller interface and together forms an embedded
system. The block diagram shows the flow of the system that is implemented for the functioning and utilization of the
Cleanroom.
The air shower operates two magnetic door that are being controlled by the prompts given from the microcontroller and
the doors can be controlled using a push switch that hasbeen incorporated in the design.
To enter the cleaning room, the User has to press the switchwhich prompts the MCU to send an acknowledgement signaland
hence the door is opened as the receptive pulse is received.Thisisbasicallycontrolled by thecodewhichsendsa signal to the
pin on which the functionality has been assigned. When the User enters the Door 1 the door willclosewithout pressing the
push switch and certain Functions areperformed as follows
We have incorporated a Status Display in the cleaning roomsuch that when any function is happening it shall be displayed
on the same. After the Door 1 has closed, timer- based fans will start functioning for 15 to 20 seconds, pleasenote that the
intensityof thefanscan beincreased/decreasedby the User as need be. These fans are powerful enough to blow-off the micro
dust particles that the human bodycarriesas clothing and such sorts. As the timer ticks, the fans are turned off, during this,
both theDoor1and 2areclosed.Oncethe blowingis finished, the Door 1 opens for the User to passthrough.
As the User has now access through the Door 2, they are Particle-free at this instant and are safe to enter the area ofwork.
After the operation of the cleaning room is finished, the User can leave from Door 2 which was closed the entire time the
blowing was going on. The Door here gets the signal prompts with a push button hence after every use it becomes necessary
to use the push button to open/close the CleaningRoom Doors.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 468
Figure 1: - Air Shower Control Working Flow Chart [1]
2.1 BLOCK DIAGRAM
Figure 2: - Air Shower Control Block Diagram
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 469
Above block diagram fig 02. represent the process flow of theunit. Here Microcontroller act as brain of the system, which
control the whole system by send and receive signals as weprogrammed alongside it supply power to certain components.
Initially the process starts by press the read switch, which isconnected to microcontroller, and getting power from power
supply unit, it then sends the signal to actuate the electromagnetic door 1 via microcontroller and the electromagnet
actuated doorsaregetting powerfrom powersupply unit.
Door-1 will be open for 5 seconds right after switch is pressed and then it will be closed automatically, as soon as the
person enter the Room -1 the air shower will run for 20seconds and then it will shutoff automatically, display will beshow
timer to aid the person entering the room with remaining time and current stage of process of entering theclean room.
After 20 seconds fan will turn off and electromagnetic door 2 will open and it will stay open for 5 seconds it will be
represented on display unit.
Whole system will be power though power supply unit.
2.2 MICRO CONTROLLER
Inthisproject Ican useC8051F920 micro controller.Itis 32 pin microcontroller and there are 3 port in the microcontroller
• Port 0
• Port 1
• Port 2
All ports are input and output pins. Controller is working from 3.3V DC voltage.
In this project I can used which pin it is show in belowtable.
Figure 3: - C8051F920 Controller [4]
Pin No Port Pin Connected
32 P0.0 Relay_1
31 P0.1 Relay_2
30 P0.2 Relay_3
29 P0.3 Relay_4
26 P0.6 DIO
25 P0.7 CLK
20 P1.4 MS_1
19 P1.5 MS_2
18 P1.6 SW_1
17 P1.7 Sw_2
Table 1: - C8051F920 pin connected
