SCHOOL OF ARCHITECTURE,BUILDING & DESIGN (SABD)
BACHELOR IN QUANTITY SURVEYING (HONOURS)
INTEGRATED ASSIGNMENT
CONCRETE FRAMED BUILDING REPORT
• BUILDING MATERIALS (BLD62003) • CONSTRUCTION TECHNOLOGY I (BLD60104) •
• MEASUREMENT I (QSB60104) •
NAME : TEO CHIANG LOONG
2
STUDENT ID : 0323762
LECTURERS : • MS. ANG FUEY LIN
• MS. AZRINA YAAKOB
• MS. MYZATUL AISHAH KAMARAZALY
3
TABLE OF CONTENTS
PAGE OF COVER 1
TABLE OF CONTENTS 2
INTRODUCTION 3 - 5
CONTENT 5 - 8
MATERIALS INVOLVED 9 - 11
4
ADDITIONAL INFORMATION 12 - 14
CONCLUSION 15
5
INTRODUCTION
This is an integrated assignment that lead by the 3 main
modules - Building Materials,Construction Technology 1 &
Measurement1. Students are required to describe,explain &
understand the method and processof construction in accordance
to the sequence of work on site after a visit to the construction site.
Students are essential to study & research on a Concrete
Framed Buildingas well as the items in the site which that are
considered as concrete frame and the materials involved in
constructing a concrete framed structure in order to fulfill the
requirements of this report.
6
VENUE - Taman Impian Murni (Lot 3607),Jalan Tanjung Balai
(Lorong Haji Yusof), 30/236,bersama satu unit
pencawang elektrik padat di atas Lot 3607 (GM2726),
Seksyen 30, 40460 Shah Alam, Selangor.
DATE - 23 NOVEMBER 2016
By this opportunity had given I have paid a visit to an actual
construction site which located at the address given above. The
objective of this construction project is to build a quantity of 42 units
terraced house. It is consideras a moderate size of construction
projectby looking at the consumption of working hour, labor cost &
construction fees to accomplishthis project.
With the given information by the projectmanager of this
construction project - Mr. LIM, we’ve fully understand the whole
estimation of the construction spending was projected at 11 million
7
ringgit Malaysia. He also predicted that the entire construction
projectwill be complete within the duration of one and a half year.
8
* Instruction were given before entering the construction site - 09 : 11 am
* The entrance of the bustling & rumble construction site - 09 : 13 am
9
* A selfie / self-picture inside the site - 09 : 50 am
10
CONTENT
Concrete framed structure are regarded as one of the most
commonlyused type of frame structure. Such type of building
actually consists of a frame / skeleton of concrete.Its vertical
elements are classified as columns moreoverits horizontal
elements are defined as beams.
• Items that are capable to be classified as concrete frame are :
I. COLUMN
Column are apart of the vertical elements that exist in the concreted
framed structure which can be found on the site. Concrete column
is an important part of the structural integrity of a building. In fact, it
is commonfora concrete column to carry part of a structural load.
This means that the column is used to keep the building from
collapsing or shifting in a way that could cause damage to the
overall structure.
11
12
ii. NON - SUSPENDED BEAM & SUSPENDED BEAM
Beam are classified as apart of the Horizontal elements within the
concrete framed structure. Suspended beam are designed to
supportbrick as well as to permanently forming a shutter to the
edge of insitu concrete floor slab whereas suspended beam are the
one that located on the upper level / floor.
(ii) a. UPSTAND BEAM
13
14
iii. NON - SUSPENDED SLAB & SUSPENDED SLAB
A concrete slab that spans the space between columns, posts, or
walls, in contrast to the concrete slab in a floating
