INTRODUCTION
This is an assignment that involves Building Materials, Construction Technology 1 and
Measurement1where everystudent mustwrite andproduce constructionsite report.
The construction site visit was held on 22nd
November 2016 and located at Taman Impian
Murni (Lot 3607), Jalan TanjungBalai (LorongHaji Yusof),Seksyen30, 40460 Shah Alam, Selangor.It
was organized by our lecturers who Sr Ang Fuey Lin, Ms Myzatul Aishah Kamarazaly and Ms Azrina
Md Yaakob.
Taman Impian Murni is built on a Malay Reserved Freehold land comprises of 42 units of
housing. Designed for the needs of the Malay ethnic group, buyer can choose either 2 to 3 storey
terrace house comprisesof 4to6bedroomswith3to4 bathrooms.The range of the layout isbetween
1950 square feetto2683 square feet. The designof the houses isceilingtoceilingheightwhichmean
11 feets from the ground. This is developed by Khas Perkasa Sdn Bhd (Subsidiary of Purcon Sdn
Bhd)andthe completiondate will be atJune of 2018. The constructioncost aroundRM 11 million.
The aim of doing site visit is to make sure student can describe,explain and understand the
method and process of construction in accordance to the sequence of work on site. For this report,
we are requiredtostudyona concrete framedbuilding.
LOCATION
SITE PLAN
FLOOR PLAN
3
CONTENTS
INTRODUCTION 2
CONTENTS 3
OBJECTIVES 4
TECHNICAL OBSERVATION 5-6
PHOTOS AND DESCRIPTION 7-9
CONCLUSION 10
4
OBJECTIVES
 Understand the basics of the construction process and witness the usage of construction
equipment’sonsite includingmechanical plants.
 Exposure toactual workingenvironmentonsite includinguncertaintycircumstances.
 Gain more basicsof the constructionprocessthroughasite visit.
 Increase personal knowledge of the construction process by listening the professional’s
briefingandgatheringall the informationcarryonsite.
 Explore andidentifyvarioustypesof buildingmaterialsandtechnologyon site.
 Explore the type of buildingmaterialsandtechnologyuse the constructabuilding.
 Awarenessof the importance of safetyonsite andunderstandingof safetyproblemsand
site conditions.
 Recognize the measurableitemsforsubstructure andreinforcedconcreteframeworks.
5
TECHNICAL OBSERVATION
Before the visit,every student must attend a whole day talk for application of green card of
constructionsite.Basically,itisa talkthat tell uswhat to doand what notto do whenyouare at site,
the safety of construction site and more. As we are still in semester 1, it is very important for us to
know the safety and dangerousness of site. Through this talk, I have learnt how important is safety
because one minormistakemaycause youaseriousinjuryorevendeath sowe mustputsafetyatthe
firstplace whenwe are at the site.
Few days before the visit, Sr Ang has reminded every student to wear appropriate clothing
andfootwearforthe sitevisit.We are veryluckytomeetaverykindcontractorwhoprovide thesafety
helmettous.She alsoaskedusto fill inanindemnityformtogetouremergencycontactnumberand
to registerwiththe designatedsite managementorsupervisorystaff.Ourseniorsalsogave sometips
whichare bringmosquitoesrepellent,sunblock,wettissue,andmedicine if we have alongsince this
isthe firsttime we are goingto site visit.
On the day of site visit,we are requestedtomeetat the site at 8.30am and we needto find
own transport as our lecturercouldn’trequestbusfor us from Taylor managementdepartmentdue
to some reasons. I car pooled withTeow Kah Yan, Maeve Lim, Shum Wen Jun and Yeo Gin Faye and
we arrivedat8.00am whichare the earliestone.Beforewe entertheconstructionsite,theygave each
of usa newsafetyhelmetwhichisquitesurprise usbecause SrAngtoldusthatnormallystudentneed
to prepare theirownsafetyhelmetbuttheyare givingusas a gift.
Duringthe site visit,weare dividedinto2groupssoitis easierforthe contractorstobrief and
take care of us. In a small group, the efficiency is higher as every student can hear clearly what the
contractor said because the site was quite noisy and student at the back will not be left out. The
contractor leading my group is not a quantity surveyor but has a civil engineering background. We
calledhimasYong, he toldus that typical constructionusedcastinsitu.
Concrete framed buildingconsistsof column,beam,slabsandreinforcedconcrete. Thisframe
becomesverystrong,andmustresistthe variousloadsthatacton a buildingduring itslife. The grade
of concrete used isgrade 25.
Slab is a flat plane of concrete and it has two categories which is non-suspended slabs and
suspended slabs. For this construction, their ground floor is a non-suspendedslab which is partially
supported bythe ground,half of theloadhasdisputedtothe groundand theotherhalfistothe beam.
It requires lesser reinforcement bar due to the lesser loading compare to above whichis suspended
slab. The slab in this construction is on ground beam, it is different with the usual one that lecturer
taughtus inclass whichisinbetweenthegroundbeam becausethe soilissofter.Otherthanthat,the
sizesof BRC inslab is reduced.
Inabuilding,itrequiresbothhorizontalandvertical membertosupportand makesitstronger.
The vertical membersare calledas column while beamisthe horizontal members. Columntransfers
loadsfromslabandbeamdirectlytosubsequentsoil.If youdamageabeaminabuilding,itwill usually
affectonlyone floor,butdamage to a columncouldbringdownthe entire building.
Concrete requires no additional fireproofing treatments to meet stringent fire codes, and
performswell duringbothnatural andmanmade disasters.Becauseof concrete’sinherentheaviness,
mass, and strength, buildings constructed with cast-in-place reinforced concrete can resist winds of
more than 200 miles per hour and perform well even under the impact of flying debris. This
6
