A REVIEW ON EFFICIENCY OF MIGRATED LABOURS IN CONSTRUCTION
INDUSTRY
K.SATHYA PRIYA 1, V.SAMPATH KUMAR 2
1 PG Scholar, Department of Civil Engineering, Kongu Engineering College, Perundurai, India.
2 Assistant Professor, Department of Civil Engineering, Kongu Engineering College, Perundurai, India.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract -The most difficult issue in Constructionindustryin
the recent decade is the manner by which to enhance the
generation proficiency. Numerous analysts have been done in
the most recent decade however a more profound
comprehension is as yet expected to enhance the profitability
by concentrate the laborers conduct in construction industry.
The execution of the works is influenced by numerous
components and is generally connected to the execution of
time, cost, work weight, safety measures andquality.Thepoint
of this examination is to get the most recent data and to
distinguish the key factors that influence generation
proficiency in works by investigation of specialists conduct in
development industry. This examination proceeds with local
labours versus migrated labours information gathering
however surveys and disseminated to respondents who work
at different tasks in wide regions of Tamilnadu. Respondents
were required to be appraised and investigated utilizing their
experience and the elements were recognized from past
inquires about, which influences the venture execution. The
execution level is estimated in view of their reactions. The
information gathered are broke down utilizing Microsoft
Exceed expectations and SPSS programming which is
systematic programming.
Key Words: Labour productivity, Local Labours,
Migrated Labours, Site Engineer, Construction Industry
1. INTRODUCTION
Construction sector is a vital piece of the country's
advancement procedure. The advancement of a nation's
foundation and industry is personally connected to the
construction industry. Construction activities incorporate
building school, doctor's facilities houses, workplaces,
townships, thruways, streets, ports, air terminals, railroads,
control venture, water system task, et cetera. Other than
being the essential contribution for financial and modern
improvement of the nation, the construction sector gives a
ton of work chances to the needy individuals particularly
from the provincial zones as untalented works and
additionally talented works. Uncommon occupations
incorporate woodworkers, handymen, circuit repairmen,
painters, bricklayers, tile-fitters.Constructionindustryisone
of the segments that require work concentratedtosatisfythe
work at destinations. For the most part, labourers are
arranged into three classesin light of the aptitudes and their
particular scholastic standings. The Lowest class is the
incompetent specialists, the middle class is made out of
semi-gifted labourers and the highest class is the talented
labourers. For over the previousdecade, Tamilnaduhasover
reliance on the moved specialists the quantity of relocated
labourers has increment step by step in Tamilnadu. In this
paper we concentrate on the part of movement in
accomplishing more prominent proficiency in the work
showcase. Works advertise defectsandoperationalcontrasts
prompt work movement. Work relocation includes
development of specialists starting with one place thenonto
the next and ensuing change in the habitation of workers
with the end goal of business. This development can be
because of push factorswinning in the workmarketofcause.
To comprehend the general elements in charge of work
relocation, would assess the near efficiencies and wasteful
aspects of the work markets.
2. LABOUR PRODUCTIVITY
The imperative capacity in any creation set-up is that the
planned amount of work must be accomplished over some
stretch of time. Labour productivity relieson how worksare
used. labour productivity can be higher or bring down
contingent upon factors like accessibility of work stack,
material, working instruments, accessibility of energy,work
proficiency, level of inspiration, level of preparing, level of
working condition (agreeable or poor) and so on. Labour
productivity can be estimated regarding hours or cash.
Labour productivity =
Labour productivity =
3. LABOUR MIGRATION
Migration is an essential element of human progress. It
reflects, human undertaking to make due in the most testing
conditions both characteristic and man-made. Migration in
