International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2240
A STUDY OF PERFORMANCE OF PRE-ENGINEERED BUILDING OF AN
INDUSTRIAL WAREHOUSE FOR DYNAMIC LOAD
Apurv Rajendra Thorat1, Santosh K. Patil2
1 Apurv Rajendra Thorat Post Graduation student, Civil Engineering Department,
K. J. College of Engineering Management and Research, Pune, India
2 Santosh K. Patil, Associate professor, Civil Engineering Department,
K. J. College of Engineering Management and Research, Pune, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - In the present study Pre-engineered Buildings
are designed and studied in accordance with Kirby
Technical Specification which is based on ASCE-07.Two
examples have been taken for the study. Comparison of Pre
Engineered Buildings (PEB) with bracings and Pre
Engineered Buildings (PEB) without bracings is done in two
examples. Later Pre Engineered Buildings (PEB) is analyzed
for Dynamic loads using El-centro specified ground motion.
Key Words: Pre Engineered Building, Dynamic load,
conventional structure, STAAD.pro software, Time History
Analysis.
1. INTRODUCTION
The industry is growing speedily in the majority the
elements of the globe. The employment of steel structures
isn't solely economical however conjointly eco-friendly at
the time once there's a danger of world warming. Here,
“economical “word suggests that considering time and
price. Time is that the most vital side, steel structures (Pre-
fabricated) square measure inbuilt terribly short amount
and one such example is Pre-Engineered Buildings (PEB).
Pre-engineered buildings square measure nothing
however steel buildings within which additional steel is
avoided by tapering the sections as per the bending
moment’s demand. One might imagine regarding its risk,
however it’s a truth many folks don't seem to be better-
known regarding Pre built Buildings. If we have a tendency
to opt for regular steel structures, time span are a lot of,
and conjointly value are a lot of, and each along i.e. time and
price, makes it uneconomical. So in pre-engineered
buildings, the full style is completed within the
manufacturing plant, and as per the planning, members
square measure pre-fabricated and so transported to the
location wherever they're erected in an exceedingly time
but half dozen to eight weeks. The structural performance
of those buildings is accepted and, for the foremost half,
adequate code provisions square measure presently in situ
to make sure satisfactory behaviour in high winds. Steel
structures even have far better Strength-to-weight ratios
than RCC and that they can also be simply razed. Pre-built
Buildings have barred connections and thence also can be
reused when razing. Thus, pre-engineered buildings are
often shifted or expanded as per the necessities in future.
Fig -1: Industrial steel frame structure
In this paper we will discuss the various advantages of pre-
engineered buildings and also, with the help of three
examples, a comparison will be made between pre-
engineered buildings and conventional steel structures.
1.1 Concept of Pre-Engineered Buildings
"Pre-engineered steel buildings" are those that are totally
invented within the industrial plant once planning, shipped
to site} in CKD (completely knocked down) condition; and
all parts are assembled and erected at a site with nut-bolts,
thereby reducing the time of completion. Pre–engineered
means that, typically speaking, is any a part of a structure
that's factory-made first off to its arrival on the building
site. The styles were ready-made however the building
parts were either ready-made or factory-made against
specific orders. These buildings were pre-designed or 'pre-
engineered' into normal sizes, spans, bays and heights, and
use normal details for fixing protection, roofing, gutters,
flashing, windows, doors taking advantage of commercial
practices of production of parts economically. Though PEB
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2241
systems are extensively utilized in industrial and plenty of
different non-residential constructions worldwide, it's
comparatively a brand new construct in Asian country.
1.2 Classification of Steel Building
Steel is that the material of selection for style as a result of
its inherently ductile and versatile. It flexes beneath hyper-
loads instead of crushing and crumbling. Structural steels
low value, strength, durability, style flexibility, ability, and
recyclability still build it the fabric of selection in building
construction. Today’s steel framing is transferal grace, art,
and performance along in nearly limitless ways that and is
giving new solutions and opportunities to make difficult
structures, that were once thought not possible. Steel
structures have reserve strength. easy stick style within the
steel framings permits construction to proceed apace from
the beginning of the erection.
1.3. Pre-Engineered Steel buildings
Pre-built Steel Buildings are factory-made or made within
the plant itself. The producing of structural members is
finished on client needs. The careful structural members
are designed for their several locations and are numbered,
that cannot be altered; as a result of members is factory-
made with regard to style options. These parts are created
in standard or fully knocked condition for transportation.
These materials are transported to the client website and
are erected. Fastening and cutting method aren't
performed at the client site.
Fig -2: Pre-Engineered Steel Frame
2. Previous Research
G. Sai Kiran (2014). Comparison of style procedures
for pre engineering buildings (PEB) in recent years, the
introduction of pre-engineered building (PEB) idea within
the style of structures has helped in optimizing the look.
The ability of PEB within the place of typical steel building
(CSB) style idea resulted in several benefits, as well as the
economy and easier fabrication. During this study, associate
industrial structure (warehouse) is analyzed and designed
consistent with the Indian standards, is 800-1984, is 800-
2007 and additionally by referring mbma-96 and aisc-
89.steel is that the material of selection for style as a result
