NEOM
Settling of Basin Earthworks
Package 01
Contract No. 4200000031
Work Order No. 015
Sama- Technical Department
For The Period Between
The 15th Of May 2023 & to The Of 22nd May 2023
Weekly Works Progress
Sama- Technical Department
C
C 3 - D o c u m e n t a t i o n S t a t u s
A
B
P r o j e c t H S E
P r o j e c t ’ s Q u a l i t y
D
W o r k s P r o g r e s s
E
E x i s t i n g U t i l i t i e s
A
B
C
D
E
Sama- Technical Department
Sama- Technical Department
I t e m
A Project HSE
Project HSE
A
Sama- Technical Department
SAMA 015 WEEKLY OCCUPATIONAL HEALTH & SAFETY STATISTICS
OXAGONEast of Zone C Phase 2 & North of L103 Access Road Earth
works
Description
May-23
Week # 01 Week # 02 Week # 03 Week # 04 MTD PTD
Manpower 97 80 111 0 72 96.17
Manhours Worked 6,402 6160 8,547 0 21,109 179,509.00
Manhours Worked since last LTI 6,402 6160 8,547 0 21,109 179,509.00
Number of Project ManagementWalkthrough 1 1 1 0 3 21.00
Number of OHS Incident InvestigationReports Closed-out 0 0 0 0 0 0.00
Number of OHS Incident InvestigationReports Open 0 0 0 0 0 0.00
Number of Health & Safety Audits 0 0 0 0 0 0.00
Number of OHS Inspection 5 5 6 0 16 105.00
Number of OHS Meetings Held 0 0 0 0 0 3.00
Number of OHS Toolbox Talks 6 7 7 0 20 155.00
OHS Induction 0 0 0 0 0 143.00
OHS Technical Training 5 5 5 0 15 25.00
OHS Campaigns 0 0 1 0 1 2.00
OHS Reward Events 0 0 0 0 0 0.00
Fatality 0 0 0 0 0 0.00
Lost Workdays Case (Injuries) 0 0 0 0 0 0.00
Property Damage 0 0 0 0 0 0.00
Number of Road TrafficAccident - Work Related 0 0 0 0 0 0.00
First-aid Injury 0 0 0 0 0 0.00
Near-miss 0 0 0 0 0 1.00
OHS Observations 18 20 18 0 56 641.00
Lost Time Injury Rate (LTIR) 0 0 0 #DIV/0! 0 #DIV/0!
safety dash Board
A
Sama- Technical Department
Project:OXAGON East of Zone C Phase 2 & North of L103 Access Road
Earth works
Description 2023
FY 2023
PTD
Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23
Manpower 0 39 107 112 115 93 111 96
Manhours Worked - 13,607 46,409 43,274 36498 18612 21109 179,509
Manhours Worked since last LTI - 13,607 46,409 43,274 36498 18612 21109 179,509
Number of Project ManagementWalkthrough 0 3 4 4 4 3 3 21
Number of OHS Incident InvestigationReports Closed-out 0 0 0 0 0 0 0 0
Number of OHS Incident InvestigationReports Open 0 0 0 0 0 0 0 0
Number of Health & Safety Audits 0 0 0 0 0 0 0 0
Number of OHS Inspection 0 10 20 20 20 19 16 105
Number of OHS Meetings Held 0 1 0 0 0 1 1 3
Number of OHS Toolbox Talks 0 25 28 28 28 27 19 155
OHS Induction 0 60 50 29 4 0 0 143
OHS Technical Training 0 3 2 1 0 4 15 25
OHS Campaigns 0 0 0 0 0 1 1 2
OHS Reward Events 0 0 0 0 0 0 0 0
OHS Observations 0 70 104 158 160 93 56 641
Lost Workdays Case (Injuries) 0 0 0 0 0 0 0 0
Property Damage 0 0 0 0 0 0 0 0
Number of Road TrafficAccident - Work Related 0 0 0 0 0 0 0 0
First-aid Injury 0 0 0 0 0 0 0 0
Near-miss 0 1 0 0 0 0 0 1
Fatality 0 0 0 0 0 0 0 0
Lost Time Injury Rate (LTIR) - 0 0 0 0 0 0
Project HSE
A
Sama- Technical Department
Project HSE
A
Sama- Technical Department
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
Project HSE
A
Sama- Technical Department
A.0
Safety
Moment
SAMA Technical Department