floor that is mechanically isolated from, and supported by,
the structural slab.Suspendedslabs are slabs that are not in direct
contact with the ground. They form roofs or floors above ground
level.
15
MATERIALS INVOLVED
• CONCRETE GRADE25
According to the speech of Mr. Lim, the grade of concrete that used
for the whole concrete framed structures are Grade 25 concrete.
The characteristic compressive strengthof concrete cube of
16
150mm X150mmX150mmtested at the end of 28 days should be
minimum 25 N/Sq.mm. The mix proportions of cement, sand &
coarse aggregate for concrete Grande 25 is 1 : 1 : 2.
• REINFORCEMENT CONCRETE ( RCC )
Reinforced CementConcrete is a combination of concrete and
steel to build a structure instead of using only concrete. Concrete is
good in resisting compressionbut is very weak in resisting tension.
On the other hand, steel has high tensile strength and the bond
between steeland concrete is good. So both parties are beneficial
to each other.
• FORMWORK
Formwork comes during the construction of reinforced
concrete works as well as their maintenance, we need to support
the structure as long as it is in its premature state or plastic state as
it could not even bear its own load. Afterthe suitable duration of
time, i.e. when concrete sets enough to take its own load, these
temporary supports are removed systematically.
17
*A traditional timber formwork formed by a flight of stairs
* Reinforcement steel bar in a concrete slab
18
*Reinforcement bar that being tied
19
ADDITIONAL INFORMATION
• ZINC METAL
By using metal doorand window frames we are becoming
environmentally friend because we save many trees which are
required to be cut for making these frames thus we are not
contributing to this loss of habitat.
20
21
• BRICKWORK
According to Mr. Lim, the entire terrace house has only been
constructing by clay & concrete bricks. Clay bricks been used as a
separation wall in between the neighbors house due to its
characteristics of fire insulation by minimize the possible lossesof
life & propertyresulting by fire ; meanwhile concrete bricks are
being chosen due to its low pricing which rougly cost only RM 20 for
one ; whereas Clay bricks costapproximately RM 4.20 for one.
22
23
• PLUMBING & PIPE SYSTEM
24
*pictures of the pipes and holes
25
CONCLUSION
Last but not least, the site visit truly offers me a better exposure
& wider vision of construction’s knowledge. By that, I am absolutely
capable to understand the basics of the construction process and
witness the usage of construction equipment’s on site including
mechanical plants.
It’s my primary experience of visiting and exploring a real
construction site personally. Apart from that, I’m able to witness
various types of building materials and technologyon the cite with
my naked eyes.
Furthermore, before entering the construction site, Mr Lim has
offered each of us a safety helmet, I’m truly appreciate the efforts of
Mr Lim because such helmet are capable to protect the safeness
our head and minimize the possibilityof involving in a accidental
injury or accident.
26
In addition, the actual condition of the constructionsite are
extremely uncomfortable.The weather of the side will be in a
extreme condition due to the climate of Malaysia is hot and humid
throughout the whole year. Any construction worker are required to
to contain a healthy & strong physical and mental in order to obtain
high work efficiency.
In short, I’m thankful for the guidance and leadership of Ms Ang,
Ms Azrina and Ms Aishah. It’s such a memorable site visit which I
would never slip of my mind.