of its inherently ductile and versatile. In structural
engineering, a pre-engineered building (PEB) is intended by
a manufacturer, to be made-up employing a pre-determined
inventory of raw materials and producing ways that may
with efficiency satisfy a large vary of structural and
aesthetic style needs. PEB is fitted with totally different
structural accessories as well as mezzanine floors, canopies,
fasciae, interior partitions, etc.
Pradeep V (March-2014) Comparative Study of Pre
designed and standard Industrial Building PEBs are unit
developed victimization potential style software package.
The onset of technological advancement enabling 3d
modeling and particularization of the planned structure and
coordination has revolutionized typical building
construction. Pre-Engineered Buildings (PEB) is that the
future for Republic of India. Low weight versatile frames of
PEB supply higher resistance to earthquake hundreds. PEB
roof structure is sort of twenty sixth lighter than typical
Steel Building. In secondary members, lightweight weight
“Z” purlins are unit used for PEB structure, whereas heavier
hot-rolled sections are unit used for CSB. Support reactions
for PEB are unit lesser than CSB as per analysis. Light-
weight foundation is adopted for PEB that ends up in
simplicity in style and reduction within the price of
construction of the inspiration. The significant foundation is
going to be needed for CSB structure. PEB building price is
half-hour lesser than the value of CSB structure. PEB offers
low price, strength, durability, style flexibility, ability, and
recyclability. To conclude “Pre-Engineered Building
construction provides finish users a way a lot of economical
and higher resolution for long span structures wherever
giant column-free are unites are required.
Milind Bhojkar P (Dec-2014) Comparison of Pre
Engineering Building and Steel Building with value and
Time Effectiveness Pre-Engineering building means that
steel building system that is predesigned and prefab. During
this study, know the value effective tool that helps to utilize
the optimum cross-sections of steel. During this study
varied the varied the assorted} ideas relating to the pre-
engineering building and its various applications. In this, we
all know the support and element used for pre-engineering
building. there's numerous kind of parts like; Primary parts,
Secondary parts, textile during this study we discover out
that Pre-engineering building is a lot of economical than
standard steel building for low rise building.
Mr. Aditya P. Mehendale (2016). Summary of Pre-
Engineered Buildings typically pre-engineered buildings
square measure quicker than standard buildings, twenty
five roughly time overwhelming & half-hour lighter than
standard buildings. The arrange & load on the building
square measure calculated at the start, & the members
square measure factory-made in plant & they're simply
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2242
assembled on actual web site at the time of construction.
Presently, massive column-free space is that the utmost
demand for any kind of trade and with the advent of
computer software’s it is now easily possible. With the
improvement in technology, computer software’s have
contributed immensely to the enhancement of quality of life
through new researches. Pre-engineered building (PEB) is
one of such revolution. "Pre-engineered buildings" are fully
fabricated in the factory after designing, then transported to
the site in completely knocked down (CKD) condition and
all components are assembled and erected with nut-bolts,
thereby reducing the time of completion. This paper
effectively conveys that PEB structures can be easily
designed by simple design procedure. PEB structures are
more advantageous than conventional structures in
economy, speed of construction & simple erection. Hence it
is concluded that PEB has wide scope in India but they are
still not preferred
3. Methodology
The present study deals with the comparative analysis of
PEB industrial sheds with a traditional style. within the
initial stage, an industrial shed is valid by comparing
support reaction and axial force of every member.
Industrial structures standard (IS 1893: part IV, 2005)
To perform well in associate degree earthquake, the
commercial structure should possess adequate strength,
stiffness, and malleability. Generally, structures have large
capacities of energy absorption in its dead region.
Structures that are unit careful as per IS 13920 and
instrumentation that are unit made from ductile materials
art stand up to earthquakes several folds above the
planning spectra while not collapse, and injury in such
cases is restricted to cracking solely. Structures are unit
classified into the subsequent four categories:
a) Category 1: Structures whose failure can cause
conditions that can lead directly or indirectly to
extensive hundreds of life/property to population at
large in the ares adjacent to the plant complex.
b) Category 2: Structures whose failure can cause
conditions that can lead directly or indirectly to
serious fire hazard/extensive damage within the plant
complex
c) Category 3: Structures, which are required to handle
emergencies immediately after an earthquake, are also
included.
d) Category 4: Structures whose failure, although
expensive, does not lead to serious hazard within the
plant complex.
For comparative purpose following models are proposed:
Model No.1 PEB sheds with 6 bays with X-bracings
Model No.2 PEB sheds with 6 bays without X-bracings
3.1. Structural analysis and design
1. Static Analysis
2. Dynamic / Seismic Analysis
3. Secondary Analysis
4. El-Centro data for Time History Analysis
3.2 Load combinations
All dead loads, live loads, wind load, accidental load will be
confirming to IS: 875-1987. Earthquake loads will be
confirming to IS: 1893-2002 part-IV Load combinations
considered
1. Self-Weight of structure
2. Weight of Purlins
3. Wind Force in X direction
4. Wind Force in Z direction
5. Negative Wind Pressure in X direction
6. Negative Wind Pressure in Z direction
7. Ground motion in X and Z direction
3.3. STAAD.Pro generated frames