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 470
2.3 DISPLAY
Figure 4: - 4 Digit 7 Segment Display Module [6}
Figure 5: - 4 Digit 7 Segment Display [6]
Pin Name Description
VCC Connected to power source.
GND Connected to ground.
DIO Data Input/output pin
CLK Clock pin
Table 2: - 4 Digit & Segment Pin Configuration [5]
2.4 RELAY CKT
Figure 6: - Controller relay circuit
In above chart there are used semiconductor, opto semiconductor, resister, drove, diode, move. A 3.3V is applyto the opto
semiconductor through resister(R21). Resister regard is 1K and pass in semiconductor pin No. 1 and pinNo.2 is connector
to the controller pin. opto Transistor work expecting a Led diode is on a light is pass on the semiconductor and opto
semiconductor become on.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 471
opto semiconductor pin no 3 is related with the semiconductor through resister(R23) and resister regard is 1K pass in
semiconductor base. opto semiconductor pin no 4is related with the vcc (5V). resister(R19) and drove (D12, LED 2) are
related with series and winning diode is related with the Parallel to the resister(R19) and drove (D12, LED2).including a
diode in an exchange circuit hinders gigantic voltage spikes from bouncing up while thestrengthconveyisseparated. exactly
when twist is off a contrary circle currentcan pass so it not be mischief to all circuit a general diode areused and it is related
between resister (R19), drove (D12, LED2) and circle with Parallel affiliation.
2.5 PCB DESIGN CONTROLLER
Figure 7: - PCB Front view
Figure 8: - PCB Back view
Figure 9: - PCB Side View
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 472
3. CONCLUSIONS
In the end we as a whole attempt to observe the importanceand importance behind the Application and Implementationof
any venture that we work whereupon functions as a significant component for the Project's genuine execution. This Air
Shower Pod is one such task which has a great deal of inconsistencies and analysis also. The viability of an Air Shower
passage framework relates straightforwardly to its legitimate plan and use. As of late tests have been led and articles
composed which show air showers to be 35% to 90% effective in the evacuation of defilement reliant upon the size of the
molecule, the plan of the air shower, piece of clothing type, article of clothing systems, shower use procedure, process
duration, and cleanroom grouping. It ought not be expected that air showers recycle clean air, subsequently they don't
need filtration themselves. Air showers, as cleanrooms, ought to follow the fundamental idea of sifting and moving air, to
both eliminate pollution from the article of clothing and concentrate the eliminated tainting from the climate. In this
project you can add some sensor to operate a fans in air shower cleaning room. If sensor can detect any object then fan will
be on with clean room chamber otherwise fan is off. A fan is not on still 5 to 10 seconds the system can automatically reset
and we can perform all task again. In my project I can use switch No. 1 to enter the room through airshower and exit
through other room so if you can used switch No. 2 for enter the clean room and exit the cleanroomthrough one chamber It
will be possible in On microcontroller board.
REFERENCES
[1] Clean Room Air Shower (airsystem.com.tw)
[2] Cleanroom Air Showers: Everything You Need to Know (angstromtechnology.com)
[3] https://sst.semiconductor- digest.com/1996/04/the- effectiveness-of-air-showers-in-the- contamination- control-
process/ - Search (bing.com)
[4] C8051F93x-92x.pdf (silabs.com)
[5] TM1637- Grove 4 Digit Display Module Datasheet, Pinout, Features and Working (components101.com)

