Bhagwan Mahavir College Of Engineering And Techno
logy, VIP road, Vesu, Surat, Gujarat 395007
CIVIL ENGINEERING DEPARTMENT
Semester : 7th
Subject : Internship / Project (3170001)
A SUMMER INTERNSHIPAT “VAISHNOVDEVI GROUP ”
AS A ROLE OF SITE ENGINEER
Prepared by: Faculty Mentor: Industry Mentor:
SINCHAN ASHIT GANDHI Mr. Sagar Naik Mr. Hemant Chauhan
190063106012
Aim
The internship aims to develop our skills to implement
theoretical knowledge into practical fields.
Contents to be Covered
• Introduction
• Objectives
• Company Profile
• Materials
• Equipments
• Brick Masonary Work
• Lintel
• Column Construction
• Stair
• Beam
• Slab
• Conclusion
Introduction
For a career-oriented applied education, GTU has introduced a new
and significant summer internship program. This internship bridges
the gap between theory and practice and provides students with
practical, field-based, real-world experiences during their years of
study. During this training period, we, the students learn how to
relate our theoretical knowledge with practical fields. What are the
difficulties faced by an engineer?.For these practical & technical
skills I participated in summer internship programme under
VAISHNOVDEVI GROUP.
Objectives
 To improve practical skill
 To upgrade the theoretical knowledge
 To supervise the construction work.
 To understand the design specification.
 To learn to solve the rising problems and unexpected events.
Company Profile
Group is a premier Real Estate Development Company which
was incorporated in Surat in 2009, but the history of our group
dates back to the year 1982. We have been crafting dreams and
desires into reality since more than a decade. The group has
embarked many glorified Residential, Commercial and Farm
House Projects in various areas like Adajan, Pal,
Jahangirpura, Narthan and Amroli with an aim to transform
and uplift the quality of living and luxurious lifestyle.
Our mission is to evolve and grow as a company that is known
for innovation, architectural brilliance, efficiency, professionalism
with high-spirited level of dedication and sincerity in the realty
sphere. Our motto is to ensure the highest level of customer
delight.
PLAN OF THE BUILDING
TRAINING SCHEDULE
MATERIALS
CEMENT
Cement is a finely milled mineral powder, usually grey in colour. The most
important raw materials for the production of cement are limestone, clay and
marl. Mixed with water served asan adhesive to bind sand, gravel and hard rock
in concrete. Cement hardens both in the air and under water andremains in its
hardened state once reached.Cements are classified according to their early and
final strength as well as their composition. In addition to cements that consists of
100% clinker, there are so called composite cements, in which a portion of the
clinker is replaced by alternative raw materials, such as flu ash, groundslag or
limestone.
MATERIALS
AGGREGATES
Aggregates are inert granular materials such as sand, gravel, or crushed stone
that, along with Water and Portland cement, are an essential ingredient in
concrete. For a good concrete mix, aggregates need to be clean, hard, strong
particles free of absorbed chemicals or coatings of clay and other fine materials
that could cause the deterioration of concrete. Aggregates, which account for 60
to 75 percent of the total volume of concrete, are divided into two distinct
categories--fine and coarse.
MATERIALS
BRICKS
Bricks consist of fired ceramic, clay, or cement materials that are cut into
specific shapes, such as a rectangle, and used for building walls or furnaces or
for paving surfaces. Bricks vary in material makeup, size, and shape and
include products for specific applications, such as firebricks or refractory
bricks, acid bricks for flooring, and bricks for masonry applications. Flyash
bricks are just as strong as traditional clay bricks, but they may contain small
amounts of pollutants such as heavy metals.
MATERIALS
REINFORCEMENT
Reinforcing bars add tensile strength and stiffness to concrete and make up 44%
of steel use in buildings. Steel is used because it binds well to concrete, has a
similar thermal expansion coefficient and is strong and relatively cost-effective.
Reinforced concrete is also used to provide deep foundations and basements
and is currently the world’s primary building material. It is reusable and
endlessly recyclable, earthquake resistant due to ductility, flexible in
combination with other materials.
MATERIALS
WATER
Water is one of the most important elements in construction and is required for
the preparation ofmortar, mixing of cement concrete and for curing work etc.
The quality of water used has adirect impact on the strength of the motor and
cement concrete in the construction work. The water used for curing and
mixing must be free from high quantities of alkalis, acid, oils, salt, sugar,
organic materials, vegetable growth, etc that might be deleterious to bricks,
concrete oriron. Impurities in water can cause metal corrosion, introduce
unwanted silt and clay into the concrete, adversely affect the hardening process
of concrete and also reduce the strength by even 25%. Thus the need to ensure
the quality of water used during construction is vital.
EQUIPMENTS
CONCRETE MIXER
It is used to mix the ingredient of concrete. It consist a hollow cylindrical part
with inner side wings in which cement, sand, aggregates and water is mix
properly. For smaller volume works, portable concrete mixers are often used so
that the concrete can be made at construction site, giving the workers ample
time to use the concrete before it hardens
EQUIPMENTS
COMAPCTORS
After the transporting of concrete, it is in the loose structure. So for the better
strength of the concrete we used dense concrete for construction work. If the
concrete is not dense and permeable, it will not be watertight. It will be less
able to withstand aggressive liquids. Moisture and air are more likely to