3.3.1. Industrial shed with bracings:
Fig -3: PEB model with 6 Bays without X-cross bracings
Fig -4: PEB model with 6 Bays with X-cross bracings
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2243
4. Results and Discussion
4.1. Deflection of an industrial shed without bracings
after applying the load combinations on STAAD.pro model
We ran Time History Analysis on the model from the El-
Centro Data and the top nodal results were as below:
Fig -5: Deflection in Time History Analysis Mode-1
Fig -6: Deflection in Time History Analysis Mode-6
All the results of Time History Analysis in table form are as
shown in table below:
Table -1: Time History analysis results
Seismic loading results in Time History Analysis results
Mode Frequency
(Hz)
Period
(Sec.)
Participation X
(%)
Participation Y
(%)
Type
1 0.275 3.637 0.00 99.236 Elastic
2
0.486 2.056 0.001 0.00 Elastic
3
0.964
1.037
97.845 0.001 Elastic
4
0.967
1.034
0.074 0.762 Elastic
5
1.018
0.982
0.540 0.00 Elastic
6
1.121
0.892
0.943 0.00 Elastic
Reactions on top nodal points of a model in all X, Y and Z
direction are as below:
Fig -7: Time Vs. Acceleration along X axis
Fig -8: Time Vs. Acceleration along Z axis
Fig -9: Time Vs. Displacement along X axis
Fig -10: Time Vs. Displacement along Z axis
2.4
2.4
10.
92.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2244
4.2. Deflection of an industrial shed with bracings
After applying the load combinations on STAAD.Pro model.
We ran Time History Analysis on the model from the El-
Centro Data and the top nodal results were as below.
Fig -11: Deflection in Time History Analysis Mode-1
Fig -12 Deflection in Time History Analysis Mode-6
4.2.1. All the results of Time History Analysis in table form
are as shown in table below:
Table -2: Time History analysis results
Seismic loading results in Time History Analysis results
Mode Frequency
(Hz)
Period
(Sec.)
Participation X
(%)
Participation Y
(%)
Type
1 0.795 1.257 99.343 0.00 Elastic
2
3.077 0.325 0.025 0.00 Elastic
3
3.282
0.305
0.019 0.356 Elastic
4
5.155
0.194
0.00 0.00 Elastic
5
6.993
0.143
0.00 1.754 Elastic
6
7.434
0.135
0.008 0.001 Elastic
4.2.2. Reactions on top nodal points of a model in all X, Y
and Z direction are as below:
Fig -13: Time Vs. Acceleration along X axis
Fig -14: Time Vs. Acceleration along Z axis
Fig -15: Time Vs. Displacement along X axis
Fig -16: Time Vs. Displacement along Z axis
492
1.03
9.41
9.64
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2245
4.3 Comparison of results from models
Here we are comparing the results we got from the
seismographs after applying the el-centro data on all the
models using time history analysis. From the readings
taken from the graphs of Acceleration, Displacement &
velocity we have drawn the following bar charts:
Fig -17: Comparison of acceleration along X & Z axis of two
models
Fig -18: Comparison of displacement along X & Z axis of
two models
5. CONCLUSIONS
In this paper Dynamic load action on Pre Engineered
Building is observed and checked for El-Centro data using
Time History Analysis. Two parametric models of Pre
Engineered Buildings of 21 meter span with and without
bracings. The sections are designed using KIRBY
TECHNICAL HANDBOOK(9) which is in accordance of
ASCE(07)
After the checks the following conclusion is obtained:
1. Displacement along X-direction of Pre Engineered
building with bracings is observed 34% less than the
Pre Engineered Building without bracings along
longitudinal direction
2. Displacement along Y-direction is observed 13% less
than the Pre Engineered Building without bracings but
it is permissible in both cases hence no extra bracings
required for specified ground motion
3. Displacement along Z-direction is observed 23% less
than the Pre Engineered Building without bracings
4. Acceleration at time period 3.02 seconds observed
609m/s2 and 492 m/s2 for with and without bracings
respectively which is very severe and need to be
controlled for current structural configuration.
ACKNOWLEDGEMENT
I am grateful to my Principal Dr. S. S. KHOT for his
encouragement and guidance throughout the preparation
of this project report. I specially thank to Prof. Mr. S. K.
PATIL Head of Civil Engineering Department, KJCOEMR,
Pune. For inspiring guidance and timely cooperation,
without which it would not have been in its present shape.
I am expressing my sincere thanks to all the staff and
colleagues who have helped me directly or indirectly in
completing this report.
REFERENCES
[1] G. Sai Kiran (2014). Comparison of Design Procedures
for Pre Engineering Buildings (PEB).
[2] Pradeep V (March-2014) Comparative Study of Pre
Engineered and Conventional Industrial Building
Sagar D. Wankhade (June-2014)Design & Comparison
of Various Types of Industrial Buildings.
[3] Milind Bhojkar P (Dec-2014). Comparison of Pre
Engineering Building and Steel Building with Cost and
Time Effectiveness
[4] Dale C. Perry, Herbert S. Saffir, James R. McDonald,
“Performance of Metal Buildings in High Winds”,
Journal of Wind Engineering and Industrial
Aerodynamics, 36 (1990) 985-999 985, Elsevier
Science Publishers.
[5] Syed Firoz, Sarath Chandra Kumar B, S.Kanakambara
Rao,” Design Concept of Pre Engineered Building”,
IJERA Vol. 2, Issue 2,Mar- Apr 2012, pp.267-272
0
100
200
300
400
500
600
700
X-AXIS
WIT
HO
UT
BR
ACI
NG
S
0
0.5
1
1.5
2
2.5
3
Z-AXIS
WI
TH
OU
T
BR
ACI
NG
S
0
100
200
300
400
500
600
700
X-AXIS
WIT
HO
UT
BRA
CIN
GS
WIT
H
BRA
CIN
GS
0
10
20
30
40
50
60
70
80
90
100
Z-AXIS
WI
TH
OU
T
BR
ACI
NG
S
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2246
http://www.ijera.com/papers/Vol2_issue2/AS22267
272.pdf
[6] IS 875- Part II (1987), Indian Standard Code of
Practice for Design Loads (Other Than Earthquake)
for Buildings and Structures.
[7] IS 1893- Part IV (2002) Indian Standard Criteria for
Earthquake Resistant of Design of Structures.
[8] IS 875- Part III (1987), Indian Standard Code of
Practice for Design Loads (Other Than Earthquake)
for Buildings and Structures. Aijaz Ahmad Zende (Jan-
Feb 2013).
[9] Kirby technical handbook for special structural & PEB
pre-engineered building systems, 2013 Alghanim
Industries.
[10] American Society of Civil Engineers (ASCE) – 07.