construction project is done with piling, cover a strip footing as a cap for the piles and it also
subsequentlyactasa beamat the same time.
Itisveryimportanttoknowthe constructionprocessof the reinforcedcementconcrete (RCC)
regardless it is for beam or column because it will cause a building failure. The four stages of
constructingRCCcolumninvolvescolumnlayoutwork,columnreinforcementwork,columnformwork
and finallypouringconcrete intocolumn. RCCcontainssteel barswhichknownas reinforcementbar
or rebar. Concrete is strong in compression, brittle and hard but very weak in tensile strength.
However,steel isstrongerinbothbutitis expensive. Perthe contractor,rebar functionasa skeleton
as a backbone of concrete,it givestensile strengthsoitcan bend a little bitandaccept the loading.If
don’thave rebar in concrete,itwill be crackinga lot,breakingwhichare the signof failure.‘Whynot
using steel for the whole block?’ a student asked. The contractor explained to us that they use
reinforcementbarsispartlydue tothe costandpartlydue tosupport. The final stagesof constructing
RCC ispouringconcrete where the workerswill doaquickcheckingbydoingslumptest.
We observed that they are using clay bricks in between the houses and cement brick within
the house. The contractor told us it is due to the law in Malaysia, firefighting needsat least 2 hours
and clay brick can help to get to this level when it is minimum 150mm. Cement brick has the same
functionasclay brick butit islesscostlyand soundinsulationisnotasgood as clay brickso it ismore
suitable to use within the house. Besides that, usingbrick as the material of wall can avoid termites
and ithas lowmaintenance. Concreteframe structuresare strongandeconomical.Hence almostany
wallingmaterialscanbe usedwith them.Masonrywallsof brick,concrete block,orstone.Whenbrick
or concrete blocksare used,it iscommon to plasterthe entire surface witha cementplastertoform
a hard, long-lastingfinish.
Onthe constructionsite,theycall concrete coverastofuwhichIfoundveryfunnyandIbelieve
that I will neverlearnthisin class. Concrete cover for reinforcementisrequiredtoprotect the rebar
against corrosion and to provide resistance against fire. The thickness of cover depends on
environmental conditionsandtype of structural member.
On a side notes,manypeople incorrectlycalledformworkasfalseworkorthinkboth are the
same.Formworkholdsthe wet concrete in the correct positionuntil the concrete has setand cured.
Falsework is any temporarystructure, in which the mainload bearing members are vertical,used to
support permanent structures, used to support a permanent structure and associated elements
during the erection until it is self-supporting. They use traditional timber formwork due to the it’s
reusable ability,lowproductioncostandhigheravailabilitythansteel. Yongtoldusif formworkbreak
loose, the concrete will flow out and concrete harden very fast so we need to find another team of
contractor tohack the floortoremove the concreteandpayextraforreinforcement.Evenifitdoesn’t
burst out,it will cause honeycomb,loose jointsandweakstructure.Therefore,itisveryimportantto
prepare a pre-checkinglist.
A lintel isahorizontalstructural member overanopening,whichcarries the weightof the wall
above it and avoids the load to goes on the door frame itself. Lintels are usually associated with
windows,thoughsuchstructural membersapplytoanyweight-bearingelementorelementsoveran
openinginawall. If loadgoesonthe doororwindow frameitself,theframe willbendcrashaftertime.
Onthe site,Isawtheyuse sub-frame systemcomprisesasub-frame which iseithercastinoranchored
tothe wall.The mainframe istheninstalledontothe subframeatamuchlargerstage of construction.
Sub frame is a rigid structure formed of relatively slender pieces, joined to surround sizable empty
spaces or non-structural panels, and generally used as a major support in building. They used sub
frame before the constructiondone because windowanddoorisquite costly.
7
PHOTOS AND DESCRIPTION
Precautiononthe site DescriptionBoard Claybrick
Cementbrick Transportingconcrete
ReinforcementBar 2 typesof Brick Wall
8
Explainwhatisconcrete coveraka tofu.Pastingconcrete coveronthe wall.
Lintel andsub-frame of doorandwindow.
Beam Column
Formworkof column Plywoodforformwork Concrete staircase
9
Non-suspendedslab Explaningthe rebarincolumn Drainand pipe
The viewfroma higherplace
Wash the car tyre before leavingthe constructionsite. Temporaryworkeraccomodation.
Before andAfter
10
CONCLUSION
Thisismyfirstsite visitandIenjoyedmyself overthere asIdiscovermanynewthingsthrough
thissite visit.The contractorisveryyoungand he advisedusnotto studyfor exambutforworking.It
will be difficult to construct if we do not prepare well. I felt grateful to have this opportunity to
experience real working space and the environment of construction. Luckily the weather was very
goodbut I knowthe weatherconditionswill be differentandmaybe worse whenIstartto work.
Next, this site visit gave me a chance to experience and learn what I couldn’t gainedduring
class. Through this site visit, I have learnt the importance of safety which is a basic of construction
because one of my friendalmosthit hishead whenhe was walkingtoupstairs.Besidesthat,I learnt
howto identifytypesof constructionmaterial,technologyandmachinery,andtheiruses.Ialsolearnt
a lot aboutconstructionprocessandmethodsthathad quite confusedme whenIstudy.
Lastly, I would like to say thank you to my lecturers for organisingthis site visit. I appreciate
the efforts they gave and the cooperation from the contractors of Subsidiary of Purcon Sdn Bhd. I
learntto be more patientto workina groupof people because teamworkisanimportantelementin
constructinga building.IwishIcouldjoinmore useful sitevisitandprepare abetterme inthe future.