More Related Content

Similar to Air Shower Controller System

2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
eugeniadean34240
 

Similar to Air Shower Controller System (20)

IRJET - Air Duct Cleaning Robot
IRJET -  	  Air Duct Cleaning RobotIRJET -  	  Air Duct Cleaning Robot
IRJET - Air Duct Cleaning Robot
 
IRJET- PureLiv: Smart Indoor Air Quality Monitoring and Purifying System
IRJET- PureLiv: Smart Indoor Air Quality Monitoring and Purifying SystemIRJET- PureLiv: Smart Indoor Air Quality Monitoring and Purifying System
IRJET- PureLiv: Smart Indoor Air Quality Monitoring and Purifying System
 
IRJET- Automatic Centralized Air Conditioner using Matlab
IRJET- Automatic Centralized Air Conditioner using MatlabIRJET- Automatic Centralized Air Conditioner using Matlab
IRJET- Automatic Centralized Air Conditioner using Matlab
 
Smart Air Purifier with Air Quality Monitoring System
Smart Air Purifier with Air Quality Monitoring SystemSmart Air Purifier with Air Quality Monitoring System
Smart Air Purifier with Air Quality Monitoring System
 
IRJET- Leakage Testing Machine
IRJET- Leakage Testing MachineIRJET- Leakage Testing Machine
IRJET- Leakage Testing Machine
 
IRJET- Design and Assembly of Prototype of Automatic Rail Track Cleaning Machine
IRJET- Design and Assembly of Prototype of Automatic Rail Track Cleaning MachineIRJET- Design and Assembly of Prototype of Automatic Rail Track Cleaning Machine
IRJET- Design and Assembly of Prototype of Automatic Rail Track Cleaning Machine
 
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
 
IRJET- Design & Fabrication of Solar Powered Air Filtration and Ventilation S...
IRJET- Design & Fabrication of Solar Powered Air Filtration and Ventilation S...IRJET- Design & Fabrication of Solar Powered Air Filtration and Ventilation S...
IRJET- Design & Fabrication of Solar Powered Air Filtration and Ventilation S...
 
Dust Control System | Arrelic Insights
Dust Control System | Arrelic InsightsDust Control System | Arrelic Insights
Dust Control System | Arrelic Insights
 
DIY Ventilator using Arduino with Blood Oxygen Sensing for Covid Pandemic
DIY Ventilator using Arduino with Blood Oxygen Sensing for Covid PandemicDIY Ventilator using Arduino with Blood Oxygen Sensing for Covid Pandemic
DIY Ventilator using Arduino with Blood Oxygen Sensing for Covid Pandemic
 
METAL PRODUCTS DESIGN AND FABRICATION OF SMART SHELF SYSTEM
METAL PRODUCTS DESIGN AND FABRICATION OF SMART SHELF SYSTEMMETAL PRODUCTS DESIGN AND FABRICATION OF SMART SHELF SYSTEM
METAL PRODUCTS DESIGN AND FABRICATION OF SMART SHELF SYSTEM
 
Design and Development of Humidity Controller for Prevention of Microbiologic...
Design and Development of Humidity Controller for Prevention of Microbiologic...Design and Development of Humidity Controller for Prevention of Microbiologic...
Design and Development of Humidity Controller for Prevention of Microbiologic...
 
Design And Fabrication of Pneumatic Paper Cup Making Machine
Design And Fabrication of Pneumatic Paper Cup Making MachineDesign And Fabrication of Pneumatic Paper Cup Making Machine
Design And Fabrication of Pneumatic Paper Cup Making Machine
 
IoT Based Smart Ventilator & Patient Monitoring System
IoT Based Smart Ventilator & Patient Monitoring SystemIoT Based Smart Ventilator & Patient Monitoring System
IoT Based Smart Ventilator & Patient Monitoring System
 
IRJET- Pneumatic Conveyer with Bottle Filling and Placing Machine
IRJET-  	  Pneumatic Conveyer with Bottle Filling and Placing MachineIRJET-  	  Pneumatic Conveyer with Bottle Filling and Placing Machine
IRJET- Pneumatic Conveyer with Bottle Filling and Placing Machine
 
IRJET- Robot to Unclog Sewage Channels
IRJET-  	  Robot to Unclog Sewage ChannelsIRJET-  	  Robot to Unclog Sewage Channels
IRJET- Robot to Unclog Sewage Channels
 
IRJET - Study on Smart Air Pollution Monitoring System based on IoT
IRJET - Study on Smart Air Pollution Monitoring System based on IoTIRJET - Study on Smart Air Pollution Monitoring System based on IoT
IRJET - Study on Smart Air Pollution Monitoring System based on IoT
 
Legroom Vaccum System
Legroom Vaccum SystemLegroom Vaccum System
Legroom Vaccum System
 
DESIGN OF EXHAUST DUCTING SYSTEM FOR THE MULTI-STOREY BUILDING
DESIGN OF EXHAUST DUCTING SYSTEM FOR THE MULTI-STOREY BUILDINGDESIGN OF EXHAUST DUCTING SYSTEM FOR THE MULTI-STOREY BUILDING
DESIGN OF EXHAUST DUCTING SYSTEM FOR THE MULTI-STOREY BUILDING
 
