BASIC MUD LOGGING
A. Operating Company.
B. Drilling Contractor.
C. Drilling Service Companies.
I- WELL PLANNIG
1- LAND RIGS.
2- OFF SHORE RIGS..
2- Drilling RIG TYPES &
COMPONENTS
2- LAND RIGS
2- OFF SHORE RIGS
 1.Jack - up Rigs.
 Those rigs drill in water
depths up to 400 ft
 1- Provide a fixed platform.
 2- does not need a marine
riser or subsea stack.
2. SEMI SUBMERSIBLES.
1- can work in water up to
2000 ft.
2- has a god safety records.
Disadvantages:
1- need marine risers and
subseastack.
2- has limited cargo capacity.
OFF SHORE RIGS (continue)
floats
2. Drilling Ships.
1- can work in ultra deep
water; more than 2000 ft.
2- self propelled.
Disadvantages:
1- need marine risers and
subseastack.
2- not as stable as jackups
and semisub.
OFF SHORE RIGS (continue)
4. Platform Rigs.
A rig installed on a fixed
marine plate form.
Can support several rigs.
OFF SHORE RIGS (continue)
Land Drilling Rig Components
1- Mast or Derrick.
((is the framework-
tower type of
support usually
associated with oil
well drilling)).
Land Rig Components
1.1- Monkey Board.
((the platform which
support he stands)).
1.1- V-Door.
((a triangular opening
on the front of the
derrick to allow drill
pipes to be pick up
from the cat walk)).
Land Rig Components
2- Crown.
2.1- Crown Sheaves.
2.2- Drilling Line.
2.3- Travelling Block.
2.4- Hook.
Land Rig Components
3- Elevators.
Two elevators are used
in pipe lifting and not
used while drilling
Land Rig Components
4- Substructure.
This is the support on
which the derrick rest
Land Rig Components
5- Rotary Table.
1. Transmits the rotation
to the drill string.
2. Suspend the drill
string during connections
& trips
Land Rig Components
 Slips
 These devices are
used to hold the
weight of the drill
string when it is not
supported by the
hook (during
connections or
tripping time).
Land Rig Components
5- kelly.
This is the topmost joint in the drill
string and is 40-45 feet in length.
It is commonly square or
hexagonal. The kelly passes
through the rotary table and
transmits the table rotation to the
drill string via the kelly bushing.
Land Rig Components
5- Rotary Table.
1. Transmits the rotation
to the drill string.
2. Suspend the drill
string during connections
& trips
Land Rig Components
5- SWEVEL.
The swivel supports the drill
string and allows rotation at
the same time. It also allows
the passage of drilling fluid
from the rotary hose into the
drill string. The swivel
performs a very tough job
Land Rig Components
7- TOP DRIVE.
Replaced kelly and kelly
bushing and it rotates the
string as well
1. drilling to be carried out
stand by stand instead.
2.Top drive is not removed
during trips.
Drilling String Components
This term includes all the components used
to drill below the kelly or top drive; and it can
include the following components:-
1- Drill Pipe & Tool Joints .
2- Heavy weight drill pipe (HWDP.
3- Drill Collars
4- Rotary Bits
Drilling String Components
3. Stabilizers: of a blade type
construction. Drilling fluid can pass
freely between the blades while the
outer edge of the blades contacts the
wall of the hole and holds the drill
collars firmly centered in the hole.
They do exactly as their name
implies, they provide stability to the
bit and collars.
Drilling String Components
 Reamers: These usually have the same
diameter as the bit and are run a little
distance above it
 Under-reamers: Used opening out a hole
below a restriction such as imposed by the
blow-out preventer assembly.
 Hole Openers: Used for drilling large
diameter holes. They have replaceable
cutters and serve the same function as an
underreamer except they are not collapsible
and can only be used when there is no
restriction smaller than the hole size they drill.
Drilling String Components
Rotary Bits
1. Drag Bits:- no moving
parts but drill by the
shovelling action of their
blade on the formation.
2. Roller Bits:- have
rotating cones.
Three cone bits (Tri-Cone)
are the most widely used in
the oil field.
Drilling String Components
3. Diamond Bits:- These
are designed to drill by the
scraping action of
diamonds set in a steel
matrix. This type of bits is
normally used in hard
formations where long bit
life and the subsequent
reduction in trip time are
desirable.
Some Off shore Components
Heave (Motion)
Compansation.
1- Drill string
compensator.
2- Riser & Guideline
Tensioners
Mud Pumps
 1.Double-acting Pumps (Duplex): - This
means that both sides of the piston are
used for pumping.
 2.Single-acting Pumps (Triplex): - These only
one side of the piston is used for pumping,
that is, the cylinder is then filling or
discharging
1- Shale shaker.
2- Desander.
3- Desilter.
4- Degaser.
5- Mud cleaner.
6- Centrifuge.
Solid Control Equipment
Blow Out Preventor (BOP)
 a means of closing-
off the annular
space between the
drill pipe and
casing
 1- Annular Preventors.
 2- Ram Preventors.
BOP’S
List of Common Drilling Terms
Abandon : To cease producing oil or gas from a well.