More Related Content

What's hot

Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report Batoul Alshamali
 
Site report
Site reportSite report
Site reportYunshi94
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015Joyce HweeMin
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structureshlok patel
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction siteUmair Ali
 
Demolition of a building
Demolition of a buildingDemolition of a building
Demolition of a buildingAbhishekKadve
 
Design of multistorey building
Design of multistorey buildingDesign of multistorey building
Design of multistorey buildingSivaji Djpk
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
Site visit report
Site visit report Site visit report
Site visit report Liming Hiew
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION Ved Jangid
 
Site visit report
Site visit reportSite visit report
Site visit reportMonnie Bao Jia
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildingsPrince Srinivas
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONRising Sher
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000PraveenKumar Shanmugam
 

What's hot (20)

Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Site report
Site reportSite report
Site report
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Demolition of a building
Demolition of a buildingDemolition of a building
Demolition of a building
 
Design of multistorey building
Design of multistorey buildingDesign of multistorey building
Design of multistorey building
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Site visit report
Site visit report Site visit report
Site visit report
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Shear wall
Shear wallShear wall
Shear wall
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 

Viewers also liked

Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportJoyeeLee0131
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 reportOng Seng Peng Jeff
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 reportYq Chong
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology Ikaiwenyeo
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreKai Yun Pang
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportKai Yun Pang
 
Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bcRohit Digra
 
Building construction report
Building construction reportBuilding construction report
Building construction reportSoh Shing
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Reporthiewyennee
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis ReportDaniel Yap
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportXinYee Khoo
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 reportAmos Tan
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction ReportSheau Hui Tan
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshulAnshul Shakya
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final ReportjolynnTJL
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)Chong jiayi
 