India has existed generally; however, with regards to
globalization and opening up of the world economy it has
accepted extraordinary criticalness for the nation and the
general public. As far as employment, construction is the
biggest work segment in India after agriculture. The greater
part of the workersin construction is migrants. Theworking
hours are from dawn to nightfall. The working day for
women frequently extends from 14 to 16 hours, joining
house work and work nearby where women are paid Rs.400
to 450 a day while men are paid Rs.600 to 650 a day.
Artisans procure up to Rs.800 to 850 a day.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1246
4. LITERATURE REVIEW
Ravi et al. (2016) this study finds that at destination,
workers have poor living and working conditions, lack
citizenship rights, entitlements and voice. As a result, we
were not able to control for differences in initial conditions,
and life cycle and other issues, which influence both
participation in migration, as well as long-term impacts.
Puthuma et al. (2016) has explained the deficiency of
manual labourers is a major problem faced by the Kerala
Economy. Migrant workers engage in almost all activities as
engaged by native workers. Emergence of migrantlabourers
in to the labour market of Kerala was a relief to the manual
labour deficit market and they supply cheaper labour force
in the labour market.
Preetham et al. (2015) This study are deals with the daily
actions and interactions of people in society as well as how
we react to society and how people think within society
opposed to their behaviors.
Rahul et al. (2015) the present study has been focused on
the migrant construction workers those who were mainly
working in commercial construction sector in NOIDA city.
Subramani et al. (2015) in this paper the problems of
policy prescriptions that failed to recognize the complexity
of the problems faced by these workers and criticize the
tendency to seek quick fixes rather than long-term and
careful institutional design.
Thiyagu et al. (2015) studied to get the latest information
and to identify the key factors that affect the labour
productivity in and around Coimbatore. The most
challenging issue in Construction industry is to improving
the production efficiency
Gourida Siham (2015) this paper reviews briefly on the
deprivation of various rights of rural- urban migrant form
policy perspective in different aspects, such asemployment,
low wages, the problemsof wage arrears, the lack of written
contracts, the long working hours, the short weekly rest
periods, the low social security coverage, the poor housing
conditions, and the difficulties they face in accessing public
services.
Joanicjusz et al. (2015) hasdiscussedaboutdifferencesand
similarities between construction sectors in European
countries. Labour productivity was calculated with DEA
method. Changes in the efficiency score over the period of
2006 to 2012 were estimated using Malmquist index. Tobit
regression was applied to explore the impact of the
economic performance of a country on the labour
productivity in its construction industry.
Muhammad et al. (2015) discussed about many problems
in construction project like cost, time, quality and
productivity facing at Pakistan. At the end ofthisstudy,some
recommendations were made in order to effetely manage
and minimize the major factors affecting the labour
productivity in building projects of Pakistan.
Anu et al. (2014) hasdiscussed construction productivityis
of interest to researchers and practitioners because of its
impact on the performance of construction projects. Results
of a questionnaire survey of project managers, site
engineers, supervisors and craftsmen, in the state of Kerala
in India, to identify the factors influencing construction
labour productivity.
5. NEED FOR STUDY
 Behaviour of labour is affected due to migration of
work place and identifying the causes and effect of
migrant labourshelpsto createacomfortableworking
environment for labours, thus improving the labour
productivity.
 To improve the efficiency of the labours, to reducethe
additional labour costs involved in construction.
6. OBJECTIVES
 To study the behaviour of Conventional labours and
Migrated labours in construction industry.
 To assess the efficiency of the labours in construction
industry.
 To suggest and recommend a freeenvironmentforthe