penetrate to the reinforcement causing it to rust. So compaction after placing of
concrete is necessary. Hence, it must be compacted to remove air bubbles and
voids which are present in the concrete and gain strength.
BRICK MASONARY WORK
➢ Initially, mix the mortar with water and blend it until a smooth and plastic
mortar is produced.
➢ After that, place the mortar on foundation line evenly using trowel (25mm
thickness and one brick wide is recommended for laid mortar).
➢ Then, lay the first course of stretcher bricks in the mortar. Start with second
brick, apply mortar to the head joint end of each brick, after that shove the
bricks into place firmly so that the mortar is squeezed out of all side of the
joints.
➢ Utilize a level to examine the course for correct height. Ensure that bricks
are plumb and level.
LINTEL
A lintel is a beam placed across the openings like doors, windows etc. in
buildings to support the load from the structure above. The width of lintel beam
is equal to the width of wall, and the ends of it is built into the wall.
Construction of the lintel can be done in a simple way just treat like as a
horizontal beam because overall coming load acts upon this horizontal member.
COLUMN CONSTRUCTION
Column formwork
In building, floor height is normally kept 3 m. If the slab has beam then we
have to pour concrete up to beam bottom level. Suppose, beam height specified
in drawing is0.45 m. So, the casting height of our column will be 2.65 m. And
our formwork height will be 2.65 m. But one thing should be considered here is
that dropping concrete from above 1.5 m height isn’t suggested during pouring.
Because it leads concrete segregation. So we shouldmake one-side of column
formwork within 1.5 m height range. After casting 1.5 m of column, we just lift
the short side up to full-casting height of column next day.
COLUMN CONSTRUCTION
Column starter
Starter is generally a casting of concrete material with equivalent width and
length of column section and comparatively smaller height of around 10 cm. It
is cast in such a manner that equal cover is left encircling the reinforcement
bars of column and then shuttering of column is provided. The main purpose of
starter is to fine-tune the form work of a column vertically to maintain sufficient
gap among column reinforcement and shuttering.To retain the exact position of
the columns in the below slab as well as retain the column lines in number of
floors easily, starter is marked.
STAIR
FORMWORK
The angle of flight, dimensions of thread and riser are properly checked.Usually
while constructing a stairs attached to wall, the line of flight, thread and risers
are marked on the wallfor proper fixing of shuttering or formwork. Supports
have been provided with the help of props.
REINFORCEMENT
The concrete steps are to be reinforced with steel bars so as it carries the loads
coming upon thestairs and transfer them to the ground. These steel
reinforcement bars are placed in the formwork with minimum of 25 mm
spacing and are tied together.
STAIR
POURING OF CONCRETE
The concrete mix plays an important role in strength and durability of stairs.
The concrete mix is designed by the structural engineer based on the strength,
durability and other requirements. It is recommended to use a concrete vibrator
while pouring the concrete to completely fill the gaps of the stairs and to avoid
the honeycomb formation.
BEAM
Formwork
To sustain concrete properly, formwork or centering and shuttering is necessary.
BEAM
Bending, binding and placing of steel bars
For making design of the slab, it is supposed that the concrete contains sound
compressive strength but it is poor in tensile strength. To make the structure
secure against the tensile stress, the steel bars are arranged. Steel bars cut with
the help of cutting machine into required length and stirrups were made
manually and then beams were casted as per given drawing and specifications.
SLAB
Construction of RCC slab involves following stages of work –
➢ Assemble and Erect Formwork
➢ Prepare and Place Reinforcement
➢ Pour, Compact and Finish Concrete
➢ Curing Concrete and Remove Formwork
1. Assemble and Erect Formwork - The formwork shall be designed to
withstand construction loads such as fresh concrete pressure and weight of
workers and operators and their machines.
SLAB
Prepare and place reinforcement
Design drawings provides necessary reinforcement details, so it only needs
understanding to use designated bar size, cutting required length, and make
necessary hooks and bents. After preparation is completed, steel bars are placed
into their positions with the provision of specified spacing and concrete cover.
The concrete cover and spacing for floor slabs can be maintained byintroducing
spacers and bars supporters. Wires are used to tie main reinforcement and
shrinkage and temperature reinforcement (distribution reinforcement).
The fresh concrete is poured into a cone as used for the slump test. This cone is
placed on the flow table that is used for the flow table testAfter pouring the
concrete in to the cone the cone is removed, then the time taken for 500 mm is
measured. This is called T500time.
SLUMP TEST
CONCLUSION
As an undergraduate of Gujarat Technological University, we would like to say
this summer internship training program is an excellent opportunity for us to get
to ground level and experience the things that we wouldn’t ever gained through
going straight into a job. We are grateful to our college BMCET and GTU for
giving us this wonderful opportunity. The main objective of the summer
internship is to provide an opportunity to undergraduate to identify, observe and
practice how civil engineering is applicable on real site it isn’t only limited to
get experience on technical practices, but also to observe management practices
and to interact with the field workers. Overall during this internship I got to
learn about various things and aspects, which wouldn’t possible in theory
Thanks To All