Viewers also liked (20)

Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
 
Assignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping CentreAssignment 2 - Jaya Shopping Centre
Assignment 2 - Jaya Shopping Centre
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit Report
 
Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bc
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Building Construction Analysis Report
Building Construction Analysis ReportBuilding Construction Analysis Report
Building Construction Analysis Report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 report
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshul
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 

Similar to Site visit report

Site report
Site reportSite report
Site reportvaylu
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Ez
EzEz
EzLee Jet
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 
Site report
Site reportSite report
Site reportHuiYik
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
Site report
Site reportSite report
Site reportEric Teo
 
Site report
Site reportSite report
Site reportyongseenyee
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportYee Len Wan
 
Site report
Site reportSite report
Site reportPenny3688
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report I'mMiss Lily
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
How to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdf
How to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdfHow to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdf
How to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdfssusereee489
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingIRJET Journal
 

Similar to Site visit report (20)

Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site report
Site reportSite report
Site report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Ez
EzEz
Ez
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site report
Site reportSite report
Site report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
 
Site report
Site reportSite report
Site report
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
Final Report
Final Report Final Report
Final Report
 
How to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdf
How to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdfHow to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdf
How to Build Bricklaying Scaffolding_ Reach New Heights in Construction!.pdf
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
 

Recently uploaded

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Recently uploaded (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

