CLIENT: Zabeel InvestementCLIENT: Zabeel InvestementCLIENT: Zabeel InvestementCLIENT: Zabeel Investement
L.I.CL.I.CL.I.CL.I.C
Planning Departement
Package No. : D0469
Planned Progress % Actual Progress % Variance % Ahead/Behind
Concrete 97% 95.03% -2.24% Behind
Residential Tower N4 100.00% 99.02% -1% Behind
Residential Tower N3 100.00% 98.94% -1% Behind
Residential Tower N2 100.00% 98.91% -1% Behind
Residential Tower N1 100% 98.90% -1% Behind
Residential Tower S3 100.00% 97.77% -2% Behind
Residential Tower S2 100% 98.91% -1% Behind
Residential Tower S1 100.00% 97.82% -2% Behind
Hotel Tower H1 100% 99.10% -1% Behind
Hotel Tower H2 100.00% 98.66% -1% Behind
Parking 89.13% 84.45% -5% Behind
Club House 100% 80% -20% Behind
Swimming Pool 8.33% 0% -8% Behind
Planned Progress % Actual Progress % Variance % Ahead/Behind
Concrete 97% 95.03% -2.24% Behind
Residentials 100% 98.61% -1% Behind
Hotel 100% 98.92% -1% Behind
Parking 89.13% 84.45% -5% Behind
Club House 100% 80% -20% Behind
Swimming Pool 8.33% 0% -8% Behind
Type Of Work
Current Month (Up to 26January2008)
Data Date :
26January 08Progress Of Concrete Works
Anantara Palm Jumeirah and Tiara Residences
Type Of Work
Current Month (Up to 26January2008)

More Related Content

What's hot

Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsClaire Zhuangg
 
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 VAnchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 VCS Unitec
 
WDT December 2014 London Salary Guide
WDT December 2014 London Salary GuideWDT December 2014 London Salary Guide
WDT December 2014 London Salary GuideMartin Dendle
 
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 U
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 UAnchor Stand Schematic for CS Unitec Core Drills: BST 300 U
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 UCS Unitec
 
Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...
Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...
Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...FIDE Master Tihomir Dovramadjiev PhD
 
WDT September 2015 London Salary Guide
WDT September 2015 London Salary GuideWDT September 2015 London Salary Guide
WDT September 2015 London Salary GuideMartin Dendle
 
CDOT PIM bid results Dec 2020
CDOT PIM bid results Dec 2020CDOT PIM bid results Dec 2020
CDOT PIM bid results Dec 2020LaSheita Sayer
 
WDT December 2015 London Salary Guide
WDT December 2015 London Salary GuideWDT December 2015 London Salary Guide
WDT December 2015 London Salary GuideMartin Dendle
 
Seabrook Texas Homes Market Report - 1st Quarter 2013
Seabrook Texas Homes Market Report - 1st Quarter 2013Seabrook Texas Homes Market Report - 1st Quarter 2013
Seabrook Texas Homes Market Report - 1st Quarter 2013Jeff Bulman
 

What's hot (11)

Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah Sections
 
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 VAnchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 V
 
WDT December 2014 London Salary Guide
WDT December 2014 London Salary GuideWDT December 2014 London Salary Guide
WDT December 2014 London Salary Guide
 
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 U
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 UAnchor Stand Schematic for CS Unitec Core Drills: BST 300 U
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 U
 
Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...
Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...
Tihomir Dovramadjiev PhD BLENDER TUTORIAL. CREATING DOOR HANDLE WITH USING 90...
 
WDT September 2015 London Salary Guide
WDT September 2015 London Salary GuideWDT September 2015 London Salary Guide
WDT September 2015 London Salary Guide
 
CDOT PIM bid results Dec 2020
CDOT PIM bid results Dec 2020CDOT PIM bid results Dec 2020
CDOT PIM bid results Dec 2020
 
WDT December 2015 London Salary Guide
WDT December 2015 London Salary GuideWDT December 2015 London Salary Guide
WDT December 2015 London Salary Guide
 
Seabrook Texas Homes Market Report - 1st Quarter 2013
Seabrook Texas Homes Market Report - 1st Quarter 2013Seabrook Texas Homes Market Report - 1st Quarter 2013
Seabrook Texas Homes Market Report - 1st Quarter 2013
 
Motorcycle supplier
Motorcycle supplierMotorcycle supplier
Motorcycle supplier
 
Migsun ultimo Greater noida
Migsun ultimo Greater noidaMigsun ultimo Greater noida
Migsun ultimo Greater noida
 

Viewers also liked

062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn Lodge062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn LodgeJamal Nelson, CCM
 