More Related Content

What's hot

Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015Joyce HweeMin
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report Batoul Alshamali
 
Site visit report
Site visit reportSite visit report
Site visit reportJıa Yıı
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1Zi Shan
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaNangkula utaberta
 
Technical report writing and research methodology course
Technical report writing and research methodology courseTechnical report writing and research methodology course
Technical report writing and research methodology courseNahom Balcha
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1KhangWei Chin
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE VISHNU VIJAYAN
 
Site report
Site reportSite report
Site reportHuiYik
 
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...IJMREMJournal
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 

What's hot (20)

Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
 
Technical report writing and research methodology course
Technical report writing and research methodology courseTechnical report writing and research methodology course
Technical report writing and research methodology course
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Site report
Site reportSite report
Site report
 
About mivan technology
About mivan technologyAbout mivan technology
About mivan technology
 
BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE BUILDING FAILURE- FOUNDATION FAILURE
BUILDING FAILURE- FOUNDATION FAILURE
 
Site report
Site reportSite report
Site report
 
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
Failure Study of Reinforced Concrete Buildings of Kathmandu Valley In Gorkha ...
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 

Viewers also liked

բասկետբոլ
բասկետբոլբասկետբոլ
բասկետբոլhedik
 
Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2Ph Multimarcas
 
PhD Defense presentation
PhD Defense presentationPhD Defense presentation
PhD Defense presentationBrunetto Ziosi
 
Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)Maria Suarez
 
Connie Shirley Design Portfolio
Connie Shirley Design PortfolioConnie Shirley Design Portfolio
Connie Shirley Design PortfolioConnie Shirley
 
Refference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisalRefference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisalSanja Milicevic
 
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736Lorain Drennan
 
Agostino y el des de la persona
Agostino y el des de la personaAgostino y el des de la persona
Agostino y el des de la personaandreaortiz1996
 
Milk flow meter
Milk flow meterMilk flow meter
Milk flow meter永恒 汪
 
Design Portfolio for Jessica Swendsen
Design Portfolio for Jessica SwendsenDesign Portfolio for Jessica Swendsen
Design Portfolio for Jessica SwendsenJessica Swendsen
 
Informatica y Periodismo
Informatica y PeriodismoInformatica y Periodismo
Informatica y PeriodismoJesaaelys Ayala
 
Boat fuel flow meter
Boat fuel flow meterBoat fuel flow meter
Boat fuel flow meter永恒 汪
 

Viewers also liked (17)

բասկետբոլ
բասկետբոլբասկետբոլ
բասկետբոլ
 
Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2Ofertas de Fin de año 2016 2
Ofertas de Fin de año 2016 2
 
PhD Defense presentation
PhD Defense presentationPhD Defense presentation
PhD Defense presentation
 
Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)Maria suarez.plan de negocios (glosario)
Maria suarez.plan de negocios (glosario)
 
Connie Shirley Design Portfolio
Connie Shirley Design PortfolioConnie Shirley Design Portfolio
Connie Shirley Design Portfolio
 
Refference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisalRefference Letter 2 FinalAppraisal
Refference Letter 2 FinalAppraisal
 
Ensayo. mariolis
Ensayo. mariolisEnsayo. mariolis
Ensayo. mariolis
 
Diabetes
Diabetes Diabetes
Diabetes
 
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
d1216c79-41c0-4794-aec1-e0191df687c7-160427020736
 
Literacy
LiteracyLiteracy
Literacy
 
Agostino y el des de la persona
Agostino y el des de la personaAgostino y el des de la persona
Agostino y el des de la persona
 
Milk flow meter
Milk flow meterMilk flow meter
Milk flow meter
 
Design Portfolio for Jessica Swendsen
Design Portfolio for Jessica SwendsenDesign Portfolio for Jessica Swendsen
Design Portfolio for Jessica Swendsen
 
Informatica y Periodismo
Informatica y PeriodismoInformatica y Periodismo
Informatica y Periodismo
 
Tarea de mate para el blog
Tarea de mate para el blogTarea de mate para el blog
Tarea de mate para el blog
 
Arbutin cream..
Arbutin cream.. Arbutin cream..
Arbutin cream..
 
Boat fuel flow meter
Boat fuel flow meterBoat fuel flow meter
Boat fuel flow meter
 

Similar to Site report

Site visit report
Site visit reportSite visit report
Site visit reportshensin1015
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.pptssusera0ac221
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industryYamini K
 
Building materials pdf
Building materials pdfBuilding materials pdf
Building materials pdfSaqib Imran
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Arthur Wilson
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork adarshkaushik6
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 

Similar to Site report (20)

Site visit report
Site visit reportSite visit report
Site visit report
 
Site Report
Site Report Site Report
Site Report
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Site report
Site reportSite report
Site report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Ez
EzEz
Ez
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report 1
Site report 1Site report 1
Site report 1
 
Final Report
Final Report Final Report
Final Report
 
BSS552 LECT 2.pptx
BSS552 LECT 2.pptxBSS552 LECT 2.pptx
BSS552 LECT 2.pptx
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 
Shinchan presentation.pptx
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptx
 
Purna.1.docx
Purna.1.docxPurna.1.docx
Purna.1.docx
 
Building materials pdf
Building materials pdfBuilding materials pdf
Building materials pdf
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 

