BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 1
School of Architecture, Building and Design
Bachelor of Science (Hons) in Architecture
Building Structure (ARC 2523/ BLD 61003)
Project 2: Beam and Column Analysis
Tutor: Ms. Norita
Group Members:
Student Name: Student ID:
Canisius Bong Wei Pheng 0318914
Joyce Wee Yi Qin 0319602
Tan Wing Hoe 0319333
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 2
Table of Contents
1.0 Brief Description of Building 3
2.0 Architectural Plan Drawings 4
2.1 Ground Floor Plan
2.2 First Floor Plan
2.3 Roof Plan
3.0 Structural Plan Drawings 7
3.1 Ground Floor Plan
3.2 First Floor Plan
3.3 Roof Plan
4.0 Slab System Analysis (Load Distribution) 10
4.1 Ground Floor Plan
4.2 First Floor Plan
4.3 Roof Plan
4.4 Identification of Types of Slab
5.0 Tributary Area 13
5.1 Ground Floor Plan
5.2 First Floor Plan
5.3 Roof Plan
6.0 Assumption of Life Load and Dead Load 16
6.1 Assumptions on Dead Loads Acting on Structure
6.2 Assumptions on Life Loads Acting on Structure
7.0 Individual Components Distribution 17
7.1 Beams
7.2 Columns
8.0 Beam Analysis Report 20
8.1 Canisius Bong
8.2 Joyce Wee
8.3 Tan Wing Hoe
9.0 Column Analysis Report 78
9.1 Canisius Bong
9.2 Joyce Wee
9.3 Tan Wing Hoe
10.0 Appendix 94
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 3
1.0 Brief Description of Building
In this project, we are required to design a double-storey bungalow together, carry out
structural framing and prepare structural drawings for the bungalow. The project is an
integrated component where it involves structural theory, force calculation and basic
structural proposal. This project is designed to allow the demonstration of knowledge and
understanding of building structure.
The bungalow is a 324m2 building which includes spaces such as:
(A) 1 master bedroom with attached study room, wardrobe, and bathroom
(B) 1 bedroom with attached bathroom
(C) 1 bedroom
(D) 1 guest room with attached
bathroom
(E) 1 maid room
(F) 2 bathrooms
(G) 2 living room (ground floor and first
floor)
(H) 1 family theatre
(I) 1 double volume dining room
(J) 1 dry and wet kitchen
(K) 1 laundry area
(L) 1 storeroom
(M)1 outdoor covered car porch
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 4
2.0 Architectural Plan Drawings
2.1 Ground Floor Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 5
2.2 First Floor Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 6
2.3 Roof Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 7
3.0 Structural Plan Drawings
3.1 Ground Floor Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 8
3.2 First Floor Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 9
3.3 Roof Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 10
4.0 Slab System Analysis (Load
Distribution)
4.1 Ground Floor Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 11
4.2 First Floor Plan (scale 1:150)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 12
4.3 Roof Plan (scale 1:150)
4.4 Identification of Slab System
Formula to determine slab system:
If Ly/Lx >2, one-way slab system;
If Ly/Lx ≤2, two-way slab system.
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 13
5.0 Tributary Area
5.1 Ground Floor Plan
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 14
5.2 First Floor Plan
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 15
5.3 Roof Plan
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 16
6.0 Assumption of Dead Load and Live
7.0 Load
6.1 Assumptions on Dead Loads Acting on Structure
(A) Slab self-weight
= 0.15 x 24kN/m3
= 3.6kN/m2
(B) Brick wall self-weight
= Wall thickness x Wall height x Density
= 0.1m x 3.0m x 19kN/m3
= 5.7kN/m
(C) Primary Beam self-weight
= Beam size x Concrete density
= 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
(D) Secondary Beam self-weight
= Beam size x Concrete density
= 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
(E) Column self-weight
= Column size x Concrete density
= 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
*All dead loads (slabs, walls, beams, columns) are assumed to have a standard size.
* Dead load factor: 1.4
6.2 Assumptions on Live Loads Acting on Structure
(A) Bedroom :1.5kN/m2
(B) Living Room :4.0kN/m2
(C) Dining Room :2.0kN/m2
(D) Kitchen :3.0kN/m2
(E) Corridor :4.0kN/m2
(F) Bathroom :2.0kN/m2
(G) Study Room :1.5kN/m2
(H) Car Porch :2.0kN/m2
(I) Stairs :1.5kN/m2
(J) Family Area :2.0kN/m2
(K) Store Room :2.5kN/m2
*All assumptions on live loads are
referred to 4th schedule of UBBL for
live loads per room functions.
* Live load factor: 1.6
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 17
8.0 Individual Components Distribution
7.1 Beams
Canisius Bong
Joyce Wee
Tan Wing Hoe
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 18
7.2 Columns
Canisius Bong
Joyce Wee
Tan Wing Hoe
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 19
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 20
9.0 Beam Analysis Report
8.1 Canisius Bong
Beam A/3-6 (Ground Floor | Primary Beam)
Dead Load:
○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) x (2/3)
= 2.29kN/m
○4 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2)
= 5.58kN/m
Total Dead Load:
Total Dead Load at (A/3-4) = 1.44kN/m + 5.7kN/m + 2.29kN/m
= 9.43kN/m
Total Dead Load at (A/4-6) = 1.44kN/m + 5.7kN/m + 5.58kN/m
= 12.72kN/m
Live Load:
○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) x (2/3)
= 2.0kN/m2 x (1.91m/2) x (2/3)
= 1.27kN/m
○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)
= 1.5kN/m2 x (3.1m/2)
= 2.33kN/m
○1 Carries self-weight – Dead Load
○2 Sab Dead Load & Live Load
 Slab 1 : Slab A-B/3-4 (Two-Way Slab)
 Slab 2 : Slab A-B/4-6 (Two-Way Slab)
○3 Brick Wall – Dead Load
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 21
Ultimate Load
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (A/3-4) = Total Dead Load (1.4) + Total Live Load (1.6)
= 9.43kN/m (1.4) + 1.27kN/m (1.6)
= 13.20kN/m + 2.03kN/m
= 15.23kN/m
Ultimate Load for (A/4-6) = Total Dead Load (1.4) + Total Live Load (1.6)
= 12.72kN/m (1.4) + 2.33kN/m (1.6)
= 17.81kN/m + 3.73kN/m
= 21.54kN/m
Point Load
Referring to Beam A-B/4, point load from the beam is = 39.5KN
Ultimate Load Diagram
Total load for A/3-4 = 15.23kN/m x 1.91m = 29.09kN
Total load for A/4-6 = 21.54kN/m x 5.18m = 111.58kN
Reaction Forces:
∑m = 0
R1(7.09) – (15.23 x 1.91)(6.14) – 39.5 (5.18) – (21.54 x 5.18 )(2.59) = 0
R1(7.09) – 178.61 – 204.61 – 288.98 = 0
R1 = 672.2/7.09
R1 = 94.81kN -----○A
∑fy = 0
R1+R2 – 39.5 – 15.23(1.91) – 21.54(5.18) = 0 -----○B
Substitute ○A into ○B ,
94.81 + R2 – 39.5 – 15.23(1.91) – 21.54(5.18) = 0
94.81 + R2 – 39.5 – 29.09 – 111.58 = 0
R2 – 85.36 = 0
R2 = 85.36kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 22
Load Diagram
169
0kN0kN
Positive area – Negative area
+ve = [1/2 x (94.81 + 65.72)(1.91)] +
[1/2 x (26.22 x 1.22)]
= 153.30 + 15.99
= 169.29 ≈ 169
-ve = 1/2 x (- 85.36)(5.18-1.22
= 169.01 ≈ 169
-85.36kN
0kN
0kN0kN
26.22kN
0kN
65.72kN
94.18kN
(+)
(-)
Shear Force Diagram
Using Triangular Proportion
x/5.18 = 26.22/(26.22 + 85.36)
x = 1.22
x
0kN85.3
6
x
0kN
0kN
26.22
6
x
0kN
0kN
5.18
6
x
0kN
0kN
Bending Moment Diagram
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 23
Beam H/3-5 (First Floor | Primary Beam)
Dead Load at Beam H-I/4:
○1 Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (H-I/3-4) = 3.6kN/m2 x (1.91m/2)
= 3.44kN/m
○4 Slab (H-I/ 4-6) = 3.6kN/m2 x (3.1m/2) x (2/3)
= 3.72kN/m
Total Dead Load at Beam H-I/4:
Total Dead Load = 0.48kN/m + 5.7kN/m + 3.44kN/m
+ 3.72kN/m
= 13.34kN/m
Live Load at Beam H-I/4:
○1 Slab (H-I/ 3-4) = Bathroom x (1.91m/2)
= 2.0kN/m2 x (1.91m/2)
= 1.91kN/m
○2 Slab (H-I/ 4-6) = Bedroom x (3.1m/2) x (2/3)
= 1.5kN/m2 x (3.1m/2) x (2/3)
= 1.55kN/m
Total Live Load at Beam H-I/4
Total Live Load = 1.91kN/m + 1.55kN/m
= 3.46kN/m
○1 Carries self-weight – Dead Load
○2 Sab Dead Load & Live Load
 Slab 1 : Slab H-I/3-4 (Two-Way Slab)
 Slab 2 : Slab H-I/4-6 (Two-Way Slab)
○3 Brick Wall – Dead Load
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 24
Ultimate Load
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (H/3-5) = Total Dead Load (1.4) + Total Live Load (1.6)
= 13.34kN/m (1.4) + 3.46kN/m (1.6)
= 18.68kN/m + 5.54kN/m
= 24.22kN/m
Ultimate Load Diagram
Total load = 3.1m x 24.22kN/m
= 75.08 kN
Reactions (UDL):
Reactions = (3.1 x 24.22)/2
= 37.54kN
Load Diagram
29.09kN
0kN 0kN
0kN
-37.54kN
37.54kN
0kN
(+)
(-)
Shear Force Diagram
Bending Moment Diagram
Point 1 = 37.54kN
Point 2 = 37.54 – (24.22 x 3.1)
= -37.54
Point 3 = -37.54 + 37.54
= 0kN
Area of Triangle
= ½ x 1.55 x 37.54
=29.09
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 25
Dead Load at Beam H/3-5:
○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (H-I/3-4) = 3.6kN/m2 x (1.91m/2) x (2/3)
= 2.29kN/m
○4 Slab (H-I/5-6) = 3.6kN/m2 x (3.1m/2)
= 5.58kN/m
Total Dead Load at Beam (H/3-5):
Total Dead Load at (H/3-4) = 1.44kN/m + 5.7kN/m + 2.29kN/m
= 9.43kN/m
Total Dead Load at (H/4-5) = 1.44kN/m + 5.7kN/m + 5.58kN/m
= 12.72kN/m
Live Load:
○1 Slab (H-I/3-4) = Bathroom x (1.91m/2) x (2/3)
= 2.0kN/m2 x (1.91m/2) x (2/3)
= 1.27kN/m
○2 Slab (H-I/4-5) = Bedroom x (3.1m/2)
= 1.5kN/m2 x (3.1m/2)
= 2.33kN/m
Ultimate Load
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (H/3-4) = Total Dead Load (1.4) + Total Live Load (1.6)
= 9.43kN/m (1.4) + 1.27kN/m (1.6)
= 13.20kN/m + 2.03kN/m
= 15.23kN/m
Ultimate Load for (H/4-5) = Total Dead Load (1.4) + Total Live Load (1.6)
= 12.72kN/m (1.4) + 2.33kN/m (1.6)
= 17.81kN/m + 3.73kN/m
= 21.54kN/m
Point Load
Referring to Beam H-I/4, point load from the beam is = 37.54KN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 26
Ultimate Load Diagram
Total load for H/3-4 = 15.23kN/m x 1.91m = 29.09kN
Total load for H/4-5 = 21.54kN/m x 1.79m = 38.56kN
Reaction Forces:
∑m = 0
R1(3.7) – (15.23 x 1.91)(2.75) – 37.54(1.79) – (21.54 x 1.79 )(0.90) = 0
R1(3.7) – 80 – 67.20 – 34.70 = 0
R1 = 181.97/3.7
R1 = 49.18kN -----○A
∑fy = 0
R1+R2 – 37.54 – 15.23(1.91) – 21.54(1.79) = 0 -----○B
Substitute ○A into ○B ,
49.18 + R2 – 37.54 – 15.23(1.91) – 21.54(1.79) = 0
49.18 + R2 – 37.54 – 29.09 – 38.56 = 0
R2 – 56.01 = 0
R2 = 56.01kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 27
Load Diagram
-17.41kN
0kN
66
0kN0kN
Area of Trapezium at (+) area
= (49.18 + 20.09) x 1.91/2
=66.15 ≈ 66
Area of Trapezium at ( - ) area
= (-17.41 – 56.01) x 1.79/2
= -65.71 ≈ 66
Area of ( + ) area + Area of ( - ) area
= 66-66
=0
-56.01kN
0kN
0kN0kN
20.09kN
49.18kN
(+)
(-)
Shear Force Diagram
Bending Moment Diagram
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 28
Beam H-I/6 (First Floor | Secondary Beam)
Dead Load:
○1 Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (H-I/4-6) = 3.6kN/m2 x (3.1m/2) x (2/3)
= 3.72kN/m
○4 Slab (H-I/6-7) = 3.6kN/m2 x (2.67m/2)
= 4.81kN/m
Total Dead Load
Total Dead Load = 0.48kN/m + 5.7kN/m + 3.72kN/m
+ 4.81kN/m
= 14.71kN/m
Live Load:
○1 Slab (H-I/4-6) = Bedroom x (3.1m/2) x (2/3)
= 1.5kN/m2 x (3.1m/2) x (2/3)
= 1.55kN/m
○2 Slab (H-I/6-7) = Bedroom x (2.67m/2)
= 1.5kN/m2 x (2.67m/2)
= 2.00kN/m
Total Live Load
Total Live Load = 1.55kN/m + 2.00kN/m
= 3.55kN/m
○1 Carries self-weight – Dead Load
○2 Sab Dead Load & Live Load
 Slab 1 : Slab H-I/4-6 (Two-Way Slab)
 Slab 2 : Slab H-I/6-7 (Two-Way Slab)
○3 Brick Wall – Dead Load
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 29
Ultimate Load
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (H-I/6) = Total Dead Load (1.4) + Total Live Load (1.6)
= 14.71kN/m (1.4) + 3.55kN/m (1.6)
= 20.59kN/m + 5.68kN/m
= 26.27kN/m
Ultimate Load Diagram
Total load = 3.1m x 26.27kN/m
= 81.44kN
Reactions (UDL):
Reactions = (3.1 x 26.27)/2
= 40.72kN
Load Diagram
31.56kN
0kN 0kN
0kN
-40.72kN
40.72kN
0kN
(+)
(-)
Shear Force Diagram
Bending Moment Diagram
Point 1 = 40.72 kN
Point 2 = 40.72 – (26.27x 3.1)
= -40.72
Point 3 = -40.72 + 40.72
= 0kN
Area of Triangle
= ½ x 1.55 x 40.72
=31.56
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 30
Beam I/5-7 (First Floor | Primary Beam)
Dead Load
at Beam H/3-5:
○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (H-I/3-4) = 3.6kN/m2 x (3.1m/2)
= 5.58kN/m
○4 Slab (H-I/5-6) = 3.6kN/m2 x (2.67m/2) x (2/3)
= 3.20kN/m
○5 Slab (I-L/5-7) = 3.6kN/m2 x (5.8 m/2)
= 10.44kN/m
Total Dead Load
Total Dead Load at (I/5-6) = 1.44kN/m + 5.7kN/m + 5.58kN/m
+ 10.44kN/m
= 23.16kN/m
Total Dead Load at (I/6-7) = 1.44kN/m + 5.7kN/m + 3.20kN/m
+ 10.44kN/m
= 20.78kN/m
Live Load:
○1 Slab (H-I/4-6) = Bedroom x (3.1m/2)
= 1.5kN/m2 x (3.1m/2)
= 2.33kN/m
○2 Slab (H-I/6-7) = Bedroom x (2.67m/2) x (2/3)
= 1.5kN/m2 x (2.67m/2) x (2/3)
= 1.34kN/m
○3 Slab (I-L/5-7) = Bedroom x (5.8m/2)
= 1.5kN/m2 x (5.8/2)
=4.35kN/m
○1 Carries self-weight – Dead Load
○2 Sab Dead Load & Live Load
 Slab 1 : Slab H-I/4-6 (Two-Way Slab)
 Slab 2 : Slab H-I/6-7 (Two-Way Slab)
 Slab 3 : Slab I-L/5-7 (Two-Way Slab)
○3 Brick Wall – Dead Load
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 31
Total Live Load
Total live load at (I/5-6) = 2.33kN/m + 4.35kN/m
= 6.68kN/m
Total live load at (I/6-7) = 1.34kN/m + 4.35kN/m
= 5.69kN/m
Ultimate Load
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (I/5-6) = Total Dead Load (1.4) + Total Live Load (1.6)
= 23.16kN/m (1.4) + 6.68kN/m (1.6)
= 32.42kN/m + 10.69kN/m
= 43.11kN/m
Ultimate Load for (I/6-7) = Total Dead Load (1.4) + Total Live Load (1.6)
= 20.78kN/m (1.4) + 5.69kN/m (1.6)
= 29.09kN/m + 9.10kN/m
= 38.19kN/m
Point Load
Referring to Beam H-I/6 point load from the beam is = 40.72KN
Ultimate Load Diagram
Total load for I/5-6 = 43.11kN/m x 3.39m = 146.14kN
Total load for I/6-7 = 39.19kN/m x 2.67m = 101.97kN
Reaction Forces:
∑m = 0
R1(6.06) – (43.11 x 3.39)(4.37) – 40.72(2.67) – (38.19 x 2.67 )(1.34)= 0
R1(6.06) – 638.64 – 108.72– 138.17 = 0
R1 = 885.53/6.06
R1 = 146.12kN -----○A
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 32
∑fy = 0
R1+R2 – 40.72 – 43.11(3.39) – 38.19(2.67) = 0 -----○B
Substitute ○A into ○B ,
146.12 + R2 – 40.72 – 43.11(3.39) – 38.19(2.67) = 0
146.12 + R2 – 40.72 – 146.14 – 101.97 = 0
R2 – 142.71= 0
R2 = 142.71kN
Load Diagram
.
-40.74kN
0kN
-142.71kN
0kN
0kN0kN
-0.02kN
146.12kN
(+)
(-)
Shear Force Diagram
Bending Moment Diagram
Using Triangular Proportion
x/3.39 = 146.12/146.14
x = 3.39
146.12
6
x
0kN
0kN
146.14
6
x
0kN
0kN
x
0kN
Positive area – Negative area
+ve = 1/2 x (146.12)(3.39)
= 247.67 ≈ 247
-ve = [1/2 x (- 142.71 + -40.74)(2.67)
+[1/2 x (-0.02 x 3.39)
= -246.91 + -0.03
= -246.94 ≈ -247
247-247 = 0
0kN
247
0kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 33
Beam H-K/7 (First Floor | Primary Beam)
Dead Load:
○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (H-I/6-7) = 3.6kN/m2 x (2.67m/2)
= 4.81kN/m
○4 Slab (I-L/5-7) = 3.6kN/m2 x (5.8 m/2)
= 10.44kN/m
Total Dead Load
Total Dead Load at (H-I/7) = 1.44kN/m + 5.7kN/m + 4.81kN/m
= 11.95kN/m
Total Dead Load at (I-K/7) = 1.44kN/m + 5.7kN/m + 10.44kN/m
= 17.58kN/m
Live Load:
○1 Slab (H-I/6-7) = Bedroom x (2.67m/2)
= 1.5kN/m2 x (2.67m/2)
= 2.00kN/m
○2 Slab (I-L/5-7) = Bedroom x (5.8m/2)
= 1.5kN/m2 x (5.8m/2)
= 4.35kN/m
Ultimate Load
○1 Carries self-weight – Dead Load
○2 Sab Dead Load & Live Load
 Slab 1 : Slab H-I/6-7 (Two-Way Slab)
 Slab 2 : Slab I-L/5-7(Two-Way Slab)
○3 Brick Wall – Dead Load
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 34
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (H-I/) = Total Dead Load (1.4) + Total Live Load (1.6)
= 11.95kN/m (1.4) + 2.00kN/m (1.6)
= 16.73kN/m + 3.2kN/m
= 19.93kN/m
Ultimate Load for (I-K/7) = Total Dead Load (1.4) + Total Live Load (1.6)
= 17.58kN/m (1.4) + 4.35kN/m (1.6)
= 24.61kN/m + 6.96kN/m
= 31.57kN/m
Point Load
Referring to Beam I/5-7, point load from the beam is = 142.71KN
Ultimate Load Diagram
Total load for H-I/7 = 19.93kN/m x 3.1m = 61.78kN
Total load for I-K/7 = 31.57kN/m x 3.21m = 101.34kN
Reaction Forces:
∑m = 0
R1(6.31) – (19.93 x 3.1)(4.76) – (142.71 X 3.21) – (31.57 x 3.21 )(1.61)= 0
R1(6.31) – 294.09 – 1458.10– 163.16 = 0
R1 = 915.35/6.31
R1 = 145.06kN -----○A
∑fy = 0
R1+R2 – 142.71 – 19.93(3.1) – 31.57(3.21) = 0 -----○B
Substitute ○A into ○B ,
145.06 + R2 – 142.71 – 19.93(3.1) – 31.57(3.21) = 0
145.06 + R2 – 142.71 – 61.78 – 101.34 = 0
R2 – 160.77 = 0
R2 = 160.77kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 35
Load Diagram
0kN
0kN
0kN
-59.43kN
0kN
353
-160.77kN
0kN
0kN
83.28kN
145.06kN
(+)
(-)
Shear Force Diagram
Bending Moment Diagram
Positive area – Negative area
+ve = 1/2 x (146.12)(3.39)
= 247.67 ≈ 247
-ve = [1/2 x (- 142.71 + -40.74)(2.67)
+[1/2 x (-0.02 x 3.39)
= -246.91 + -0.03
= -246.94 ≈ -247
247-247 = 0
Area of Trapezium at (+) area
= (145.06 + 83.28) x 3.1/2
=353.93 ≈ 353
Area of Trapezium at ( - ) area
= (-59.43 – 160.77) x 3.21/2
= -353.43 ≈ 353
Area of ( + ) area + Area of ( - ) area
= 353-353
=0
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 36
Beam H-I/6 (First Floor | Secondary Beam)
Dead Load:
○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2
= 5.7kN/m
○3 Slab (I-N/3-5) = 3.6kN/m2 x (3.7m/2)
= 6.66kN/m
○4 Slab (I-L/5-7) = 3.6kN/m2 x (5.8m/2)
= 10.44kN/m
Total Dead Load
Total Dead Load = 1.44kN/m + 5.7kN/m + 6.66kN/m
+ 10.44kN/m
= 24.24kN/m
Live Load:
○1 Slab (I-N/3-5) = Living Room x (3.7m/2)
= 4.0kN/m2 x (3.7m/2)
= 7.4kN/m
○2 Slab (I-L/5-7) = Bedroom x (5.8m/2)
= 1.5kN/m2 x (5.8m/2)
= 4.35kN/m
Total Live Load
Total Live Load = 7.4kN/m + 4.35kN/m
= 11.75kN/m
○1 Carries self-weight – Dead Load
○2 Sab Dead Load & Live Load
 Slab 1 : Slab I-N/3-5 (One-Way Slab)
 Slab 2 : Slab I-LI/5-7 (Two-Way Slab)
○3 Brick Wall – Dead Load
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 37
Ultimate Load
Apply factor 1.4 and 1.6 to dead load and live load respectively.
Ultimate Load for (H-I/6) = Total Dead Load (1.4) + Total Live Load (1.6)
= 24.24kN/m (1.4) + 11.75kN/m (1.6)
= 33.94kN/m + 18.8kN/m
= 52.74kN/m
Ultimate Load Diagram
Total load = 5.8m x 52.74kN/m
= 305.89kN
Reactions (UDL):
Reactions = (5.8 x 52.74)/2
= 152.95kN
Load Diagram
Shear Force Diagram
221.78kN
0kN 0kN
0kN
-152.95kN
152.95kN
0kN
(+)
(-)
Bending Moment Diagram
Point 1 = 152.95kN
Point 2 = 152.95 – (52.74x 5.8)
= -152.95
Point 3 = -152.95 + 152.95
= 0kN
Area of Triangle
= ½ x 2.9 x 152.95
=221.78
8.2 Joyce Wee
Beam A-B/4 (Ground Floor | Secondary Beam)
Dead Load:
○1 Slab (A-B/ 3-4) = 3.6kN/m2 x (1.91m/2)
= 3.44kN/m
○2 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) 2/3
= 3.72kN/m
○3 Brick wall weight = 3m x 0.1m x 19kN/m3
=5.7kN/m
○4 Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 3.44 + 3.72 + 5.7 + 0.48