Abnormal Pressure :Pressure exerted by a formation exceeding normal
pressure for any given depth.
Acidize :To inject Hcl into a calcareous formation under
pressure, that causes, enlargement of fissures and
improvement of permeability characteristics.
Annular BOP :A large valve installed above the ram preventers.
Annular Space :The space between drill string and casing or open
hole.
API :American petroleum Institute; founded in 1920,
this organisation aims for standardisation in the oil
field.
Back off :To unscrew one threaded section from another as
with pipe.
Barite :Ba S04, a mineral used to weight up drilling fluid.
Barrel :42 US. Gallon = 158.97 litres 1m3 = 6.2897 bbls.
Basket Sub :Fishing accessory run above a bit or mill to
recover small pieces of junk.
Bit breaker :Device for breaking out the bit from the string.
Blow-out Preventer BOP’s :Equipment installed to prevent the uncontrolled
escape of gas oil or salt water from the well.
Breakout :To unscrew one section of pipe from another
generally during pulling of pipe. The tongs are used
in this operation.
Calibre Log :A record of the diameter of the wellbore
indicating washout or enlargements due to casings.
Cap a well :To control a blow-out by placing a very strong
valve on the well bore.
Casing shoe :A short heavy hollow cylindrical steel- concrete
section with a rounded bottom placed on the end of
the casing shoe. Also called a guide shoe.
Fish :An object left in the well that need be recovered.
Fracturing :A method to stimulate production from a poorly
permeable zone by pressuring open the fissures
jacking them open with beads or such like, then
releasing this pressure.
Gas cut mud :A drilling mud with entrained formation gas,
causing reduced weight.
Joint :A single length of drill pipe, casing or drill collar.
Kelly saver sub :A short sub placed between kelly and drill pipe to
save excessive wear on the kelly threads.
Kelly spinner :A pneumatically operated device mound on the top
of the kelly that turns the kelly. useful in making up
pipe.
Latch on :To attach the elevators to a section of pipe to pull
it, or run it, into hole.
Monkeyboard : A platform on derrick from which the derrickman
works while triping.
Mouse-hole :An opening in the rig floor, pipe lined, that singles
are placed in before making up.
Mudman :The mud engineer.
Nipple up :To assemble the BOP stack onto the well.
Perforate :To pierce the casing and cement for the purpose of
allowing formation fluids to enter the production
piping.
Pull out :To trip string out of the hole.
Rat hole :Either a line hole in the rig floor on that the kelly
is kept during trips, or a hole of smaller diameter
drilled at the bottom of the main hole.
Round trip :To trip out, then into the hole.
Run in :To trip pipe into the hole.
Sheave :A grooved pulley.
Sidetrack :To drill around a blocked well bore by kicking off
a new hole at an angle to the original.
Stuck pipe :Drill string, casing or tubing that has become
immovable in the hole.
Sub :A short length of pipe, threaded at each end, used
to adapt different pats of the drill string that
otherwise would not connect, or else to perform a
specialist function e.g. junk sub, kelly saver sub.
T.D. :Abbreviation of total depth - the end of the well.
Tight hole :Under gauge hole section through which it is
difficult to pull the drill string. Or a well about that
information is restricted.
Tongs :The large wrenches used for making up or
breaking out drill pipe.
Work Pipe :Moving the drill string up and down in the hole
whilst not rotating to prevent sticking.
Wiper trip :A short trip up into casing then back to bottom to
clean out the hole, to check for gauge, and to
reduce the danger of getting stuck.
Common Rig Terms
Rig Personnel
• Company Man or Company Representative:
The operator representative usually a drilling engineer employed by the oil
company engaged in drilling.
• Tool Pusher:
A drilling foreman or rig superintendent.
• Driller :
Employee in charge of the “brake” responsible for making hole as quickly as
possible.
• Assistant Driller:
Assists driller in “making hole” and general jobs around the rig.
• Derrick Man:
Responsible for stacking pipe in derrick during trips. Operates from monkey board
attached by safety harness. Assist mud engineer to mix mud.
• Roughnecks/ Floor hands:
General workers under supervision of the driller.
• Rig Mechanic :
Keeps the rig running smoothly. Controls maintenance of rig.
• Motorman Rig Electrician Rig Welder:
Keep the motors running.
• Mud Engineer:
Controls properties of drilling fluid within limits specified by operator.
Mud Loggers :
Produce mud log of the well. Responsible for detecting changes in volume of
surface mud, changes of drilling parameters and the presence of hydrocarbons.
 Offshore Personnel
• Captain :
Responsible for the rig as a marine vessel. He will hole a masters certificate, and
is in command during rig moves.