workersin order to improve theproductionefficiency.
7. METHODOLOGY
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1247
8. FACTORS IDENTIFICATION
This factors are collected from the literatures with contain
relevant investigations to the project carried out in this
phase. The factors are,
 Wages and Salary
 Overtime
 Fatigue
 Stacking of Trades
 Joint Occupancy
 Concurrent Operations
 Absenteeism and Turnover
 Confined Space
 Hazardous Work Area
 Weather and Season Changes
 Shift in Work
 Welfare Services
9. CONCLUSIONS
Based on the various literature reviews the factors were
identified for the labour’s behavior in the construction
industry. Identified or selected factorsare categorizedbased
on the need of our project. The questionnaires were
prepared from the selected factors by the studyonlaboursin
construction industry. The prepared questionnaires have
been sent to the reputed construction in order to obtain
response from company personnel. In continuation of my
project, comparison of local labours and migrated labours
efficiency is to be done. The responses from local labours,
migrated labours and site engineers are to be obtained in
future and the survey results will be analyzedandcompared.
The comparison will helps in improving the efficiency of
labours in construction industry.
REFERENCES
[1] Abdul Rahim, Abdul Hamid, Bachan Singh, M. Aminah
and NurAshikin M Abdullah, “The Employment of
Foreign Workers at Construction Sites”, IPEDR, Vol. 15.
Dec 2011, pp. 35-43.
[2] E. Anu, V. Thomas and J. Sudhakumar , “Factors
Influencing Construction LabourProductivity:AnIndian
Case Study”, Journal of Construction in Developing
Countries, Vol. 19, No. 1, Nov 2014, pp. 53-68.
[3] Attar, AK. Gupta, B. Desai, J. Magdum, “A Study of
Various Factors Affecting Labour Productivity and
Methods to Improve”, IOSR Journal of Mechanical and
Civil Engineering, Vol. 14, Apr 2013, pp. 11-14.
[4] GouridaSiham, “Rural-Urban MigrantsWorkersinChina
Evaluation Study of Labour Market ConditionsinChina”,
International Journal of Social Science and Humanity,
Vol. 05, No. 1, May 2015, pp. 134-138.
[5] Hamzah Abdul Rahmana, Chen Wanga, C. Lincoln,
Woodsb and Shu Fung Lowa, “Negative impact induced
by foreign workers: Evidence in Malaysian construction
sector”, Habitat International, Vol. 36, No. 1, Jan 2012,
pp. 433-443.
[6] Joanicjusz Nazarko and Ewa Chodakowska, “Measuring
productivity of construction industry in Europe with
Data Envelopment Analysis”, Procedia Engineering,Vol.
122, Jun 2012, pp. 204-212.
[7] Muhammad AsadullahTahir, Hashimhanif,
ZuhaibAslamShahid and Abdullah hanif, “Factors
Affecting Labour Productivity In Building Projects of
Pakistan”, International Journal of Management and
Applied Science, Vol. 01, No. 2,Apr 2015, pp. 37-42.
[8] Pei-Wen Liao, “Exploring the Impacts of Labour
Migration and Job Satisfaction on Organizational
Commitment of Foreign Workers in Taiwan’s
Construction Industry: Employ Ability as a Moderator”
American Journal of Industrial and Business
Management, Vol. 05, Apr 2015, pp. 148-153.
[9] V.PreethamSurya, “Socio-EconomicProblemsofMigrant
Workers: A Micro-Level Study of Migrated Unskilled
Labour to Hyderabad City” International Journal of
Science and Research, Vol. 06, No. 1, Jul 2017, pp. 370-
376.
[10] Puthuma Joy, “Impact of Migrant Workers in the Kerala
Economy”, International Journal of Informative &
Futuristic Research, Vol. 03, No. 8, Aug 2016, pp. 2943-
2948.
[11] S.Rahul, “Migrant Workers in the Commercial
Construction Sector a Case Study of NOIDA Uttar
Pradesh”, IOSR Journal of HumanitiesandSocialScience,
Vol. 20, No.10, Nov 2015, pp.46-51.
[12] RaviSrivastava and RajibSutradhar, “Labour Migration
to the Construction Sector in India and its Impact on
Rural Poverty”, Indian Journal of Human Development,
Vol. 10, No. 1, May 2015, pp. 27-48.
[13] TC. Shamna and KC. Baiju, “The Emerging Issues of in
Migrant Labourersin the Construction SectorofKerala”,
Indian Journal of Economics and Development, Vol. 02,
No. 2. Apr 2016, pp. 543-555.
[14] T. Subramani and J. Jayaraman, “Analysis of
Construction Workers Migrate From Industries”,
International Journal of Application or Innovation in
Engineering & Management, Vol. 04, No.5,Aug2015,pp.
274-283.
[15] C. Thiyagu and M. Dheenadhayalan, “Construction
Labour Productivity and its Improvement”,
International Research Journal of Engineering and
Technology, Vol. 02, No.8, Apr 2015, pp. 824–832.