= 13.34kN/m
Live Load:
○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2)
= 2.0kN/m2 x (1.91m/2)
= 1.91kN/m
○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)
= 1.5kN/m2 x (3.1m/2)
= 2.33kN/m
Total Live Load:
Total Live Load = 1.91kN/m + 2.33kN/m
=4.24kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 39
Ultimate Load:
Ultimate Load = TDL(1.4) + TLL(1.6)
= 13.34(1.4) + 4.24(1.6)
= 25.46kN/m
Load Diagram for Beam (A-B/4)
Reaction Force:
∑m = 0
(RA x 3.1) – (25.46 x 3.1)(1.55) = 0
RA(3.1) – 122.34 = 0
RA = 122.34/3.1
RA = 39.46kN -----○A
∑fy = 0
RA + RB + (-25.46 x 3.1) = 0 -----○B
Substitute ○A into ○B
39.46 + RB – 78.926 = 0
RB = 78.926 – 39.46
RB = 39.5kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 40
Shear Force Diagram
Point 1 = 39.46kN
Point 2 = 39.46 + (-25.46 x 3.1)
= 39.46 x 78.926
= -39.5K
Point 3 = -39.5 + 39.5
= 0kN
Bending Moment Diagram
Peak = (39.46 x 1.55) x ½
= 30.58
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 41
Beam B-D/5 (Ground Floor | Secondary Beam)
Dead Load:
○1 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) 2/3
= 3.85kN/m
○2 Slab (B-D/5-6) = 3.6kN/m2 X (3.21m/2)2/3
= 3.85kN/m
○3 Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 3.85 + 3.85 + 0.48
= 8.18kN/m
Live Load:
○1 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3
= 1.5kN/m2 x (3.21m/2)2/3
= 1.605kN/m
At Slab (B-D/3-5),
Slab : Stairs = 3.21m : 1.4m
1.605 : α = 3.21 : 1.4
1.605/a = 3.21/1.4
a = 0.7kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 42
○2 Slab (B-D/3-5) = Corridor x (3.21m/2)2/3
= 4.0kN/m2 x (3.21m/2)2/3
= 4.28kN/m
At Slab (B-D/3-5),
Slab : Corridor = 3.21m : 1.81m
4.28 : α = 3.21 : 1.81
4.28/a = 3.21/1.81
a = 2.41kN/m
○3 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3
= 1.5kN/m2 x (3.21m/2)2/3
= 1.605kN/m
At Slab (B-D/3-5),
Slab : Stairs = 3.21m : 1.4m
1.605 : α = 3.21 : 1.4
1.605/a = 3.21/1.4
a = 0.7kN/m
○4 Slab (B-D/3-5) = Corridor x (3.21/2)2/3
= 4.0kN/m2 x (3.21/2)2/3
= 4.28kN/m
At Slab (B-D/3-5),
Slab : Corridor = 3.21m : 1.81m
4.28 : α = 3.21 : 1.81
4.28/a = 3.21/1.81
a = 2.41kN/m
Total Live Load:
Total Live Load at (B-C) = 0.7 + 0.7
= 1.4kN/m
Total Live Load at (C-D) = 2.41 + 2.41
= 4.82kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 43
Ultimate Load:
Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)
= 8.18(1.4) + 1.4(1.6)
= 13.69kN/m
Ultimate Load at (C-D) = TDL(1.4) + TLL(1.6)
= 8.18(1.4) + 4.82(1.6)
= 19.16kN/m
Load Diagram of Beam (B-D/5):
Reaction Forces:
∑m = 0
RB(3.21) – (19.16 x 1.81)(0.91) – (13.69)(2.51) = 0
RB(3.21) – 31.56 – 34.36 = 0
RB = 65.92/3.21
RB = 20.54kN/m -----○A
∑fy = 0
RB+RD-(13.69 X 1.4) – (19.16 X 1.81) = 0 -----○B
Substitute ○A into ○B ,
20.54 + RD – 19.17 – 34.68 = 0
RD = 53.85 - 20.54
RD = 33.31kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 44
Shear Force Diagram:
Point 1 = 20.54
Point 2 = 20.54 – (13.69 x 1.4)
= 1.374
Point 3 = 1.374 – (19.16 x 1.81)
= -33.31
Point 4 = -33.31 + 33.31
= 0
Bending Moment Diagram:
Bending Moment 1
= (20.54 + 1.374)/2 x 1.4
= 15.34
Bending Moment 2
= 15.3398 + (1.374 x 0.3)/2
= 15.55
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 45
Beam B/3-6 (Ground Floor | Primary Beam)
Dead Load:
○1 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) 2/3
= 2.29kN/m
○2 Slab (A-B/4-6) = 3.6kN/m2 x (3.1m/2)
= 5.58kN/m
○3 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2)
= 5.78kN/m
○4 Slab (B-D/5-6) = 3.6kN/m2 x (3.21m/2)
= 5.78kN/m
○5 Brick wall weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○6 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (B/3-4) = 2.29 + 5.78 + 5.7 + 1.44
= 15.21kN/m
Total Dead Load at (B/4-5) = 5.58 + 5.78 + 5.7 + 1.44
= 18.5kN/m
Total Dead Load at (B/5-6) = 5.58 + 5.78 + 5.7 + 1.44
= 18.5kN/m
Live Load:
○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) 2/3
= 2.0kN/m2 x (1.91m/2) 2/3
= 1.27kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 46
○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)
= 1.5kN/m2 x (3.1m/2)
= 2.33kN/m
○3 Slab (B-D/ 3-4) = Stairs x (3.21m/2)
= 1.5kN/m2 x (3.21m/2)
= 2.41kN/m
○4 Slab (D-F/ 5-6) = Stairs x (3.21m/2)
= 1.5kN/m2 x (3.21m/2)
= 2.41kN/m
Total Live Load:
Total Live Load at (B/3-4) = 1.27 + 2.41
= 3.68kN/m
Total Live Load at (B/4-5) = 2.33 + 2.41
= 4.74kN/m
Total Live Load at (B/5-6) = 2.33 + 2.41
= 4.74kN/m
Ultimate Load:
Ultimate Load at (B/3-4) = TDL(1.4) + TLL(1.6)
= 15.21(1.4) + 3.68(1.6)
= 27.18kN/m
Ultimate Load at (B/4-6) = TDL(1.4) + TLL(1.6)
= 18.5(1.4) + 4.74(1.6)
= 33.48kN/m
Load Diagram of Beam (B/3-6):
○1 Referring to Beam (A-B/4), Point Load at B/4 = 39.5kN
○2 Referring to Beam (B-D/5), Point Load at B/5 = 20.76kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 47
Reaction Force:
∑m = 0
RB3(7.09) – (27.18 x 1.91)(6.14) – (39.5)(5.18) – (20.76)(3.39) – (33.48 x 5.18)(2.59) = 0
RB3(7.09) – 318.75 – 204.61 – 70.38 – 449.17 = 0
RB3 = 1042.91/7.09
RB3 = 147.1kN -----○A
∑fy = 0
RB3 + RB6 – 39.5 – 20.76 – 27.18(1.91) – 33.48(5.18) = 0 -----○B
Substitute ○A into ○B ,
147.1 + RB6 – 39.5 – 20.76 – 51.91 – 173.43 = 0
RB6 = 138.5kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 48
Shear Force Diagram:
Point 1 = 147.1
Point 2 = 147.1 – (27.18 x 1.91)
= 95.19
Point 3 = 95.19 – 39.5
= 55.69
Point 4 = 55.69 – (33.48 x 1.79)
= -4.24
Point 5 = -4.24 – 20.76
= -25
Point 6 = -25 – (33.48 x 3.39)
= - 138.5
Bending Moment Diagram:
Bending Point 1
= (147.1 + 95.19)/2 x 1.91
= 231.39
Bending Point 2
= 231.39 + (55.69 x 1.662)/2
= 277.67
Bending Point 3
= 277.67 – (4.24 x 0.128)/2
= 277.4
Bending Point 4
= 277.4 – (25 + 138.5)/2 x 3.39
= 0
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 49
Beam J/1-3 (First Floor | Secondary Beam)
Dead Load at Beam (J-K/2):
○1 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3
= 2.172kN/m
○2 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)
= 2.88kN/m
○3 Brick Wall Load = 3.0m x 0.1m x 19kN/m3
= 5.7kN/m
○4 Beam Self-Weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load at Beam (J-K/2):
Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48
= 11.23kN/m
Live Load:
1 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3
= 2.0kN/m2 x (1.81m/2)2/3
= 1.21kN/m
2 Slab (J-K/2-3) = Bedroom x (1.6m/2)
= 1.5kN/m2 x (1.6m/2)
= 1.2kN/m
Total Live Load at Beam (J-K/2):
Total Live Load = 1.21 + 1.2
= 2.41kN/m
Ultimate Load at Beam (J-K/2):
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 50
Ultimate Load = TDL(1.4) + TLL(1.6)
= 11.23(1.4) + 2.41(1.6)
= 19.58kN/m2
Load Diagram of beam (J-K/2):
Reaction Force
∑m = 0
RJ (1.81) – (19.58 x 1.81)(0.91) = 0
RJ (1.81) – 32.35 = 0
RJ = 32.25/1.81
RJ = 17.82kN -----○A
∑fy = 0
RJ + RK – (19.58) (1.81) = 0 -----○B
Substitute ○A into ○B ,
17.82 + RK – 35.44 = 0
RK = 17.62kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 51
Dead Load at Beam J/1-3
○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)2/3
= 5.03kN/m
○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)
= 3.26kN/m
○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)2/3
= 1.92kN/m
○4 Brick Wall Weight = 3.0m x 0.1m x 19kN/m3
= 5.7kN/m
○5 Beam Self Weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load at Beam (J/1-3):
Total Dead Load at (J/1-2) = 5.03 + 3.26 + 5.7 + 0.48
= 14.47kN/m
Total Dead Load at (J/2-3) = 5.03 + 1.92 + 5.7 + 0.48
= 13.13kN/m
Live Load at Beam J/1-3
○1 Slab (H-J/1-3) = Bedroom x (4,19m/2)2/3
= 1.5kN/m2 x (4.19m/2)2/3
= 2.095kN/m
○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)
= 2.0kN/m2 x (1.81m/2)
= 1.81kN/m
○3 Slab J-K/2-3) = Bedroom x 1.6m/2)2/3
= 1.5kN/m2 x 1.6m/2)2/3
= 0.8kN/m
Total Live Load at Beam J/1-3:
Total Live Load at (J/1-2) = 2.095 + 1.81
= 3.905kN/m
Total Live Load at (J/2-3) = 2.095 + 0.8
= 2.895kN/m
Ultimate Load at Beam J/1-3
Ultimate Load at (J/1-2) = TDL (1.4) + TLL (1.6)
=14.47(1.4) + 3.905(1.6)
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 52
= 26.51kN/m
Ultimate Load at (J/2-3) = TDL (1.4) + TLL (1.6)
= 13.13(1.4) + 2.9(1.6)
= 23.02kN/m
Load Diagram of Beam (J/1-3):
○1 Referring to Beam (J-K/2), Point Load at J/2 = 17.82kN
∑m = 0
RJ1(4.19) – (23.02 x 1.6) (0.8) – (17.82) (1.6) – (26.51 x 2.59) (2.9) = 0
RJ1(4.19) – 29.47 – 28.512 – 199.12 = 0
RJ1 = 257.1/4.19
RJ1 = 61.36kN -----○A
∑fy = 0
RJ1 + RJ2 – 17.82 – (26.51 x 2.59) – (23.02 x 1.6) = 0 -----○B
Substitute ○A into ○B ,
61.36 + RJ2 – 17.82 – 68.66 – 36.83 = 0
RJ2 = 61.95kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 53
Shear Force Diagram
Point 1 = 61.36
Point 2 = 61.36 – (26.51 x 2.59)
= -7.3
Point 3 = -7.3 – 17.82
= -25.12
Point 4 = -25.12 – (23.02 x 1.6)
= -61.95
Point 5 = -61.95 + 61.95
Bending Moment Diagram
Bending Point 1
= (61.36 x 2.3)/2
= 70.56
Bending Point 2
= 70.56 – (7.3 x 0.29)/2
= 69.5
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 54
Beam H-K/1 (First Floor | Primary Beam)
Dead Load:
○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)
= 7.542kN/m
○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3
= 2.17kN/m
○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (H-J) = 7.542 + 5.7 + 1.44
= 14.68kN/m
Total Dead Load at (J-K) = 2.17 + 5.7 + 1.44
= 9.31kN/m
Live Load:
○1 Slab (H-J/1-3) = Bedroom x (4.19m/2)
= 1.5kN/m2 x (4.19m/2)
= 3.14kN/m
○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3
= 2.0kN/m2 x (1.81/2)2/3
= 1.21kN/m
Total Live Load:
Total Live Load at (H-J) = 3.14kN/m
Total Live Load at (J-K) = 1.21kN/m
Ultimate Load:
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 55
Ultimate Load at (H-J) = TDL (1.4) + TLL (1.6)
=14.68(1.4) + 3.14(1.6)
= 25.57kN/m
Ultimate Load at (J-K) = TDL (1.4) + TLL (1.6)
= 9.31(1.4) + 1.21(1.6)
= 14.97kN/m
Load Diagram of Beam (H-K/1):
○1 Referring to Beam (J/1-3), Point Load at J/1 = 61.36kN
∑m = 0
RH (6.3) – (25.57 X 4.49) (4.06) – (61.36) (1.81) – (14.97 X 1.81) (0.91) = 0
RH (6.3) – 466.13 – 111.06 – 24.66 = 0
RH = 601.85/6.3
RH = 95.53kN/m -----○A
∑fy = 0
RH + RK – 61.36 – (25.57 X 4.49) – (14.97 X 1.81) = 0 -----○B
Substitute ○A into ○B ,
95.53 + RK – 61.36 – 114.81 – 27.1 = 0
RK = 107.34kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 56
Shear Force Diagram
Point 1 = 95.53
Point 2 = 95.53 – (25.57 x 4.49)
= -19.28
Point 3 = -19.28 – 61.36
= -80.64
Point 4 = -80.64 – (14.97 x 1.81)
= -107.34
Point 5 = -107.34 + 107.34
= 0
Bending Moment Diagram
Bending Point 1
= (95.53 x 3.73)/2
= 178.163
Bending Point 2
= 178.163 - (19.28 x 0.76)/2
= 170.837
Bending Point 3
= 170.837 – (80.64 + 107.34)/2 x 1.81
= 0
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 57
Beam I-K/3 (First Floor | Primary Beam)
Dead Load
○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.49m/2)
= 7.54kN/m
○2 Slab (I-N/3-5) = 3.6kN/m2 x (4.71/2)
= 8.48kN/m
○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6/2)
= 2.88kN/m
○4 Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○5 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (I-J) = 7.54 + 8.48 + 5.7 + 1.44
= 23.16kN/m
Total Dead Load at (J-K) = 18.5kN/m
Live Load:
○1 Slab (H-J/1-3) = Bedroom x (4.49m/2)
= 1.5kN/m2 x (4.49m/2)
= 3.37kN/m
○2 Slab (I-N/3-5) = Living Room x (4.71m/2)
= 4.0kN/m2 x (4.71m/2)
= 9.4kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 58
○3 Slab (J-K/2-3) = Bedroom x (1.6m/2)
= 1.5kN/m2 x(1.6m/2)
= 1.2kN/m
Total Live Load:
Total Live Load at (I-J) = 3.37 + 9.4
= 12.77kN/m
Total Live Load at (J-K) = 9.4 + 1.2
= 10.6kN/m
Ultimate Load:
Ultimate Load at (I-J) = TDL (1.4) + TLL (1.6)
= 23.16(1.4) + 12.77(1.6)
= 52.85kN/m
Ultimate Load at (J-K) = TDL(1.4) + TLL(1.6)
= 18.5(1.4) + 10.6(1.6)
= 42.86kN/m
Load Diagram of Beam (I-K/3):
○1 Referring to Beam (J/1-3), Point Load at J/3 = 61.95kN/m
∑m = 0
RI(3.21) – (52.85 x 1.4) (2.51) – (61.95) (1.81) – (42.86 x 1.81) (0.91) = 0
RI(3.21) – 185.71 – 112.13 – 70.59 = 0
RI = 368.43/3.21
RI = 114.76kN -----○A
∑fy = 0
RI + RK – 61.95 – (52.85 X 1.4) – (42.86 X 1.81) = 0 -----○B
Substitute ○A into ○B ,
114.76 + RK – 61.95 – 73.99 – 77.58 = 0
RK = 98.76kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 59
Shear Force Diagram:
Point 1 = 114.76
Point 2 = 114.76 – (52.85 x 1.4)
=40.77
Point 3 = 40.77 – 61.95
= - 21.18
Point 4 = -21.18 – (42.86 x 1.81)
= -98.76
Point 5 = -98.76 + 98.76
= 0
Bending Moment Diagram
Bending Point 1
= (114.76 + 40.77)/2 x 1.4
= 108.87
Bending Point 2
= 108.87 - (21.18 + 98.76)/2 x 1.81
= 0
1.4 3.21
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 60
8.3 Tan Wing Hoe
Beam A-B/4 (Ground Floor | Secondary Beam)
Dead Load:
1. Slab (C-D/ 1-2) = 3.6kN/m2 x (1.81m/2) x 2/3
= 2.17kN/m
2. Slab (C-D/ 2-3) = 3.6kN/m2 x (1.6m/2)
= 2.88kN/m
3. Brick wall weight = 3m x 0.1m x 19kN/m3
=5.7kN/m
4. Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48
= 11.23kN/m
Live Load:
○1 Slab (C-D/ 1-2) = Bathroom x (1.81m/2)
= 2.0kN/m2 x (1.81m/2)
= 1.21kN/m
○2 Slab (C-D/ 2-3) = Bedroom x (1.6m/2)
= 1.5kN/m2 x (1.6m/2)
= 1.2kN/m
Total Live Load:
Total Live Load = 1.21kN/m + 1.2kN/m
=2.41kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 61
Ultimate Load:
Ultimate Load = TDL(1.4) + TLL(1.6)
= 11.23(1.4) + 2.41(1.6)
= 19.58kN/m
Load Diagram for Beam (C-D/2)
Reaction Force:
∑m = 0
(RA x 1.81) – (19.58 x 1.81)(0.91) = 0
RA(1.81) – 32.25 = 0
RA = 32.25/1.81
RA = 17.82kN -----○A
∑fy = 0
RA + RB + (-19.58 x 1.81) = 0 -----○B
Substitute ○A into ○B
17.82 + RB – 35.44 = 0
RB = 35.44-17.82
RB = 17.62kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 62
Shear Force Diagram
Point 1 = 17.82
Point 2 = 17.82 -(19.58 x 1.81)
= 17.82 - 35.68
= -17.62
Point 3 = -17.62+17.62
= 0kN
Bending Moment Diagram
Peak = (17.82 x 1.55) x ½
= 13.81
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 63
Beam (F/3-5) (Ground Floor | Secondary Beam)
Dead Load:
1. Slab (D-F/3-5) = 3.6kN/m2 x (3.7m/2) 2/3
= 4.44kN/m
2. Slab (F-G/3-5) = 3.6kN/m2 X (3.55m/2)
= 6.39kN/m
3. Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 4.44 + 6.39 + 0.48
= 11.31kN/m
Live Load:
1. Slab (D-F/3-5) = KTICHEN x (3.55m/2)
= 3kN/m2 x (3.55m/2)
= 5.33kN/m
2. Slab (D-F/3-5) = KTICHEN x (3.7m/2) x 2/3
= 3kN/m2 x (3.7m/2) x 2/3
= 3.7kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 64
Total Live Load:
= Slab (D-F/3-5) + Slab (D-F/3-5)
=(5.33+3.7) kN/m
=9.03kN/m
Ultimate Load:
Ultimate Load = TDL(1.4) + TLL(1.6)
= 11.31(1.4) + 9.03(1.6)
= 30.28kN/m
Load Diagram of Beam (B-D/5):
Reaction Forces:
∑m = 0
RB(3.7) – (30.28 x 3.7)(1.85) = 0
RB(3.7) – 207.27 = 0
RB = 207.27/3.7
RB = 56.02kN/m -----1
∑fy = 0
RB+RA-(30.28 X 3.7) = 0 -----2
Substitute 1 into2,
56.02+ RA –(30.28 x 3.7) = 0
- RA = 56.45-112.04
RA = 56.02kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 65
Shear Force Diagram
Point 1 = 56.02
Point 2 = 56.02 -(30.28x 3.7)
= 56.02 - 111.93
= 55.91
Point 3 = 56.02-55.91
= 0.11kN
Bending Moment Diagram
Peak = (56.02x 1.55) x ½
= 43.42
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 66
Beam D-E/5 (Ground Floor | Secondary Beam)
Dead Load:
1. Slab (D-E/3-5) = 3.6kN/m2 x (3.7m/2)
= 6.66kN/m
2. Slab (D-E/5-6) = 3.6kN/m2 x (2.59m/2) x 2/3
= 3.11kN/m
3. Brick wall weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
4. Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load =(6.66+3.11+5.7+0.48)kN/m
=15.95Kn/M
Live Load:
○1 Slab (D-E/3-5) = Kitchen x (3.7m/2)
= 3.0kN/m2 x (3.7m/2)
= 5.55kN/m
○2 Slab (D-E/5-6) = Store x (2.59m/2) x 2/3
= 2.5kN/m2 x (2.59m/2) x 2/3
= 2.16kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 67
Total Live Load:
Total Live Load = Slab (D-E/3-5) + Slab (D-E/5-6)
=(5.55+2.16)Kn/m
=7.71 Kn/M
Ultimate Load:
Ultimate Load = TDL(1.4) + TLL(1.6)
=15.95(1.4)+7.71(1.6)
=34.67 Kn/M
Load Diagram of Beam (D/4-5):
Reaction Force:
∑m = 0
RB(2.59) – (34.67 x 2.59)(1.3) = 0
RB(2.59) –116.73 = 0
RB = 116.73/2.59
RB = 45.06kN -----1
∑fy = 0
RB + RA –(34.67 x 2.59) = 0 -----2
Substitute 1 into2,
45.06 + RA –89.80 = 0
RA = 44.74kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 68
Shear Force Diagram
Point 1 = 44.74
Point 2 = 44.74 -(34.63 x 2.59)
= 44.74 - 89.69
= -44.95
Point 3 = -44.95+45.06
= 0.11kN
Bending Moment Diagram
Peak = (44.74 x 1.55) x ½
= 34.67kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 69
Beam D/1-3 (Ground Floor | Primary Beam)
Dead Load:
1. Slab (C-D/1-2) = 3.6kN/m2 x (1.81m/2)
= 3.26kN/m
2. Slab (C-D/2-3) = 3.6kN/m2 x (1.6m/2)2/3
= 1.92kN/m
3. Slab (D-F/1-2) = 3.6kN/m2 x (4.11M/2)
= 7.4kN/m
○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (D/1-2) = (3.26 + 7.4 +1.44+5.7)Kn/M
A-B = 17.8kN/m
Total Dead Load at (D/2-3) = (1.92 + 7.4 + 5.7 + 1.44) kN/m
B-C = 16.48kN/m
Live Load:
1.Slab (C-D/1-2) = Bathroom x (1.81m/2)
= 2kN/m2 x (1.81m/2)
= 1.81kN/m
2. Slab (C-D/2-3) = Bedroom x (1.6m/2)2/3
= 1.5kN/m2 x (1.6/2)2/3
= 0.8kN/m
○2 Slab (C-D/2-3) = Dining x (4.11m/2)
= 2.0kN/m2 x (4.11/2)
=4.11kN/m
Total Live Load:
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 70
Total Live Load at (D/1-2)= 5.98kN/m
Total Live Load at (D/2-3)= 4.91kN/m
Ultimate Load:
Ultimate Load at (D/1-2)= TDL (1.4) + TLL (1.6)
=17.8(1.4) + 5.92(1.6)
= 34.39kN/m
Ultimate Load at (D/2-3)= TDL (1.4) + TLL (1.6)
= 16.481(1.4) + 4.91(1.6)
= 30.93kN/m
Load Diagram of Beam (D/1-3):
○1 Referring to Beam (C-D/ 2), Point Load at D1 =17.62 kN
∑m = 0
RC (4.19) – (30.93 X 1.6) (3.39) – (17.62) (2.59) – (34.39 x 2.59) (1.3) = 0
RC (4.19) – 167.76 – 45.64– 115.79 = 0
RC = 329.16/64.19
RC = 78.56kN/m -----1
∑fy = 0
RC + RA – 17.62 – (34.39 X 2.59) – (30.93 X 1.6) = 0 -----2
Substitute 1 into 2,
78.56 + RA – 17.62 – 89.07 – 49.49 = 0
RA = 77.62kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 71
Shear Force Diagram
Point 1 = 77.62
Point 2 = 77.62-(34.39 x 2.59)
= 77.62 - 89.07
= -11.45
Point 3 =-11.45-17.62
= -29.07
Point 4 = -29.07 - (30.93 x 1.6)
= -79.19
Point 5 = -79.19+78.56
=-0.63kN
Bending Moment Diagram
Peak = (44.74 x 1.55) x ½
= 34.67kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 72
d
Beam E-G/5 (Ground Floor | Primary Beam)
Dead Load
1. Slab (E-G/5-7) = 3.6kN/m2 x (5.08m/2) x 2/3
= 6.10kN/m
2. Slab (E-G/3-5) = 3.6kN/m2 x (3.55/2) x 2/3
= 4.26kN/m
3. Slab (D-F/3-5)= 3.6kN/m2 x (3.7/2)
= 6.66kN/m
Load involved area =6.66Kn/m x 1.52/2.59
=3.91 kN/m
4. Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
5. Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (A-B) = 6.10 + 6.66 +3.91+ 5.7 + 1.44
= 17.15kN/m
Total Dead Load at (B-C) = 6.1+4.26+5.7+1.44
=17.5 Kn/M
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 73
Live Load:
○1 Slab (E-G/5-7) = PORCH x (5.08m/2) x 2/3
= 2.0kN/m2 x (5.08m/2) x 2/3
= 3.38kN/m
○2 Slab (F-G/3-5) = KITCHEN x (3.55/2) x 2/3