More from Eric Teo

Final presentation-1
Final presentation-1Final presentation-1
Final presentation-1Eric Teo
 
Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892Eric Teo
 
Final project
Final projectFinal project
Final projectEric Teo
 
enbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdfenbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdfEric Teo
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering Eric Teo
 
English Assignment ( Essay Question)
English Assignment ( Essay Question)English Assignment ( Essay Question)
English Assignment ( Essay Question)Eric Teo
 

More from Eric Teo (6)

Final presentation-1
Final presentation-1Final presentation-1
Final presentation-1
 
Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892Interiorarchitectitdici 150816140444-lva1-app6892
Interiorarchitectitdici 150816140444-lva1-app6892
 
Final project
Final projectFinal project
Final project
 
enbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdfenbeproject2brief-150819041851-lva1-app6892.pdf
enbeproject2brief-150819041851-lva1-app6892.pdf
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
English Assignment ( Essay Question)
English Assignment ( Essay Question)English Assignment ( Essay Question)
English Assignment ( Essay Question)
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

Site report

  • 1. 1 SCHOOL OF ARCHITECTURE,BUILDING & DESIGN (SABD) BACHELOR IN QUANTITY SURVEYING (HONOURS) INTEGRATED ASSIGNMENT CONCRETE FRAMED BUILDING REPORT • BUILDING MATERIALS (BLD62003) • CONSTRUCTION TECHNOLOGY I (BLD60104) • • MEASUREMENT I (QSB60104) • NAME : TEO CHIANG LOONG
  • 2. 2 STUDENT ID : 0323762 LECTURERS : • MS. ANG FUEY LIN • MS. AZRINA YAAKOB • MS. MYZATUL AISHAH KAMARAZALY
  • 3. 3 TABLE OF CONTENTS PAGE OF COVER 1 TABLE OF CONTENTS 2 INTRODUCTION 3 - 5 CONTENT 5 - 8 MATERIALS INVOLVED 9 - 11
  • 4. 4 ADDITIONAL INFORMATION 12 - 14 CONCLUSION 15
  • 5. 5 INTRODUCTION This is an integrated assignment that lead by the 3 main modules - Building Materials,Construction Technology 1 & Measurement1. Students are required to describe,explain & understand the method and processof construction in accordance to the sequence of work on site after a visit to the construction site. Students are essential to study & research on a Concrete Framed Buildingas well as the items in the site which that are considered as concrete frame and the materials involved in constructing a concrete framed structure in order to fulfill the requirements of this report.
  • 6. 6 VENUE - Taman Impian Murni (Lot 3607),Jalan Tanjung Balai (Lorong Haji Yusof), 30/236,bersama satu unit pencawang elektrik padat di atas Lot 3607 (GM2726), Seksyen 30, 40460 Shah Alam, Selangor. DATE - 23 NOVEMBER 2016 By this opportunity had given I have paid a visit to an actual construction site which located at the address given above. The objective of this construction project is to build a quantity of 42 units terraced house. It is consideras a moderate size of construction projectby looking at the consumption of working hour, labor cost & construction fees to accomplishthis project. With the given information by the projectmanager of this construction project - Mr. LIM, we’ve fully understand the whole estimation of the construction spending was projected at 11 million
  • 7. 7 ringgit Malaysia. He also predicted that the entire construction projectwill be complete within the duration of one and a half year.
  • 8. 8 * Instruction were given before entering the construction site - 09 : 11 am * The entrance of the bustling & rumble construction site - 09 : 13 am
  • 9. 9 * A selfie / self-picture inside the site - 09 : 50 am
  • 10. 10 CONTENT Concrete framed structure are regarded as one of the most commonlyused type of frame structure. Such type of building actually consists of a frame / skeleton of concrete.Its vertical elements are classified as columns moreoverits horizontal elements are defined as beams. • Items that are capable to be classified as concrete frame are : I. COLUMN Column are apart of the vertical elements that exist in the concreted framed structure which can be found on the site. Concrete column is an important part of the structural integrity of a building. In fact, it is commonfora concrete column to carry part of a structural load. This means that the column is used to keep the building from collapsing or shifting in a way that could cause damage to the overall structure.