More Related Content

What's hot

140080714001 akshay ardeshana
140080714001 akshay ardeshana140080714001 akshay ardeshana
140080714001 akshay ardeshanapitroda24977
 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineeringdanieldwi2
 
IRJET-Graduate Employability in the Field of Construction Management
IRJET-Graduate Employability in the Field of Construction ManagementIRJET-Graduate Employability in the Field of Construction Management
IRJET-Graduate Employability in the Field of Construction ManagementIRJET Journal
 
Design and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using FeaDesign and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using Feaijtsrd
 
Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...
Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...
Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...MelindaFischer1
 
IRJET- Appropriate Technology and Economic Development of the Emerging Nations
IRJET- Appropriate Technology and Economic Development of the Emerging NationsIRJET- Appropriate Technology and Economic Development of the Emerging Nations
IRJET- Appropriate Technology and Economic Development of the Emerging NationsIRJET Journal
 
Bikram final summar tranning
Bikram final summar tranningBikram final summar tranning
Bikram final summar tranningbikram99tiwary
 
Mechanical Engineers in Corporate world
Mechanical Engineers in Corporate worldMechanical Engineers in Corporate world
Mechanical Engineers in Corporate worldvivatechijri
 
Mba human resource management ii year- Annamalai Assignments 2017-18
Mba human resource management ii year- Annamalai Assignments 2017-18Mba human resource management ii year- Annamalai Assignments 2017-18
Mba human resource management ii year- Annamalai Assignments 2017-18PRADEEP SHARMA
 
WPI From Theory to Practice
WPI From Theory to PracticeWPI From Theory to Practice
WPI From Theory to PracticeBEYOND4.0
 
Hmt organization study report 2014
Hmt organization study report 2014Hmt organization study report 2014
Hmt organization study report 2014Tirthankar Sutradhar
 

What's hot (17)

140080714001 akshay ardeshana
140080714001 akshay ardeshana140080714001 akshay ardeshana
140080714001 akshay ardeshana
 
Industrial Engineering
Industrial EngineeringIndustrial Engineering
Industrial Engineering
 
IRJET-Graduate Employability in the Field of Construction Management
IRJET-Graduate Employability in the Field of Construction ManagementIRJET-Graduate Employability in the Field of Construction Management
IRJET-Graduate Employability in the Field of Construction Management
 
UDAAN
UDAANUDAAN
UDAAN
 
Design and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using FeaDesign and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using Fea
 
Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...
Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...
Dr Karen O'Reilly Briggs -Advanced Manufacturing, Engineering Trades and Inno...
 
Pankaj report
Pankaj reportPankaj report
Pankaj report
 
IRJET- Appropriate Technology and Economic Development of the Emerging Nations
IRJET- Appropriate Technology and Economic Development of the Emerging NationsIRJET- Appropriate Technology and Economic Development of the Emerging Nations
IRJET- Appropriate Technology and Economic Development of the Emerging Nations
 
10
1010
10
 
ICMI 2014!
ICMI 2014!ICMI 2014!
ICMI 2014!
 
