Definition
In our introduction to production and operations
management ("POM") we suggested that there are
several different methods of handling the conversion or
production process - Job, Batch, Flow and Group.
This revision note explains these methods in more
detail.
Introduction
The various methods of production are not associated
with a particular volume of production. Similarly,
several methods may be used at different stages of the
overall production process.
Job Method
With Job production, the complete task is handled by
a single worker or group of workers. Jobs can be
small-scale/low technology as well as complex/high
technology.
1. Low technology jobs: here the organisation of
production is extremely simply, with the required
1
skills and equipment easily obtainable. This
method enables customer's specific requirements
to be included, often as the job progresses.
Examples include: hairdressers; tailoring
2. High technology jobs: high technology jobs
involve much greater complexity - and therefore
present greater management challenge. The
important ingredient in high-technology job
production is project management, or project
control. The essential features of good project
control for a job are:
- Clear definitions of objectives - how should the job
progress (milestones, dates, stages)
- Decision-making process - how are decisions taking
about the needs of each process in the job, labour and
other resources
Examples of high technology / complex jobs: film
production; large construction projects (e.g. the
Millennium Dome)
2
Batch Method
As businesses grow and production volumes increase, it
is not unusual to see the production process organised
so that "Batch methods" can be used.
Batch methods require that the work for any task is
divided into parts or operations. Each operation is
completed through the whole batch before the next
operation is performed. By using the batch method, it is
possible to achieve specialisation of labour. Capital
expenditure can also be kept lower although careful
planning is required to ensure that production
equipment is not idle. The main aims of the batch
method are, therefore, to:
- Concentrate skills (specialization)
- Achieve high equipment utilisation
This technique is probably the most commonly used
method for organising manufacture. A good example is
the production of electronic instruments.
Batch methods are not without their problems. There is
a high probability of poor work flow, particularly if the
batches are not of the optimal size or if there is a
significant difference in productivity by each operation
3
in the process. Batch methods often result in the build
up of significant "work in progress" or stocks (i.e.
completed batches waiting for their turn to be worked
on in the next operation).
Flow Methods
Flow methods are similar to batch methods - except
that the problem of rest/idle production/batch queuing
is eliminated.
Flow has been defined as a "method of production
organisation where the task is worked on continuously
or where the processing of material is continuous and
progressive,"
The aims of flow methods are:
- Improved work & material flow
- Reduced need for labour skills
- Added value / completed work faster
Flow methods mean that as work on a task at a
particular stage is complete, it must be passed directly
to the next stage for processing without waiting for the
remaining tasks in the "batch". When it arrives at the
next stage, work must start immediately on the next
process. In order for the flow to be smooth, the times
4
that each task requires on each stage must be of equal
length and there should be no movement off the flow
production line. In theory, therefore, any fault or error
at a particular stage
In order that flow methods can work well, several
requirements must be met:
(1) There must be substantially constant demand
If demand is unpredictable or irregular, then the flow
production line can lead to a substantial build up of
stocks and possibility storage difficulties. Many
businesses using flow methods get round this problem
by "building for stock" - i.e. keeping the flow line
working during quiet periods of demand so that output
can be produced efficiently.
(2) The product and/or production tasks must
be standardized
Flow methods are inflexible - they cannot deal
effectively with variations in the product (although
some "variety" can be accomplished through applying
different finishes, decorations etc. at the end of the
production line).
5
(3) Materials used in production must be to
specification and delivered on time
Since the flow production line is working continuously,
it is not a good idea to use materials that vary in style,
form or quality. Similarly, if the required materials are
not available, then the whole production line will come
to a close - with potentially serious cost consequences.
(4) Each operation in the production flow
must be carefully defined - and recorded in
detail
(5) The output from each stage of the flow
must conform to quality standards
Since the output from each stage moves forward
continuously, there is no room for sub-standard output
to be "re-worked" (compare this with job or batch
production where it is possible to compensate for a lack
of quality by doing some extra work on the job or the
batch before it is completed).
The achievement of a successful production flow line
requires considerable planning, particularly in ensuring
6
that the correct production materials are delivered on
time and that operations in the flow are of equal
duration.
Common examples where flow methods are used are
the manufacture of motor cars, chocolates and
televisions.
7