More Related Content

Similar to Shinchan presentation.pptx

WHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIAL
WHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIALWHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIAL
WHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIALpwhite91
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....RaazYadav6
 
Adv.Construction - assignement.pdf
Adv.Construction - assignement.pdfAdv.Construction - assignement.pdf
Adv.Construction - assignement.pdfDarshanLimbda
 
Mortar and Concrete overall surkhi function
Mortar and Concrete overall surkhi functionMortar and Concrete overall surkhi function
Mortar and Concrete overall surkhi functionanasali786mughalali
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptxHimanshumangal12
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick WallI'mMiss Lily
 
concrete technology lecture notes for BTech students
concrete technology lecture notes for BTech studentsconcrete technology lecture notes for BTech students
concrete technology lecture notes for BTech studentsPanshulJamwal
 
Concrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingConcrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingRishabh Lala
 
FLOORING work in construction of residential building pdf
FLOORING work in construction of residential building pdfFLOORING work in construction of residential building pdf
FLOORING work in construction of residential building pdfJanhaviBover
 
Building construction 02
Building construction 02Building construction 02
Building construction 02Sarah Esa
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)Lek Yuen
 

Similar to Shinchan presentation.pptx (20)

WHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIAL
WHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIALWHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIAL
WHY CONCRETE IS CONSIDERED AS STRONG BUILDING MATERIAL
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
Unitone 140120111824-phpapp01
Unitone 140120111824-phpapp01Unitone 140120111824-phpapp01
Unitone 140120111824-phpapp01
 
