More Related Content
Similar to Final Majarrah rev 0
Similar to Final Majarrah rev 0 (20)
More from Ahmed Mehrem (10)
Final Majarrah rev 0
- 1. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
Majarrah BusinessMajarrah Business Complex 164 15-Jun-15 31-Dec-15 0
Stage IStage I 164 15-Jun-15 31-Dec-15 0
M10000000 Project Data Date 0 15-Jun-15 0
M90000000 Stage 1 Ready for Operation 0 01-Dec-15 0
M90000010 Stage I Soft Opening 0 31-Dec-15 0
Plaza LevelPlaza Level 138 15-Jun-15 30-Nov-15 1
GeneralGeneral 16 25-Jun-15 14-Jul-15 83
M10000100 Sign a Contract with Fountains and Water Fall Contractor 0 25-Jun-15 C/SCG N/A 33
M10000200 Sign a Contract with Hardscape Contractor for Plaza 0 25-Jun-15 C/TB N/A 13
M10000300 Sign a Contract with Public Address Supplier for Plaza 0 25-Jun-15 C/SCG N/A 33
M10000400 Sign a Contract with CCTV Supplier for Plaza 0 25-Jun-15 C/SCG N/A 16
M10000410 Sign a Contract with External Plaza Lighting Fixture Suppl 0 02-Jul-15 C/SCG N/A 39
M10000440 Sign a Contract with Gas Company for Gas Facility 0 14-Jul-15 Client Gas 83
DesignDesign 22 15-Jun-15 09-Jul-15 33
Architectural DesArchitectural Design 10 15-Jun-15 25-Jun-15 1
M11000100 Final Architectural Design for Plaza level 10 15-Jun-15 25-Jun-15 T.B 1
Structural DesignStructural Design 12 27-Jun-15 09-Jul-15 3
M11000200 Structural Design for Demolishing works 12 27-Jun-15 09-Jul-15 HW 3
MEP DesignMEP Design 6 27-Jun-15 02-Jul-15 39
Electrical SystemsElectrical Systems 6 27-Jun-15 02-Jul-15 39
Power SystemPower System 6 27-Jun-15 02-Jul-15 37
M11000300 Power System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37
Lighting SystemLighting System 6 27-Jun-15 02-Jul-15 39
M11000400 Lighting System for External Lighting By LCD 6 27-Jun-15 02-Jul-15 LCD 39
Public Address SysPublic Address System 6 27-Jun-15 02-Jul-15 39
M11000500 Public Address System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 39
CCTV SystemCCTV System 6 27-Jun-15 02-Jul-15 30
M11000600 CCTV System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 30
Data SystemData System 6 27-Jun-15 02-Jul-15 37
M11000700 Data System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37
Mechanical SystemsMechanical Systems 6 27-Jun-15 02-Jul-15 35
Fire Fighting SysteFire Fighting System 6 27-Jun-15 02-Jul-15 35
M11000800 Fire Fighting System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 35
Plumbing SystemPlumbing System 6 27-Jun-15 02-Jul-15 26
Drainage SystemDrainage System 6 27-Jun-15 02-Jul-15 1
M11000900 Drainage System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 1
Irrigation SystemIrrigation System 6 27-Jun-15 02-Jul-15 24
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
31-Dec-
31-Dec-
30-Nov-15, Pla
14-Jul-15, General
09-Jul-15, Design
25-Jun-15, Architectural Design
09-Jul-15, Structural Design
02-Jul-15, MEP Design
02-Jul-15, Electrical Systems
02-Jul-15, Power System
02-Jul-15, Lighting System
02-Jul-15, Public Address System
02-Jul-15, CCTV System
02-Jul-15, Data System
02-Jul-15, Mechanical Systems
02-Jul-15, Fire Fighting System
02-Jul-15, Plumbing System
02-Jul-15, Drainage System
02-Jul-15, Irrigation System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 1 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 2. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M110001000 Irrigation System Layout for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 24
Fountains and WateFountains and Water Fall 6 27-Jun-15 02-Jul-15 26
M110001004 Water Fall Design 6 27-Jun-15 02-Jul-15 SCG 26
M110001002 Fountains Design 6 27-Jun-15 02-Jul-15 SCG 26
Shop DrawingsShop Drawings 28 27-Jun-15 30-Jul-15 29
Architectural ShoArchitectural Shop Drawing 12 27-Jun-15 09-Jul-15 13
M110001006 Plaza Architecture Layout Shop Drawing Submittal 6 27-Jun-15 02-Jul-15 N/A 13
M110001008 Plaza Architecture Layout Shop Drawing Approval 6 04-Jul-15 09-Jul-15 T.B 13
Structural Shop DStructural Shop Drawing 16 11-Jul-15 30-Jul-15 3
M110001010 Plaza Structural Modifications Layout Submittal 10 11-Jul-15 22-Jul-15 ECIP 3
M110001012 Plaza Structural Modifications Layout Approval 6 25-Jul-15 30-Jul-15 HW 3
Electrical SystemsElectrical Systems 18 04-Jul-15 26-Jul-15 33
Power SystemPower System 12 04-Jul-15 16-Jul-15 37
M110001014 Power System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 37
M110001016 Power System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 37
Lighting SystemLighting System 12 04-Jul-15 16-Jul-15 39
M110001018 Lighting System for External Lighting Submittal 6 04-Jul-15 09-Jul-15 Ofoq 39
M110001020 Lighting System for External Lighting Approval 6 11-Jul-15 16-Jul-15 SCG 39
Public Address SysPublic Address System 12 11-Jul-15 26-Jul-15 33