Austonian Construction Progress
Austonian Construction ProgressAustonian Construction Progress
Austonian Construction Progresschupahunter
 
WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25Tofik Nazirov, B.Sc., PhD
 
Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31
Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31
Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31Damon Thomas
 
Project Progress Report
Project Progress ReportProject Progress Report
Project Progress ReportAbdul Aslam
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 

Viewers also liked (7)

062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn Lodge062115 Weekly Pulse 13-0934 Elkhorn Lodge
062115 Weekly Pulse 13-0934 Elkhorn Lodge
 
Austonian Construction Progress
Austonian Construction ProgressAustonian Construction Progress
Austonian Construction Progress
 
Final Submission EOT 1
Final Submission EOT 1Final Submission EOT 1
Final Submission EOT 1
 
WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25
 
Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31
Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31
Construction Progress for TechTown 1st Floor Renovation | Oct 1 - Oct 31
 
Project Progress Report
Project Progress ReportProject Progress Report
Project Progress Report
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 

More from Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust

More from Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust (20)

Kandil Mohammed Ibrahim_Sameh_Dissertation
Kandil Mohammed Ibrahim_Sameh_DissertationKandil Mohammed Ibrahim_Sameh_Dissertation
Kandil Mohammed Ibrahim_Sameh_Dissertation
 
Progress Of Ceiling Per Floors
Progress Of Ceiling Per FloorsProgress Of Ceiling Per Floors
Progress Of Ceiling Per Floors
 
N1
N1N1
N1
 
Progress Of Slab
Progress Of SlabProgress Of Slab
Progress Of Slab
 
Overall Progress S-Curve For Ceiling
Overall Progress S-Curve For CeilingOverall Progress S-Curve For Ceiling
Overall Progress S-Curve For Ceiling
 
Overall Progress S-Curve For Facades
Overall Progress S-Curve For FacadesOverall Progress S-Curve For Facades
Overall Progress S-Curve For Facades
 
Overall Progress S-Curve For Elevators
Overall Progress S-Curve For ElevatorsOverall Progress S-Curve For Elevators
Overall Progress S-Curve For Elevators
 
Overall Progres S-Curve For Concrete Works
Overall Progres S-Curve For Concrete WorksOverall Progres S-Curve For Concrete Works
Overall Progres S-Curve For Concrete Works
 
Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
13. Overall S-Curve
13. Overall S-Curve13. Overall S-Curve
13. Overall S-Curve
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Building-Structure Planning Model
Building-Structure Planning ModelBuilding-Structure Planning Model
Building-Structure Planning Model
 
AWI20202 commercial
AWI20202 commercialAWI20202 commercial
AWI20202 commercial
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
Cash Flow Portfolio
 
Resources Histograms
Resources HistogramsResources Histograms
Resources Histograms
 
Resources Calculations for Bldg. A
Resources Calculations for Bldg. AResources Calculations for Bldg. A
Resources Calculations for Bldg. A
 
Monthly Progress Report No.05 - June-2012
Monthly Progress Report No.05 - June-2012Monthly Progress Report No.05 - June-2012
Monthly Progress Report No.05 - June-2012
 

Summary Progress Of Concrete Works

  • 1. CLIENT: Zabeel InvestementCLIENT: Zabeel InvestementCLIENT: Zabeel InvestementCLIENT: Zabeel Investement L.I.CL.I.CL.I.CL.I.C Planning Departement Package No. : D0469 Planned Progress % Actual Progress % Variance % Ahead/Behind Concrete 97% 95.03% -2.24% Behind Residential Tower N4 100.00% 99.02% -1% Behind Residential Tower N3 100.00% 98.94% -1% Behind Residential Tower N2 100.00% 98.91% -1% Behind Residential Tower N1 100% 98.90% -1% Behind Residential Tower S3 100.00% 97.77% -2% Behind Residential Tower S2 100% 98.91% -1% Behind Residential Tower S1 100.00% 97.82% -2% Behind Hotel Tower H1 100% 99.10% -1% Behind Hotel Tower H2 100.00% 98.66% -1% Behind Parking 89.13% 84.45% -5% Behind Club House 100% 80% -20% Behind Swimming Pool 8.33% 0% -8% Behind Planned Progress % Actual Progress % Variance % Ahead/Behind Concrete 97% 95.03% -2.24% Behind Residentials 100% 98.61% -1% Behind Hotel 100% 98.92% -1% Behind Parking 89.13% 84.45% -5% Behind Club House 100% 80% -20% Behind Swimming Pool 8.33% 0% -8% Behind Type Of Work Current Month (Up to 26January2008) Data Date : 26January 08Progress Of Concrete Works Anantara Palm Jumeirah and Tiara Residences Type Of Work Current Month (Up to 26January2008)