UNITED FLOOR MILL
UNITED FLOOR MILLUNITED FLOOR MILL
UNITED FLOOR MILL
 
Bikram final summar tranning
Bikram final summar tranningBikram final summar tranning
Bikram final summar tranning
 
Operations management
Operations managementOperations management
Operations management
 
Mechanical Engineers in Corporate world
Mechanical Engineers in Corporate worldMechanical Engineers in Corporate world
Mechanical Engineers in Corporate world
 
Mba human resource management ii year- Annamalai Assignments 2017-18
Mba human resource management ii year- Annamalai Assignments 2017-18Mba human resource management ii year- Annamalai Assignments 2017-18
Mba human resource management ii year- Annamalai Assignments 2017-18
 
WPI From Theory to Practice
WPI From Theory to PracticeWPI From Theory to Practice
WPI From Theory to Practice
 
Hmt organization study report 2014
Hmt organization study report 2014Hmt organization study report 2014
Hmt organization study report 2014
 

Similar to A Review on Efficiency of Migrated Labours in Construction Industry

Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersIAEME Publication
 
An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...eSAT Journals
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET Journal
 
The construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysiaThe construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysiaeSAT Journals
 
The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,eSAT Publishing House
 
IRJET- A Review on “Productivity Improvement in Small Scale Industries”
IRJET- A Review on “Productivity Improvement in Small Scale Industries”IRJET- A Review on “Productivity Improvement in Small Scale Industries”
IRJET- A Review on “Productivity Improvement in Small Scale Industries”IRJET Journal
 
An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...IRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Journals
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Publishing House
 
Bulletin of Research Developments March 2015
Bulletin of Research Developments March 2015Bulletin of Research Developments March 2015
Bulletin of Research Developments March 2015Dr.Subramonian Shanmugham
 
IRJET- Precast Construction Technique: A Sustainable Approach for Smart Cities
IRJET- Precast Construction Technique: A Sustainable Approach for Smart CitiesIRJET- Precast Construction Technique: A Sustainable Approach for Smart Cities
IRJET- Precast Construction Technique: A Sustainable Approach for Smart CitiesIRJET Journal
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 
IRJET- A Study Report on Causes and Effects of Employee Turnover in Constr...
IRJET- 	  A Study Report on Causes and Effects of Employee Turnover in Constr...IRJET- 	  A Study Report on Causes and Effects of Employee Turnover in Constr...
IRJET- A Study Report on Causes and Effects of Employee Turnover in Constr...IRJET Journal
 
An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industryijtsrd
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurementSiddharth Mantri
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSAmy Roman
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectseSAT Journals
 
Future of industrialization in india
Future of industrialization in indiaFuture of industrialization in india
Future of industrialization in indiaBitan Dolai
 

Similar to A Review on Efficiency of Migrated Labours in Construction Industry (20)

Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated members
 
An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
The construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysiaThe construction labour shortage in johor bahru, malaysia
The construction labour shortage in johor bahru, malaysia
 
The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,The construction labour shortage in johor bahru,
The construction labour shortage in johor bahru,
 
IRJET- A Review on “Productivity Improvement in Small Scale Industries”
IRJET- A Review on “Productivity Improvement in Small Scale Industries”IRJET- A Review on “Productivity Improvement in Small Scale Industries”
IRJET- A Review on “Productivity Improvement in Small Scale Industries”
 
An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...An analysis of Factors affecting Labour Productivity in Construction Projects...
An analysis of Factors affecting Labour Productivity in Construction Projects...
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
Bulletin of Research Developments March 2015
Bulletin of Research Developments March 2015Bulletin of Research Developments March 2015
Bulletin of Research Developments March 2015
 
IRJET- Precast Construction Technique: A Sustainable Approach for Smart Cities
IRJET- Precast Construction Technique: A Sustainable Approach for Smart CitiesIRJET- Precast Construction Technique: A Sustainable Approach for Smart Cities
IRJET- Precast Construction Technique: A Sustainable Approach for Smart Cities
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
IRJET- A Study Report on Causes and Effects of Employee Turnover in Constr...
IRJET- 	  A Study Report on Causes and Effects of Employee Turnover in Constr...IRJET- 	  A Study Report on Causes and Effects of Employee Turnover in Constr...
IRJET- A Study Report on Causes and Effects of Employee Turnover in Constr...
 