More Related Content

What's hot

Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...
Comparative Study of an Industrial Pre Engineered Building with Conventiona...Yogita Kadam
 
IRJET- Alternative Designs for Gable Industrial Structure
IRJET-  	  Alternative Designs for Gable Industrial StructureIRJET-  	  Alternative Designs for Gable Industrial Structure
IRJET- Alternative Designs for Gable Industrial StructureIRJET Journal
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Habibie Razak
 
Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa Industries Ltd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET Journal
 
A Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction TechniqueA Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction TechniqueIJERA Editor
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Presentation on PEB Metal
Presentation on PEB MetalPresentation on PEB Metal
Presentation on PEB MetalPEB Metal
 
Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering buildingRathin Rakshit
 
PEB Steel Buildings (English brochure)
PEB Steel Buildings (English brochure)PEB Steel Buildings (English brochure)
PEB Steel Buildings (English brochure)PEB Steel Buildings
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-buildinghlksd
 

What's hot (20)

Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
 
IRJET- Alternative Designs for Gable Industrial Structure
IRJET-  	  Alternative Designs for Gable Industrial StructureIRJET-  	  Alternative Designs for Gable Industrial Structure
IRJET- Alternative Designs for Gable Industrial Structure
 
B2 b purchase jan 2018 article
B2 b purchase jan 2018  articleB2 b purchase jan 2018  article
B2 b purchase jan 2018 article
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
 
Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
EPACK LGSF PPT
EPACK LGSF PPTEPACK LGSF PPT
EPACK LGSF PPT
 
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate DevelopersIRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
IRJET- Adoption of Pre-Fabricated Bathroom Units by Real Estate Developers
 
PRE & CON (1)
PRE  & CON (1)PRE  & CON (1)
PRE & CON (1)
 
A Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction TechniqueA Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction Technique
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Prefab company profile nw
Prefab company profile nwPrefab company profile nw
Prefab company profile nw
 
Presentation on PEB Metal
Presentation on PEB MetalPresentation on PEB Metal
Presentation on PEB Metal
 
Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering building
 
PEB Presentation
PEB PresentationPEB Presentation
PEB Presentation
 
PEB Steel Company profile
PEB Steel Company profilePEB Steel Company profile
PEB Steel Company profile
 
PEB Steel Buildings (English brochure)
PEB Steel Buildings (English brochure)PEB Steel Buildings (English brochure)
PEB Steel Buildings (English brochure)
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 
Mpil pre engineered-building
Mpil pre engineered-buildingMpil pre engineered-building
Mpil pre engineered-building
 

Similar to A Study of Performance of Pre-Engineered Building of an Industrial Warehouse for Dynamic Load

A Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and TimeA Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and TimeIRJET Journal
 
An Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB StructureAn Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB StructureIRJET Journal
 
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...IRJET Journal
 
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...IRJET Journal
 
Comparative Study of Codal Provisions for Pre-Engineered Buildings
Comparative Study of  Codal Provisions for Pre-Engineered BuildingsComparative Study of  Codal Provisions for Pre-Engineered Buildings
Comparative Study of Codal Provisions for Pre-Engineered BuildingsIRJET Journal
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxINTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxsatish sajja
 
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”IRJET Journal
 
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET Journal
 
Pre Engineered Structure study: A review
Pre Engineered Structure study: A reviewPre Engineered Structure study: A review
Pre Engineered Structure study: A reviewIRJET Journal
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...IRJET Journal
 
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...
Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...
Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...IRJET Journal
 
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind LoadingEffect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind LoadingIRJET Journal
 
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...IRJET Journal
 
Comparative Study on the Economy between Pre-Engineered and Conventional Stee...
Comparative Study on the Economy between Pre-Engineered and Conventional Stee...Comparative Study on the Economy between Pre-Engineered and Conventional Stee...
Comparative Study on the Economy between Pre-Engineered and Conventional Stee...IRJET Journal
 
Analysis and Design of a Commercial Building
Analysis and Design of a Commercial BuildingAnalysis and Design of a Commercial Building
Analysis and Design of a Commercial BuildingIRJET Journal
 

Similar to A Study of Performance of Pre-Engineered Building of an Industrial Warehouse for Dynamic Load (20)

A Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and TimeA Review on PEB Regarding Cost and Time
A Review on PEB Regarding Cost and Time
 
An Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB StructureAn Investigation on Cost, Delay & Labor Problems in PEB Structure
An Investigation on Cost, Delay & Labor Problems in PEB Structure
 
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
 
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
Analysis And Design of Pre-Engineered Building Using Indian And Equivalent Am...
 
Comparative Study of Codal Provisions for Pre-Engineered Buildings
Comparative Study of  Codal Provisions for Pre-Engineered BuildingsComparative Study of  Codal Provisions for Pre-Engineered Buildings
Comparative Study of Codal Provisions for Pre-Engineered Buildings
 
Irjet v4 i7530
Irjet v4 i7530Irjet v4 i7530
Irjet v4 i7530
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxINTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
 
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
“ANALYSIS AND DESIGN OF PRE ENGINEERED BUILDING FOR INDUSTRIAL SHED IN CHAKAN”
 
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
 
Pre Engineered Structure study: A review
Pre Engineered Structure study: A reviewPre Engineered Structure study: A review
Pre Engineered Structure study: A review
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
 
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...
Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...
Design of Overhead Tank with Carbon Fibre/Fiber Rebar as Reinforcement and Ti...
 
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind LoadingEffect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
Effect of Harp and Perimeter Bracing on PEB Subjected to Wind Loading
 
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
 
Pre-engineered bldg.pptx
Pre-engineered bldg.pptxPre-engineered bldg.pptx
Pre-engineered bldg.pptx
 
Comparative Study on the Economy between Pre-Engineered and Conventional Stee...
Comparative Study on the Economy between Pre-Engineered and Conventional Stee...Comparative Study on the Economy between Pre-Engineered and Conventional Stee...
Comparative Study on the Economy between Pre-Engineered and Conventional Stee...
 
Analysis and Design of a Commercial Building
Analysis and Design of a Commercial BuildingAnalysis and Design of a Commercial Building
Analysis and Design of a Commercial Building
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsIRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant Coefficients
 

Recently uploaded

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

A Study of Performance of Pre-Engineered Building of an Industrial Warehouse for Dynamic Load