Esco Cleanroom Air Showers
Esco Cleanroom Air ShowersEsco Cleanroom Air Showers
Esco Cleanroom Air Showers
 

More from IRJET Journal

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 

Recently uploaded (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 

Air Shower Controller System

  • 1. © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 466 Air Shower Controller System Vishvesh Jhatakia1, Narendra Solanki2, Vikas Yadav 3, Parth Chauhan4 1 Student, Dept. of Electronics and communication Engineering, Silver Oak University, Ahmedabad, Gujarat, India 2 Head of Dept. of Electronics and communication Engineering, Azista Industries Pvt. Ltd. , Ahmedabad, Gujarat, India 3-4 Asst. Prof., Dept. of Electronics and communication Engineering, Silver Oak University, Ahmedabad, Gujarat, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Air shower for clean room framework with gathering and knockdown design. Get together and knockdown design implies that air showers are framed from alarger part of essential parts with standard determination insize. The air shower has two principal cases, a top case and abase case. The cases above and underneath are two square shapes equal.Each equal cylinder has two right triangle cases and one isosceles triangle case. By orchestrating these two top and base cases, an air shower with an octagonal shape or passagetype can be make. This gives greater adaptability to the quantity of individualsentering or leaving the air shower, and an increment orreduction in the quantity of gadgets introduced may relyuponthe volume of business. In the meantime, the space design forthe air shower is movable. Key Words: I2C, DIO, CLK 1. INTRODUCTION An ordinary air shower ought to just be consolidated insidethe plan of a designed cleanroom "passage framework." Forthe motivations behind our conversations, "section framework" ought to be characterized as a very much planned garmenting region integrating appropriate class recognizable proof, article of clothing stockpiling, and garmenting methods, with the general objective being the avoidance of particulate entering the cleanroom on articles of clothing, or because of the garmenting system. An Air shower is characterize as a disconnected chamber furnishedwith an independent blower and engine, interlocking entryways, stack/ulna filtration, and a recycling fumes framework. The highlights, capacities, and advantages of anair shower section framework rely generally upon its legitimate plan and use. This paper concentrates. To a greatextent on the airshower and itslegitimate plan to guaranteeit conveys a functional and monetary advantage. The contentions of the allies and pundits of the utilization of air showers, as well as of late distributed test reports will inspected. The expected elements of an appropriately planned air shower will be talked about alongside the functional utilization of an air shower, inside anappropriately planned "passage framework", and the legitimate utilization of the air shower to upgradeadequacy.A definitive objective being to separatemost extreme worthfrom its establishment. Our undertaking is Air Shower Control and Monitor Systemthat can be accustomed to tidying up space to eliminate dustor Nanoparticle in our body. Air shower serves to compelling lessen impurities from people and materials preceding their entrance into the cleanroom. Air Shower Control and Monitor framework there are utilized in temperature and dampness sensor, microcontroller and microchip, controlling framework by AC drive, Galvanic Isolation(Opto - Coupler), attractive switch, Timer and counter, Electric high power Relay. 1.1 JUSTIFICATION Air showers are specific encased waiting rooms which are consolidated as doorways of cleanrooms andothercontrolled conditions to decrease molecule contamination. Air showersuse high-pressure, HEPA-or ULPA-separated air to eliminatedust, sinewy build up and different impurities from facultyorarticle surfaces. The powerful "purging" of surfaces precedingentering cleanconditions diminishesthe quantityofairborneparticulates presented. Whenappropriately integrated into cleanroomconfiguration,air showers give an ISO-arranged change vestibule to guarantee the tidiness of the ordered cleanroom. Airshowersare normally positioned between a gowning region and cleanroom; after International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 467 specialists wear suitable attire and individual defensive gear, they enter the shower so the compressed air spouts eliminate any leftover particles fromcoveralls. When the program cycle is finished, clients exit outthrough a subsequent entryway, into the cleanroom. Air showers (or air burrows) may likewise be set between cleanrooms of various ISO evaluations. 