Site visit report

  • 1. 1 SITE VISIT REPORT MEASUREMENT I (QSB 60104) – Sr Ang Fuey Lin CONSTRUCTION TECHNOLOGY I (BLD 60104) – Ms Azrina Binti Md Yaakod BUILDING MATERIALS (BLD 62003) – Ms Myzatul Aishah Binti Kamarazaly Name: YAP FOONG MEI Student ID: 0324867 Intake: AUGUST’16 Semester: ONE
  • 2. 2 INTRODUCTION This is an assignment that involves Building Materials, Construction Technology 1 and Measurement1where everystudent mustwrite andproduce constructionsite report. The construction site visit was held on 22nd November 2016 and located at Taman Impian Murni (Lot 3607), Jalan TanjungBalai (LorongHaji Yusof),Seksyen30, 40460 Shah Alam, Selangor.It was organized by our lecturers who Sr Ang Fuey Lin, Ms Myzatul Aishah Kamarazaly and Ms Azrina Md Yaakob. Taman Impian Murni is built on a Malay Reserved Freehold land comprises of 42 units of housing. Designed for the needs of the Malay ethnic group, buyer can choose either 2 to 3 storey terrace house comprisesof 4to6bedroomswith3to4 bathrooms.The range of the layout isbetween 1950 square feetto2683 square feet. The designof the houses isceilingtoceilingheightwhichmean 11 feets from the ground. This is developed by Khas Perkasa Sdn Bhd (Subsidiary of Purcon Sdn Bhd)andthe completiondate will be atJune of 2018. The constructioncost aroundRM 11 million. The aim of doing site visit is to make sure student can describe,explain and understand the method and process of construction in accordance to the sequence of work on site. For this report, we are requiredtostudyona concrete framedbuilding. LOCATION SITE PLAN FLOOR PLAN
  • 3. 3 CONTENTS INTRODUCTION 2 CONTENTS 3 OBJECTIVES 4 TECHNICAL OBSERVATION 5-6 PHOTOS AND DESCRIPTION 7-9 CONCLUSION 10
  • 4. 4 OBJECTIVES  Understand the basics of the construction process and witness the usage of construction equipment’sonsite includingmechanical plants.  Exposure toactual workingenvironmentonsite includinguncertaintycircumstances.  Gain more basicsof the constructionprocessthroughasite visit.  Increase personal knowledge of the construction process by listening the professional’s briefingandgatheringall the informationcarryonsite.  Explore andidentifyvarioustypesof buildingmaterialsandtechnologyon site.  Explore the type of buildingmaterialsandtechnologyuse the constructabuilding.  Awarenessof the importance of safetyonsite andunderstandingof safetyproblemsand site conditions.  Recognize the measurableitemsforsubstructure andreinforcedconcreteframeworks.
  • 5. 5 TECHNICAL OBSERVATION Before the visit,every student must attend a whole day talk for application of green card of constructionsite.Basically,itisa talkthat tell uswhat to doand what notto do whenyouare at site, the safety of construction site and more. As we are still in semester 1, it is very important for us to know the safety and dangerousness of site. Through this talk, I have learnt how important is safety because one minormistakemaycause youaseriousinjuryorevendeath sowe mustputsafetyatthe firstplace whenwe are at the site. Few days before the visit, Sr Ang has reminded every student to wear appropriate clothing andfootwearforthe sitevisit.We are veryluckytomeetaverykindcontractorwhoprovide thesafety helmettous.She alsoaskedusto fill inanindemnityformtogetouremergencycontactnumberand to registerwiththe designatedsite managementorsupervisorystaff.Ourseniorsalsogave sometips whichare bringmosquitoesrepellent,sunblock,wettissue,andmedicine if we have alongsince this isthe firsttime we are goingto site visit. On the day of site visit,we are requestedtomeetat the site at 8.30am and we needto find own transport as our lecturercouldn’trequestbusfor us from Taylor managementdepartmentdue to some reasons. I car pooled withTeow Kah Yan, Maeve Lim, Shum Wen Jun and Yeo Gin Faye and we arrivedat8.00am whichare the earliestone.Beforewe entertheconstructionsite,theygave each of usa newsafetyhelmetwhichisquitesurprise usbecause SrAngtoldusthatnormallystudentneed to prepare theirownsafetyhelmetbuttheyare givingusas a gift. Duringthe site visit,weare dividedinto2groupssoitis easierforthe contractorstobrief and take care of us. In a small group, the efficiency is higher as every student can hear clearly what the contractor said because the site was quite noisy and student at the back will not be left out. The contractor leading my group is not a quantity surveyor but has a civil engineering background. We calledhimasYong, he toldus that typical constructionusedcastinsitu. Concrete framed buildingconsistsof column,beam,slabsandreinforcedconcrete. Thisframe becomesverystrong,andmustresistthe variousloadsthatacton a buildingduring itslife. The grade of concrete used isgrade 25. Slab is a flat plane of concrete and it has two categories which is non-suspended slabs and suspended slabs. For this construction, their ground floor is a non-suspendedslab which is partially supported bythe ground,half of theloadhasdisputedtothe groundand theotherhalfistothe beam. It requires lesser reinforcement bar due to the lesser loading compare to above whichis suspended slab. The slab in this construction is on ground beam, it is different with the usual one that lecturer taughtus inclass whichisinbetweenthegroundbeam becausethe soilissofter.Otherthanthat,the sizesof BRC inslab is reduced. Inabuilding,itrequiresbothhorizontalandvertical membertosupportand makesitstronger. The vertical membersare calledas column while beamisthe horizontal members. Columntransfers loadsfromslabandbeamdirectlytosubsequentsoil.If youdamageabeaminabuilding,itwill usually affectonlyone floor,butdamage to a columncouldbringdownthe entire building. Concrete requires no additional fireproofing treatments to meet stringent fire codes, and performswell duringbothnatural andmanmade disasters.Becauseof concrete’sinherentheaviness, mass, and strength, buildings constructed with cast-in-place reinforced concrete can resist winds of more than 200 miles per hour and perform well even under the impact of flying debris. This