More Related Content

What's hot

Cellular Manufacturing
Cellular Manufacturing Cellular Manufacturing
Cellular Manufacturing
sgrsoni45
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
Akhil Lal
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 

What's hot (20)

Process selection
Process selectionProcess selection
Process selection
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 
Process selection
Process selectionProcess selection
Process selection
 
Product, process, fixed and group layouts
Product, process, fixed and group layoutsProduct, process, fixed and group layouts
Product, process, fixed and group layouts
 
Types of production systems
Types of production systemsTypes of production systems
Types of production systems
 
Cellular Manufacturing
Cellular Manufacturing Cellular Manufacturing
Cellular Manufacturing
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
job shop production system in productions and operations system
job shop production system in productions and operations systemjob shop production system in productions and operations system
job shop production system in productions and operations system
 
Product design concept
Product design conceptProduct design concept
Product design concept
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
travel chart for plant layout
travel chart for plant layouttravel chart for plant layout
travel chart for plant layout
 
facility location and planning layout
facility location and planning layoutfacility location and planning layout
facility location and planning layout
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Standardization
StandardizationStandardization
Standardization
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/Manufacturing
 
Product:- Design, Objectives, Importance, Product Life Cycle.
Product:- Design, Objectives, Importance, Product Life Cycle.Product:- Design, Objectives, Importance, Product Life Cycle.
Product:- Design, Objectives, Importance, Product Life Cycle.
 

Similar to Types of production system (production and operation management)

Production and operations managment notes
Production and operations managment notesProduction and operations managment notes
Production and operations managment notes
Wasim Arshad
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
Sophie Michelot
 
plant layout ( Operation Research )
plant layout ( Operation Research ) plant layout ( Operation Research )
plant layout ( Operation Research )
Arpit gupta
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production Systems
RobbieA
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production Systems
RobbieA
 
production & material management
production & material managementproduction & material management
production & material management
BhaveshThakur11
 
om ch 2.5 Layouting.pptx
om ch 2.5 Layouting.pptxom ch 2.5 Layouting.pptx
om ch 2.5 Layouting.pptx
YosefSisay3
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
newar_07
 

Similar to Types of production system (production and operation management) (20)

Production and operations managment notes
Production and operations managment notesProduction and operations managment notes
Production and operations managment notes
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
Chapter 7.pptx
Chapter 7.pptxChapter 7.pptx
Chapter 7.pptx
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation management
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
 
Job shop production system final
Job shop production system finalJob shop production system final
Job shop production system final
 
Concept of production
Concept of productionConcept of production
Concept of production
 
plant layout ( Operation Research )
plant layout ( Operation Research ) plant layout ( Operation Research )
plant layout ( Operation Research )
 
Production and Operation Management.pptx
Production and Operation Management.pptxProduction and Operation Management.pptx
Production and Operation Management.pptx
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production Systems
 
Operations - Introduction & Production Systems
Operations - Introduction & Production SystemsOperations - Introduction & Production Systems
Operations - Introduction & Production Systems
 
production & material management
production & material managementproduction & material management
production & material management
 
Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
 
Production & operations management.
Production & operations management.Production & operations management.
Production & operations management.
 
final Production
 final Production  final Production
final Production
 
3.0 Plant Layout Types.pptx
3.0 Plant Layout Types.pptx3.0 Plant Layout Types.pptx
3.0 Plant Layout Types.pptx
 
om ch 2.5 Layouting.pptx
om ch 2.5 Layouting.pptxom ch 2.5 Layouting.pptx
om ch 2.5 Layouting.pptx
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
Production System optimization: Case Study of a Local Textile Company
Production System optimization: Case Study of a Local Textile CompanyProduction System optimization: Case Study of a Local Textile Company
Production System optimization: Case Study of a Local Textile Company
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
 

More from Yamini Kahaliya

More from Yamini Kahaliya (20)

Accounting cycle in Accountancy
Accounting cycle in AccountancyAccounting cycle in Accountancy
Accounting cycle in Accountancy
 