More Related Content

What's hot

Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA DesignM.T.H Group
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_PresentationMuhammad Hassaan
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
FinalProjectFall2014presentation
FinalProjectFall2014presentationFinalProjectFall2014presentation
FinalProjectFall2014presentationMichael Okuneye
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN Elsayed Amer
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls externalBladimir R
 
Rig types and components
Rig types and componentsRig types and components
Rig types and componentsMarwan Elaraby
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsLatif Hyder Wadho
 
Functions of drilling rig components Presentation
Functions of drilling rig components PresentationFunctions of drilling rig components Presentation
Functions of drilling rig components PresentationThanos Paraschos
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo Petroleum
 
Drilling problems and optimization
Drilling problems and optimizationDrilling problems and optimization
Drilling problems and optimizationFareed Khan
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wlegElsayed Amer
 

What's hot (20)

Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
FinalProjectFall2014presentation
FinalProjectFall2014presentationFinalProjectFall2014presentation
FinalProjectFall2014presentation
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
 
Rig types and components
Rig types and componentsRig types and components
Rig types and components
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - Definitions
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
 
Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
Functions of drilling rig components Presentation
Functions of drilling rig components PresentationFunctions of drilling rig components Presentation
Functions of drilling rig components Presentation
 
Rig types.
Rig types.Rig types.
Rig types.
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
 
Rig components
Rig componentsRig components
Rig components
 
Drilling problems and optimization
Drilling problems and optimizationDrilling problems and optimization
Drilling problems and optimization
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 

Similar to 01_Rig Components & Personel.pdf

1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjdahmdrabymnswr
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptxHayder Al Ali
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminariesKartikeya Pandey
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling OperationsTarek Saati
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnentsRIZWAN KHAN
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Mohamed _el_shora
 
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Mohamed _el_shora
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )amrhaggag
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Designrahul827662
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Aijaz Ali Mooro
 
Wel Planing
Wel PlaningWel Planing
Wel Planingsaqib129
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview Shaukat Ali
 

Similar to 01_Rig Components & Personel.pdf (20)

6 day.pptx
6 day.pptx6 day.pptx
6 day.pptx
 
Drilling - Qazma English
Drilling - Qazma EnglishDrilling - Qazma English
Drilling - Qazma English
 
Drilling - Qazma English
Drilling - Qazma English Drilling - Qazma English
Drilling - Qazma English
 
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Drilling engineering zaidi
Drilling engineering zaidiDrilling engineering zaidi
Drilling engineering zaidi
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling Operations
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016
 
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Design
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
Wel Planing
Wel PlaningWel Planing
Wel Planing
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview
 