Adv.Construction - assignement.pdf
Adv.Construction - assignement.pdfAdv.Construction - assignement.pdf
Adv.Construction - assignement.pdf
 
Mortar and Concrete overall surkhi function
Mortar and Concrete overall surkhi functionMortar and Concrete overall surkhi function
Mortar and Concrete overall surkhi function
 
Special Concrete - Concrete Technology
Special Concrete - Concrete TechnologySpecial Concrete - Concrete Technology
Special Concrete - Concrete Technology
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
Unit one
Unit oneUnit one
Unit one
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick Wall
 
concrete technology lecture notes for BTech students
concrete technology lecture notes for BTech studentsconcrete technology lecture notes for BTech students
concrete technology lecture notes for BTech students
 
Concrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingConcrete- Classification,Properties and Testing
Concrete- Classification,Properties and Testing
 
Concrete
ConcreteConcrete
Concrete
 
4. concrete and building block
4. concrete and building block4. concrete and building block
4. concrete and building block
 
FLOORING work in construction of residential building pdf
FLOORING work in construction of residential building pdfFLOORING work in construction of residential building pdf
FLOORING work in construction of residential building pdf
 
Site report
Site reportSite report
Site report
 
Types of concrete
Types of concreteTypes of concrete
Types of concrete
 
Building construction 02
Building construction 02Building construction 02
Building construction 02
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)
 
PCC [Autosaved].pptx
PCC [Autosaved].pptxPCC [Autosaved].pptx
PCC [Autosaved].pptx
 

Recently uploaded

办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一Fi L
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 

Recently uploaded (20)

办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
办理学位证加州州立大学洛杉矶分校毕业证成绩单原版一比一
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 