An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industry
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Essay Construction
Essay ConstructionEssay Construction
Essay Construction
 
Importance of labor productivity and its measurement
Importance of labor productivity and its measurementImportance of labor productivity and its measurement
Importance of labor productivity and its measurement
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
 
Future of industrialization in india
Future of industrialization in indiaFuture of industrialization in india
Future of industrialization in india
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 

A Review on Efficiency of Migrated Labours in Construction Industry

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1245 A REVIEW ON EFFICIENCY OF MIGRATED LABOURS IN CONSTRUCTION INDUSTRY K.SATHYA PRIYA 1, V.SAMPATH KUMAR 2 1 PG Scholar, Department of Civil Engineering, Kongu Engineering College, Perundurai, India. 2 Assistant Professor, Department of Civil Engineering, Kongu Engineering College, Perundurai, India. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract -The most difficult issue in Constructionindustryin the recent decade is the manner by which to enhance the generation proficiency. Numerous analysts have been done in the most recent decade however a more profound comprehension is as yet expected to enhance the profitability by concentrate the laborers conduct in construction industry. The execution of the works is influenced by numerous components and is generally connected to the execution of time, cost, work weight, safety measures andquality.Thepoint of this examination is to get the most recent data and to distinguish the key factors that influence generation proficiency in works by investigation of specialists conduct in development industry. This examination proceeds with local labours versus migrated labours information gathering however surveys and disseminated to respondents who work at different tasks in wide regions of Tamilnadu. Respondents were required to be appraised and investigated utilizing their experience and the elements were recognized from past inquires about, which influences the venture execution. The execution level is estimated in view of their reactions. The information gathered are broke down utilizing Microsoft Exceed expectations and SPSS programming which is systematic programming. Key Words: Labour productivity, Local Labours, Migrated Labours, Site Engineer, Construction Industry 1. INTRODUCTION Construction sector is a vital piece of the country's advancement procedure. The advancement of a nation's foundation and industry is personally connected to the construction industry. Construction activities incorporate building school, doctor's facilities houses, workplaces, townships, thruways, streets, ports, air terminals, railroads, control venture, water system task, et cetera. Other than being the essential contribution for financial and modern improvement of the nation, the construction sector gives a ton of work chances to the needy individuals particularly from the provincial zones as untalented works and additionally talented works. Uncommon occupations incorporate woodworkers, handymen, circuit repairmen, painters, bricklayers, tile-fitters.Constructionindustryisone of the segments that require work concentratedtosatisfythe work at destinations. For the most part, labourers are arranged into three classesin light of the aptitudes and their particular scholastic standings. The Lowest class is the incompetent specialists, the middle class is made out of semi-gifted labourers and the highest class is the talented labourers. For over the previousdecade, Tamilnaduhasover reliance on the moved specialists the quantity of relocated labourers has increment step by step in Tamilnadu. In this paper we concentrate on the part of movement in accomplishing more prominent proficiency in the work showcase. Works advertise defectsandoperationalcontrasts prompt work movement. Work relocation includes development of specialists starting with one place thenonto the next and ensuing change in the habitation of workers with the end goal of business. This development can be because of push factorswinning in the workmarketofcause. To comprehend the general elements in charge of work relocation, would assess the near efficiencies and wasteful aspects of the work markets. 