= 3.0kN/m2 x (3.55/2) x 2/3
= 3.54kN/m
○3 Slab (D-F/3-5) = KITCHEN x (3.7m/2)
= 3.0kN/m2 x(3.7m/2)
= 3.26kN/m
Total Live Load:
Total Live Load at (A-B) = 6.64kN/m
Total Live Load at (B-C) = 6.92kN/m
Ultimate Load:
Ultimate Load at (A-B) = TDL (1.4) + TLL (1.6)
= 17.15(1.4) + 6.64(1.6)
= 34.63kN/m
Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)
= 17.5(1.4) + 6.92(1.6)
= 35.57kN/m
Load Diagram of Beam (E-G/5):
1. Referring to Beam (F/3-5), Point Load at D/5 = 56.02kN/m
∑m = 0
RC(5.08) – (35.57 x 3.55) (3.29) – (56.02) (1.52) – (34.63 x 1.52) (0.76) = 0
RC(5.08) – 415.44 – 85.15 – 40 = 0
RC = 540.59/5.08
RC = 106.42kN -----1
∑fy = 0
RC + RA – 56.02 – (34.63 X 1.52) – (35.57 X 3.55) = 0 -----2
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 74
Substitute 1 into 2,
106.42 + RA – 56.02 – 52.64 – 126.27 = 0
RA = 128.51kN
Shear Force Diagram
Point 1 =128.51 - 34.63(1.52)
=128.51 - 52.64
= 75.87
Point 2 = 75.87 - 56.02
= 19.85
Point 3 = 19.85 - 35.57(3.55)
= 19.85 -126.27
= -106.42
Point 4 =-106.42+106.42
=0kN
Bending Moment Diagram
Peak = (44.74 x 1.55) x ½
= 34.67kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 75
Beam D/3-6 (Ground Floor | Primary Beam)
Dead Load
1. Slab (B-C/5-6) = 3.6kN/m2 x (3.21m/2)
= 5.78kN/m
2. Slab (D-E/5-6) = 3.6kN/m2 x (2.59/2)
= 4.66kN/m
3. Slab (B-D/3-5) = 3.6kN/m2 x (3.21/2)
= 5.78kN/m
4. Slab (D-F/3-5) = 3.6kN/m2 x (3.7/2) x 2/3
= 4.44kN/m
Load involved area =6.66Kn/m x 1.52/2.59
=3.91 kN/m
5. Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
6. Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (A-B) = 5.78 + 4.44 + 1.44
= 11.66kN/m
Total Dead Load at (B-C) = 5.78+4.66+5.7+1.44
=17.58 Kn/M
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 76
Live Load:
1. Slab (B-C/5-6) = Corridor x (3.21/2)
= 4.0kN/m2 x (3.21/2)
= 6.42kN/m
2. Slab (D-E/5-6) = Store x (2.59/2)
= 2.5kN/m2 x (2.59/2)
= 3.24kN/m
3. Slab (B-D/3-5) = Corridor x (3.21/2)
= 4.0kN/m2 x (3.21/2)
= 6.42kN/m
4. Slab (D-F/3-5) = Kitchen x (3.7/2) x 2/3
= 3.0kN/m2 x(3.7/2) x 2/3
= 3.7kN/m
Total Live Load:
Total Live Load at (A-B) = 6.94kN/m
Total Live Load at (B-C) = 9.66kN/m
Ultimate Load:
Ultimate Load at (A-B) = TDL (1.4) + TLL (1.6)
= 11.66(1.4) + 6.94(1.6)
= 27.43kN/m
Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)
= 17.58(1.4) + 9.66(1.6)
= 40.07kN/m
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 77
Load Diagram of Beam (D/3-6):
1. Referring to Beam (D-E/5), Point Load at B = 14.60kN/m
2. Referring to Beam (B-D/5), Point Load at B = 33.31kN/m
∑m = 0
Rc(7.09) – (40.07 x 3.39) (4.08) – (14.60 x 2.59) - (33.31 x 3.21) - (27.48 x 3.7)(1.85)= 0
Rc(7.09) – 554.22 – 37.81 - 106.93– 188.10 = 0
Rc = 887.06/7.09
Rc = 125.11kN -----1
∑fy = 0
Rc + Ra – 14.60 - 33.31– (27.48 X 3.7) – (40.12 X 3.39) = 0 -----2
Substitute 1 into 2,
125.11+ Ra – 101.68 – 14.60 - 33.31 – 136 = 0
Ra = 160.48kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 78
Shear Force Diagram
Point 1 = 160.48- 27.43(3.7)
= 58.99
Point 2 = 58.99-47.91
= 11.08
Point 3 =11.08 - 40.07(3.39)
= - 124.76
Point 4 = -124.76 + 125.11
Point 5 = 0.35
Bending Moment Diagram
Peak = (44.74 x 1.55) x ½
= 34.67kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 79
10.0 Column Analysis Report
9.1 Canisius Bong
Column A/3 (Connected to All Floors)
-Roof Level-
Dead Load:
○1 Roof Slab = (3.05 x 1.55) m2 x 3.6kN/m2
= 4.73m2 x 3.6kN/m2
= 17.03kN
○2 Roof Beam = (0.96 + 2.09 + 1.55) m x 1.44kN/m
= 4.60m x 1.44kN/m
= 6.62kN
Total Dead Load at Roof Level
= 17.03N + 6.62kN
= 23.65kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (3.05 x 1.55) m2 x 3.6kN/m2
○1 Bedroom
= 4.73m2 x 3.6kN/m2 = (2.09m x 1.55m) x 1.5kN/m2
= 17.03kN = 4.86kN
○2 Wall = (0.96m + 2.09m + 1.55m) x 5.7kN/m ○2 Toilet
= 4.60m x 5.7kN/m = (0.96m x 1.55m) x 2.0kN/m2
= 26.22kN = 2.98kN
○3 Beam = (0.96m + 2.09m + 1.55m) x 1.44kN/m
= 4.60m x 1.44kN/m
= 6.62kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 17.03kN + 26.22kN + 6.62kN + 6.48kN = 4.86kN + 2.98kN
= 56.35kN = 7.84kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 80
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (3.05 x 1.55) m2 x 3.6kN/m2
○1 Bedroom
= 4.73m2 x 3.6kN/m2 = (2.09m x 1.55m) x 1.5kN/m2
= 17.03kN = 4.86kN
○2 Wall = (0.96m + 2.09m + 1.55m) x 5.7kN/m ○2 Toilet
= 4.60m x 5.7kN/m = (0.96m x 1.55m) x 2.0kN/m2
= 26.22kN = 2.98kN
○3 Beam = (0.96m + 2.09m + 1.55m) x 1.44kN/m
= 4.60m x 1.44kN/m
= 6.62kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 17.03kN + 26.22kN + 6.62kN + 6.48kN = 4.86kN + 2.98kN
= 56.35kN = 7.84kN
Total Dead Load at Column A/3 Total Live Load at Column A/3
= 23.65kN + 56.35kN + 56.35kN = 7.84kN + 7.84kN
= 136.35kN = 15.68kN
Ultimate Load at Column A/3
= TDL (1.4) + TLL (1.6)
= 136.35kN (1.4) + 15.68kN (1.6)
= 190.89kN + 25.09kN
= 215.98kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 81
Column E/5 (Connected to All Floors)
-Roof Level-
Dead Load:
○1 Roof Slab = (2.06 x 3.55) m2 x 3.6kN/m2
= 7.31m2 x 3.6kN/m2
= 26.32kN
○2 Roof Beam = (1.3 + 1.7 + 0.76) m x 1.44kN/m
= 3.76m x 1.44kN/m
= 5.41kN
Total Dead Load at Roof Level
= 26.32kN + 5.41kN
= 31.73kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (2.06 x 3.55) m2 x 3.6kN/m2
○1 Living Room
= 7.31m2 x 3.6kN/m2 = (1.85m x 2.06m) x 4.0kN/m2
= 26.32kN = 15.24kN
○2 Wall = (1.3m + 1.7m + 0.76m) x 5.7kN/m ○2 Bedrrom
= 3.76m x 5.7kN/m = (1.3m x 1.7m) x 1.5kN/m2
= 21.43kN = 3.32kN
○3 Beam = (1.3m + 1.7m + 0.76m) x 1.44kN/m ○3 Bedroom
= 3.76m x 1.44kN/m = (0.76m x 1.7m) x 1.5kN/m2
= 5.41kN = 1.94kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 26.32kN + 21.43kN + 5.41kN + 6.48kN = 15.24kN + 3.32kN + 1.94kN
= 59.64KN = 20.5kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 82
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (2.06 x 3.55) m2 x 3.6kN/m2
○1 Dining Room
= 7.31m2 x 3.6kN/m2 = (1.85m x 2.06m) x 2.0kN/m2
= 26.32kN = 7.62kN
○2 Wall = (1.3m + 1.7m + 0.76m) x 5.7kN/m ○2 Family Area
= 3.76m x 5.7kN/m = (1.3m x 1.7m) x 2.0kN/m2
= 21.43kN = 4.42kN
○3 Beam = (1.3m + 1.7m + 0.76m) x 1.44kN/m ○3 Car Porch
= 3.76m x 1.44kN/m = (0.76m x 1.7m) x 2.0kN/m2
= 5.41kN = 2.58kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 26.32kN + 21.43kN + 5.41kN + 6.48kN = 7.62kN + 4.42kN + 2.58kN
= 59.64kN = 14.62kN
Total Dead Load at Column E/5 Total Live Load at Column E/5
= 31.73kN + 59.64kN + 59.64kN = 14.62kN + 20.5kN
= 151.01kN = 35.12kN
Ultimate Load at Column E/5
= TDL (1.4) + TLL (1.6)
= 151.01kN (1.4) + 35.12kN (1.6)
= 211.41kN + 56.19kN
= 267.6kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 83
Column E/7 (Connected to All Floors)
-Roof Level-
Dead Load:
○1 Roof Slab = (2.06 x 3.31) m2 x 3.6kN/m2
= 6.82m2 x 3.6kN/m2
= 24.55kN
○2 Roof Beam = (1.3 + 1.34 + 0.76 + 1.97) m x 1.44kN/m
= 5.37m x 1.44kN/m
=3.41kN
Total Dead Load at Roof Level
= 24.55kN + 3.41kN
= 27.96kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (3.83 x 3) m2 x 3.6kN/m2
○1 Bedrrom
= 11.49m2 x 3.6kN/m2 = (1.3m x 3m) x 1.5kN/m2
= 41.36kN = 5.85kN
○2 Wall = (1.3m + 2.53m + 3m) x 5.7kN/m ○2 Bedroom
= 6.83m x 5.7kN/m = (2.53m x 3m) x 1.5kN/m2
= 38.93kN = 11.39kN
○3 Beam = (1.3m + 2.53m + 3m) x 1.44kN/m
= 6.83m x 1.44kN/m
= 9.84kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 41.36kN + 38.93kN + 9.84kN + 6.48kN = 5.85kN + 11.39kN
= 96.61kN = 17.24kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 84
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (2.06 x 3.31) m2 x 3.6kN/m2
○1 Living Area
= 6.82m2 x 3.6kN/m2 = (1.3m x 1.34m) x 4.0kN/m2
= 24.55kN = 6.97kN
○2 Wall = (1.3m + 1.34m + 0.76m + 1.97m) x 5.7kN/m ○2 Living Area
= 5.37m x 5.7kN/m = (1.3m x 1.97m) x 4.0kN/m2
= 30.61kN = 10.24kN
○3 Beam = (1.3m + 1.3m + 0.76m + 1.97m) x 1.44kN/m ○3 Car Porch
= 5.37m x 1.44kN/m = (0.76m x 1.34m) x 2.0kN/m2
= 7.73kN = 2.04kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
○4 Car Porch
= 6.48kN = (0.76m x 1.97m) x 2.0kN/m2
= 2.99kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 24.55kN + 30.61kN + 5.37kN + 6.48kN = 6.97kN + 10.24kN + 2.04kN + 2.99kN
= 67.01kN = 22.24kN
Total Dead Load at Column E/7 Total Live Load at Column E/7
= 27.96kN + 96.61kN + 67.01kN = 17.24kN + 22.24kN
= 191.58kN = 39.48kN
Ultimate Load at Column E/7
= TDL (1.4) + TLL (1.6)
= 191.58kN (1.4) + 39.48N (1.6)
= 268.21kN + 63.17kN
= 331.38N
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 85
9.2 Joyce Wee
Column A/1 (Connected to All Floors)
-Roof Level-
Dead Load:
○1 Roof Slab = (3.155 x 2.09) m2 x 3.6kN/m2
= 6.59m2 x 3.6kN/m2
= 23.72kN
○2 Roof Beam = (3.155 + 2.09) m x 1.44kN/m
= 5.245m x 1.44kN/m
= 7.55kN
Total Dead Load at Roof Level
= 23.72kN + 7.55kN
= 31.27kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (3.155 x 2.09)m2 x 3.6kN/m2
○1 Bedroom
= 6.59m2 x 3.6kN/m2 = (2.09m x 3.155m) x 1.5kN/m2
= 23.72kN = 9.89kN
○2 Wall = (3.155m + 2.09m) x 5.7kN/m
= 5.245m x 5.7kN/m
= 29.9kN
○3 Beam = (3.155m + 2.09m) x 1.44kN/m
= 5.75m x 1.44kN/m
= 7.55kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN
= 67.65kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 86
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (3.155 + 2.09) m2 x 3.6kN/m2
○1 Bedroom
= 6.59m2 x 3.6kN/m2 = (3.155m x 2.09m) x 1.5kN/m2
= 23.72kN = 9.89kN
○2 Wall = (3.155m + 2.09m) x 5.7kN/m
= 5.245m x 5.7kN/m
= 29.9kN
○3 Beam = (3.155 + 2.09) m x 1.44kN/m
= 5.245m x 1.44kN/m
= 7.55kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN
= 67.65kN
Total Dead Load at Column A/1 Total Live Load at Column A/1
= 31.27kN + 67.65kN + 67.65kN = 9.89kN + 9.89kN
= 166.57kN = 19.78kN
Ultimate Load at Column A/1
= TDL (1.4) + TLL (1.6)
= 166.57kN (1.4) + 19.78kN (1.6)
= 233.198kN + 31.648kN
= 264.85kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 87
Column D/3 (Connected to All Floors)
-Roof Level-
Dead Load: Live Load:
○1 Roof Slab = (3.66 x 3.94) m2 x 3.6kN/m2
= 14.42m2 x 3.6kN/m2
= 51.91kN
○2 Roof Beam = (2.09 + 1.61 + 2.05) m x 1.44kN/m
= 5.75m x 1.44kN/m
= 8.28kN
Total Dead Load at Roof Level
= 51.91kN + 8.28kN
= 60.19kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (3.36m2 + 2.98m2 + 3.79m2) x 3.6kN/m2
○1 Bedroom
= 10.13m2 x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2
= 36.468kN = 5.05kN
○2 Wall = (2.09m + 1.61m) x 5.7kN/m ○2 Corridor
= 3.7m x 5.7kN/m = (3.66m x 1.85m) x 4.0kN/m2
= 21.09kN = 27.08kN
○3 Beam = (2.09m + 1.61m + 2.05m) x 1.44kN/m
= 5.75m x 1.44kN/m
= 8.28kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 36.47kN + 21.09kN + 8.28kN + 6.48kN = 5.05kN + 27.08kN
= 72.32kN = 32.13kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 88
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (1.61 + 2.05)m x (2.09 + 1.85)m x 3.6kN/m2
○1 Bedroom
= (3.66m x 3.94m) x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2
= 51.91kN = 5.05kN
○2 Wall = (2.05m + 2.09m + 1.61m) x 5.7kN/m ○2 Corridor
= 5.75m x 5.7kN/m = (1.85m x 1.61m) x 4.0kN/m2
= 32.78kN = 11.91kN
○3 Beam = (2.05 + 2.09 + 1.61 + 1.85) m x 1.44kN/m ○3 Kitchen
= 7.6m x 1.44kN/m = (3.94m x 2.05m) x 3.0kN/m2
= 10.944kN = 24.231kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 51.91kN + 32.78kN + 10.944kN + 6.48kN = 5.05kN + 11.91kN + 24.23kN
= 234.62kN = 41.19kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 60.19kN + 72.32kN + 102.11kN = 32.13kN + 41.19kN
= 234.62kN = 73.32kN
Ultimate Load at Column D/3
= TDL (1.4) + TLL (1.6)
= 234.62kN (1.4) + 73.32kN (1.6)
= 328.47kN + 117.312kN
= 445.78kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 89
Column D/6 (Acting on Ground Floor Only)
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (1.7 + 1.34)m (1.61 + 3.83)m x 3.6kN/m2
○1 Corridor
= (3.04m x 5.444m) x 3.6kN/m2 = (1.61m x 1.7) x 4.0kN/m2
= 59.54kN = 10.95kN
○2 Wall = (1.7m + 3.83m) x 5.7kN/m ○2 Living Room
= 5.53m x 5.7kN/m = (1.61m + 3.83m) x 1.34m x 4.0kN/m2
= 31.52kN = 29.16kN
○3 Beam = (1.7 + 3.83 + 1.34 + 1.61) m x 1.44kN/m ○3 Storeroom
= 8.48m x 1.44kN/m = (1.7m x 3.83m) x 2.5kN/m2
= 12.214kN = 16.28kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 51.54kN + 31.52kN + 12.21kN + 6.48kN = 10.95kN + 29.16kN + 16.28kN
= 109.75kN = 56.39kN
Total Dead Load at Column D/6 Total Live Load at Column D/6
= 109.75kN = 56.39kN
Ultimate Load at Column D/6
= TDL (1.4) + TLL (1.6)
= 109.75kN (1.4) + 56.39kN (1.6)
= 153.65kN + 90.22kN
= 243.87kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 90
9.3 Tan Wing Hoe
Column B/3 (Connected to All Floors)
-Roof Level-
Dead Load:
○1 Roof Slab = (2.95 x 3.505) m2 x 3.6kN/m2
= 37.22 kN
○2 Roof Beam = (2.95 + 3.505) m x 1.44kN/m
= 14.89 kN
Total Dead Load at Roof Level
= 37.22kN + 14.89kN
= 52.11kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (2.95 x 3.505)m2 x 3.6kN/m2
○1 Bedroom
= 10.16m2 x 3.6kN/m2 = (2.95 x 3.505m) x 1.5kN/m2
= 36.58kN = 15.51kN
○2 Wall = (2.95 + 1.55 + 1.91m) x 5.7kN/m ○2 Bathroom
= 6.41m x 5.7kN/m =(1.91 x 1.55)m x2.0kN/m2
= 36.54kN =5.92kn
○3 Beam = (3.155m + 2.09m) x 1.44kN/m ○3 Stairs
= (2.95 + 3.505) m x 1.44kN/m =(1.4 x 1.91) x 1.5kN/m2
= 14.89 kN =4.01
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 36.58kN + 36.54kN + 14.89kN + 6.48kN = 15.51kN + 5.92kN + 4.01kN
= 94.49kN =25.44 kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 91
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (2.95 x 3.505)m2 x 3.6kN/m2
○1 Bedroom
= 10.16m2 x 3.6kN/m2 = (2.95 x 3.505m) x 1.5kN/m2
= 36.58kN = 15.51kN
○2 Wall = (2.95 + 1.55 + 1.91m) x 5.7kN/m ○2 Bathroom
= 6.41m x 5.7kN/m =(1.91 x 1.55)m x2.0kN/m2
= 36.54kN =5.92kn
○3 Beam = (3.155m + 2.09m) x 1.44kN/m ○3 Stairs
= (2.95 + 3.505) m x 1.44kN/m =(1.4 x 1.91) x 1.5kN/m2
= 14.89 kN =4.01
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 36.58kN + 36.54kN + 14.89kN + 6.48kN = 15.51kN + 5.92kN + 4.01kN
= 94.49kN =25.44 kN
Total Dead Load at Column B/3 Total Live Load at Column B/3
= 52.11kN + 94.49kN + 94.49kN = 25.44kN + 25.44kN
= 241.09kN = 50.88kN
Ultimate Load at Column B/3
= TDL (1.4) + TLL (1.6)
= 241.09(1.4) + 50.88kN (1.6)
= 337.53kN + 81.41kN
= 418.94kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 92
Column G/5 (Connected to All Floors)
-Roof Level-
Dead Load: Live Load:
○1 Roof Slab = (2.53 x 3.58) m2 x 3.6kN/m2
= 32.61kN
○2 Roof Beam = (2.53 x 3.58) m x 1.44kN/m
= 13.04kN
Total Dead Load at Roof Level
= 51.91kN + 8.28kN
= 60.19kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (4.03m2 + 4.82m2) x 3.6kN/m2 1.Bedroom
= 31.86kN - (2.97x1.5)m x 3,6kN/m = (2.015 x 1.85m) x 1.5kN/m2
= 30.96kN - 16.04
= 14.92kN = 3.73kN
○2 Wall = (2.53m + 2.015m + 1.85m + 1.79m) x 5.7kN/m 2. Corridor
= 8.19m x 5.7kN/m = (2.53m x 1.85m) x 4.0kN/m2
= 46.69kN = 18.72kN
○3 Beam = (2.53m + 2.015m + 1.85m + 1.79m) x 1.44kN/m 3. Bedroom
= 8.19m x 1.44kN/m =(3.03 x 2.53m) x 1.5kN/m2
= 11.79kN = 11.50kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 14.92kN + 46.69kN + 11.79kN + 6.48kN = 3.73kN + 18.72kN + 11.50kN
= 79.88kN = 33.95kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 93
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (3.49 + 2.53)m x 3.6kN/m2 1. Porch =(2.53 + 1.695)m x 2.0kN/m
= (6.02) x 1.5kN/m2
= 21.67kN = 8.45kN
○2 Wall = (2.53m) x 5.7kN/m 2. Kitchen
= 2.53m x 5.7kN/m = (1.79m x 2.53m) x 3.0kN/m2
= 14.42kN =12.96kN
○3 Beam = (2.53) m x 1.44kN/m
= 2.53m x 1.44kN/m
= 3.64kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 21.67kN + 14.42kN + 3.64kN + 6.48kN = 8.45kN + 12.96kN
= 46.21kN = 21.41kN
Total Dead Load at Column G/5 Total Live Load at Column G/5
= 60.19kN + 79.88kN + 46.21kN = 33.95kN + 21.41kN
= 186.28kN = 55.36kN
Ultimate Load at Column G/5
= TDL (1.4) + TLL (1.6)
= 186.28kN (1.4) + 55.36kN (1.6)
= 260.79kN + 88.58kN
= 349.37kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 94
Column E/8 (Acting on Ground Floor Only)
-Ground Floor-
Dead Load: Live Load:
1. Slab = (1.94 +1.295)m (1.94 + 2.53)m x 3.6kN/m2 1. Porch
= (3.235m x 4.47m) x 3.6kN/m2 = (1.94m x 2.53) x 2.0kN/m2
= 52.06kN = 9.82kN
2. Wall = 1.94 x 5.7kN/m 2. Living Room
= (1.94x 1.295m) x 4.0kN/m2
= 11.06kN = 10.05kN
3. Beam = (1.94 + 1.295 + 2.53) m x 1.44kN/m
= 5.765m x 1.44kN/m
= 8.3kN
4. Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 52.06kN + 11.06kN + 8.3kN + 6.48kN = 10.05kN + 9.82kN
= 77.9kN = 19.87kN
Total Dead Load at Column E/8 Total Live Load at Column E/8
= 77.9kN = 19.87kN
Ultimate Load at Column E/8
= TDL (1.4) + TLL (1.6)
= 77.9kN (1.4) + 19.87kN (1.6)
= 109.06kN + 31.79kN
= 140.85kN
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 95
11.0 Appendix
Slab System
If Ly/Lx > 2, one-way slab system
If Ly/Lx ≤ 2, two-way slab system
Beam Calculation
Beam self-weight = beam size x density of reinforced concrete
Slab dead load = thickness x density of reinforced concrete x Lx/2 (Trapezoid)
= thickness x density of reinforced concrete x Lx/2 x 2/3 (Triangular)
Slab live load = live load (UBBL) x Lx/2 (Trapezoid)
= live load (UBBL) x Lx/2 x 2/3 (Triangular)
Brick wall dead load = wall height x thickness x density of bricks
Column Calculation
Beam self-weight = beam size x density of reinforced concrete x length
Slab dead load = thickness x density of reinforced concrete x tributary area
Slab live load = live load (UBBL) x tributary area
Brick wall self-weight = thickness x wall height x density of bricks x length
Column self-weight = width x length x height x density of reinforced concrete
BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 96
Assumption of Dead Load and Live Load
Assumptions on Dead Loads Acting on Structure
(F) Slab self-weight
= 0.15 x 24kN/m3
= 3.6kN/m2
(G) Brick wall self-weight
= Wall thickness x Wall height x Density
= 0.1m x 3.0m x 19kN/m3
= 5.7kN/m
(H) Primary Beam self-weight
= Beam size x Concrete density
= 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
(I) Secondary Beam self-weight
= Beam size x Concrete density
= 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
(J) Column self-weight
= Column size x Concrete density
= 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
*All dead loads (slabs, walls, beams, columns) are assumed to have a standard size.
* Dead load factor: 1.4
Assumptions on Live Loads Acting on Structure
(L) Bedroom :1.5kN/m2
(M) Living Room :4.0kN/m2
(N) Dining Room :2.0kN/m2
(O) Kitchen :3.0kN/m2
(P) Corridor :4.0kN/m2
(Q) Bathroom :2.0kN/m2
(R) Study Room :1.5kN/m2
(S) Car Porch :2.0kN/m2
(T) Stairs :1.5kN/m2
(U) Family Area :2.0kN/m2
(V) Store Room :2.5kN/m2
*All assumptions on live loads are referred to 4th schedule of UBBL for live loads per
room functions.
* Live load factor: 1.6