Shinchan presentation.pptx

  • 1. Bhagwan Mahavir College Of Engineering And Techno logy, VIP road, Vesu, Surat, Gujarat 395007 CIVIL ENGINEERING DEPARTMENT Semester : 7th Subject : Internship / Project (3170001) A SUMMER INTERNSHIPAT “VAISHNOVDEVI GROUP ” AS A ROLE OF SITE ENGINEER Prepared by: Faculty Mentor: Industry Mentor: SINCHAN ASHIT GANDHI Mr. Sagar Naik Mr. Hemant Chauhan 190063106012
  • 2. Aim The internship aims to develop our skills to implement theoretical knowledge into practical fields.
  • 3. Contents to be Covered • Introduction • Objectives • Company Profile • Materials • Equipments • Brick Masonary Work • Lintel • Column Construction • Stair • Beam • Slab • Conclusion
  • 4. Introduction For a career-oriented applied education, GTU has introduced a new and significant summer internship program. This internship bridges the gap between theory and practice and provides students with practical, field-based, real-world experiences during their years of study. During this training period, we, the students learn how to relate our theoretical knowledge with practical fields. What are the difficulties faced by an engineer?.For these practical & technical skills I participated in summer internship programme under VAISHNOVDEVI GROUP.
  • 5. Objectives  To improve practical skill  To upgrade the theoretical knowledge  To supervise the construction work.  To understand the design specification.  To learn to solve the rising problems and unexpected events.
  • 6. Company Profile Group is a premier Real Estate Development Company which was incorporated in Surat in 2009, but the history of our group dates back to the year 1982. We have been crafting dreams and desires into reality since more than a decade. The group has embarked many glorified Residential, Commercial and Farm House Projects in various areas like Adajan, Pal, Jahangirpura, Narthan and Amroli with an aim to transform and uplift the quality of living and luxurious lifestyle. Our mission is to evolve and grow as a company that is known for innovation, architectural brilliance, efficiency, professionalism with high-spirited level of dedication and sincerity in the realty sphere. Our motto is to ensure the highest level of customer delight.
  • 7. PLAN OF THE BUILDING
  • 9. MATERIALS CEMENT Cement is a finely milled mineral powder, usually grey in colour. The most important raw materials for the production of cement are limestone, clay and marl. Mixed with water served asan adhesive to bind sand, gravel and hard rock in concrete. Cement hardens both in the air and under water andremains in its hardened state once reached.Cements are classified according to their early and final strength as well as their composition. In addition to cements that consists of 100% clinker, there are so called composite cements, in which a portion of the clinker is replaced by alternative raw materials, such as flu ash, groundslag or limestone.
  • 10. MATERIALS AGGREGATES Aggregates are inert granular materials such as sand, gravel, or crushed stone that, along with Water and Portland cement, are an essential ingredient in concrete. For a good concrete mix, aggregates need to be clean, hard, strong particles free of absorbed chemicals or coatings of clay and other fine materials that could cause the deterioration of concrete. Aggregates, which account for 60 to 75 percent of the total volume of concrete, are divided into two distinct categories--fine and coarse.
  • 11. MATERIALS BRICKS Bricks consist of fired ceramic, clay, or cement materials that are cut into specific shapes, such as a rectangle, and used for building walls or furnaces or for paving surfaces. Bricks vary in material makeup, size, and shape and include products for specific applications, such as firebricks or refractory bricks, acid bricks for flooring, and bricks for masonry applications. Flyash bricks are just as strong as traditional clay bricks, but they may contain small amounts of pollutants such as heavy metals.
  • 12. MATERIALS REINFORCEMENT Reinforcing bars add tensile strength and stiffness to concrete and make up 44% of steel use in buildings. Steel is used because it binds well to concrete, has a similar thermal expansion coefficient and is strong and relatively cost-effective. Reinforced concrete is also used to provide deep foundations and basements and is currently the world’s primary building material. It is reusable and endlessly recyclable, earthquake resistant due to ductility, flexible in combination with other materials.
  • 13. MATERIALS WATER Water is one of the most important elements in construction and is required for the preparation ofmortar, mixing of cement concrete and for curing work etc. The quality of water used has adirect impact on the strength of the motor and cement concrete in the construction work. The water used for curing and mixing must be free from high quantities of alkalis, acid, oils, salt, sugar, organic materials, vegetable growth, etc that might be deleterious to bricks, concrete oriron. Impurities in water can cause metal corrosion, introduce unwanted silt and clay into the concrete, adversely affect the hardening process of concrete and also reduce the strength by even 25%. Thus the need to ensure the quality of water used during construction is vital.
  • 14. EQUIPMENTS CONCRETE MIXER It is used to mix the ingredient of concrete. It consist a hollow cylindrical part with inner side wings in which cement, sand, aggregates and water is mix properly. For smaller volume works, portable concrete mixers are often used so that the concrete can be made at construction site, giving the workers ample time to use the concrete before it hardens
  • 15. EQUIPMENTS COMAPCTORS After the transporting of concrete, it is in the loose structure. So for the better strength of the concrete we used dense concrete for construction work. If the concrete is not dense and permeable, it will not be watertight. It will be less able to withstand aggressive liquids. Moisture and air are more likely to penetrate to the reinforcement causing it to rust. So compaction after placing of concrete is necessary. Hence, it must be compacted to remove air bubbles and voids which are present in the concrete and gain strength.