INTRODUCTION TO ACCOUNTANCY
INTRODUCTION TO ACCOUNTANCYINTRODUCTION TO ACCOUNTANCY
INTRODUCTION TO ACCOUNTANCY
 
Pricing in marketing Management
Pricing in marketing ManagementPricing in marketing Management
Pricing in marketing Management
 
Simulation in Operation Research
Simulation in Operation ResearchSimulation in Operation Research
Simulation in Operation Research
 
COMMUNICATION FOR MANAGEMENT
COMMUNICATION FOR MANAGEMENT COMMUNICATION FOR MANAGEMENT
COMMUNICATION FOR MANAGEMENT
 
PROFIT & LOSS FOR COMPETITIVE EXAMS
PROFIT & LOSS FOR COMPETITIVE EXAMSPROFIT & LOSS FOR COMPETITIVE EXAMS
PROFIT & LOSS FOR COMPETITIVE EXAMS
 
Simplification (for Competitive exams)
Simplification (for Competitive exams)Simplification (for Competitive exams)
Simplification (for Competitive exams)
 
EXPORT & IMPORT POLICY & DOCUMENTATION
EXPORT & IMPORT POLICY & DOCUMENTATIONEXPORT & IMPORT POLICY & DOCUMENTATION
EXPORT & IMPORT POLICY & DOCUMENTATION
 
QUALITY AWARD ASSIGNMENT
QUALITY AWARD ASSIGNMENTQUALITY AWARD ASSIGNMENT
QUALITY AWARD ASSIGNMENT
 
Supply Chain Management Assignment on ITC- Diversification
Supply Chain Management Assignment on ITC- DiversificationSupply Chain Management Assignment on ITC- Diversification
Supply Chain Management Assignment on ITC- Diversification
 
ASSIGNMENT ON STOCK MARKET FRAUD (Security Analysis & Portfolio Management)
ASSIGNMENT ON STOCK MARKET FRAUD (Security Analysis & Portfolio Management)ASSIGNMENT ON STOCK MARKET FRAUD (Security Analysis & Portfolio Management)
ASSIGNMENT ON STOCK MARKET FRAUD (Security Analysis & Portfolio Management)
 
ASSIGNMENT ON IMPACT OF GLOBALISATION ON TOYOTA
ASSIGNMENT ON IMPACT OF GLOBALISATION ON TOYOTAASSIGNMENT ON IMPACT OF GLOBALISATION ON TOYOTA
ASSIGNMENT ON IMPACT OF GLOBALISATION ON TOYOTA
 
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
 
Security Analysis & Portfolio Management Assignment on Mutual Fund Of SBI
Security Analysis & Portfolio Management Assignment on Mutual Fund Of SBISecurity Analysis & Portfolio Management Assignment on Mutual Fund Of SBI
Security Analysis & Portfolio Management Assignment on Mutual Fund Of SBI
 
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
 
International business assignment on Globalization of Toyota (For BBA/B.com S...
International business assignment on Globalization of Toyota (For BBA/B.com S...International business assignment on Globalization of Toyota (For BBA/B.com S...
International business assignment on Globalization of Toyota (For BBA/B.com S...
 
Introduction of Security analysis & portfolio management
Introduction of Security analysis & portfolio managementIntroduction of Security analysis & portfolio management
Introduction of Security analysis & portfolio management
 
Leverage (Operating, financial & combined leverage)
Leverage (Operating, financial & combined leverage)Leverage (Operating, financial & combined leverage)
Leverage (Operating, financial & combined leverage)
 
HUMAN RESOURCE MANAGEMENT
HUMAN RESOURCE MANAGEMENTHUMAN RESOURCE MANAGEMENT
HUMAN RESOURCE MANAGEMENT
 
Decission support system in MIS (assignment)
Decission support system in MIS (assignment)Decission support system in MIS (assignment)
Decission support system in MIS (assignment)
 

Recently uploaded

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
httgc7rh9c
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 

Recently uploaded (20)

Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111Details on CBSE Compartment Exam.pptx1111
Details on CBSE Compartment Exam.pptx1111
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 

