1. Al Ain Water Distribution Network
Building/Structure Planning Model
Hydraulic
Analysis
Material
tal/Approval
TRANSCO Approval for Hydraulic Analysis
Main Pumps Material Submittal
Pump House Valves Material Approval
MV Motor-Phase Shift Transformer-VFD Material
Submittal
Pump House Valves Material Submittal
MV Motor-Phase Shift Transformer-VFD Material
33 KV Switch Gear Material Submittal
33 KV Switch Gear Material Approval
SS=0 Dys
Cooling Water System for
Pump/Motors Material Submittal
Submit
Design G.A Drawings M
General Arrangement Drawing of Pump House-
Elec.Building-Transformer Approval
General Arrangement Drawing of 33 KV
Switch Gear Approval
Design & Engineering for Pump House (Incl.
Approvals)
Design & Engineering for Electrical Building
(Incl. Approvals)
Design & Engineering for Transformer
Foundation (Incl. Approvals)
Excavation Of Pump House Excavation Of Electrical Building Excavation Of Transformers Boxs
FS=106 Dys
Design & Engineering for 33 KV Substation
(Incl. Approvals)
Excavation Of Substation Building
SS=0 Dys
Design & Engineering for Utility Building (Incl.
Approvals )
Excavation Of Utility Building
Design & Engineering for WQM Building
(Incl. Approvals)
Excavation Of WQM Building
General Arrangement Drawing of Pump House-
Elec.Building-Transformer Submital
Motor Transformer Approval
General Arrangement Drawing of 33 KV
Switch Gear Submittal
SS=0 Dys
SS=0 Dys
SS=0 Dys
Cooling Water System for
Pump/Motors Material Approval
Civil Work
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
FS=55 Days
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
SS=150 Dys
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
SS=90 Dys
C
&
P ks
Programme
Reinf.Steel,Shuttering Works and
Casting of Walls,Columns
Reinforcement Steel, Shuttering
and Casting for Ground Slab
Reinforcement Steel, Shuttering
and Casting for Columns
Supply and Erection of Metal
Roofing System
Reinf.Steel,Shuttering Works and
Casting of Walls,Columns
Reinforcement Steel, Shuttering
and Casting for Ground Slab
Reinforcement Steel, Shuttering and
Casting for Columns and Staircase
Reinforcement Steel, Shuttering
and Casting for Roof and Parapet
Reinf.Steel,Shuttering Works and
Casting of Walls,
Reinf.Steel,Shuttering Works and
Casting of Walls,Columns
Reinforcement Steel, Shuttering and
Casting for Columns and Staircase
Reinforcement Steel, Shuttering
and Casting for Roof and Parapet
Reinforcement Steel, Shuttering
and Casting for Columns and
Staircase
Reinforcement Steel, Shuttering
and Casting for Roof and Parapet
Reinforcement Steel, Shuttering
and Casting for Columns and
Staircase
Reinforcement Steel, Shuttering
and Casting for Roof and Parapet
Arch
MEP
Work
See The Overall Implementation File : AARC Planning Model Page 1 of 2 Printed on : 12/21/2009 at 6:16 PM
2. Hydr.-Surge Analysis
Al Ain Water Distribution Network
Building/Structure Planning Model
Hydr.-Surge
Analysis
Material
mital/App.
TRANSCO Approval for Surge Vessel Analysis TRANSCO Approval for Hydraulic Analysis
Surge Vessels Material Submittal Air Compressor Material Submittal Pump House Valves Material Submittal Pump House Pipes Material Submittal
Design Subm
M
Surge Vessels Material Approval Air Compressor Material Approval
Design & Engineering for Surge Vessel
Foundation (Incl. Approvals)
Design & Engineering for Air Compressor
Shelter Foundation (Incl. Approvals)
Design & Engineering for Valve Chambers
(Incl. Approvals)
Excavation Of Surge Vessel Air Compressors Foundation
Excavation Of Transformers Boxs
Pump House Valves Material Approval Pump House Pipes Material Approval
Excavation Of Pump House
SS=150 Dys
Installation of External Pipes and Valves
SS=30 Dys
Air Compressors Foundation
Civil Work
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Screed Over Water
Proofing&Curing
Reinf.Steel,Shuttering Works and
Casting Foundation
Formation Level and Compaction
Test
Casting of Blinding and Curing
Laying Water Proofing
Casting Protection Screed Over
Water Proofing System
Reinf Steel,Shuttering and Casting
f B Sl b
Arch & MEP
Works
of Base Slab
Reinf Steel,Shuttering and Casting
of Wall Shaft
Supply and Erection of Roof Slab
,Including Vent Pipes,Ladders,…
See The Overall Implementation Programme
File : AARC Planning Model Page 2 of 2 Printed on : 12/21/2009 at 6:16 PM