1.2 LITERATURE REVIEW A cleanroom air shower furnishes our item and our workers with an additional a layer of security from any destructive pollutants or particles that could advance into your cleanroom. One occasion of an excessive amount of particulate can bring about a demolished bunch of drugs or a failing piece of electrical hardware. An air shower capacities to keep these significant issues from occurring. They are additionally an accommodating suggestion to representatives about the significance of staying without particulate. Besides, in case a representative was not so cautious as they ought to have been while wearing an outfit,an air shower will assist with guaranteeing that any additional particulate is scour off prior to entering a foreignsubstance free space. [2]. Results from surface molecule tests show thatair showerssuccessfully eliminate particulate on ruined/utilizedarticlesof clothing. Normal molecule decrease was between 56% (polyester) to 62 percent (Gortex), successful in eliminatingtainting of 0.3 microns and bigger. Air showers are a successful apparatus in keeping tainting from moving into the cleanroom during the section interaction. Assuming piece of clothing use is more huge than one change for each passage into the cleanroom, an air shower will be a powerfulinstrument to eliminate tainting from pieces of clothing andcontrol defilement from entering the cleanroom. Without acleanse and stay time, an air shower's importance in controlling the movement of particles-eliminated from ruined pieces of clothingfrom entering thecleanroomwillbefundamentally diminished. [3]. 2. FLOW CHART The Air Shower Control and monitor system is based on a microcontroller interface and together forms an embedded system. The block diagram shows the flow of the system that is implemented for the functioning and utilization of the Cleanroom. The air shower operates two magnetic door that are being controlled by the prompts given from the microcontroller and the doors can be controlled using a push switch that hasbeen incorporated in the design. To enter the cleaning room, the User has to press the switchwhich prompts the MCU to send an acknowledgement signaland hence the door is opened as the receptive pulse is received.Thisisbasicallycontrolled by thecodewhichsendsa signal to the pin on which the functionality has been assigned. When the User enters the Door 1 the door willclosewithout pressing the push switch and certain Functions areperformed as follows We have incorporated a Status Display in the cleaning roomsuch that when any function is happening it shall be displayed on the same. After the Door 1 has closed, timer- based fans will start functioning for 15 to 20 seconds, pleasenote that the intensityof thefanscan beincreased/decreasedby the User as need be. These fans are powerful enough to blow-off the micro dust particles that the human bodycarriesas clothing and such sorts. As the timer ticks, the fans are turned off, during this, both theDoor1and 2areclosed.Oncethe blowingis finished, the Door 1 opens for the User to passthrough. As the User has now access through the Door 2, they are Particle-free at this instant and are safe to enter the area ofwork. After the operation of the cleaning room is finished, the User can leave from Door 2 which was closed the entire time the blowing was going on. The Door here gets the signal prompts with a push button hence after every use it becomes necessary to use the push button to open/close the CleaningRoom Doors.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 468 Figure 1: - Air Shower Control Working Flow Chart [1] 2.1 BLOCK DIAGRAM Figure 2: - Air Shower Control Block Diagram
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 469 Above block diagram fig 02. represent the process flow of theunit. Here Microcontroller act as brain of the system, which control the whole system by send and receive signals as weprogrammed alongside it supply power to certain components. Initially the process starts by press the read switch, which isconnected to microcontroller, and getting power from power supply unit, it then sends the signal to actuate the electromagnetic door 1 via microcontroller and the electromagnet actuated doorsaregetting powerfrom powersupply unit. Door-1 will be open for 5 seconds right after switch is pressed and then it will be closed automatically, as soon as the person enter the Room -1 the air shower will run for 20seconds and then it