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2240 A STUDY OF PERFORMANCE OF PRE-ENGINEERED BUILDING OF AN INDUSTRIAL WAREHOUSE FOR DYNAMIC LOAD Apurv Rajendra Thorat1, Santosh K. Patil2 1 Apurv Rajendra Thorat Post Graduation student, Civil Engineering Department, K. J. College of Engineering Management and Research, Pune, India 2 Santosh K. Patil, Associate professor, Civil Engineering Department, K. J. College of Engineering Management and Research, Pune, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - In the present study Pre-engineered Buildings are designed and studied in accordance with Kirby Technical Specification which is based on ASCE-07.Two examples have been taken for the study. Comparison of Pre Engineered Buildings (PEB) with bracings and Pre Engineered Buildings (PEB) without bracings is done in two examples. Later Pre Engineered Buildings (PEB) is analyzed for Dynamic loads using El-centro specified ground motion. Key Words: Pre Engineered Building, Dynamic load, conventional structure, STAAD.pro software, Time History Analysis. 1. INTRODUCTION The industry is growing speedily in the majority the elements of the globe. The employment of steel structures isn't solely economical however conjointly eco-friendly at the time once there's a danger of world warming. Here, “economical “word suggests that considering time and price. Time is that the most vital side, steel structures (Pre- fabricated) square measure inbuilt terribly short amount and one such example is Pre-Engineered Buildings (PEB). Pre-engineered buildings square measure nothing however steel buildings within which additional steel is avoided by tapering the sections as per the bending moment’s demand. One might imagine regarding its risk, however it’s a truth many folks don't seem to be better- known regarding Pre built Buildings. If we have a tendency to opt for regular steel structures, time span are a lot of, and conjointly value are a lot of, and each along i.e. time and price, makes it uneconomical. So in pre-engineered buildings, the full style is completed within the manufacturing plant, and as per the planning, members square measure pre-fabricated and so transported to the location wherever they're erected in an exceedingly time but half dozen to eight weeks. The structural performance of those buildings is accepted and, for the foremost half, adequate code provisions square measure presently in situ to make sure satisfactory behaviour in high winds. Steel structures even have far better Strength-to-weight ratios than RCC and that they can also be simply razed. Pre-built Buildings have barred connections and thence also can be reused when razing. Thus, pre-engineered buildings are often shifted or expanded as per the necessities in future. Fig -1: Industrial steel frame structure In this paper we will discuss the various advantages of pre- engineered buildings and also, with the help of three examples, a comparison will be made between pre- engineered buildings and conventional steel structures. 1.1 Concept of Pre-Engineered Buildings "Pre-engineered steel buildings" are those that are totally invented within the industrial plant once planning, shipped to site} in CKD (completely knocked down) condition; and all parts are assembled and erected at a site with nut-bolts, thereby reducing the time of completion. Pre–engineered means that, typically speaking, is any a part of a structure that's factory-made first off to its arrival on the building site. The styles were ready-made however the building parts were either ready-made or factory-made against specific orders. These buildings were pre-designed or 'pre- engineered' into normal sizes, spans, bays and heights, and use normal details for fixing protection, roofing, gutters, flashing, windows, doors taking advantage of commercial practices of production of parts economically. Though PEB
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2241 systems are extensively utilized in industrial and plenty of different non-residential constructions worldwide, it's comparatively a brand new construct in Asian country. 1.2 Classification of Steel Building Steel is that the material of selection for style as a result of its inherently ductile and versatile. It flexes beneath hyper- loads instead of crushing and crumbling. Structural steels low value, strength, durability, style flexibility, ability, and recyclability still build it the fabric of selection in building construction. Today’s steel framing is transferal grace, art, and performance along in nearly limitless ways that and is giving new solutions and opportunities to make difficult structures, that were once thought not possible. Steel structures have reserve strength. easy stick style within the steel framings permits construction to proceed apace from the beginning of the erection. 1.3. Pre-Engineered Steel buildings Pre-built Steel Buildings are factory-made or made within the plant itself. The producing of structural members is finished on client needs. The careful structural members are designed for their several locations and are numbered, that cannot be altered; as a result of members is factory- made with regard to style options. These parts are created in standard or fully knocked condition for transportation. These materials are transported to the client website and are erected. Fastening and cutting method aren't performed at the client site. Fig -2: Pre-Engineered Steel Frame 2. Previous Research G. Sai Kiran (2014). Comparison of style procedures for pre engineering buildings (PEB) in recent years, the introduction of pre-engineered building (PEB) idea within the style of structures has helped in optimizing the look. The ability of PEB within the place of typical steel building (CSB) style idea resulted in several benefits, as well as the economy and easier fabrication. During this study, associate industrial structure (warehouse) is analyzed and designed consistent with the Indian standards, is 800-1984, is 800- 2007 and additionally by referring mbma-96 and aisc- 89.steel is that the material of selection for style as a result of its inherently