More Related Content

What's hot

Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Patch Yuen
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Wen Yee
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilationjisunfoo
 
Building Structure
Building StructureBuilding Structure
Building StructureBolin Loong
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
Finite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal LoadingFinite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal LoadingMohammad Tawfik
 
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường họcđồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường họchttps://www.facebook.com/garmentspace
 
CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)Cyle Teal
 
Analisa struktur metode slope deflection
Analisa struktur metode slope deflectionAnalisa struktur metode slope deflection
Analisa struktur metode slope deflectionrahmawan luqman
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)Sumarno Feriyal
 
Сalculation of the сentral node
Сalculation of the сentral nodeСalculation of the сentral node
Сalculation of the сentral nodeDmitriy Semenov
 
MERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANGMERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANGMira Pemayun
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPSumarno Feriyal
 
Calculating the closure jacking-force of a large-span pre-stressed concrete c...
Calculating the closure jacking-force of a large-span pre-stressed concrete c...Calculating the closure jacking-force of a large-span pre-stressed concrete c...
Calculating the closure jacking-force of a large-span pre-stressed concrete c...IJERA Editor
 
Engineering Mechanics.pdf
Engineering Mechanics.pdfEngineering Mechanics.pdf
Engineering Mechanics.pdf163NaveenKumarS
 
L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method Dr. OmPrakash
 

What's hot (19)

Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
 
Building Structure
Building StructureBuilding Structure
Building Structure
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
1 perhitungan-balok
1 perhitungan-balok1 perhitungan-balok
1 perhitungan-balok
 
Finite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal LoadingFinite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal Loading
 
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường họcđồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
 
CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)
 
Analisa struktur metode slope deflection
Analisa struktur metode slope deflectionAnalisa struktur metode slope deflection
Analisa struktur metode slope deflection
 
Water tank design ppt
Water tank design pptWater tank design ppt
Water tank design ppt
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
 
Сalculation of the сentral node
Сalculation of the сentral nodeСalculation of the сentral node
Сalculation of the сentral node
 
MERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANGMERENCANAKAN BALOK BETON PRATEGANG
MERENCANAKAN BALOK BETON PRATEGANG
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
 
Calculating the closure jacking-force of a large-span pre-stressed concrete c...
Calculating the closure jacking-force of a large-span pre-stressed concrete c...Calculating the closure jacking-force of a large-span pre-stressed concrete c...
Calculating the closure jacking-force of a large-span pre-stressed concrete c...
 