More Related Content

Similar to Weekly slide - Wo-015 - 15 May to 22 May.pptx

EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectTapas Das
 
Departmental Briefing to Secretary Works on 08-02-2023.pptx
Departmental Briefing to Secretary Works on 08-02-2023.pptxDepartmental Briefing to Secretary Works on 08-02-2023.pptx
Departmental Briefing to Secretary Works on 08-02-2023.pptxsheikhInayat5
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxMohHElkomy
 
Tentative vacancies of combined graduate level examination 2012
Tentative vacancies of combined graduate level examination 2012Tentative vacancies of combined graduate level examination 2012
Tentative vacancies of combined graduate level examination 2012Rabindra Mahalik
 
EHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxEHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxMoolRaj3
 
Jadwal_Gasal_2023_25Ags for safekeeeping
Jadwal_Gasal_2023_25Ags for safekeeepingJadwal_Gasal_2023_25Ags for safekeeeping
Jadwal_Gasal_2023_25Ags for safekeeepingEde Wardhana
 
Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...
Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...
Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...Muhamad Rizky
 
Bachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxBachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxUIET,KUK
 
Black belt Project -Process optimization DV Cyl Head.pptx
Black belt Project -Process optimization DV Cyl Head.pptxBlack belt Project -Process optimization DV Cyl Head.pptx
Black belt Project -Process optimization DV Cyl Head.pptxvasant bhoknal
 
MPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxMPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxSuyogJungare
 
Final Majarrah rev 0
Final Majarrah rev 0Final Majarrah rev 0
Final Majarrah rev 0Ahmed Mehrem
 

Similar to Weekly slide - Wo-015 - 15 May to 22 May.pptx (20)

EHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West ProjectEHS Review - May 2017 - Vijay West Project
EHS Review - May 2017 - Vijay West Project
 
Departmental Briefing to Secretary Works on 08-02-2023.pptx
Departmental Briefing to Secretary Works on 08-02-2023.pptxDepartmental Briefing to Secretary Works on 08-02-2023.pptx
Departmental Briefing to Secretary Works on 08-02-2023.pptx
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptx
 
Tentative vacancies of combined graduate level examination 2012
Tentative vacancies of combined graduate level examination 2012Tentative vacancies of combined graduate level examination 2012
Tentative vacancies of combined graduate level examination 2012
 
1274.pdf
1274.pdf1274.pdf
1274.pdf
 
Review Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptxReview Week 1 Oktober 2022.pptx
Review Week 1 Oktober 2022.pptx
 
EHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxEHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptx
 
Jadwal_Gasal_2023_25Ags for safekeeeping
Jadwal_Gasal_2023_25Ags for safekeeepingJadwal_Gasal_2023_25Ags for safekeeeping
Jadwal_Gasal_2023_25Ags for safekeeeping
 
Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...
Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...
Ground Vibration Control Using Signature Hole Method - Thesis BE Mining, Univ...
 
School District Budget
School District Budget School District Budget
School District Budget
 
AMW FIXTURES
AMW FIXTURESAMW FIXTURES
AMW FIXTURES
 
10 final highway (1) baby
10   final highway (1) baby10   final highway (1) baby
10 final highway (1) baby
 
Final highway (1) baby
Final highway (1) babyFinal highway (1) baby
Final highway (1) baby
 
ARB JANADREA 25.01.16 UPDATE PM
ARB JANADREA 25.01.16 UPDATE  PMARB JANADREA 25.01.16 UPDATE  PM
ARB JANADREA 25.01.16 UPDATE PM
 
Sensors for SmartCity
Sensors for SmartCitySensors for SmartCity
Sensors for SmartCity
 
Bachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxBachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docx
 
Black belt Project -Process optimization DV Cyl Head.pptx
Black belt Project -Process optimization DV Cyl Head.pptxBlack belt Project -Process optimization DV Cyl Head.pptx
Black belt Project -Process optimization DV Cyl Head.pptx
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
MPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxMPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptx
 
Final Majarrah rev 0
Final Majarrah rev 0Final Majarrah rev 0
Final Majarrah rev 0
 

Recently uploaded

Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书c3384a92eb32
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationEmaan Sharma
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/FootingEr. Suman Jyoti
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 

Recently uploaded (20)

Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 

Weekly slide - Wo-015 - 15 May to 22 May.pptx

  • 1. Weekly Progress Meeting 15th May 22nd May 2023 NEOM Settling of Basin Earthworks Package 01 Contract No. 4200000031 Work Order No. 015 Sama- Technical Department
  • 2. For The Period Between The 15th Of May 2023 & to The Of 22nd May 2023 Weekly Works Progress Sama- Technical Department
  • 3. C C 3 - D o c u m e n t a t i o n S t a t u s A B P r o j e c t H S E P r o j e c t ’ s Q u a l i t y D W o r k s P r o g r e s s E E x i s t i n g U t i l i t i e s A B C D E Sama- Technical Department
  • 4. Sama- Technical Department I t e m A Project HSE
  • 5. Project HSE A Sama- Technical Department SAMA 015 WEEKLY OCCUPATIONAL HEALTH & SAFETY STATISTICS OXAGONEast of Zone C Phase 2 & North of L103 Access Road Earth works Description May-23 Week # 01 Week # 02 Week # 03 Week # 04 MTD PTD Manpower 97 80 111 0 72 96.17 Manhours Worked 6,402 6160 8,547 0 21,109 179,509.00 Manhours Worked since last LTI 6,402 6160 8,547 0 21,109 179,509.00 Number of Project ManagementWalkthrough 1 1 1 0 3 21.00 Number of OHS Incident InvestigationReports Closed-out 0 0 0 0 0 0.00 Number of OHS Incident InvestigationReports Open 0 0 0 0 0 0.00 Number of Health & Safety Audits 0 0 0 0 0 0.00 Number of OHS Inspection 5 5 6 0 16 105.00 Number of OHS Meetings Held 0 0 0 0 0 3.00 Number of OHS Toolbox Talks 6 7 7 0 20 155.00 OHS Induction 0 0 0 0 0 143.00 OHS Technical Training 5 5 5 0 15 25.00 OHS Campaigns 0 0 1 0 1 2.00 OHS Reward Events 0 0 0 0 0 0.00 Fatality 0 0 0 0 0 0.00 Lost Workdays Case (Injuries) 0 0 0 0 0 0.00 Property Damage 0 0 0 0 0 0.00 Number of Road TrafficAccident - Work Related 0 0 0 0 0 0.00 First-aid Injury 0 0 0 0 0 0.00 Near-miss 0 0 0 0 0 1.00 OHS Observations 18 20 18 0 56 641.00 Lost Time Injury Rate (LTIR) 0 0 0 #DIV/0! 0 #DIV/0!
  • 6. safety dash Board A Sama- Technical Department Project:OXAGON East of Zone C Phase 2 & North of L103 Access Road Earth works Description 2023 FY 2023 PTD Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Manpower 0 39 107 112 115 93 111 96 Manhours Worked - 13,607 46,409 43,274 36498 18612 21109 179,509 Manhours Worked since last LTI - 13,607 46,409 43,274 36498 18612 21109 179,509 Number of Project ManagementWalkthrough 0 3 4 4 4 3 3 21 Number of OHS Incident InvestigationReports Closed-out 0 0 0 0 0 0 0 0 Number of OHS Incident InvestigationReports Open 0 0 0 0 0 0 0 0 Number of Health & Safety Audits 0 0 0 0 0 0 0 0 Number of OHS Inspection 0 10 20 20 20 19 16 105 Number of OHS Meetings Held 0 1 0 0 0 1 1 3 Number of OHS Toolbox Talks 0 25 28 28 28 27 19 155 OHS Induction 0 60 50 29 4 0 0 143 OHS Technical Training 0 3 2 1 0 4 15 25 OHS Campaigns 0 0 0 0 0 1 1 2 OHS Reward Events 0 0 0 0 0 0 0 0 OHS Observations 0 70 104 158 160 93 56 641 Lost Workdays Case (Injuries) 0 0 0 0 0 0 0 0 Property Damage 0 0 0 0 0 0 0 0 Number of Road TrafficAccident - Work Related 0 0 0 0 0 0 0 0 First-aid Injury 0 0 0 0 0 0 0 0 Near-miss 0 1 0 0 0 0 0 1 Fatality 0 0 0 0 0 0 0 0 Lost Time Injury Rate (LTIR) - 0 0 0 0 0 0
  • 9. Project HSE A Sama- Technical Department A.0 Safety Moment
  • 10. Project HSE A Sama- Technical Department A.0 Safety Moment
  • 11. Project HSE A Sama- Technical Department A.0 Safety Moment
  • 12. Project HSE A Sama- Technical Department A.0 Safety Moment
  • 13. Project HSE A Sama- Technical Department A.0 Safety Moment
  • 14. Project HSE A Sama- Technical Department A.0 Safety Moment
  • 15. Project HSE A Sama- Technical Department A.0 Safety Moment