2. LABOUR PRODUCTIVITY The imperative capacity in any creation set-up is that the planned amount of work must be accomplished over some stretch of time. Labour productivity relieson how worksare used. labour productivity can be higher or bring down contingent upon factors like accessibility of work stack, material, working instruments, accessibility of energy,work proficiency, level of inspiration, level of preparing, level of working condition (agreeable or poor) and so on. Labour productivity can be estimated regarding hours or cash. Labour productivity = Labour productivity = 3. LABOUR MIGRATION Migration is an essential element of human progress. It reflects, human undertaking to make due in the most testing conditions both characteristic and man-made. Migration in India has existed generally; however, with regards to globalization and opening up of the world economy it has accepted extraordinary criticalness for the nation and the general public. As far as employment, construction is the biggest work segment in India after agriculture. The greater part of the workersin construction is migrants. Theworking hours are from dawn to nightfall. The working day for women frequently extends from 14 to 16 hours, joining house work and work nearby where women are paid Rs.400 to 450 a day while men are paid Rs.600 to 650 a day. Artisans procure up to Rs.800 to 850 a day.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1246 4. LITERATURE REVIEW Ravi et al. (2016) this study finds that at destination, workers have poor living and working conditions, lack citizenship rights, entitlements and voice. As a result, we were not able to control for differences in initial conditions, and life cycle and other issues, which influence both participation in migration, as well as long-term impacts. Puthuma et al. (2016) has explained the deficiency of manual labourers is a major problem faced by the Kerala Economy. Migrant workers engage in almost all activities as engaged by native workers. Emergence of migrantlabourers in to the labour market of Kerala was a relief to the manual labour deficit market and they supply cheaper labour force in the labour market. Preetham et al. (2015) This study are deals with the daily actions and interactions of people in society as well as how we react to society and how people think within society opposed to their behaviors. Rahul et al. (2015) the present study has been focused on the migrant construction workers those who were mainly working in commercial construction sector in NOIDA city. Subramani et al. (2015) in this paper the problems of policy prescriptions that failed to recognize the complexity of the problems faced by these workers and criticize the tendency to seek quick fixes rather than long-term and careful institutional design. Thiyagu et al. (2015) studied to get the latest information and to identify the key factors that affect the labour productivity in and around Coimbatore. The most challenging issue in Construction industry is to improving the production efficiency Gourida Siham (2015) this paper reviews briefly on the deprivation of various rights of rural- urban migrant form policy perspective in different aspects, such asemployment, low wages, the problemsof wage arrears, the lack of written contracts, the long working hours, the short weekly rest periods, the low social security coverage, the poor housing conditions, and the difficulties they face in accessing public services. Joanicjusz et al. (2015) hasdiscussedaboutdifferencesand similarities between construction sectors in European countries. Labour productivity was calculated with DEA method. Changes in the efficiency score over the period of 2006 to 2012 were estimated using Malmquist index. Tobit regression was applied to explore the impact of the economic performance of a country on the labour productivity in its construction industry. Muhammad et al. (2015) discussed about many problems in construction project like cost, time, quality and productivity facing at Pakistan. At the end ofthisstudy,some recommendations were made in order to effetely manage and minimize the major factors affecting the labour productivity in building projects of Pakistan. Anu et al. (2014) hasdiscussed construction productivityis of interest to researchers and practitioners because of its impact on the performance of construction projects. Results of a questionnaire survey of project managers, site engineers, supervisors and craftsmen, in the state of Kerala in India, to identify the factors influencing construction labour productivity. 5. NEED FOR STUDY  Behaviour of labour is affected due to migration of work place and identifying the causes and effect of migrant labourshelpsto createacomfortableworking environment for labours, thus improving the labour productivity.  To improve the efficiency of the labours, to reducethe additional labour costs involved in construction. 6. OBJECTIVES  To study the behaviour of Conventional labours and Migrated labours in construction industry.  To assess the efficiency of the labours in construction industry.  To suggest and recommend a freeenvironmentforthe workersin order to improve theproductionefficiency. 7. METHODOLOGY