Engineering Mechanics.pdf
Engineering Mechanics.pdfEngineering Mechanics.pdf
Engineering Mechanics.pdf
 
L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method
 

Viewers also liked

Lecture 1 building structure-an introduction-r2
Lecture 1 building structure-an introduction-r2Lecture 1 building structure-an introduction-r2
Lecture 1 building structure-an introduction-r2Aida Amalina
 
Properties of Concrete (CE-203)
Properties of Concrete (CE-203)Properties of Concrete (CE-203)
Properties of Concrete (CE-203)Safiullah Khan
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Fresh concrete properties & its standard tests
Fresh concrete properties & its standard testsFresh concrete properties & its standard tests
Fresh concrete properties & its standard testsMaHmoud AliraQi
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementAditi Shah
 

Viewers also liked (6)

Lecture 1 building structure-an introduction-r2
Lecture 1 building structure-an introduction-r2Lecture 1 building structure-an introduction-r2
Lecture 1 building structure-an introduction-r2
 
Properties of Concrete (CE-203)
Properties of Concrete (CE-203)Properties of Concrete (CE-203)
Properties of Concrete (CE-203)
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Fresh concrete properties & its standard tests
Fresh concrete properties & its standard testsFresh concrete properties & its standard tests
Fresh concrete properties & its standard tests
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 

Similar to Building Structure Final report

Beam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentBeam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentJoyce Wee
 
B structure final_c
B structure final_cB structure final_c
B structure final_cleejanett3
 
B structure final final
B structure final finalB structure final final
B structure final final杉 江紫
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowYee Len Wan
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Building Structure Project 2 report
Building Structure Project 2 reportBuilding Structure Project 2 report
Building Structure Project 2 reportTan Jaden
 
Bstruc final report
Bstruc final reportBstruc final report
Bstruc final reportLee Yih
 
Assignement 2: Structural Analysis
Assignement 2: Structural AnalysisAssignement 2: Structural Analysis
Assignement 2: Structural AnalysisDavidJPCChai
 
Building structures final
Building structures finalBuilding structures final
Building structures finalJamie Lee
 
B structure power point
B structure power pointB structure power point
B structure power pointAnderson Wong
 
Final structure report
Final structure reportFinal structure report
Final structure reportTay Jit Ying
 
B.structure report
B.structure reportB.structure report
B.structure reportjiuaN59
 
Building Structure
Building Structure Building Structure
Building Structure Nicole Foo
 
individual part
individual part individual part
individual part KC Wong
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension junAh Jun
 
Building Structures
Building StructuresBuilding Structures
Building StructuresYuan0623
 
B structure-report (3)
B structure-report (3)B structure-report (3)
B structure-report (3)Nge Chen
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculationJy Chong
 

Similar to Building Structure Final report (20)

Beam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentBeam and Column Analysis | Group Component
Beam and Column Analysis | Group Component
 
B structure final_c
B structure final_cB structure final_c
B structure final_c
 
B structure final final
B structure final finalB structure final final
B structure final final
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Building Structure Project 2 report
Building Structure Project 2 reportBuilding Structure Project 2 report
Building Structure Project 2 report
 
Bstruc final report
Bstruc final reportBstruc final report
Bstruc final report
 
Assignement 2: Structural Analysis
Assignement 2: Structural AnalysisAssignement 2: Structural Analysis
Assignement 2: Structural Analysis
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
B structure power point
B structure power pointB structure power point
B structure power point
 
Final structure report
Final structure reportFinal structure report
Final structure report
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Building Structure
Building Structure Building Structure
Building Structure
 
individual part
individual part individual part
individual part
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension jun
 
Building Structures
Building StructuresBuilding Structures
Building Structures
 
B structure-report (3)
B structure-report (3)B structure-report (3)
B structure-report (3)
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
 

More from Canisius Bong

Project Management Project 1 Final slides
Project Management Project 1 Final slidesProject Management Project 1 Final slides
Project Management Project 1 Final slidesCanisius Bong
 
Food and culture research proposal
Food and culture research proposal Food and culture research proposal
Food and culture research proposal Canisius Bong
 
Urban comparative essays
Urban comparative essaysUrban comparative essays
Urban comparative essaysCanisius Bong
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Canisius Bong
 
P2 bscience 2- Integration Project
P2 bscience 2- Integration ProjectP2 bscience 2- Integration Project
P2 bscience 2- Integration ProjectCanisius Bong
 
P1 building science 2
P1 building science 2 P1 building science 2
P1 building science 2 Canisius Bong
 
P1 building science 2
P1 building science 2 P1 building science 2
P1 building science 2 Canisius Bong
 
CSI sample proposal
CSI sample proposal CSI sample proposal
CSI sample proposal Canisius Bong
 
Internship Training report
Internship Training report Internship Training report
Internship Training report Canisius Bong
 
Building services report
Building services reportBuilding services report
Building services reportCanisius Bong
 
Heat gain-calculations-(After-improved)
Heat gain-calculations-(After-improved)Heat gain-calculations-(After-improved)
Heat gain-calculations-(After-improved)Canisius Bong
 
Heat gain-calculations-(Before)
Heat gain-calculations-(Before)Heat gain-calculations-(Before)
Heat gain-calculations-(Before)Canisius Bong
 
Ipoh Rainbow Shophouses Report
Ipoh Rainbow Shophouses Report Ipoh Rainbow Shophouses Report
Ipoh Rainbow Shophouses Report Canisius Bong
 
Culture and history (san marco basilica)
Culture and history (san marco basilica) Culture and history (san marco basilica)
Culture and history (san marco basilica) Canisius Bong
 
Cn c brief2_092014sept
Cn c brief2_092014septCn c brief2_092014sept
Cn c brief2_092014septCanisius Bong
 
Cn c brief2_ctb_201514sept
Cn c brief2_ctb_201514septCn c brief2_ctb_201514sept
Cn c brief2_ctb_201514septCanisius Bong
 

More from Canisius Bong (20)

Presentation slides
Presentation slidesPresentation slides
Presentation slides
 
Project Management Project 1 Final slides
Project Management Project 1 Final slidesProject Management Project 1 Final slides
Project Management Project 1 Final slides
 
Food and culture research proposal
Food and culture research proposal Food and culture research proposal
Food and culture research proposal
 
Urban Synopsis
Urban Synopsis Urban Synopsis
Urban Synopsis
 
Urban comparative essays
Urban comparative essaysUrban comparative essays
Urban comparative essays
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
P2 bscience 2- Integration Project
P2 bscience 2- Integration ProjectP2 bscience 2- Integration Project
P2 bscience 2- Integration Project
 
P1 building science 2
P1 building science 2 P1 building science 2
P1 building science 2
 
P1 building science 2
P1 building science 2 P1 building science 2
P1 building science 2
 
Csi proposal slides
Csi proposal slidesCsi proposal slides
Csi proposal slides
 
CSI sample proposal
CSI sample proposal CSI sample proposal
CSI sample proposal
 
Internship Training report
Internship Training report Internship Training report
Internship Training report
 
Building services report
Building services reportBuilding services report
Building services report
 
Asian paper-final
Asian paper-finalAsian paper-final
Asian paper-final
 
Heat gain-calculations-(After-improved)
Heat gain-calculations-(After-improved)Heat gain-calculations-(After-improved)
Heat gain-calculations-(After-improved)
 
Heat gain-calculations-(Before)
Heat gain-calculations-(Before)Heat gain-calculations-(Before)
Heat gain-calculations-(Before)
 
Ipoh Rainbow Shophouses Report
Ipoh Rainbow Shophouses Report Ipoh Rainbow Shophouses Report
Ipoh Rainbow Shophouses Report
 
Culture and history (san marco basilica)
Culture and history (san marco basilica) Culture and history (san marco basilica)
Culture and history (san marco basilica)
 
Cn c brief2_092014sept
Cn c brief2_092014septCn c brief2_092014sept
Cn c brief2_092014sept
 
Cn c brief2_ctb_201514sept
Cn c brief2_ctb_201514septCn c brief2_ctb_201514sept
Cn c brief2_ctb_201514sept
 

Recently uploaded

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationAadityaSharma884161
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 

Recently uploaded (20)

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint Presentation
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 