Recently uploaded

Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

01_Rig Components & Personel.pdf

  • 2. A. Operating Company. B. Drilling Contractor. C. Drilling Service Companies. I- WELL PLANNIG
  • 3. 1- LAND RIGS. 2- OFF SHORE RIGS.. 2- Drilling RIG TYPES & COMPONENTS
  • 5. 2- OFF SHORE RIGS  1.Jack - up Rigs.  Those rigs drill in water depths up to 400 ft  1- Provide a fixed platform.  2- does not need a marine riser or subsea stack.
  • 6. 2. SEMI SUBMERSIBLES. 1- can work in water up to 2000 ft. 2- has a god safety records. Disadvantages: 1- need marine risers and subseastack. 2- has limited cargo capacity. OFF SHORE RIGS (continue) floats
  • 7. 2. Drilling Ships. 1- can work in ultra deep water; more than 2000 ft. 2- self propelled. Disadvantages: 1- need marine risers and subseastack. 2- not as stable as jackups and semisub. OFF SHORE RIGS (continue)
  • 8. 4. Platform Rigs. A rig installed on a fixed marine plate form. Can support several rigs. OFF SHORE RIGS (continue)
  • 9. Land Drilling Rig Components 1- Mast or Derrick. ((is the framework- tower type of support usually associated with oil well drilling)).
  • 10.
  • 11. Land Rig Components 1.1- Monkey Board. ((the platform which support he stands)). 1.1- V-Door. ((a triangular opening on the front of the derrick to allow drill pipes to be pick up from the cat walk)).
  • 12. Land Rig Components 2- Crown. 2.1- Crown Sheaves. 2.2- Drilling Line. 2.3- Travelling Block. 2.4- Hook.
  • 13. Land Rig Components 3- Elevators. Two elevators are used in pipe lifting and not used while drilling
  • 14. Land Rig Components 4- Substructure. This is the support on which the derrick rest
  • 15. Land Rig Components 5- Rotary Table. 1. Transmits the rotation to the drill string. 2. Suspend the drill string during connections & trips
  • 16. Land Rig Components  Slips  These devices are used to hold the weight of the drill string when it is not supported by the hook (during connections or tripping time).
  • 17. Land Rig Components 5- kelly. This is the topmost joint in the drill string and is 40-45 feet in length. It is commonly square or hexagonal. The kelly passes through the rotary table and transmits the table rotation to the drill string via the kelly bushing.
  • 18. Land Rig Components 5- Rotary Table. 1. Transmits the rotation to the drill string. 2. Suspend the drill string during connections & trips
  • 19. Land Rig Components 5- SWEVEL. The swivel supports the drill string and allows rotation at the same time. It also allows the passage of drilling fluid from the rotary hose into the drill string. The swivel performs a very tough job
  • 20. Land Rig Components 7- TOP DRIVE. Replaced kelly and kelly bushing and it rotates the string as well 1. drilling to be carried out stand by stand instead. 2.Top drive is not removed during trips.
  • 21. Drilling String Components This term includes all the components used to drill below the kelly or top drive; and it can include the following components:- 1- Drill Pipe & Tool Joints . 2- Heavy weight drill pipe (HWDP. 3- Drill Collars 4- Rotary Bits
  • 22. Drilling String Components 3. Stabilizers: of a blade type construction. Drilling fluid can pass freely between the blades while the outer edge of the blades contacts the wall of the hole and holds the drill collars firmly centered in the hole. They do exactly as their name implies, they provide stability to the bit and collars.
  • 23. Drilling String Components  Reamers: These usually have the same diameter as the bit and are run a little distance above it  Under-reamers: Used opening out a hole below a restriction such as imposed by the blow-out preventer assembly.  Hole Openers: Used for drilling large diameter holes. They have replaceable cutters and serve the same function as an underreamer except they are not collapsible and can only be used when there is no restriction smaller than the hole size they drill.
  • 24. Drilling String Components Rotary Bits 1. Drag Bits:- no moving parts but drill by the shovelling action of their blade on the formation. 2. Roller Bits:- have rotating cones. Three cone bits (Tri-Cone) are the most widely used in the oil field.
  • 25.
  • 26. Drilling String Components 3. Diamond Bits:- These are designed to drill by the scraping action of diamonds set in a steel matrix. This type of bits is normally used in hard formations where long bit life and the subsequent reduction in trip time are desirable.
  • 27. Some Off shore Components Heave (Motion) Compansation. 1- Drill string compensator. 2- Riser & Guideline Tensioners
  • 28. Mud Pumps  1.Double-acting Pumps (Duplex): - This means that both sides of the piston are used for pumping.  2.Single-acting Pumps (Triplex): - These only one side of the piston is used for pumping, that is, the cylinder is then filling or discharging
  • 29. 1- Shale shaker. 2- Desander. 3- Desilter. 4- Degaser. 5- Mud cleaner. 6- Centrifuge. Solid Control Equipment
  • 30. Blow Out Preventor (BOP)  a means of closing- off the annular space between the drill pipe and casing  1- Annular Preventors.  2- Ram Preventors.