  • 16. BRICK MASONARY WORK ➢ Initially, mix the mortar with water and blend it until a smooth and plastic mortar is produced. ➢ After that, place the mortar on foundation line evenly using trowel (25mm thickness and one brick wide is recommended for laid mortar). ➢ Then, lay the first course of stretcher bricks in the mortar. Start with second brick, apply mortar to the head joint end of each brick, after that shove the bricks into place firmly so that the mortar is squeezed out of all side of the joints. ➢ Utilize a level to examine the course for correct height. Ensure that bricks are plumb and level.
  • 17. LINTEL A lintel is a beam placed across the openings like doors, windows etc. in buildings to support the load from the structure above. The width of lintel beam is equal to the width of wall, and the ends of it is built into the wall. Construction of the lintel can be done in a simple way just treat like as a horizontal beam because overall coming load acts upon this horizontal member.
  • 18. COLUMN CONSTRUCTION Column formwork In building, floor height is normally kept 3 m. If the slab has beam then we have to pour concrete up to beam bottom level. Suppose, beam height specified in drawing is0.45 m. So, the casting height of our column will be 2.65 m. And our formwork height will be 2.65 m. But one thing should be considered here is that dropping concrete from above 1.5 m height isn’t suggested during pouring. Because it leads concrete segregation. So we shouldmake one-side of column formwork within 1.5 m height range. After casting 1.5 m of column, we just lift the short side up to full-casting height of column next day.
  • 19. COLUMN CONSTRUCTION Column starter Starter is generally a casting of concrete material with equivalent width and length of column section and comparatively smaller height of around 10 cm. It is cast in such a manner that equal cover is left encircling the reinforcement bars of column and then shuttering of column is provided. The main purpose of starter is to fine-tune the form work of a column vertically to maintain sufficient gap among column reinforcement and shuttering.To retain the exact position of the columns in the below slab as well as retain the column lines in number of floors easily, starter is marked.
  • 20. STAIR FORMWORK The angle of flight, dimensions of thread and riser are properly checked.Usually while constructing a stairs attached to wall, the line of flight, thread and risers are marked on the wallfor proper fixing of shuttering or formwork. Supports have been provided with the help of props. REINFORCEMENT The concrete steps are to be reinforced with steel bars so as it carries the loads coming upon thestairs and transfer them to the ground. These steel reinforcement bars are placed in the formwork with minimum of 25 mm spacing and are tied together.
  • 21. STAIR POURING OF CONCRETE The concrete mix plays an important role in strength and durability of stairs. The concrete mix is designed by the structural engineer based on the strength, durability and other requirements. It is recommended to use a concrete vibrator while pouring the concrete to completely fill the gaps of the stairs and to avoid the honeycomb formation.
  • 22. BEAM Formwork To sustain concrete properly, formwork or centering and shuttering is necessary.
  • 23. BEAM Bending, binding and placing of steel bars For making design of the slab, it is supposed that the concrete contains sound compressive strength but it is poor in tensile strength. To make the structure secure against the tensile stress, the steel bars are arranged. Steel bars cut with the help of cutting machine into required length and stirrups were made manually and then beams were casted as per given drawing and specifications.
  • 24. SLAB Construction of RCC slab involves following stages of work – ➢ Assemble and Erect Formwork ➢ Prepare and Place Reinforcement ➢ Pour, Compact and Finish Concrete ➢ Curing Concrete and Remove Formwork 1. Assemble and Erect Formwork - The formwork shall be designed to withstand construction loads such as fresh concrete pressure and weight of workers and operators and their machines.
  • 25. SLAB Prepare and place reinforcement Design drawings provides necessary reinforcement details, so it only needs understanding to use designated bar size, cutting required length, and make necessary hooks and bents. After preparation is completed, steel bars are placed into their positions with the provision of specified spacing and concrete cover. The concrete cover and spacing for floor slabs can be maintained byintroducing spacers and bars supporters. Wires are used to tie main reinforcement and shrinkage and temperature reinforcement (distribution reinforcement).
  • 26. The fresh concrete is poured into a cone as used for the slump test. This cone is placed on the flow table that is used for the flow table testAfter pouring the concrete in to the cone the cone is removed, then the time taken for 500 mm is measured. This is called T500time. SLUMP TEST
  • 27. CONCLUSION As an undergraduate of Gujarat Technological University, we would like to say this summer internship training program is an excellent opportunity for us to get to ground level and experience the things that we wouldn’t ever gained through going straight into a job. We are grateful to our college BMCET and GTU for giving us this wonderful opportunity. The main objective of the summer internship is to provide an opportunity to undergraduate to identify, observe and practice how civil engineering is applicable on real site it isn’t only limited to get experience on technical practices, but also to observe management practices and to interact with the field workers. Overall during this internship I got to learn about various things and aspects, which wouldn’t possible in theory