  • 6. 6 construction project is done with piling, cover a strip footing as a cap for the piles and it also subsequentlyactasa beamat the same time. Itisveryimportanttoknowthe constructionprocessof the reinforcedcementconcrete (RCC) regardless it is for beam or column because it will cause a building failure. The four stages of constructingRCCcolumninvolvescolumnlayoutwork,columnreinforcementwork,columnformwork and finallypouringconcrete intocolumn. RCCcontainssteel barswhichknownas reinforcementbar or rebar. Concrete is strong in compression, brittle and hard but very weak in tensile strength. However,steel isstrongerinbothbutitis expensive. Perthe contractor,rebar functionasa skeleton as a backbone of concrete,it givestensile strengthsoitcan bend a little bitandaccept the loading.If don’thave rebar in concrete,itwill be crackinga lot,breakingwhichare the signof failure.‘Whynot using steel for the whole block?’ a student asked. The contractor explained to us that they use reinforcementbarsispartlydue tothe costandpartlydue tosupport. The final stagesof constructing RCC ispouringconcrete where the workerswill doaquickcheckingbydoingslumptest. We observed that they are using clay bricks in between the houses and cement brick within the house. The contractor told us it is due to the law in Malaysia, firefighting needsat least 2 hours and clay brick can help to get to this level when it is minimum 150mm. Cement brick has the same functionasclay brick butit islesscostlyand soundinsulationisnotasgood as clay brickso it ismore suitable to use within the house. Besides that, usingbrick as the material of wall can avoid termites and ithas lowmaintenance. Concreteframe structuresare strongandeconomical.Hence almostany wallingmaterialscanbe usedwith them.Masonrywallsof brick,concrete block,orstone.Whenbrick or concrete blocksare used,it iscommon to plasterthe entire surface witha cementplastertoform a hard, long-lastingfinish. Onthe constructionsite,theycall concrete coverastofuwhichIfoundveryfunnyandIbelieve that I will neverlearnthisin class. Concrete cover for reinforcementisrequiredtoprotect the rebar against corrosion and to provide resistance against fire. The thickness of cover depends on environmental conditionsandtype of structural member. On a side notes,manypeople incorrectlycalledformworkasfalseworkorthinkboth are the same.Formworkholdsthe wet concrete in the correct positionuntil the concrete has setand cured. Falsework is any temporarystructure, in which the mainload bearing members are vertical,used to support permanent structures, used to support a permanent structure and associated elements during the erection until it is self-supporting. They use traditional timber formwork due to the it’s reusable ability,lowproductioncostandhigheravailabilitythansteel. Yongtoldusif formworkbreak loose, the concrete will flow out and concrete harden very fast so we need to find another team of contractor tohack the floortoremove the concreteandpayextraforreinforcement.Evenifitdoesn’t burst out,it will cause honeycomb,loose jointsandweakstructure.Therefore,itisveryimportantto prepare a pre-checkinglist. A lintel isahorizontalstructural member overanopening,whichcarries the weightof the wall above it and avoids the load to goes on the door frame itself. Lintels are usually associated with windows,thoughsuchstructural membersapplytoanyweight-bearingelementorelementsoveran openinginawall. If loadgoesonthe doororwindow frameitself,theframe willbendcrashaftertime. Onthe site,Isawtheyuse sub-frame systemcomprisesasub-frame which iseithercastinoranchored tothe wall.The mainframe istheninstalledontothe subframeatamuchlargerstage of construction. Sub frame is a rigid structure formed of relatively slender pieces, joined to surround sizable empty spaces or non-structural panels, and generally used as a major support in building. They used sub frame before the constructiondone because windowanddoorisquite costly.
  • 7. 7 PHOTOS AND DESCRIPTION Precautiononthe site DescriptionBoard Claybrick Cementbrick Transportingconcrete ReinforcementBar 2 typesof Brick Wall
  • 8. 8 Explainwhatisconcrete coveraka tofu.Pastingconcrete coveronthe wall. Lintel andsub-frame of doorandwindow. Beam Column Formworkof column Plywoodforformwork Concrete staircase
  • 9. 9 Non-suspendedslab Explaningthe rebarincolumn Drainand pipe The viewfroma higherplace Wash the car tyre before leavingthe constructionsite. Temporaryworkeraccomodation. Before andAfter
  • 10. 10 CONCLUSION Thisismyfirstsite visitandIenjoyedmyself overthere asIdiscovermanynewthingsthrough thissite visit.The contractorisveryyoungand he advisedusnotto studyfor exambutforworking.It will be difficult to construct if we do not prepare well. I felt grateful to have this opportunity to experience real working space and the environment of construction. Luckily the weather was very goodbut I knowthe weatherconditionswill be differentandmaybe worse whenIstartto work. Next, this site visit gave me a chance to experience and learn what I couldn’t gainedduring class. Through this site visit, I have learnt the importance of safety which is a basic of construction because one of my friendalmosthit hishead whenhe was walkingtoupstairs.Besidesthat,I learnt howto identifytypesof constructionmaterial,technologyandmachinery,andtheiruses.Ialsolearnt a lot aboutconstructionprocessandmethodsthathad quite confusedme whenIstudy. Lastly, I would like to say thank you to my lecturers for organisingthis site visit. I appreciate the efforts they gave and the cooperation from the contractors of Subsidiary of Purcon Sdn Bhd. I learntto be more patientto workina groupof people because teamworkisanimportantelementin constructinga building.IwishIcouldjoinmore useful sitevisitandprepare abetterme inthe future.