Building Structure Final report

  • 1. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 1 School of Architecture, Building and Design Bachelor of Science (Hons) in Architecture Building Structure (ARC 2523/ BLD 61003) Project 2: Beam and Column Analysis Tutor: Ms. Norita Group Members: Student Name: Student ID: Canisius Bong Wei Pheng 0318914 Joyce Wee Yi Qin 0319602 Tan Wing Hoe 0319333
  • 2. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 2 Table of Contents 1.0 Brief Description of Building 3 2.0 Architectural Plan Drawings 4 2.1 Ground Floor Plan 2.2 First Floor Plan 2.3 Roof Plan 3.0 Structural Plan Drawings 7 3.1 Ground Floor Plan 3.2 First Floor Plan 3.3 Roof Plan 4.0 Slab System Analysis (Load Distribution) 10 4.1 Ground Floor Plan 4.2 First Floor Plan 4.3 Roof Plan 4.4 Identification of Types of Slab 5.0 Tributary Area 13 5.1 Ground Floor Plan 5.2 First Floor Plan 5.3 Roof Plan 6.0 Assumption of Life Load and Dead Load 16 6.1 Assumptions on Dead Loads Acting on Structure 6.2 Assumptions on Life Loads Acting on Structure 7.0 Individual Components Distribution 17 7.1 Beams 7.2 Columns 8.0 Beam Analysis Report 20 8.1 Canisius Bong 8.2 Joyce Wee 8.3 Tan Wing Hoe 9.0 Column Analysis Report 78 9.1 Canisius Bong 9.2 Joyce Wee 9.3 Tan Wing Hoe 10.0 Appendix 94
  • 3. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 3 1.0 Brief Description of Building In this project, we are required to design a double-storey bungalow together, carry out structural framing and prepare structural drawings for the bungalow. The project is an integrated component where it involves structural theory, force calculation and basic structural proposal. This project is designed to allow the demonstration of knowledge and understanding of building structure. The bungalow is a 324m2 building which includes spaces such as: (A) 1 master bedroom with attached study room, wardrobe, and bathroom (B) 1 bedroom with attached bathroom (C) 1 bedroom (D) 1 guest room with attached bathroom (E) 1 maid room (F) 2 bathrooms (G) 2 living room (ground floor and first floor) (H) 1 family theatre (I) 1 double volume dining room (J) 1 dry and wet kitchen (K) 1 laundry area (L) 1 storeroom (M)1 outdoor covered car porch
  • 4. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 4 2.0 Architectural Plan Drawings 2.1 Ground Floor Plan (scale 1:150)
  • 5. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 5 2.2 First Floor Plan (scale 1:150)
  • 6. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 6 2.3 Roof Plan (scale 1:150)
  • 7. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 7 3.0 Structural Plan Drawings 3.1 Ground Floor Plan (scale 1:150)
  • 8. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 8 3.2 First Floor Plan (scale 1:150)
  • 9. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 9 3.3 Roof Plan (scale 1:150)
  • 10. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 10 4.0 Slab System Analysis (Load Distribution) 4.1 Ground Floor Plan (scale 1:150)
  • 11. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 11 4.2 First Floor Plan (scale 1:150)
  • 12. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 12 4.3 Roof Plan (scale 1:150) 4.4 Identification of Slab System Formula to determine slab system: If Ly/Lx >2, one-way slab system; If Ly/Lx ≤2, two-way slab system.
  • 13. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 13 5.0 Tributary Area 5.1 Ground Floor Plan
  • 14. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 14 5.2 First Floor Plan
  • 15. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 15 5.3 Roof Plan
  • 16. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 16 6.0 Assumption of Dead Load and Live 7.0 Load 6.1 Assumptions on Dead Loads Acting on Structure (A) Slab self-weight = 0.15 x 24kN/m3 = 3.6kN/m2 (B) Brick wall self-weight = Wall thickness x Wall height x Density = 0.1m x 3.0m x 19kN/m3 = 5.7kN/m (C) Primary Beam self-weight = Beam size x Concrete density = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m (D) Secondary Beam self-weight = Beam size x Concrete density = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m (E) Column self-weight = Column size x Concrete density = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN *All dead loads (slabs, walls, beams, columns) are assumed to have a standard size. * Dead load factor: 1.4 6.2 Assumptions on Live Loads Acting on Structure (A) Bedroom :1.5kN/m2 (B) Living Room :4.0kN/m2 (C) Dining Room :2.0kN/m2 (D) Kitchen :3.0kN/m2 (E) Corridor :4.0kN/m2 (F) Bathroom :2.0kN/m2 (G) Study Room :1.5kN/m2 (H) Car Porch :2.0kN/m2 (I) Stairs :1.5kN/m2 (J) Family Area :2.0kN/m2 (K) Store Room :2.5kN/m2 *All assumptions on live loads are referred to 4th schedule of UBBL for live loads per room functions. * Live load factor: 1.6
  • 17. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 17 8.0 Individual Components Distribution 7.1 Beams Canisius Bong Joyce Wee Tan Wing Hoe
  • 18. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 18 7.2 Columns Canisius Bong Joyce Wee Tan Wing Hoe
  • 19. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 19
  • 20. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 20 9.0 Beam Analysis Report 8.1 Canisius Bong Beam A/3-6 (Ground Floor | Primary Beam) Dead Load: ○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) x (2/3) = 2.29kN/m ○4 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) = 5.58kN/m Total Dead Load: Total Dead Load at (A/3-4) = 1.44kN/m + 5.7kN/m + 2.29kN/m = 9.43kN/m Total Dead Load at (A/4-6) = 1.44kN/m + 5.7kN/m + 5.58kN/m = 12.72kN/m Live Load: ○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) x (2/3) = 2.0kN/m2 x (1.91m/2) x (2/3) = 1.27kN/m ○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m ○1 Carries self-weight – Dead Load ○2 Sab Dead Load & Live Load  Slab 1 : Slab A-B/3-4 (Two-Way Slab)  Slab 2 : Slab A-B/4-6 (Two-Way Slab) ○3 Brick Wall – Dead Load
  • 21. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 21 Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (A/3-4) = Total Dead Load (1.4) + Total Live Load (1.6) = 9.43kN/m (1.4) + 1.27kN/m (1.6) = 13.20kN/m + 2.03kN/m = 15.23kN/m Ultimate Load for (A/4-6) = Total Dead Load (1.4) + Total Live Load (1.6) = 12.72kN/m (1.4) + 2.33kN/m (1.6) = 17.81kN/m + 3.73kN/m = 21.54kN/m Point Load Referring to Beam A-B/4, point load from the beam is = 39.5KN Ultimate Load Diagram Total load for A/3-4 = 15.23kN/m x 1.91m = 29.09kN Total load for A/4-6 = 21.54kN/m x 5.18m = 111.58kN Reaction Forces: ∑m = 0 R1(7.09) – (15.23 x 1.91)(6.14) – 39.5 (5.18) – (21.54 x 5.18 )(2.59) = 0 R1(7.09) – 178.61 – 204.61 – 288.98 = 0 R1 = 672.2/7.09 R1 = 94.81kN -----○A ∑fy = 0 R1+R2 – 39.5 – 15.23(1.91) – 21.54(5.18) = 0 -----○B Substitute ○A into ○B , 94.81 + R2 – 39.5 – 15.23(1.91) – 21.54(5.18) = 0 94.81 + R2 – 39.5 – 29.09 – 111.58 = 0 R2 – 85.36 = 0 R2 = 85.36kN
  • 22. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 22 Load Diagram 169 0kN0kN Positive area – Negative area +ve = [1/2 x (94.81 + 65.72)(1.91)] + [1/2 x (26.22 x 1.22)] = 153.30 + 15.99 = 169.29 ≈ 169 -ve = 1/2 x (- 85.36)(5.18-1.22 = 169.01 ≈ 169 -85.36kN 0kN 0kN0kN 26.22kN 0kN 65.72kN 94.18kN (+) (-) Shear Force Diagram Using Triangular Proportion x/5.18 = 26.22/(26.22 + 85.36) x = 1.22 x 0kN85.3 6 x 0kN 0kN 26.22 6 x 0kN 0kN 5.18 6 x 0kN 0kN Bending Moment Diagram
  • 23. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 23 Beam H/3-5 (First Floor | Primary Beam) Dead Load at Beam H-I/4: ○1 Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (H-I/3-4) = 3.6kN/m2 x (1.91m/2) = 3.44kN/m ○4 Slab (H-I/ 4-6) = 3.6kN/m2 x (3.1m/2) x (2/3) = 3.72kN/m Total Dead Load at Beam H-I/4: Total Dead Load = 0.48kN/m + 5.7kN/m + 3.44kN/m + 3.72kN/m = 13.34kN/m Live Load at Beam H-I/4: ○1 Slab (H-I/ 3-4) = Bathroom x (1.91m/2) = 2.0kN/m2 x (1.91m/2) = 1.91kN/m ○2 Slab (H-I/ 4-6) = Bedroom x (3.1m/2) x (2/3) = 1.5kN/m2 x (3.1m/2) x (2/3) = 1.55kN/m Total Live Load at Beam H-I/4 Total Live Load = 1.91kN/m + 1.55kN/m = 3.46kN/m ○1 Carries self-weight – Dead Load ○2 Sab Dead Load & Live Load  Slab 1 : Slab H-I/3-4 (Two-Way Slab)  Slab 2 : Slab H-I/4-6 (Two-Way Slab) ○3 Brick Wall – Dead Load
  • 24. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 24 Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (H/3-5) = Total Dead Load (1.4) + Total Live Load (1.6) = 13.34kN/m (1.4) + 3.46kN/m (1.6) = 18.68kN/m + 5.54kN/m = 24.22kN/m Ultimate Load Diagram Total load = 3.1m x 24.22kN/m = 75.08 kN Reactions (UDL): Reactions = (3.1 x 24.22)/2 = 37.54kN Load Diagram 29.09kN 0kN 0kN 0kN -37.54kN 37.54kN 0kN (+) (-) Shear Force Diagram Bending Moment Diagram Point 1 = 37.54kN Point 2 = 37.54 – (24.22 x 3.1) = -37.54 Point 3 = -37.54 + 37.54 = 0kN Area of Triangle = ½ x 1.55 x 37.54 =29.09
  • 25. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 25 Dead Load at Beam H/3-5: ○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (H-I/3-4) = 3.6kN/m2 x (1.91m/2) x (2/3) = 2.29kN/m ○4 Slab (H-I/5-6) = 3.6kN/m2 x (3.1m/2) = 5.58kN/m Total Dead Load at Beam (H/3-5): Total Dead Load at (H/3-4) = 1.44kN/m + 5.7kN/m + 2.29kN/m = 9.43kN/m Total Dead Load at (H/4-5) = 1.44kN/m + 5.7kN/m + 5.58kN/m = 12.72kN/m Live Load: ○1 Slab (H-I/3-4) = Bathroom x (1.91m/2) x (2/3) = 2.0kN/m2 x (1.91m/2) x (2/3) = 1.27kN/m ○2 Slab (H-I/4-5) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (H/3-4) = Total Dead Load (1.4) + Total Live Load (1.6) = 9.43kN/m (1.4) + 1.27kN/m (1.6) = 13.20kN/m + 2.03kN/m = 15.23kN/m Ultimate Load for (H/4-5) = Total Dead Load (1.4) + Total Live Load (1.6) = 12.72kN/m (1.4) + 2.33kN/m (1.6) = 17.81kN/m + 3.73kN/m = 21.54kN/m Point Load Referring to Beam H-I/4, point load from the beam is = 37.54KN
  • 26. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 26 Ultimate Load Diagram Total load for H/3-4 = 15.23kN/m x 1.91m = 29.09kN Total load for H/4-5 = 21.54kN/m x 1.79m = 38.56kN Reaction Forces: ∑m = 0 R1(3.7) – (15.23 x 1.91)(2.75) – 37.54(1.79) – (21.54 x 1.79 )(0.90) = 0 R1(3.7) – 80 – 67.20 – 34.70 = 0 R1 = 181.97/3.7 R1 = 49.18kN -----○A ∑fy = 0 R1+R2 – 37.54 – 15.23(1.91) – 21.54(1.79) = 0 -----○B Substitute ○A into ○B , 49.18 + R2 – 37.54 – 15.23(1.91) – 21.54(1.79) = 0 49.18 + R2 – 37.54 – 29.09 – 38.56 = 0 R2 – 56.01 = 0 R2 = 56.01kN
  • 27. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 27 Load Diagram -17.41kN 0kN 66 0kN0kN Area of Trapezium at (+) area = (49.18 + 20.09) x 1.91/2 =66.15 ≈ 66 Area of Trapezium at ( - ) area = (-17.41 – 56.01) x 1.79/2 = -65.71 ≈ 66 Area of ( + ) area + Area of ( - ) area = 66-66 =0 -56.01kN 0kN 0kN0kN 20.09kN 49.18kN (+) (-) Shear Force Diagram Bending Moment Diagram
  • 28. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 28 Beam H-I/6 (First Floor | Secondary Beam) Dead Load: ○1 Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (H-I/4-6) = 3.6kN/m2 x (3.1m/2) x (2/3) = 3.72kN/m ○4 Slab (H-I/6-7) = 3.6kN/m2 x (2.67m/2) = 4.81kN/m Total Dead Load Total Dead Load = 0.48kN/m + 5.7kN/m + 3.72kN/m + 4.81kN/m = 14.71kN/m Live Load: ○1 Slab (H-I/4-6) = Bedroom x (3.1m/2) x (2/3) = 1.5kN/m2 x (3.1m/2) x (2/3) = 1.55kN/m ○2 Slab (H-I/6-7) = Bedroom x (2.67m/2) = 1.5kN/m2 x (2.67m/2) = 2.00kN/m Total Live Load Total Live Load = 1.55kN/m + 2.00kN/m = 3.55kN/m ○1 Carries self-weight – Dead Load ○2 Sab Dead Load & Live Load  Slab 1 : Slab H-I/4-6 (Two-Way Slab)  Slab 2 : Slab H-I/6-7 (Two-Way Slab) ○3 Brick Wall – Dead Load
  • 29. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 29 Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (H-I/6) = Total Dead Load (1.4) + Total Live Load (1.6) = 14.71kN/m (1.4) + 3.55kN/m (1.6) = 20.59kN/m + 5.68kN/m = 26.27kN/m Ultimate Load Diagram Total load = 3.1m x 26.27kN/m = 81.44kN Reactions (UDL): Reactions = (3.1 x 26.27)/2 = 40.72kN Load Diagram 31.56kN 0kN 0kN 0kN -40.72kN 40.72kN 0kN (+) (-) Shear Force Diagram Bending Moment Diagram Point 1 = 40.72 kN Point 2 = 40.72 – (26.27x 3.1) = -40.72 Point 3 = -40.72 + 40.72 = 0kN Area of Triangle = ½ x 1.55 x 40.72 =31.56
  • 30. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 30 Beam I/5-7 (First Floor | Primary Beam) Dead Load at Beam H/3-5: ○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (H-I/3-4) = 3.6kN/m2 x (3.1m/2) = 5.58kN/m ○4 Slab (H-I/5-6) = 3.6kN/m2 x (2.67m/2) x (2/3) = 3.20kN/m ○5 Slab (I-L/5-7) = 3.6kN/m2 x (5.8 m/2) = 10.44kN/m Total Dead Load Total Dead Load at (I/5-6) = 1.44kN/m + 5.7kN/m + 5.58kN/m + 10.44kN/m = 23.16kN/m Total Dead Load at (I/6-7) = 1.44kN/m + 5.7kN/m + 3.20kN/m + 10.44kN/m = 20.78kN/m Live Load: ○1 Slab (H-I/4-6) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m ○2 Slab (H-I/6-7) = Bedroom x (2.67m/2) x (2/3) = 1.5kN/m2 x (2.67m/2) x (2/3) = 1.34kN/m ○3 Slab (I-L/5-7) = Bedroom x (5.8m/2) = 1.5kN/m2 x (5.8/2) =4.35kN/m ○1 Carries self-weight – Dead Load ○2 Sab Dead Load & Live Load  Slab 1 : Slab H-I/4-6 (Two-Way Slab)  Slab 2 : Slab H-I/6-7 (Two-Way Slab)  Slab 3 : Slab I-L/5-7 (Two-Way Slab) ○3 Brick Wall – Dead Load
  • 31. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 31 Total Live Load Total live load at (I/5-6) = 2.33kN/m + 4.35kN/m = 6.68kN/m Total live load at (I/6-7) = 1.34kN/m + 4.35kN/m = 5.69kN/m Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (I/5-6) = Total Dead Load (1.4) + Total Live Load (1.6) = 23.16kN/m (1.4) + 6.68kN/m (1.6) = 32.42kN/m + 10.69kN/m = 43.11kN/m Ultimate Load for (I/6-7) = Total Dead Load (1.4) + Total Live Load (1.6) = 20.78kN/m (1.4) + 5.69kN/m (1.6) = 29.09kN/m + 9.10kN/m = 38.19kN/m Point Load Referring to Beam H-I/6 point load from the beam is = 40.72KN Ultimate Load Diagram Total load for I/5-6 = 43.11kN/m x 3.39m = 146.14kN Total load for I/6-7 = 39.19kN/m x 2.67m = 101.97kN Reaction Forces: ∑m = 0 R1(6.06) – (43.11 x 3.39)(4.37) – 40.72(2.67) – (38.19 x 2.67 )(1.34)= 0 R1(6.06) – 638.64 – 108.72– 138.17 = 0 R1 = 885.53/6.06 R1 = 146.12kN -----○A
  • 32. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 32 ∑fy = 0 R1+R2 – 40.72 – 43.11(3.39) – 38.19(2.67) = 0 -----○B Substitute ○A into ○B , 146.12 + R2 – 40.72 – 43.11(3.39) – 38.19(2.67) = 0 146.12 + R2 – 40.72 – 146.14 – 101.97 = 0 R2 – 142.71= 0 R2 = 142.71kN Load Diagram . -40.74kN 0kN -142.71kN 0kN 0kN0kN -0.02kN 146.12kN (+) (-) Shear Force Diagram Bending Moment Diagram Using Triangular Proportion x/3.39 = 146.12/146.14 x = 3.39 146.12 6 x 0kN 0kN 146.14 6 x 0kN 0kN x 0kN Positive area – Negative area +ve = 1/2 x (146.12)(3.39) = 247.67 ≈ 247 -ve = [1/2 x (- 142.71 + -40.74)(2.67) +[1/2 x (-0.02 x 3.39) = -246.91 + -0.03 = -246.94 ≈ -247 247-247 = 0 0kN 247 0kN
  • 33. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 33 Beam H-K/7 (First Floor | Primary Beam) Dead Load: ○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (H-I/6-7) = 3.6kN/m2 x (2.67m/2) = 4.81kN/m ○4 Slab (I-L/5-7) = 3.6kN/m2 x (5.8 m/2) = 10.44kN/m Total Dead Load Total Dead Load at (H-I/7) = 1.44kN/m + 5.7kN/m + 4.81kN/m = 11.95kN/m Total Dead Load at (I-K/7) = 1.44kN/m + 5.7kN/m + 10.44kN/m = 17.58kN/m Live Load: ○1 Slab (H-I/6-7) = Bedroom x (2.67m/2) = 1.5kN/m2 x (2.67m/2) = 2.00kN/m ○2 Slab (I-L/5-7) = Bedroom x (5.8m/2) = 1.5kN/m2 x (5.8m/2) = 4.35kN/m Ultimate Load ○1 Carries self-weight – Dead Load ○2 Sab Dead Load & Live Load  Slab 1 : Slab H-I/6-7 (Two-Way Slab)  Slab 2 : Slab I-L/5-7(Two-Way Slab) ○3 Brick Wall – Dead Load
  • 34. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 34 Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (H-I/) = Total Dead Load (1.4) + Total Live Load (1.6) = 11.95kN/m (1.4) + 2.00kN/m (1.6) = 16.73kN/m + 3.2kN/m = 19.93kN/m Ultimate Load for (I-K/7) = Total Dead Load (1.4) + Total Live Load (1.6) = 17.58kN/m (1.4) + 4.35kN/m (1.6) = 24.61kN/m + 6.96kN/m = 31.57kN/m Point Load Referring to Beam I/5-7, point load from the beam is = 142.71KN Ultimate Load Diagram Total load for H-I/7 = 19.93kN/m x 3.1m = 61.78kN Total load for I-K/7 = 31.57kN/m x 3.21m = 101.34kN Reaction Forces: ∑m = 0 R1(6.31) – (19.93 x 3.1)(4.76) – (142.71 X 3.21) – (31.57 x 3.21 )(1.61)= 0 R1(6.31) – 294.09 – 1458.10– 163.16 = 0 R1 = 915.35/6.31 R1 = 145.06kN -----○A ∑fy = 0 R1+R2 – 142.71 – 19.93(3.1) – 31.57(3.21) = 0 -----○B Substitute ○A into ○B , 145.06 + R2 – 142.71 – 19.93(3.1) – 31.57(3.21) = 0 145.06 + R2 – 142.71 – 61.78 – 101.34 = 0 R2 – 160.77 = 0 R2 = 160.77kN
  • 35. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 35 Load Diagram 0kN 0kN 0kN -59.43kN 0kN 353 -160.77kN 0kN 0kN 83.28kN 145.06kN (+) (-) Shear Force Diagram Bending Moment Diagram Positive area – Negative area +ve = 1/2 x (146.12)(3.39) = 247.67 ≈ 247 -ve = [1/2 x (- 142.71 + -40.74)(2.67) +[1/2 x (-0.02 x 3.39) = -246.91 + -0.03 = -246.94 ≈ -247 247-247 = 0 Area of Trapezium at (+) area = (145.06 + 83.28) x 3.1/2 =353.93 ≈ 353 Area of Trapezium at ( - ) area = (-59.43 – 160.77) x 3.21/2 = -353.43 ≈ 353 Area of ( + ) area + Area of ( - ) area = 353-353 =0
  • 36. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 36 Beam H-I/6 (First Floor | Secondary Beam) Dead Load: ○1 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m ○2 Brick wall self-weight = 3m x 0.1m x 19kN/m2 = 5.7kN/m ○3 Slab (I-N/3-5) = 3.6kN/m2 x (3.7m/2) = 6.66kN/m ○4 Slab (I-L/5-7) = 3.6kN/m2 x (5.8m/2) = 10.44kN/m Total Dead Load Total Dead Load = 1.44kN/m + 5.7kN/m + 6.66kN/m + 10.44kN/m = 24.24kN/m Live Load: ○1 Slab (I-N/3-5) = Living Room x (3.7m/2) = 4.0kN/m2 x (3.7m/2) = 7.4kN/m ○2 Slab (I-L/5-7) = Bedroom x (5.8m/2) = 1.5kN/m2 x (5.8m/2) = 4.35kN/m Total Live Load Total Live Load = 7.4kN/m + 4.35kN/m = 11.75kN/m ○1 Carries self-weight – Dead Load ○2 Sab Dead Load & Live Load  Slab 1 : Slab I-N/3-5 (One-Way Slab)  Slab 2 : Slab I-LI/5-7 (Two-Way Slab) ○3 Brick Wall – Dead Load
  • 37. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 37 Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Ultimate Load for (H-I/6) = Total Dead Load (1.4) + Total Live Load (1.6) = 24.24kN/m (1.4) + 11.75kN/m (1.6) = 33.94kN/m + 18.8kN/m = 52.74kN/m Ultimate Load Diagram Total load = 5.8m x 52.74kN/m = 305.89kN Reactions (UDL): Reactions = (5.8 x 52.74)/2 = 152.95kN Load Diagram Shear Force Diagram 221.78kN 0kN 0kN 0kN -152.95kN 152.95kN 0kN (+) (-) Bending Moment Diagram Point 1 = 152.95kN Point 2 = 152.95 – (52.74x 5.8) = -152.95 Point 3 = -152.95 + 152.95 = 0kN Area of Triangle = ½ x 2.9 x 152.95 =221.78