  • 32. List of Common Drilling Terms Abandon : To cease producing oil or gas from a well. Abnormal Pressure :Pressure exerted by a formation exceeding normal pressure for any given depth. Acidize :To inject Hcl into a calcareous formation under pressure, that causes, enlargement of fissures and improvement of permeability characteristics. Annular BOP :A large valve installed above the ram preventers. Annular Space :The space between drill string and casing or open hole. API :American petroleum Institute; founded in 1920, this organisation aims for standardisation in the oil field. Back off :To unscrew one threaded section from another as with pipe. Barite :Ba S04, a mineral used to weight up drilling fluid. Barrel :42 US. Gallon = 158.97 litres 1m3 = 6.2897 bbls. Basket Sub :Fishing accessory run above a bit or mill to recover small pieces of junk. Bit breaker :Device for breaking out the bit from the string. Blow-out Preventer BOP’s :Equipment installed to prevent the uncontrolled escape of gas oil or salt water from the well. Breakout :To unscrew one section of pipe from another generally during pulling of pipe. The tongs are used in this operation. Calibre Log :A record of the diameter of the wellbore indicating washout or enlargements due to casings. Cap a well :To control a blow-out by placing a very strong valve on the well bore. Casing shoe :A short heavy hollow cylindrical steel- concrete section with a rounded bottom placed on the end of the casing shoe. Also called a guide shoe. Fish :An object left in the well that need be recovered. Fracturing :A method to stimulate production from a poorly permeable zone by pressuring open the fissures jacking them open with beads or such like, then releasing this pressure. Gas cut mud :A drilling mud with entrained formation gas, causing reduced weight. Joint :A single length of drill pipe, casing or drill collar. Kelly saver sub :A short sub placed between kelly and drill pipe to save excessive wear on the kelly threads. Kelly spinner :A pneumatically operated device mound on the top of the kelly that turns the kelly. useful in making up pipe. Latch on :To attach the elevators to a section of pipe to pull it, or run it, into hole. Monkeyboard : A platform on derrick from which the derrickman works while triping. Mouse-hole :An opening in the rig floor, pipe lined, that singles are placed in before making up. Mudman :The mud engineer. Nipple up :To assemble the BOP stack onto the well. Perforate :To pierce the casing and cement for the purpose of allowing formation fluids to enter the production piping. Pull out :To trip string out of the hole. Rat hole :Either a line hole in the rig floor on that the kelly is kept during trips, or a hole of smaller diameter drilled at the bottom of the main hole. Round trip :To trip out, then into the hole. Run in :To trip pipe into the hole. Sheave :A grooved pulley. Sidetrack :To drill around a blocked well bore by kicking off a new hole at an angle to the original. Stuck pipe :Drill string, casing or tubing that has become immovable in the hole. Sub :A short length of pipe, threaded at each end, used to adapt different pats of the drill string that otherwise would not connect, or else to perform a specialist function e.g. junk sub, kelly saver sub. T.D. :Abbreviation of total depth - the end of the well. Tight hole :Under gauge hole section through which it is difficult to pull the drill string. Or a well about that information is restricted. Tongs :The large wrenches used for making up or breaking out drill pipe. Work Pipe :Moving the drill string up and down in the hole whilst not rotating to prevent sticking. Wiper trip :A short trip up into casing then back to bottom to clean out the hole, to check for gauge, and to reduce the danger of getting stuck. Common Rig Terms
  • 33. Rig Personnel • Company Man or Company Representative: The operator representative usually a drilling engineer employed by the oil company engaged in drilling. • Tool Pusher: A drilling foreman or rig superintendent. • Driller : Employee in charge of the “brake” responsible for making hole as quickly as possible. • Assistant Driller: Assists driller in “making hole” and general jobs around the rig. • Derrick Man: Responsible for stacking pipe in derrick during trips. Operates from monkey board attached by safety harness. Assist mud engineer to mix mud. • Roughnecks/ Floor hands: General workers under supervision of the driller. • Rig Mechanic : Keeps the rig running smoothly. Controls maintenance of rig. • Motorman Rig Electrician Rig Welder: Keep the motors running. • Mud Engineer: Controls properties of drilling fluid within limits specified by operator. Mud Loggers : Produce mud log of the well. Responsible for detecting changes in volume of surface mud, changes of drilling parameters and the presence of hydrocarbons.  Offshore Personnel • Captain : Responsible for the rig as a marine vessel. He will hole a masters certificate, and is in command during rig moves.