ductile and versatile. In structural engineering, a pre-engineered building (PEB) is intended by a manufacturer, to be made-up employing a pre-determined inventory of raw materials and producing ways that may with efficiency satisfy a large vary of structural and aesthetic style needs. PEB is fitted with totally different structural accessories as well as mezzanine floors, canopies, fasciae, interior partitions, etc. Pradeep V (March-2014) Comparative Study of Pre designed and standard Industrial Building PEBs are unit developed victimization potential style software package. The onset of technological advancement enabling 3d modeling and particularization of the planned structure and coordination has revolutionized typical building construction. Pre-Engineered Buildings (PEB) is that the future for Republic of India. Low weight versatile frames of PEB supply higher resistance to earthquake hundreds. PEB roof structure is sort of twenty sixth lighter than typical Steel Building. In secondary members, lightweight weight “Z” purlins are unit used for PEB structure, whereas heavier hot-rolled sections are unit used for CSB. Support reactions for PEB are unit lesser than CSB as per analysis. Light- weight foundation is adopted for PEB that ends up in simplicity in style and reduction within the price of construction of the inspiration. The significant foundation is going to be needed for CSB structure. PEB building price is half-hour lesser than the value of CSB structure. PEB offers low price, strength, durability, style flexibility, ability, and recyclability. To conclude “Pre-Engineered Building construction provides finish users a way a lot of economical and higher resolution for long span structures wherever giant column-free are unites are required. Milind Bhojkar P (Dec-2014) Comparison of Pre Engineering Building and Steel Building with value and Time Effectiveness Pre-Engineering building means that steel building system that is predesigned and prefab. During this study, know the value effective tool that helps to utilize the optimum cross-sections of steel. During this study varied the varied the assorted} ideas relating to the pre- engineering building and its various applications. In this, we all know the support and element used for pre-engineering building. there's numerous kind of parts like; Primary parts, Secondary parts, textile during this study we discover out that Pre-engineering building is a lot of economical than standard steel building for low rise building. Mr. Aditya P. Mehendale (2016). Summary of Pre- Engineered Buildings typically pre-engineered buildings square measure quicker than standard buildings, twenty five roughly time overwhelming & half-hour lighter than standard buildings. The arrange & load on the building square measure calculated at the start, & the members square measure factory-made in plant & they're simply
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2242 assembled on actual web site at the time of construction. Presently, massive column-free space is that the utmost demand for any kind of trade and with the advent of computer software’s it is now easily possible. With the improvement in technology, computer software’s have contributed immensely to the enhancement of quality of life through new researches. Pre-engineered building (PEB) is one of such revolution. "Pre-engineered buildings" are fully fabricated in the factory after designing, then transported to the site in completely knocked down (CKD) condition and all components are assembled and erected with nut-bolts, thereby reducing the time of completion. This paper effectively conveys that PEB structures can be easily designed by simple design procedure. PEB structures are more advantageous than conventional structures in economy, speed of construction & simple erection. Hence it is concluded that PEB has wide scope in India but they are still not preferred 3. Methodology The present study deals with the comparative analysis of PEB industrial sheds with a traditional style. within the initial stage, an industrial shed is valid by comparing support reaction and axial force of every member. Industrial structures standard (IS 1893: part IV, 2005) To perform well in associate degree earthquake, the commercial structure should possess adequate strength, stiffness, and malleability. Generally, structures have large capacities of energy absorption in its dead region. Structures that are unit careful as per IS 13920 and instrumentation that are unit made from ductile materials art stand up to earthquakes several folds above the planning spectra while not collapse, and injury in such cases is restricted to cracking solely. Structures are unit classified into the subsequent four categories: a) Category 1: Structures whose failure can cause conditions that can lead directly or indirectly to extensive hundreds of life/property to population at large in the ares adjacent to the plant complex. b) Category 2: Structures whose failure can cause conditions that can lead directly or indirectly to serious fire hazard/extensive damage within the plant complex c) Category 3: Structures, which are required to handle emergencies immediately after an earthquake, are also included. d) Category 4: Structures whose failure, although expensive, does not lead to serious hazard within the plant complex. For comparative purpose following models are proposed: Model No.1 PEB sheds with 6 bays with X-bracings Model No.2 PEB sheds with 6 bays without X-bracings 3.1. Structural analysis and design 1. Static Analysis 2. Dynamic / Seismic Analysis 3. Secondary Analysis 4. El-Centro data for Time History Analysis 3.2 Load combinations All dead loads, live loads, wind load, accidental load will be confirming to IS: 875-1987. Earthquake loads will be confirming to IS: 1893-2002 part-IV Load combinations considered 1. Self-Weight of structure 2. Weight of Purlins 3. Wind Force in X direction 4. Wind Force in Z direction 5. Negative Wind Pressure in X direction 6. Negative Wind Pressure in Z direction 7. Ground motion in X and Z direction 3.3. STAAD.Pro generated frames 3.3.1. Industrial shed with bracings: Fig -3: PEB model with 6 Bays without X-cross bracings Fig -4: PEB model with 6 Bays with X-cross bracings