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 01 | Jan-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1247 8. FACTORS IDENTIFICATION This factors are collected from the literatures with contain relevant investigations to the project carried out in this phase. The factors are,  Wages and Salary  Overtime  Fatigue  Stacking of Trades  Joint Occupancy  Concurrent Operations  Absenteeism and Turnover  Confined Space  Hazardous Work Area  Weather and Season Changes  Shift in Work  Welfare Services 9. CONCLUSIONS Based on the various literature reviews the factors were identified for the labour’s behavior in the construction industry. Identified or selected factorsare categorizedbased on the need of our project. The questionnaires were prepared from the selected factors by the studyonlaboursin construction industry. The prepared questionnaires have been sent to the reputed construction in order to obtain response from company personnel. In continuation of my project, comparison of local labours and migrated labours efficiency is to be done. The responses from local labours, migrated labours and site engineers are to be obtained in future and the survey results will be analyzedandcompared. The comparison will helps in improving the efficiency of labours in construction industry. REFERENCES [1] Abdul Rahim, Abdul Hamid, Bachan Singh, M. Aminah and NurAshikin M Abdullah, “The Employment of Foreign Workers at Construction Sites”, IPEDR, Vol. 15. Dec 2011, pp. 35-43. [2] E. Anu, V. Thomas and J. Sudhakumar , “Factors Influencing Construction LabourProductivity:AnIndian Case Study”, Journal of Construction in Developing Countries, Vol. 19, No. 1, Nov 2014, pp. 53-68. [3] Attar, AK. Gupta, B. Desai, J. Magdum, “A Study of Various Factors Affecting Labour Productivity and Methods to Improve”, IOSR Journal of Mechanical and Civil Engineering, Vol. 14, Apr 2013, pp. 11-14. [4] GouridaSiham, “Rural-Urban MigrantsWorkersinChina Evaluation Study of Labour Market ConditionsinChina”, International Journal of Social Science and Humanity, Vol. 05, No. 1, May 2015, pp. 134-138. [5] Hamzah Abdul Rahmana, Chen Wanga, C. Lincoln, Woodsb and Shu Fung Lowa, “Negative impact induced by foreign workers: Evidence in Malaysian construction sector”, Habitat International, Vol. 36, No. 1, Jan 2012, pp. 433-443. [6] Joanicjusz Nazarko and Ewa Chodakowska, “Measuring productivity of construction industry in Europe with Data Envelopment Analysis”, Procedia Engineering,Vol. 122, Jun 2012, pp. 204-212. [7] Muhammad AsadullahTahir, Hashimhanif, ZuhaibAslamShahid and Abdullah hanif, “Factors Affecting Labour Productivity In Building Projects of Pakistan”, International Journal of Management and Applied Science, Vol. 01, No. 2,Apr 2015, pp. 37-42. [8] Pei-Wen Liao, “Exploring the Impacts of Labour Migration and Job Satisfaction on Organizational Commitment of Foreign Workers in Taiwan’s Construction Industry: Employ Ability as a Moderator” American Journal of Industrial and Business Management, Vol. 05, Apr 2015, pp. 148-153. [9] V.PreethamSurya, “Socio-EconomicProblemsofMigrant Workers: A Micro-Level Study of Migrated Unskilled Labour to Hyderabad City” International Journal of Science and Research, Vol. 06, No. 1, Jul 2017, pp. 370- 376. [10] Puthuma Joy, “Impact of Migrant Workers in the Kerala Economy”, International Journal of Informative & Futuristic Research, Vol. 03, No. 8, Aug 2016, pp. 2943- 2948. [11] S.Rahul, “Migrant Workers in the Commercial Construction Sector a Case Study of NOIDA Uttar Pradesh”, IOSR Journal of HumanitiesandSocialScience, Vol. 20, No.10, Nov 2015, pp.46-51. [12] RaviSrivastava and RajibSutradhar, “Labour Migration to the Construction Sector in India and its Impact on Rural Poverty”, Indian Journal of Human Development, Vol. 10, No. 1, May 2015, pp. 27-48. [13] TC. Shamna and KC. Baiju, “The Emerging Issues of in Migrant Labourersin the Construction SectorofKerala”, Indian Journal of Economics and Development, Vol. 02, No. 2. Apr 2016, pp. 543-555. [14] T. Subramani and J. Jayaraman, “Analysis of Construction Workers Migrate From Industries”, International Journal of Application or Innovation in Engineering & Management, Vol. 04, No.5,Aug2015,pp. 274-283. [15] C. Thiyagu and M. Dheenadhayalan, “Construction Labour Productivity and its Improvement”, International Research Journal of Engineering and Technology, Vol. 02, No.8, Apr 2015, pp. 824–832.