  • 38. 8.2 Joyce Wee Beam A-B/4 (Ground Floor | Secondary Beam) Dead Load: ○1 Slab (A-B/ 3-4) = 3.6kN/m2 x (1.91m/2) = 3.44kN/m ○2 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) 2/3 = 3.72kN/m ○3 Brick wall weight = 3m x 0.1m x 19kN/m3 =5.7kN/m ○4 Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load = 3.44 + 3.72 + 5.7 + 0.48 = 13.34kN/m Live Load: ○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) = 2.0kN/m2 x (1.91m/2) = 1.91kN/m ○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m Total Live Load: Total Live Load = 1.91kN/m + 2.33kN/m =4.24kN/m
  • 39. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 39 Ultimate Load: Ultimate Load = TDL(1.4) + TLL(1.6) = 13.34(1.4) + 4.24(1.6) = 25.46kN/m Load Diagram for Beam (A-B/4) Reaction Force: ∑m = 0 (RA x 3.1) – (25.46 x 3.1)(1.55) = 0 RA(3.1) – 122.34 = 0 RA = 122.34/3.1 RA = 39.46kN -----○A ∑fy = 0 RA + RB + (-25.46 x 3.1) = 0 -----○B Substitute ○A into ○B 39.46 + RB – 78.926 = 0 RB = 78.926 – 39.46 RB = 39.5kN
  • 40. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 40 Shear Force Diagram Point 1 = 39.46kN Point 2 = 39.46 + (-25.46 x 3.1) = 39.46 x 78.926 = -39.5K Point 3 = -39.5 + 39.5 = 0kN Bending Moment Diagram Peak = (39.46 x 1.55) x ½ = 30.58
  • 41. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 41 Beam B-D/5 (Ground Floor | Secondary Beam) Dead Load: ○1 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) 2/3 = 3.85kN/m ○2 Slab (B-D/5-6) = 3.6kN/m2 X (3.21m/2)2/3 = 3.85kN/m ○3 Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load = 3.85 + 3.85 + 0.48 = 8.18kN/m Live Load: ○1 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3 = 1.5kN/m2 x (3.21m/2)2/3 = 1.605kN/m At Slab (B-D/3-5), Slab : Stairs = 3.21m : 1.4m 1.605 : α = 3.21 : 1.4 1.605/a = 3.21/1.4 a = 0.7kN/m
  • 42. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 42 ○2 Slab (B-D/3-5) = Corridor x (3.21m/2)2/3 = 4.0kN/m2 x (3.21m/2)2/3 = 4.28kN/m At Slab (B-D/3-5), Slab : Corridor = 3.21m : 1.81m 4.28 : α = 3.21 : 1.81 4.28/a = 3.21/1.81 a = 2.41kN/m ○3 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3 = 1.5kN/m2 x (3.21m/2)2/3 = 1.605kN/m At Slab (B-D/3-5), Slab : Stairs = 3.21m : 1.4m 1.605 : α = 3.21 : 1.4 1.605/a = 3.21/1.4 a = 0.7kN/m ○4 Slab (B-D/3-5) = Corridor x (3.21/2)2/3 = 4.0kN/m2 x (3.21/2)2/3 = 4.28kN/m At Slab (B-D/3-5), Slab : Corridor = 3.21m : 1.81m 4.28 : α = 3.21 : 1.81 4.28/a = 3.21/1.81 a = 2.41kN/m Total Live Load: Total Live Load at (B-C) = 0.7 + 0.7 = 1.4kN/m Total Live Load at (C-D) = 2.41 + 2.41 = 4.82kN/m
  • 43. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 43 Ultimate Load: Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6) = 8.18(1.4) + 1.4(1.6) = 13.69kN/m Ultimate Load at (C-D) = TDL(1.4) + TLL(1.6) = 8.18(1.4) + 4.82(1.6) = 19.16kN/m Load Diagram of Beam (B-D/5): Reaction Forces: ∑m = 0 RB(3.21) – (19.16 x 1.81)(0.91) – (13.69)(2.51) = 0 RB(3.21) – 31.56 – 34.36 = 0 RB = 65.92/3.21 RB = 20.54kN/m -----○A ∑fy = 0 RB+RD-(13.69 X 1.4) – (19.16 X 1.81) = 0 -----○B Substitute ○A into ○B , 20.54 + RD – 19.17 – 34.68 = 0 RD = 53.85 - 20.54 RD = 33.31kN/m
  • 44. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 44 Shear Force Diagram: Point 1 = 20.54 Point 2 = 20.54 – (13.69 x 1.4) = 1.374 Point 3 = 1.374 – (19.16 x 1.81) = -33.31 Point 4 = -33.31 + 33.31 = 0 Bending Moment Diagram: Bending Moment 1 = (20.54 + 1.374)/2 x 1.4 = 15.34 Bending Moment 2 = 15.3398 + (1.374 x 0.3)/2 = 15.55
  • 45. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 45 Beam B/3-6 (Ground Floor | Primary Beam) Dead Load: ○1 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) 2/3 = 2.29kN/m ○2 Slab (A-B/4-6) = 3.6kN/m2 x (3.1m/2) = 5.58kN/m ○3 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) = 5.78kN/m ○4 Slab (B-D/5-6) = 3.6kN/m2 x (3.21m/2) = 5.78kN/m ○5 Brick wall weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○6 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (B/3-4) = 2.29 + 5.78 + 5.7 + 1.44 = 15.21kN/m Total Dead Load at (B/4-5) = 5.58 + 5.78 + 5.7 + 1.44 = 18.5kN/m Total Dead Load at (B/5-6) = 5.58 + 5.78 + 5.7 + 1.44 = 18.5kN/m Live Load: ○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) 2/3 = 2.0kN/m2 x (1.91m/2) 2/3 = 1.27kN/m
  • 46. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 46 ○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m ○3 Slab (B-D/ 3-4) = Stairs x (3.21m/2) = 1.5kN/m2 x (3.21m/2) = 2.41kN/m ○4 Slab (D-F/ 5-6) = Stairs x (3.21m/2) = 1.5kN/m2 x (3.21m/2) = 2.41kN/m Total Live Load: Total Live Load at (B/3-4) = 1.27 + 2.41 = 3.68kN/m Total Live Load at (B/4-5) = 2.33 + 2.41 = 4.74kN/m Total Live Load at (B/5-6) = 2.33 + 2.41 = 4.74kN/m Ultimate Load: Ultimate Load at (B/3-4) = TDL(1.4) + TLL(1.6) = 15.21(1.4) + 3.68(1.6) = 27.18kN/m Ultimate Load at (B/4-6) = TDL(1.4) + TLL(1.6) = 18.5(1.4) + 4.74(1.6) = 33.48kN/m Load Diagram of Beam (B/3-6): ○1 Referring to Beam (A-B/4), Point Load at B/4 = 39.5kN ○2 Referring to Beam (B-D/5), Point Load at B/5 = 20.76kN
  • 47. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 47 Reaction Force: ∑m = 0 RB3(7.09) – (27.18 x 1.91)(6.14) – (39.5)(5.18) – (20.76)(3.39) – (33.48 x 5.18)(2.59) = 0 RB3(7.09) – 318.75 – 204.61 – 70.38 – 449.17 = 0 RB3 = 1042.91/7.09 RB3 = 147.1kN -----○A ∑fy = 0 RB3 + RB6 – 39.5 – 20.76 – 27.18(1.91) – 33.48(5.18) = 0 -----○B Substitute ○A into ○B , 147.1 + RB6 – 39.5 – 20.76 – 51.91 – 173.43 = 0 RB6 = 138.5kN
  • 48. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 48 Shear Force Diagram: Point 1 = 147.1 Point 2 = 147.1 – (27.18 x 1.91) = 95.19 Point 3 = 95.19 – 39.5 = 55.69 Point 4 = 55.69 – (33.48 x 1.79) = -4.24 Point 5 = -4.24 – 20.76 = -25 Point 6 = -25 – (33.48 x 3.39) = - 138.5 Bending Moment Diagram: Bending Point 1 = (147.1 + 95.19)/2 x 1.91 = 231.39 Bending Point 2 = 231.39 + (55.69 x 1.662)/2 = 277.67 Bending Point 3 = 277.67 – (4.24 x 0.128)/2 = 277.4 Bending Point 4 = 277.4 – (25 + 138.5)/2 x 3.39 = 0
  • 49. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 49 Beam J/1-3 (First Floor | Secondary Beam) Dead Load at Beam (J-K/2): ○1 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3 = 2.172kN/m ○2 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2) = 2.88kN/m ○3 Brick Wall Load = 3.0m x 0.1m x 19kN/m3 = 5.7kN/m ○4 Beam Self-Weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load at Beam (J-K/2): Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48 = 11.23kN/m Live Load: 1 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3 = 2.0kN/m2 x (1.81m/2)2/3 = 1.21kN/m 2 Slab (J-K/2-3) = Bedroom x (1.6m/2) = 1.5kN/m2 x (1.6m/2) = 1.2kN/m Total Live Load at Beam (J-K/2): Total Live Load = 1.21 + 1.2 = 2.41kN/m Ultimate Load at Beam (J-K/2):
  • 50. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 50 Ultimate Load = TDL(1.4) + TLL(1.6) = 11.23(1.4) + 2.41(1.6) = 19.58kN/m2 Load Diagram of beam (J-K/2): Reaction Force ∑m = 0 RJ (1.81) – (19.58 x 1.81)(0.91) = 0 RJ (1.81) – 32.35 = 0 RJ = 32.25/1.81 RJ = 17.82kN -----○A ∑fy = 0 RJ + RK – (19.58) (1.81) = 0 -----○B Substitute ○A into ○B , 17.82 + RK – 35.44 = 0 RK = 17.62kN
  • 51. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 51 Dead Load at Beam J/1-3 ○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2)2/3 = 5.03kN/m ○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2) = 3.26kN/m ○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)2/3 = 1.92kN/m ○4 Brick Wall Weight = 3.0m x 0.1m x 19kN/m3 = 5.7kN/m ○5 Beam Self Weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load at Beam (J/1-3): Total Dead Load at (J/1-2) = 5.03 + 3.26 + 5.7 + 0.48 = 14.47kN/m Total Dead Load at (J/2-3) = 5.03 + 1.92 + 5.7 + 0.48 = 13.13kN/m Live Load at Beam J/1-3 ○1 Slab (H-J/1-3) = Bedroom x (4,19m/2)2/3 = 1.5kN/m2 x (4.19m/2)2/3 = 2.095kN/m ○2 Slab (J-K/1-2) = Bathroom x (1.81m/2) = 2.0kN/m2 x (1.81m/2) = 1.81kN/m ○3 Slab J-K/2-3) = Bedroom x 1.6m/2)2/3 = 1.5kN/m2 x 1.6m/2)2/3 = 0.8kN/m Total Live Load at Beam J/1-3: Total Live Load at (J/1-2) = 2.095 + 1.81 = 3.905kN/m Total Live Load at (J/2-3) = 2.095 + 0.8 = 2.895kN/m Ultimate Load at Beam J/1-3 Ultimate Load at (J/1-2) = TDL (1.4) + TLL (1.6) =14.47(1.4) + 3.905(1.6)
  • 52. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 52 = 26.51kN/m Ultimate Load at (J/2-3) = TDL (1.4) + TLL (1.6) = 13.13(1.4) + 2.9(1.6) = 23.02kN/m Load Diagram of Beam (J/1-3): ○1 Referring to Beam (J-K/2), Point Load at J/2 = 17.82kN ∑m = 0 RJ1(4.19) – (23.02 x 1.6) (0.8) – (17.82) (1.6) – (26.51 x 2.59) (2.9) = 0 RJ1(4.19) – 29.47 – 28.512 – 199.12 = 0 RJ1 = 257.1/4.19 RJ1 = 61.36kN -----○A ∑fy = 0 RJ1 + RJ2 – 17.82 – (26.51 x 2.59) – (23.02 x 1.6) = 0 -----○B Substitute ○A into ○B , 61.36 + RJ2 – 17.82 – 68.66 – 36.83 = 0 RJ2 = 61.95kN
  • 53. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 53 Shear Force Diagram Point 1 = 61.36 Point 2 = 61.36 – (26.51 x 2.59) = -7.3 Point 3 = -7.3 – 17.82 = -25.12 Point 4 = -25.12 – (23.02 x 1.6) = -61.95 Point 5 = -61.95 + 61.95 Bending Moment Diagram Bending Point 1 = (61.36 x 2.3)/2 = 70.56 Bending Point 2 = 70.56 – (7.3 x 0.29)/2 = 69.5
  • 54. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 54 Beam H-K/1 (First Floor | Primary Beam) Dead Load: ○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.19m/2) = 7.542kN/m ○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3 = 2.17kN/m ○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (H-J) = 7.542 + 5.7 + 1.44 = 14.68kN/m Total Dead Load at (J-K) = 2.17 + 5.7 + 1.44 = 9.31kN/m Live Load: ○1 Slab (H-J/1-3) = Bedroom x (4.19m/2) = 1.5kN/m2 x (4.19m/2) = 3.14kN/m ○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3 = 2.0kN/m2 x (1.81/2)2/3 = 1.21kN/m Total Live Load: Total Live Load at (H-J) = 3.14kN/m Total Live Load at (J-K) = 1.21kN/m Ultimate Load:
  • 55. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 55 Ultimate Load at (H-J) = TDL (1.4) + TLL (1.6) =14.68(1.4) + 3.14(1.6) = 25.57kN/m Ultimate Load at (J-K) = TDL (1.4) + TLL (1.6) = 9.31(1.4) + 1.21(1.6) = 14.97kN/m Load Diagram of Beam (H-K/1): ○1 Referring to Beam (J/1-3), Point Load at J/1 = 61.36kN ∑m = 0 RH (6.3) – (25.57 X 4.49) (4.06) – (61.36) (1.81) – (14.97 X 1.81) (0.91) = 0 RH (6.3) – 466.13 – 111.06 – 24.66 = 0 RH = 601.85/6.3 RH = 95.53kN/m -----○A ∑fy = 0 RH + RK – 61.36 – (25.57 X 4.49) – (14.97 X 1.81) = 0 -----○B Substitute ○A into ○B , 95.53 + RK – 61.36 – 114.81 – 27.1 = 0 RK = 107.34kN
  • 56. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 56 Shear Force Diagram Point 1 = 95.53 Point 2 = 95.53 – (25.57 x 4.49) = -19.28 Point 3 = -19.28 – 61.36 = -80.64 Point 4 = -80.64 – (14.97 x 1.81) = -107.34 Point 5 = -107.34 + 107.34 = 0 Bending Moment Diagram Bending Point 1 = (95.53 x 3.73)/2 = 178.163 Bending Point 2 = 178.163 - (19.28 x 0.76)/2 = 170.837 Bending Point 3 = 170.837 – (80.64 + 107.34)/2 x 1.81 = 0
  • 57. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 57 Beam I-K/3 (First Floor | Primary Beam) Dead Load ○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.49m/2) = 7.54kN/m ○2 Slab (I-N/3-5) = 3.6kN/m2 x (4.71/2) = 8.48kN/m ○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6/2) = 2.88kN/m ○4 Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○5 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (I-J) = 7.54 + 8.48 + 5.7 + 1.44 = 23.16kN/m Total Dead Load at (J-K) = 18.5kN/m Live Load: ○1 Slab (H-J/1-3) = Bedroom x (4.49m/2) = 1.5kN/m2 x (4.49m/2) = 3.37kN/m ○2 Slab (I-N/3-5) = Living Room x (4.71m/2) = 4.0kN/m2 x (4.71m/2) = 9.4kN/m
  • 58. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 58 ○3 Slab (J-K/2-3) = Bedroom x (1.6m/2) = 1.5kN/m2 x(1.6m/2) = 1.2kN/m Total Live Load: Total Live Load at (I-J) = 3.37 + 9.4 = 12.77kN/m Total Live Load at (J-K) = 9.4 + 1.2 = 10.6kN/m Ultimate Load: Ultimate Load at (I-J) = TDL (1.4) + TLL (1.6) = 23.16(1.4) + 12.77(1.6) = 52.85kN/m Ultimate Load at (J-K) = TDL(1.4) + TLL(1.6) = 18.5(1.4) + 10.6(1.6) = 42.86kN/m Load Diagram of Beam (I-K/3): ○1 Referring to Beam (J/1-3), Point Load at J/3 = 61.95kN/m ∑m = 0 RI(3.21) – (52.85 x 1.4) (2.51) – (61.95) (1.81) – (42.86 x 1.81) (0.91) = 0 RI(3.21) – 185.71 – 112.13 – 70.59 = 0 RI = 368.43/3.21 RI = 114.76kN -----○A ∑fy = 0 RI + RK – 61.95 – (52.85 X 1.4) – (42.86 X 1.81) = 0 -----○B Substitute ○A into ○B , 114.76 + RK – 61.95 – 73.99 – 77.58 = 0 RK = 98.76kN
  • 59. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 59 Shear Force Diagram: Point 1 = 114.76 Point 2 = 114.76 – (52.85 x 1.4) =40.77 Point 3 = 40.77 – 61.95 = - 21.18 Point 4 = -21.18 – (42.86 x 1.81) = -98.76 Point 5 = -98.76 + 98.76 = 0 Bending Moment Diagram Bending Point 1 = (114.76 + 40.77)/2 x 1.4 = 108.87 Bending Point 2 = 108.87 - (21.18 + 98.76)/2 x 1.81 = 0 1.4 3.21
  • 60. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 60 8.3 Tan Wing Hoe Beam A-B/4 (Ground Floor | Secondary Beam) Dead Load: 1. Slab (C-D/ 1-2) = 3.6kN/m2 x (1.81m/2) x 2/3 = 2.17kN/m 2. Slab (C-D/ 2-3) = 3.6kN/m2 x (1.6m/2) = 2.88kN/m 3. Brick wall weight = 3m x 0.1m x 19kN/m3 =5.7kN/m 4. Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48 = 11.23kN/m Live Load: ○1 Slab (C-D/ 1-2) = Bathroom x (1.81m/2) = 2.0kN/m2 x (1.81m/2) = 1.21kN/m ○2 Slab (C-D/ 2-3) = Bedroom x (1.6m/2) = 1.5kN/m2 x (1.6m/2) = 1.2kN/m Total Live Load: Total Live Load = 1.21kN/m + 1.2kN/m =2.41kN/m
  • 61. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 61 Ultimate Load: Ultimate Load = TDL(1.4) + TLL(1.6) = 11.23(1.4) + 2.41(1.6) = 19.58kN/m Load Diagram for Beam (C-D/2) Reaction Force: ∑m = 0 (RA x 1.81) – (19.58 x 1.81)(0.91) = 0 RA(1.81) – 32.25 = 0 RA = 32.25/1.81 RA = 17.82kN -----○A ∑fy = 0 RA + RB + (-19.58 x 1.81) = 0 -----○B Substitute ○A into ○B 17.82 + RB – 35.44 = 0 RB = 35.44-17.82 RB = 17.62kN
  • 62. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 62 Shear Force Diagram Point 1 = 17.82 Point 2 = 17.82 -(19.58 x 1.81) = 17.82 - 35.68 = -17.62 Point 3 = -17.62+17.62 = 0kN Bending Moment Diagram Peak = (17.82 x 1.55) x ½ = 13.81
  • 63. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 63 Beam (F/3-5) (Ground Floor | Secondary Beam) Dead Load: 1. Slab (D-F/3-5) = 3.6kN/m2 x (3.7m/2) 2/3 = 4.44kN/m 2. Slab (F-G/3-5) = 3.6kN/m2 X (3.55m/2) = 6.39kN/m 3. Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load = 4.44 + 6.39 + 0.48 = 11.31kN/m Live Load: 1. Slab (D-F/3-5) = KTICHEN x (3.55m/2) = 3kN/m2 x (3.55m/2) = 5.33kN/m 2. Slab (D-F/3-5) = KTICHEN x (3.7m/2) x 2/3 = 3kN/m2 x (3.7m/2) x 2/3 = 3.7kN/m
  • 64. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 64 Total Live Load: = Slab (D-F/3-5) + Slab (D-F/3-5) =(5.33+3.7) kN/m =9.03kN/m Ultimate Load: Ultimate Load = TDL(1.4) + TLL(1.6) = 11.31(1.4) + 9.03(1.6) = 30.28kN/m Load Diagram of Beam (B-D/5): Reaction Forces: ∑m = 0 RB(3.7) – (30.28 x 3.7)(1.85) = 0 RB(3.7) – 207.27 = 0 RB = 207.27/3.7 RB = 56.02kN/m -----1 ∑fy = 0 RB+RA-(30.28 X 3.7) = 0 -----2 Substitute 1 into2, 56.02+ RA –(30.28 x 3.7) = 0 - RA = 56.45-112.04 RA = 56.02kN/m
  • 65. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 65 Shear Force Diagram Point 1 = 56.02 Point 2 = 56.02 -(30.28x 3.7) = 56.02 - 111.93 = 55.91 Point 3 = 56.02-55.91 = 0.11kN Bending Moment Diagram Peak = (56.02x 1.55) x ½ = 43.42
  • 66. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 66 Beam D-E/5 (Ground Floor | Secondary Beam) Dead Load: 1. Slab (D-E/3-5) = 3.6kN/m2 x (3.7m/2) = 6.66kN/m 2. Slab (D-E/5-6) = 3.6kN/m2 x (2.59m/2) x 2/3 = 3.11kN/m 3. Brick wall weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m 4. Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load =(6.66+3.11+5.7+0.48)kN/m =15.95Kn/M Live Load: ○1 Slab (D-E/3-5) = Kitchen x (3.7m/2) = 3.0kN/m2 x (3.7m/2) = 5.55kN/m ○2 Slab (D-E/5-6) = Store x (2.59m/2) x 2/3 = 2.5kN/m2 x (2.59m/2) x 2/3 = 2.16kN/m
  • 67. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 67 Total Live Load: Total Live Load = Slab (D-E/3-5) + Slab (D-E/5-6) =(5.55+2.16)Kn/m =7.71 Kn/M Ultimate Load: Ultimate Load = TDL(1.4) + TLL(1.6) =15.95(1.4)+7.71(1.6) =34.67 Kn/M Load Diagram of Beam (D/4-5): Reaction Force: ∑m = 0 RB(2.59) – (34.67 x 2.59)(1.3) = 0 RB(2.59) –116.73 = 0 RB = 116.73/2.59 RB = 45.06kN -----1 ∑fy = 0 RB + RA –(34.67 x 2.59) = 0 -----2 Substitute 1 into2, 45.06 + RA –89.80 = 0 RA = 44.74kN
  • 68. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 68 Shear Force Diagram Point 1 = 44.74 Point 2 = 44.74 -(34.63 x 2.59) = 44.74 - 89.69 = -44.95 Point 3 = -44.95+45.06 = 0.11kN Bending Moment Diagram Peak = (44.74 x 1.55) x ½ = 34.67kN
  • 69. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 69 Beam D/1-3 (Ground Floor | Primary Beam) Dead Load: 1. Slab (C-D/1-2) = 3.6kN/m2 x (1.81m/2) = 3.26kN/m 2. Slab (C-D/2-3) = 3.6kN/m2 x (1.6m/2)2/3 = 1.92kN/m 3. Slab (D-F/1-2) = 3.6kN/m2 x (4.11M/2) = 7.4kN/m ○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (D/1-2) = (3.26 + 7.4 +1.44+5.7)Kn/M A-B = 17.8kN/m Total Dead Load at (D/2-3) = (1.92 + 7.4 + 5.7 + 1.44) kN/m B-C = 16.48kN/m Live Load: 1.Slab (C-D/1-2) = Bathroom x (1.81m/2) = 2kN/m2 x (1.81m/2) = 1.81kN/m 2. Slab (C-D/2-3) = Bedroom x (1.6m/2)2/3 = 1.5kN/m2 x (1.6/2)2/3 = 0.8kN/m ○2 Slab (C-D/2-3) = Dining x (4.11m/2) = 2.0kN/m2 x (4.11/2) =4.11kN/m Total Live Load:
  • 70. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 70 Total Live Load at (D/1-2)= 5.98kN/m Total Live Load at (D/2-3)= 4.91kN/m Ultimate Load: Ultimate Load at (D/1-2)= TDL (1.4) + TLL (1.6) =17.8(1.4) + 5.92(1.6) = 34.39kN/m Ultimate Load at (D/2-3)= TDL (1.4) + TLL (1.6) = 16.481(1.4) + 4.91(1.6) = 30.93kN/m Load Diagram of Beam (D/1-3): ○1 Referring to Beam (C-D/ 2), Point Load at D1 =17.62 kN ∑m = 0 RC (4.19) – (30.93 X 1.6) (3.39) – (17.62) (2.59) – (34.39 x 2.59) (1.3) = 0 RC (4.19) – 167.76 – 45.64– 115.79 = 0 RC = 329.16/64.19 RC = 78.56kN/m -----1 ∑fy = 0 RC + RA – 17.62 – (34.39 X 2.59) – (30.93 X 1.6) = 0 -----2 Substitute 1 into 2, 78.56 + RA – 17.62 – 89.07 – 49.49 = 0 RA = 77.62kN
  • 71. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 71 Shear Force Diagram Point 1 = 77.62 Point 2 = 77.62-(34.39 x 2.59) = 77.62 - 89.07 = -11.45 Point 3 =-11.45-17.62 = -29.07 Point 4 = -29.07 - (30.93 x 1.6) = -79.19 Point 5 = -79.19+78.56 =-0.63kN Bending Moment Diagram Peak = (44.74 x 1.55) x ½ = 34.67kN
  • 72. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 72 d Beam E-G/5 (Ground Floor | Primary Beam) Dead Load 1. Slab (E-G/5-7) = 3.6kN/m2 x (5.08m/2) x 2/3 = 6.10kN/m 2. Slab (E-G/3-5) = 3.6kN/m2 x (3.55/2) x 2/3 = 4.26kN/m 3. Slab (D-F/3-5)= 3.6kN/m2 x (3.7/2) = 6.66kN/m Load involved area =6.66Kn/m x 1.52/2.59 =3.91 kN/m 4. Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m 5. Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (A-B) = 6.10 + 6.66 +3.91+ 5.7 + 1.44 = 17.15kN/m Total Dead Load at (B-C) = 6.1+4.26+5.7+1.44 =17.5 Kn/M