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2243 4. Results and Discussion 4.1. Deflection of an industrial shed without bracings after applying the load combinations on STAAD.pro model We ran Time History Analysis on the model from the El- Centro Data and the top nodal results were as below: Fig -5: Deflection in Time History Analysis Mode-1 Fig -6: Deflection in Time History Analysis Mode-6 All the results of Time History Analysis in table form are as shown in table below: Table -1: Time History analysis results Seismic loading results in Time History Analysis results Mode Frequency (Hz) Period (Sec.) Participation X (%) Participation Y (%) Type 1 0.275 3.637 0.00 99.236 Elastic 2 0.486 2.056 0.001 0.00 Elastic 3 0.964 1.037 97.845 0.001 Elastic 4 0.967 1.034 0.074 0.762 Elastic 5 1.018 0.982 0.540 0.00 Elastic 6 1.121 0.892 0.943 0.00 Elastic Reactions on top nodal points of a model in all X, Y and Z direction are as below: Fig -7: Time Vs. Acceleration along X axis Fig -8: Time Vs. Acceleration along Z axis Fig -9: Time Vs. Displacement along X axis Fig -10: Time Vs. Displacement along Z axis 2.4 2.4 10. 92.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2244 4.2. Deflection of an industrial shed with bracings After applying the load combinations on STAAD.Pro model. We ran Time History Analysis on the model from the El- Centro Data and the top nodal results were as below. Fig -11: Deflection in Time History Analysis Mode-1 Fig -12 Deflection in Time History Analysis Mode-6 4.2.1. All the results of Time History Analysis in table form are as shown in table below: Table -2: Time History analysis results Seismic loading results in Time History Analysis results Mode Frequency (Hz) Period (Sec.) Participation X (%) Participation Y (%) Type 1 0.795 1.257 99.343 0.00 Elastic 2 3.077 0.325 0.025 0.00 Elastic 3 3.282 0.305 0.019 0.356 Elastic 4 5.155 0.194 0.00 0.00 Elastic 5 6.993 0.143 0.00 1.754 Elastic 6 7.434 0.135 0.008 0.001 Elastic 4.2.2. Reactions on top nodal points of a model in all X, Y and Z direction are as below: Fig -13: Time Vs. Acceleration along X axis Fig -14: Time Vs. Acceleration along Z axis Fig -15: Time Vs. Displacement along X axis Fig -16: Time Vs. Displacement along Z axis 492 1.03 9.41 9.64
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2245 4.3 Comparison of results from models Here we are comparing the results we got from the seismographs after applying the el-centro data on all the models using time history analysis. From the readings taken from the graphs of Acceleration, Displacement & velocity we have drawn the following bar charts: Fig -17: Comparison of acceleration along X & Z axis of two models Fig -18: Comparison of displacement along X & Z axis of two models 5. CONCLUSIONS In this paper Dynamic load action on Pre Engineered Building is observed and checked for El-Centro data using Time History Analysis. Two parametric models of Pre Engineered Buildings of 21 meter span with and without bracings. The sections are designed using KIRBY TECHNICAL HANDBOOK(9) which is in accordance of ASCE(07) After the checks the following conclusion is obtained: 1. Displacement along X-direction of Pre Engineered building with bracings is observed 34% less than the Pre Engineered Building without bracings along longitudinal direction 2. Displacement along Y-direction is observed 13% less than the Pre Engineered Building without bracings but it is permissible in both cases hence no extra bracings required for specified ground motion 3. Displacement along Z-direction is observed 23% less than the Pre Engineered Building without bracings 4. Acceleration at time period 3.02 seconds observed 609m/s2 and 492 m/s2 for with and without bracings respectively which is very severe and need to be controlled for current structural configuration. ACKNOWLEDGEMENT I am grateful to my Principal Dr. S. S. KHOT for his encouragement and guidance throughout the preparation of this project report. I specially thank to Prof. Mr. S. K. PATIL Head of Civil Engineering Department, KJCOEMR, Pune. For inspiring guidance and timely cooperation, without which it would not have been in its present shape. I am expressing my sincere thanks to all the staff and colleagues who have helped me directly or indirectly in completing this report. REFERENCES [1] G. Sai Kiran (2014). Comparison of Design Procedures for Pre Engineering Buildings (PEB). [2] Pradeep V (March-2014) Comparative Study of Pre Engineered and Conventional Industrial Building Sagar D. Wankhade (June-2014)Design & Comparison of Various Types of Industrial Buildings. [3] Milind Bhojkar P (Dec-2014). Comparison of Pre Engineering Building and Steel Building with Cost and Time Effectiveness [4] Dale C. Perry, Herbert S. Saffir, James R. McDonald, “Performance of Metal Buildings in High Winds”, Journal of Wind Engineering and Industrial Aerodynamics, 36 (1990) 985-999 985, Elsevier Science Publishers. [5] Syed Firoz, Sarath Chandra Kumar B, S.Kanakambara Rao,” Design Concept of Pre Engineered Building”, IJERA Vol. 2, Issue 2,Mar- Apr 2012, pp.267-272 0 100 200 300 400 500 600 700 X-AXIS WIT HO UT BR ACI NG S 0 0.5 1 1.5 2 2.5 3 Z-AXIS WI TH OU T BR ACI NG S 0 100 200 300 400 500 600 700 X-AXIS WIT HO UT BRA CIN GS WIT H BRA CIN GS 0 10 20 30 40 50 60 70 80 90 100 Z-AXIS WI TH OU T BR ACI NG S
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2246 http://www.ijera.com/papers/Vol2_issue2/AS22267 272.pdf [6] IS 875- Part II (1987), Indian Standard Code of Practice for Design Loads (Other Than Earthquake) for Buildings and Structures. [7] IS 1893- Part IV (2002) Indian Standard Criteria for Earthquake Resistant of Design of Structures. [8] IS 875- Part III (1987), Indian Standard Code of Practice for Design Loads (Other Than Earthquake) for Buildings and Structures. Aijaz Ahmad Zende (Jan- Feb 2013). [9] Kirby technical handbook for special structural & PEB pre-engineered building systems, 2013 Alghanim Industries. [10] American Society of Civil Engineers (ASCE) – 07.