will shutoff automatically, display will beshow timer to aid the person entering the room with remaining time and current stage of process of entering theclean room. After 20 seconds fan will turn off and electromagnetic door 2 will open and it will stay open for 5 seconds it will be represented on display unit. Whole system will be power though power supply unit. 2.2 MICRO CONTROLLER Inthisproject Ican useC8051F920 micro controller.Itis 32 pin microcontroller and there are 3 port in the microcontroller • Port 0 • Port 1 • Port 2 All ports are input and output pins. Controller is working from 3.3V DC voltage. In this project I can used which pin it is show in belowtable. Figure 3: - C8051F920 Controller [4] Pin No Port Pin Connected 32 P0.0 Relay_1 31 P0.1 Relay_2 30 P0.2 Relay_3 29 P0.3 Relay_4 26 P0.6 DIO 25 P0.7 CLK 20 P1.4 MS_1 19 P1.5 MS_2 18 P1.6 SW_1 17 P1.7 Sw_2 Table 1: - C8051F920 pin connected
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 470 2.3 DISPLAY Figure 4: - 4 Digit 7 Segment Display Module [6} Figure 5: - 4 Digit 7 Segment Display [6] Pin Name Description VCC Connected to power source. GND Connected to ground. DIO Data Input/output pin CLK Clock pin Table 2: - 4 Digit & Segment Pin Configuration [5] 2.4 RELAY CKT Figure 6: - Controller relay circuit In above chart there are used semiconductor, opto semiconductor, resister, drove, diode, move. A 3.3V is applyto the opto semiconductor through resister(R21). Resister regard is 1K and pass in semiconductor pin No. 1 and pinNo.2 is connector to the controller pin. opto Transistor work expecting a Led diode is on a light is pass on the semiconductor and opto semiconductor become on.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 471 opto semiconductor pin no 3 is related with the semiconductor through resister(R23) and resister regard is 1K pass in semiconductor base. opto semiconductor pin no 4is related with the vcc (5V). resister(R19) and drove (D12, LED 2) are related with series and winning diode is related with the Parallel to the resister(R19) and drove (D12, LED2).including a diode in an exchange circuit hinders gigantic voltage spikes from bouncing up while thestrengthconveyisseparated. exactly when twist is off a contrary circle currentcan pass so it not be mischief to all circuit a general diode areused and it is related between resister (R19), drove (D12, LED2) and circle with Parallel affiliation. 2.5 PCB DESIGN CONTROLLER Figure 7: - PCB Front view Figure 8: - PCB Back view Figure 9: - PCB Side View
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 472 3. CONCLUSIONS In the end we as a whole attempt to observe the importanceand importance behind the Application and Implementationof any venture that we work whereupon functions as a significant component for the Project's genuine execution. This Air Shower Pod is one such task which has a great deal of inconsistencies and analysis also. The viability of an Air Shower passage framework relates straightforwardly to its legitimate plan and use. As of late tests have been led and articles composed which show air showers to be 35% to 90% effective in the evacuation of defilement reliant upon the size of the molecule, the plan of the air shower, piece of clothing type, article of clothing systems, shower use procedure, process duration, and cleanroom grouping. It ought not be expected that air showers recycle clean air, subsequently they don't need filtration themselves. Air showers, as cleanrooms, ought to follow the fundamental idea of sifting and moving air, to both eliminate pollution from the article of clothing and concentrate the eliminated tainting from the climate. In this project you can add some sensor to operate a fans in air shower cleaning room. If sensor can detect any object then fan will be on with clean room chamber otherwise fan is off. A fan is not on still 5 to 10 seconds the system can automatically reset and we can perform all task again. In my project I can use switch No. 1 to enter the room through airshower and exit through other room so if you can used switch No. 2 for enter the clean room and exit the cleanroomthrough one chamber It will be possible in On microcontroller board. REFERENCES [1] Clean Room Air Shower (airsystem.com.tw) [2] Cleanroom Air Showers: Everything You Need to Know (angstromtechnology.com) [3] https://sst.semiconductor- digest.com/1996/04/the- effectiveness-of-air-showers-in-the- contamination- control- process/ - Search (bing.com) [4] C8051F93x-92x.pdf (silabs.com) [5] TM1637- Grove 4 Digit Display Module Datasheet, Pinout, Features and Working (components101.com)