  • 73. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 73 Live Load: ○1 Slab (E-G/5-7) = PORCH x (5.08m/2) x 2/3 = 2.0kN/m2 x (5.08m/2) x 2/3 = 3.38kN/m ○2 Slab (F-G/3-5) = KITCHEN x (3.55/2) x 2/3 = 3.0kN/m2 x (3.55/2) x 2/3 = 3.54kN/m ○3 Slab (D-F/3-5) = KITCHEN x (3.7m/2) = 3.0kN/m2 x(3.7m/2) = 3.26kN/m Total Live Load: Total Live Load at (A-B) = 6.64kN/m Total Live Load at (B-C) = 6.92kN/m Ultimate Load: Ultimate Load at (A-B) = TDL (1.4) + TLL (1.6) = 17.15(1.4) + 6.64(1.6) = 34.63kN/m Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6) = 17.5(1.4) + 6.92(1.6) = 35.57kN/m Load Diagram of Beam (E-G/5): 1. Referring to Beam (F/3-5), Point Load at D/5 = 56.02kN/m ∑m = 0 RC(5.08) – (35.57 x 3.55) (3.29) – (56.02) (1.52) – (34.63 x 1.52) (0.76) = 0 RC(5.08) – 415.44 – 85.15 – 40 = 0 RC = 540.59/5.08 RC = 106.42kN -----1 ∑fy = 0 RC + RA – 56.02 – (34.63 X 1.52) – (35.57 X 3.55) = 0 -----2
  • 74. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 74 Substitute 1 into 2, 106.42 + RA – 56.02 – 52.64 – 126.27 = 0 RA = 128.51kN Shear Force Diagram Point 1 =128.51 - 34.63(1.52) =128.51 - 52.64 = 75.87 Point 2 = 75.87 - 56.02 = 19.85 Point 3 = 19.85 - 35.57(3.55) = 19.85 -126.27 = -106.42 Point 4 =-106.42+106.42 =0kN Bending Moment Diagram Peak = (44.74 x 1.55) x ½ = 34.67kN
  • 75. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 75 Beam D/3-6 (Ground Floor | Primary Beam) Dead Load 1. Slab (B-C/5-6) = 3.6kN/m2 x (3.21m/2) = 5.78kN/m 2. Slab (D-E/5-6) = 3.6kN/m2 x (2.59/2) = 4.66kN/m 3. Slab (B-D/3-5) = 3.6kN/m2 x (3.21/2) = 5.78kN/m 4. Slab (D-F/3-5) = 3.6kN/m2 x (3.7/2) x 2/3 = 4.44kN/m Load involved area =6.66Kn/m x 1.52/2.59 =3.91 kN/m 5. Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m 6. Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (A-B) = 5.78 + 4.44 + 1.44 = 11.66kN/m Total Dead Load at (B-C) = 5.78+4.66+5.7+1.44 =17.58 Kn/M
  • 76. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 76 Live Load: 1. Slab (B-C/5-6) = Corridor x (3.21/2) = 4.0kN/m2 x (3.21/2) = 6.42kN/m 2. Slab (D-E/5-6) = Store x (2.59/2) = 2.5kN/m2 x (2.59/2) = 3.24kN/m 3. Slab (B-D/3-5) = Corridor x (3.21/2) = 4.0kN/m2 x (3.21/2) = 6.42kN/m 4. Slab (D-F/3-5) = Kitchen x (3.7/2) x 2/3 = 3.0kN/m2 x(3.7/2) x 2/3 = 3.7kN/m Total Live Load: Total Live Load at (A-B) = 6.94kN/m Total Live Load at (B-C) = 9.66kN/m Ultimate Load: Ultimate Load at (A-B) = TDL (1.4) + TLL (1.6) = 11.66(1.4) + 6.94(1.6) = 27.43kN/m Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6) = 17.58(1.4) + 9.66(1.6) = 40.07kN/m
  • 77. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 77 Load Diagram of Beam (D/3-6): 1. Referring to Beam (D-E/5), Point Load at B = 14.60kN/m 2. Referring to Beam (B-D/5), Point Load at B = 33.31kN/m ∑m = 0 Rc(7.09) – (40.07 x 3.39) (4.08) – (14.60 x 2.59) - (33.31 x 3.21) - (27.48 x 3.7)(1.85)= 0 Rc(7.09) – 554.22 – 37.81 - 106.93– 188.10 = 0 Rc = 887.06/7.09 Rc = 125.11kN -----1 ∑fy = 0 Rc + Ra – 14.60 - 33.31– (27.48 X 3.7) – (40.12 X 3.39) = 0 -----2 Substitute 1 into 2, 125.11+ Ra – 101.68 – 14.60 - 33.31 – 136 = 0 Ra = 160.48kN
  • 78. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 78 Shear Force Diagram Point 1 = 160.48- 27.43(3.7) = 58.99 Point 2 = 58.99-47.91 = 11.08 Point 3 =11.08 - 40.07(3.39) = - 124.76 Point 4 = -124.76 + 125.11 Point 5 = 0.35 Bending Moment Diagram Peak = (44.74 x 1.55) x ½ = 34.67kN
  • 79. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 79 10.0 Column Analysis Report 9.1 Canisius Bong Column A/3 (Connected to All Floors) -Roof Level- Dead Load: ○1 Roof Slab = (3.05 x 1.55) m2 x 3.6kN/m2 = 4.73m2 x 3.6kN/m2 = 17.03kN ○2 Roof Beam = (0.96 + 2.09 + 1.55) m x 1.44kN/m = 4.60m x 1.44kN/m = 6.62kN Total Dead Load at Roof Level = 17.03N + 6.62kN = 23.65kN -First Floor- Dead Load: Live Load: ○1 Slab = (3.05 x 1.55) m2 x 3.6kN/m2 ○1 Bedroom = 4.73m2 x 3.6kN/m2 = (2.09m x 1.55m) x 1.5kN/m2 = 17.03kN = 4.86kN ○2 Wall = (0.96m + 2.09m + 1.55m) x 5.7kN/m ○2 Toilet = 4.60m x 5.7kN/m = (0.96m x 1.55m) x 2.0kN/m2 = 26.22kN = 2.98kN ○3 Beam = (0.96m + 2.09m + 1.55m) x 1.44kN/m = 4.60m x 1.44kN/m = 6.62kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 17.03kN + 26.22kN + 6.62kN + 6.48kN = 4.86kN + 2.98kN = 56.35kN = 7.84kN
  • 80. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 80 -Ground Floor- Dead Load: Live Load: ○1 Slab = (3.05 x 1.55) m2 x 3.6kN/m2 ○1 Bedroom = 4.73m2 x 3.6kN/m2 = (2.09m x 1.55m) x 1.5kN/m2 = 17.03kN = 4.86kN ○2 Wall = (0.96m + 2.09m + 1.55m) x 5.7kN/m ○2 Toilet = 4.60m x 5.7kN/m = (0.96m x 1.55m) x 2.0kN/m2 = 26.22kN = 2.98kN ○3 Beam = (0.96m + 2.09m + 1.55m) x 1.44kN/m = 4.60m x 1.44kN/m = 6.62kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 17.03kN + 26.22kN + 6.62kN + 6.48kN = 4.86kN + 2.98kN = 56.35kN = 7.84kN Total Dead Load at Column A/3 Total Live Load at Column A/3 = 23.65kN + 56.35kN + 56.35kN = 7.84kN + 7.84kN = 136.35kN = 15.68kN Ultimate Load at Column A/3 = TDL (1.4) + TLL (1.6) = 136.35kN (1.4) + 15.68kN (1.6) = 190.89kN + 25.09kN = 215.98kN
  • 81. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 81 Column E/5 (Connected to All Floors) -Roof Level- Dead Load: ○1 Roof Slab = (2.06 x 3.55) m2 x 3.6kN/m2 = 7.31m2 x 3.6kN/m2 = 26.32kN ○2 Roof Beam = (1.3 + 1.7 + 0.76) m x 1.44kN/m = 3.76m x 1.44kN/m = 5.41kN Total Dead Load at Roof Level = 26.32kN + 5.41kN = 31.73kN -First Floor- Dead Load: Live Load: ○1 Slab = (2.06 x 3.55) m2 x 3.6kN/m2 ○1 Living Room = 7.31m2 x 3.6kN/m2 = (1.85m x 2.06m) x 4.0kN/m2 = 26.32kN = 15.24kN ○2 Wall = (1.3m + 1.7m + 0.76m) x 5.7kN/m ○2 Bedrrom = 3.76m x 5.7kN/m = (1.3m x 1.7m) x 1.5kN/m2 = 21.43kN = 3.32kN ○3 Beam = (1.3m + 1.7m + 0.76m) x 1.44kN/m ○3 Bedroom = 3.76m x 1.44kN/m = (0.76m x 1.7m) x 1.5kN/m2 = 5.41kN = 1.94kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 26.32kN + 21.43kN + 5.41kN + 6.48kN = 15.24kN + 3.32kN + 1.94kN = 59.64KN = 20.5kN
  • 82. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 82 -Ground Floor- Dead Load: Live Load: ○1 Slab = (2.06 x 3.55) m2 x 3.6kN/m2 ○1 Dining Room = 7.31m2 x 3.6kN/m2 = (1.85m x 2.06m) x 2.0kN/m2 = 26.32kN = 7.62kN ○2 Wall = (1.3m + 1.7m + 0.76m) x 5.7kN/m ○2 Family Area = 3.76m x 5.7kN/m = (1.3m x 1.7m) x 2.0kN/m2 = 21.43kN = 4.42kN ○3 Beam = (1.3m + 1.7m + 0.76m) x 1.44kN/m ○3 Car Porch = 3.76m x 1.44kN/m = (0.76m x 1.7m) x 2.0kN/m2 = 5.41kN = 2.58kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 26.32kN + 21.43kN + 5.41kN + 6.48kN = 7.62kN + 4.42kN + 2.58kN = 59.64kN = 14.62kN Total Dead Load at Column E/5 Total Live Load at Column E/5 = 31.73kN + 59.64kN + 59.64kN = 14.62kN + 20.5kN = 151.01kN = 35.12kN Ultimate Load at Column E/5 = TDL (1.4) + TLL (1.6) = 151.01kN (1.4) + 35.12kN (1.6) = 211.41kN + 56.19kN = 267.6kN
  • 83. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 83 Column E/7 (Connected to All Floors) -Roof Level- Dead Load: ○1 Roof Slab = (2.06 x 3.31) m2 x 3.6kN/m2 = 6.82m2 x 3.6kN/m2 = 24.55kN ○2 Roof Beam = (1.3 + 1.34 + 0.76 + 1.97) m x 1.44kN/m = 5.37m x 1.44kN/m =3.41kN Total Dead Load at Roof Level = 24.55kN + 3.41kN = 27.96kN -First Floor- Dead Load: Live Load: ○1 Slab = (3.83 x 3) m2 x 3.6kN/m2 ○1 Bedrrom = 11.49m2 x 3.6kN/m2 = (1.3m x 3m) x 1.5kN/m2 = 41.36kN = 5.85kN ○2 Wall = (1.3m + 2.53m + 3m) x 5.7kN/m ○2 Bedroom = 6.83m x 5.7kN/m = (2.53m x 3m) x 1.5kN/m2 = 38.93kN = 11.39kN ○3 Beam = (1.3m + 2.53m + 3m) x 1.44kN/m = 6.83m x 1.44kN/m = 9.84kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 41.36kN + 38.93kN + 9.84kN + 6.48kN = 5.85kN + 11.39kN = 96.61kN = 17.24kN
  • 84. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 84 -Ground Floor- Dead Load: Live Load: ○1 Slab = (2.06 x 3.31) m2 x 3.6kN/m2 ○1 Living Area = 6.82m2 x 3.6kN/m2 = (1.3m x 1.34m) x 4.0kN/m2 = 24.55kN = 6.97kN ○2 Wall = (1.3m + 1.34m + 0.76m + 1.97m) x 5.7kN/m ○2 Living Area = 5.37m x 5.7kN/m = (1.3m x 1.97m) x 4.0kN/m2 = 30.61kN = 10.24kN ○3 Beam = (1.3m + 1.3m + 0.76m + 1.97m) x 1.44kN/m ○3 Car Porch = 5.37m x 1.44kN/m = (0.76m x 1.34m) x 2.0kN/m2 = 7.73kN = 2.04kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 ○4 Car Porch = 6.48kN = (0.76m x 1.97m) x 2.0kN/m2 = 2.99kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 24.55kN + 30.61kN + 5.37kN + 6.48kN = 6.97kN + 10.24kN + 2.04kN + 2.99kN = 67.01kN = 22.24kN Total Dead Load at Column E/7 Total Live Load at Column E/7 = 27.96kN + 96.61kN + 67.01kN = 17.24kN + 22.24kN = 191.58kN = 39.48kN Ultimate Load at Column E/7 = TDL (1.4) + TLL (1.6) = 191.58kN (1.4) + 39.48N (1.6) = 268.21kN + 63.17kN = 331.38N
  • 85. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 85 9.2 Joyce Wee Column A/1 (Connected to All Floors) -Roof Level- Dead Load: ○1 Roof Slab = (3.155 x 2.09) m2 x 3.6kN/m2 = 6.59m2 x 3.6kN/m2 = 23.72kN ○2 Roof Beam = (3.155 + 2.09) m x 1.44kN/m = 5.245m x 1.44kN/m = 7.55kN Total Dead Load at Roof Level = 23.72kN + 7.55kN = 31.27kN -First Floor- Dead Load: Live Load: ○1 Slab = (3.155 x 2.09)m2 x 3.6kN/m2 ○1 Bedroom = 6.59m2 x 3.6kN/m2 = (2.09m x 3.155m) x 1.5kN/m2 = 23.72kN = 9.89kN ○2 Wall = (3.155m + 2.09m) x 5.7kN/m = 5.245m x 5.7kN/m = 29.9kN ○3 Beam = (3.155m + 2.09m) x 1.44kN/m = 5.75m x 1.44kN/m = 7.55kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN = 67.65kN
  • 86. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 86 -Ground Floor- Dead Load: Live Load: ○1 Slab = (3.155 + 2.09) m2 x 3.6kN/m2 ○1 Bedroom = 6.59m2 x 3.6kN/m2 = (3.155m x 2.09m) x 1.5kN/m2 = 23.72kN = 9.89kN ○2 Wall = (3.155m + 2.09m) x 5.7kN/m = 5.245m x 5.7kN/m = 29.9kN ○3 Beam = (3.155 + 2.09) m x 1.44kN/m = 5.245m x 1.44kN/m = 7.55kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN = 67.65kN Total Dead Load at Column A/1 Total Live Load at Column A/1 = 31.27kN + 67.65kN + 67.65kN = 9.89kN + 9.89kN = 166.57kN = 19.78kN Ultimate Load at Column A/1 = TDL (1.4) + TLL (1.6) = 166.57kN (1.4) + 19.78kN (1.6) = 233.198kN + 31.648kN = 264.85kN
  • 87. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 87 Column D/3 (Connected to All Floors) -Roof Level- Dead Load: Live Load: ○1 Roof Slab = (3.66 x 3.94) m2 x 3.6kN/m2 = 14.42m2 x 3.6kN/m2 = 51.91kN ○2 Roof Beam = (2.09 + 1.61 + 2.05) m x 1.44kN/m = 5.75m x 1.44kN/m = 8.28kN Total Dead Load at Roof Level = 51.91kN + 8.28kN = 60.19kN -First Floor- Dead Load: Live Load: ○1 Slab = (3.36m2 + 2.98m2 + 3.79m2) x 3.6kN/m2 ○1 Bedroom = 10.13m2 x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2 = 36.468kN = 5.05kN ○2 Wall = (2.09m + 1.61m) x 5.7kN/m ○2 Corridor = 3.7m x 5.7kN/m = (3.66m x 1.85m) x 4.0kN/m2 = 21.09kN = 27.08kN ○3 Beam = (2.09m + 1.61m + 2.05m) x 1.44kN/m = 5.75m x 1.44kN/m = 8.28kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 36.47kN + 21.09kN + 8.28kN + 6.48kN = 5.05kN + 27.08kN = 72.32kN = 32.13kN
  • 88. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 88 -Ground Floor- Dead Load: Live Load: ○1 Slab = (1.61 + 2.05)m x (2.09 + 1.85)m x 3.6kN/m2 ○1 Bedroom = (3.66m x 3.94m) x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2 = 51.91kN = 5.05kN ○2 Wall = (2.05m + 2.09m + 1.61m) x 5.7kN/m ○2 Corridor = 5.75m x 5.7kN/m = (1.85m x 1.61m) x 4.0kN/m2 = 32.78kN = 11.91kN ○3 Beam = (2.05 + 2.09 + 1.61 + 1.85) m x 1.44kN/m ○3 Kitchen = 7.6m x 1.44kN/m = (3.94m x 2.05m) x 3.0kN/m2 = 10.944kN = 24.231kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 51.91kN + 32.78kN + 10.944kN + 6.48kN = 5.05kN + 11.91kN + 24.23kN = 234.62kN = 41.19kN Total Dead Load at Column D/3 Total Live Load at Column D/3 = 60.19kN + 72.32kN + 102.11kN = 32.13kN + 41.19kN = 234.62kN = 73.32kN Ultimate Load at Column D/3 = TDL (1.4) + TLL (1.6) = 234.62kN (1.4) + 73.32kN (1.6) = 328.47kN + 117.312kN = 445.78kN
  • 89. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 89 Column D/6 (Acting on Ground Floor Only) -Ground Floor- Dead Load: Live Load: ○1 Slab = (1.7 + 1.34)m (1.61 + 3.83)m x 3.6kN/m2 ○1 Corridor = (3.04m x 5.444m) x 3.6kN/m2 = (1.61m x 1.7) x 4.0kN/m2 = 59.54kN = 10.95kN ○2 Wall = (1.7m + 3.83m) x 5.7kN/m ○2 Living Room = 5.53m x 5.7kN/m = (1.61m + 3.83m) x 1.34m x 4.0kN/m2 = 31.52kN = 29.16kN ○3 Beam = (1.7 + 3.83 + 1.34 + 1.61) m x 1.44kN/m ○3 Storeroom = 8.48m x 1.44kN/m = (1.7m x 3.83m) x 2.5kN/m2 = 12.214kN = 16.28kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 51.54kN + 31.52kN + 12.21kN + 6.48kN = 10.95kN + 29.16kN + 16.28kN = 109.75kN = 56.39kN Total Dead Load at Column D/6 Total Live Load at Column D/6 = 109.75kN = 56.39kN Ultimate Load at Column D/6 = TDL (1.4) + TLL (1.6) = 109.75kN (1.4) + 56.39kN (1.6) = 153.65kN + 90.22kN = 243.87kN
  • 90. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 90 9.3 Tan Wing Hoe Column B/3 (Connected to All Floors) -Roof Level- Dead Load: ○1 Roof Slab = (2.95 x 3.505) m2 x 3.6kN/m2 = 37.22 kN ○2 Roof Beam = (2.95 + 3.505) m x 1.44kN/m = 14.89 kN Total Dead Load at Roof Level = 37.22kN + 14.89kN = 52.11kN -First Floor- Dead Load: Live Load: ○1 Slab = (2.95 x 3.505)m2 x 3.6kN/m2 ○1 Bedroom = 10.16m2 x 3.6kN/m2 = (2.95 x 3.505m) x 1.5kN/m2 = 36.58kN = 15.51kN ○2 Wall = (2.95 + 1.55 + 1.91m) x 5.7kN/m ○2 Bathroom = 6.41m x 5.7kN/m =(1.91 x 1.55)m x2.0kN/m2 = 36.54kN =5.92kn ○3 Beam = (3.155m + 2.09m) x 1.44kN/m ○3 Stairs = (2.95 + 3.505) m x 1.44kN/m =(1.4 x 1.91) x 1.5kN/m2 = 14.89 kN =4.01 ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 36.58kN + 36.54kN + 14.89kN + 6.48kN = 15.51kN + 5.92kN + 4.01kN = 94.49kN =25.44 kN
  • 91. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 91 -Ground Floor- Dead Load: Live Load: ○1 Slab = (2.95 x 3.505)m2 x 3.6kN/m2 ○1 Bedroom = 10.16m2 x 3.6kN/m2 = (2.95 x 3.505m) x 1.5kN/m2 = 36.58kN = 15.51kN ○2 Wall = (2.95 + 1.55 + 1.91m) x 5.7kN/m ○2 Bathroom = 6.41m x 5.7kN/m =(1.91 x 1.55)m x2.0kN/m2 = 36.54kN =5.92kn ○3 Beam = (3.155m + 2.09m) x 1.44kN/m ○3 Stairs = (2.95 + 3.505) m x 1.44kN/m =(1.4 x 1.91) x 1.5kN/m2 = 14.89 kN =4.01 ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 36.58kN + 36.54kN + 14.89kN + 6.48kN = 15.51kN + 5.92kN + 4.01kN = 94.49kN =25.44 kN Total Dead Load at Column B/3 Total Live Load at Column B/3 = 52.11kN + 94.49kN + 94.49kN = 25.44kN + 25.44kN = 241.09kN = 50.88kN Ultimate Load at Column B/3 = TDL (1.4) + TLL (1.6) = 241.09(1.4) + 50.88kN (1.6) = 337.53kN + 81.41kN = 418.94kN
  • 92. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 92 Column G/5 (Connected to All Floors) -Roof Level- Dead Load: Live Load: ○1 Roof Slab = (2.53 x 3.58) m2 x 3.6kN/m2 = 32.61kN ○2 Roof Beam = (2.53 x 3.58) m x 1.44kN/m = 13.04kN Total Dead Load at Roof Level = 51.91kN + 8.28kN = 60.19kN -First Floor- Dead Load: Live Load: ○1 Slab = (4.03m2 + 4.82m2) x 3.6kN/m2 1.Bedroom = 31.86kN - (2.97x1.5)m x 3,6kN/m = (2.015 x 1.85m) x 1.5kN/m2 = 30.96kN - 16.04 = 14.92kN = 3.73kN ○2 Wall = (2.53m + 2.015m + 1.85m + 1.79m) x 5.7kN/m 2. Corridor = 8.19m x 5.7kN/m = (2.53m x 1.85m) x 4.0kN/m2 = 46.69kN = 18.72kN ○3 Beam = (2.53m + 2.015m + 1.85m + 1.79m) x 1.44kN/m 3. Bedroom = 8.19m x 1.44kN/m =(3.03 x 2.53m) x 1.5kN/m2 = 11.79kN = 11.50kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 14.92kN + 46.69kN + 11.79kN + 6.48kN = 3.73kN + 18.72kN + 11.50kN = 79.88kN = 33.95kN
  • 93. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 93 -Ground Floor- Dead Load: Live Load: ○1 Slab = (3.49 + 2.53)m x 3.6kN/m2 1. Porch =(2.53 + 1.695)m x 2.0kN/m = (6.02) x 1.5kN/m2 = 21.67kN = 8.45kN ○2 Wall = (2.53m) x 5.7kN/m 2. Kitchen = 2.53m x 5.7kN/m = (1.79m x 2.53m) x 3.0kN/m2 = 14.42kN =12.96kN ○3 Beam = (2.53) m x 1.44kN/m = 2.53m x 1.44kN/m = 3.64kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 21.67kN + 14.42kN + 3.64kN + 6.48kN = 8.45kN + 12.96kN = 46.21kN = 21.41kN Total Dead Load at Column G/5 Total Live Load at Column G/5 = 60.19kN + 79.88kN + 46.21kN = 33.95kN + 21.41kN = 186.28kN = 55.36kN Ultimate Load at Column G/5 = TDL (1.4) + TLL (1.6) = 186.28kN (1.4) + 55.36kN (1.6) = 260.79kN + 88.58kN = 349.37kN
  • 94. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 94 Column E/8 (Acting on Ground Floor Only) -Ground Floor- Dead Load: Live Load: 1. Slab = (1.94 +1.295)m (1.94 + 2.53)m x 3.6kN/m2 1. Porch = (3.235m x 4.47m) x 3.6kN/m2 = (1.94m x 2.53) x 2.0kN/m2 = 52.06kN = 9.82kN 2. Wall = 1.94 x 5.7kN/m 2. Living Room = (1.94x 1.295m) x 4.0kN/m2 = 11.06kN = 10.05kN 3. Beam = (1.94 + 1.295 + 2.53) m x 1.44kN/m = 5.765m x 1.44kN/m = 8.3kN 4. Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 52.06kN + 11.06kN + 8.3kN + 6.48kN = 10.05kN + 9.82kN = 77.9kN = 19.87kN Total Dead Load at Column E/8 Total Live Load at Column E/8 = 77.9kN = 19.87kN Ultimate Load at Column E/8 = TDL (1.4) + TLL (1.6) = 77.9kN (1.4) + 19.87kN (1.6) = 109.06kN + 31.79kN = 140.85kN
  • 95. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 95 11.0 Appendix Slab System If Ly/Lx > 2, one-way slab system If Ly/Lx ≤ 2, two-way slab system Beam Calculation Beam self-weight = beam size x density of reinforced concrete Slab dead load = thickness x density of reinforced concrete x Lx/2 (Trapezoid) = thickness x density of reinforced concrete x Lx/2 x 2/3 (Triangular) Slab live load = live load (UBBL) x Lx/2 (Trapezoid) = live load (UBBL) x Lx/2 x 2/3 (Triangular) Brick wall dead load = wall height x thickness x density of bricks Column Calculation Beam self-weight = beam size x density of reinforced concrete x length Slab dead load = thickness x density of reinforced concrete x tributary area Slab live load = live load (UBBL) x tributary area Brick wall self-weight = thickness x wall height x density of bricks x length Column self-weight = width x length x height x density of reinforced concrete
  • 96. BUILDING STRUCTURE PROJECT 2: BEAM AND COLUMN 96 Assumption of Dead Load and Live Load Assumptions on Dead Loads Acting on Structure (F) Slab self-weight = 0.15 x 24kN/m3 = 3.6kN/m2 (G) Brick wall self-weight = Wall thickness x Wall height x Density = 0.1m x 3.0m x 19kN/m3 = 5.7kN/m (H) Primary Beam self-weight = Beam size x Concrete density = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m (I) Secondary Beam self-weight = Beam size x Concrete density = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m (J) Column self-weight = Column size x Concrete density = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN *All dead loads (slabs, walls, beams, columns) are assumed to have a standard size. * Dead load factor: 1.4 Assumptions on Live Loads Acting on Structure (L) Bedroom :1.5kN/m2 (M) Living Room :4.0kN/m2 (N) Dining Room :2.0kN/m2 (O) Kitchen :3.0kN/m2 (P) Corridor :4.0kN/m2 (Q) Bathroom :2.0kN/m2 (R) Study Room :1.5kN/m2 (S) Car Porch :2.0kN/m2 (T) Stairs :1.5kN/m2 (U) Family Area :2.0kN/m2 (V) Store Room :2.5kN/m2 *All assumptions on live loads are referred to 4th schedule of UBBL for live loads per room functions. * Live load factor: 1.6