  • 11. 11
  • 12. 12 ii. NON - SUSPENDED BEAM & SUSPENDED BEAM Beam are classified as apart of the Horizontal elements within the concrete framed structure. Suspended beam are designed to supportbrick as well as to permanently forming a shutter to the edge of insitu concrete floor slab whereas suspended beam are the one that located on the upper level / floor. (ii) a. UPSTAND BEAM
  • 13. 13
  • 14. 14 iii. NON - SUSPENDED SLAB & SUSPENDED SLAB A concrete slab that spans the space between columns, posts, or walls, in contrast to the concrete slab in a floating floor that is mechanically isolated from, and supported by, the structural slab.Suspendedslabs are slabs that are not in direct contact with the ground. They form roofs or floors above ground level.
  • 15. 15 MATERIALS INVOLVED • CONCRETE GRADE25 According to the speech of Mr. Lim, the grade of concrete that used for the whole concrete framed structures are Grade 25 concrete. The characteristic compressive strengthof concrete cube of
  • 16. 16 150mm X150mmX150mmtested at the end of 28 days should be minimum 25 N/Sq.mm. The mix proportions of cement, sand & coarse aggregate for concrete Grande 25 is 1 : 1 : 2. • REINFORCEMENT CONCRETE ( RCC ) Reinforced CementConcrete is a combination of concrete and steel to build a structure instead of using only concrete. Concrete is good in resisting compressionbut is very weak in resisting tension. On the other hand, steel has high tensile strength and the bond between steeland concrete is good. So both parties are beneficial to each other. • FORMWORK Formwork comes during the construction of reinforced concrete works as well as their maintenance, we need to support the structure as long as it is in its premature state or plastic state as it could not even bear its own load. Afterthe suitable duration of time, i.e. when concrete sets enough to take its own load, these temporary supports are removed systematically.
  • 17. 17 *A traditional timber formwork formed by a flight of stairs * Reinforcement steel bar in a concrete slab
  • 19. 19 ADDITIONAL INFORMATION • ZINC METAL By using metal doorand window frames we are becoming environmentally friend because we save many trees which are required to be cut for making these frames thus we are not contributing to this loss of habitat.
  • 20. 20
  • 21. 21 • BRICKWORK According to Mr. Lim, the entire terrace house has only been constructing by clay & concrete bricks. Clay bricks been used as a separation wall in between the neighbors house due to its characteristics of fire insulation by minimize the possible lossesof life & propertyresulting by fire ; meanwhile concrete bricks are being chosen due to its low pricing which rougly cost only RM 20 for one ; whereas Clay bricks costapproximately RM 4.20 for one.
  • 22. 22
  • 23. 23 • PLUMBING & PIPE SYSTEM
  • 24. 24 *pictures of the pipes and holes
  • 25. 25 CONCLUSION Last but not least, the site visit truly offers me a better exposure & wider vision of construction’s knowledge. By that, I am absolutely capable to understand the basics of the construction process and witness the usage of construction equipment’s on site including mechanical plants. It’s my primary experience of visiting and exploring a real construction site personally. Apart from that, I’m able to witness various types of building materials and technologyon the cite with my naked eyes. Furthermore, before entering the construction site, Mr Lim has offered each of us a safety helmet, I’m truly appreciate the efforts of Mr Lim because such helmet are capable to protect the safeness our head and minimize the possibilityof involving in a accidental injury or accident.
  • 26. 26 In addition, the actual condition of the constructionsite are extremely uncomfortable.The weather of the side will be in a extreme condition due to the climate of Malaysia is hot and humid throughout the whole year. Any construction worker are required to to contain a healthy & strong physical and mental in order to obtain high work efficiency. In short, I’m thankful for the guidance and leadership of Ms Ang, Ms Azrina and Ms Aishah. It’s such a memorable site visit which I would never slip of my mind.