Types of production system (production and operation management)

  • 1. Production - types of production method Definition In our introduction to production and operations management ("POM") we suggested that there are several different methods of handling the conversion or production process - Job, Batch, Flow and Group. This revision note explains these methods in more detail. Introduction The various methods of production are not associated with a particular volume of production. Similarly, several methods may be used at different stages of the overall production process. Job Method With Job production, the complete task is handled by a single worker or group of workers. Jobs can be small-scale/low technology as well as complex/high technology. 1. Low technology jobs: here the organisation of production is extremely simply, with the required 1
  • 2. skills and equipment easily obtainable. This method enables customer's specific requirements to be included, often as the job progresses. Examples include: hairdressers; tailoring 2. High technology jobs: high technology jobs involve much greater complexity - and therefore present greater management challenge. The important ingredient in high-technology job production is project management, or project control. The essential features of good project control for a job are: - Clear definitions of objectives - how should the job progress (milestones, dates, stages) - Decision-making process - how are decisions taking about the needs of each process in the job, labour and other resources Examples of high technology / complex jobs: film production; large construction projects (e.g. the Millennium Dome) 2
  • 3. Batch Method As businesses grow and production volumes increase, it is not unusual to see the production process organised so that "Batch methods" can be used. Batch methods require that the work for any task is divided into parts or operations. Each operation is completed through the whole batch before the next operation is performed. By using the batch method, it is possible to achieve specialisation of labour. Capital expenditure can also be kept lower although careful planning is required to ensure that production equipment is not idle. The main aims of the batch method are, therefore, to: - Concentrate skills (specialization) - Achieve high equipment utilisation This technique is probably the most commonly used method for organising manufacture. A good example is the production of electronic instruments. Batch methods are not without their problems. There is a high probability of poor work flow, particularly if the batches are not of the optimal size or if there is a significant difference in productivity by each operation 3
  • 4. in the process. Batch methods often result in the build up of significant "work in progress" or stocks (i.e. completed batches waiting for their turn to be worked on in the next operation). Flow Methods Flow methods are similar to batch methods - except that the problem of rest/idle production/batch queuing is eliminated. Flow has been defined as a "method of production organisation where the task is worked on continuously or where the processing of material is continuous and progressive," The aims of flow methods are: - Improved work & material flow - Reduced need for labour skills - Added value / completed work faster Flow methods mean that as work on a task at a particular stage is complete, it must be passed directly to the next stage for processing without waiting for the remaining tasks in the "batch". When it arrives at the next stage, work must start immediately on the next process. In order for the flow to be smooth, the times 4
  • 5. that each task requires on each stage must be of equal length and there should be no movement off the flow production line. In theory, therefore, any fault or error at a particular stage In order that flow methods can work well, several requirements must be met: (1) There must be substantially constant demand If demand is unpredictable or irregular, then the flow production line can lead to a substantial build up of stocks and possibility storage difficulties. Many businesses using flow methods get round this problem by "building for stock" - i.e. keeping the flow line working during quiet periods of demand so that output can be produced efficiently. (2) The product and/or production tasks must be standardized Flow methods are inflexible - they cannot deal effectively with variations in the product (although some "variety" can be accomplished through applying different finishes, decorations etc. at the end of the production line). 5
  • 6. (3) Materials used in production must be to specification and delivered on time Since the flow production line is working continuously, it is not a good idea to use materials that vary in style, form or quality. Similarly, if the required materials are not available, then the whole production line will come to a close - with potentially serious cost consequences. (4) Each operation in the production flow must be carefully defined - and recorded in detail (5) The output from each stage of the flow must conform to quality standards Since the output from each stage moves forward continuously, there is no room for sub-standard output to be "re-worked" (compare this with job or batch production where it is possible to compensate for a lack of quality by doing some extra work on the job or the batch before it is completed). The achievement of a successful production flow line requires considerable planning, particularly in ensuring 6
  • 7. that the correct production materials are delivered on time and that operations in the flow are of equal duration. Common examples where flow methods are used are the manufacture of motor cars, chocolates and televisions. 7