M110001022 Public Address System for External Lighting Submittal 6 11-Jul-15 16-Jul-15 Ofoq 33
M110001024 Public Address System for External Lighting Approval 6 19-Jul-15 26-Jul-15 SCG 33
CCTV SystemCCTV System 12 04-Jul-15 16-Jul-15 30
M1PS1360 CCTV System for External Lighting Submittal 6 04-Jul-15 09-Jul-15 Ofoq 30
M1PS1370 CCTV System for External Lighting Approval 6 11-Jul-15 16-Jul-15 SCG 30
Data SystemData System 12 04-Jul-15 16-Jul-15 37
M110001026 Data System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 37
M110001028 Data System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 37
Mechanical SysteMechanical Systems 21 04-Jul-15 29-Jul-15 29
Fire Fighting SystemFire Fighting System 12 04-Jul-15 16-Jul-15 35
M110001030 Fire Fighting System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 35
M110001032 Fire Fighting System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 35
Plumbing SystemPlumbing System 21 04-Jul-15 29-Jul-15 29
Drainage SystemDrainage System 21 04-Jul-15 29-Jul-15 24
M110001034 Drainage System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 1
M110001036 Drainage System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 1
M110001038 Builder Work and Core drill openings for Floor drains
Submittal
3 19-Jul-15 21-Jul-15 Ofoq 24
M110001040 Builder Work and Core drill openings for Floor drains Appr 6 22-Jul-15 29-Jul-15 HW 24
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
02-Jul-15, Fountains and Water Fall
30-Jul-15, Shop Drawings
09-Jul-15, Architectural Shop Drawing
30-Jul-15, Structural Shop Drawing
26-Jul-15, Electrical Systems
16-Jul-15, Power System
16-Jul-15, Lighting System
26-Jul-15, Public Address System
16-Jul-15, CCTV System
16-Jul-15, Data System
29-Jul-15, Mechanical Systems
16-Jul-15, Fire Fighting System
29-Jul-15, Plumbing System
29-Jul-15, Drainage System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 2 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 3. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
Irrigation SystemIrrigation System 21 04-Jul-15 29-Jul-15 24
M110001042 Irrigation System Layout for Plaza Level Submittal 15 04-Jul-15 21-Jul-15 Ofoq 24
M110001044 Irrigation System Layout for Plaza Level Approval 6 22-Jul-15 29-Jul-15 SCG 24
Fountains and WateFountains and Water Fall 18 04-Jul-15 26-Jul-15 32
M110001048 Water Fall Shop drawing Submittal 12 04-Jul-15 16-Jul-15 Ofoq 27
M110001046 Fountains Shop drawing Submittal 12 04-Jul-15 16-Jul-15 Ofoq 32
M110001052 Water Fall Shop drawing Approval 6 19-Jul-15 26-Jul-15 SCG 27
M110001050 Fountains Shop drawing Approval 6 19-Jul-15 26-Jul-15 SCG 32
MaterialsMaterials 103 15-Jun-15 20-Oct-15 34
Structural MateriaStructural Materials 36 15-Jun-15 28-Jul-15 12
Structural Material SStructural Material Submittal 6 15-Jun-15 21-Jun-15 12
M110001166 Expansion Joints Submittal 6 15-Jun-15 21-Jun-15 ECIP 12
Structural Material AStructural Material Approval 6 22-Jun-15 28-Jun-15 12
M110001176 Expansion Joints Approval 6 22-Jun-15 28-Jun-15 ECIP 12
Structural Material PStructural Material P.O 6 29-Jun-15 05-Jul-15 12
M110001186 Expansion Joints PO 6 29-Jun-15 05-Jul-15 ECIP 12
Structural Material DStructural Material Delivery 18 06-Jul-15 28-Jul-15 12
M110001196 Expansion Joints Delivery to Site 18 06-Jul-15 28-Jul-15 ECIP 12
Finishing MateriaFinishing Materials 76 11-Jul-15 13-Oct-15 37
Finishing Material SFinishing Material Submittal 26 11-Jul-15 11-Aug-15 52
M110001054 Plaza Flooring Filling (M-01&M-02&M-03) Material Submi 6 11-Jul-15 16-Jul-15 N/A 13
M110001056 Plaza Walkway Filling (M-04) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 61
M110001058 Plaza Driveway Filling (M-05 & M-06) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64
M110001060 Fountain Area M-07 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 54
M110001062 Plaza Borders B-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64
M110001064 Building Borders B-02 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64
M110001068 Drive Borders B-03 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64
M110001070 Planters Copping (C-01 & C-02 & C-03) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64
M110001072 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Subm 6 11-Jul-15 16-Jul-15 N/A 70
M110001074 Loose Gravel GR-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 72
M110001078 Pre-Cast Concrete Curb CB-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 65
M110001080 Soft Scape Material Submittal 26 11-Jul-15 11-Aug-15 MIAC 35
Finishing Material AFinishing Material Approval 26 19-Jul-15 18-Aug-15 52
M110001082 Plaza Flooring Filling (M-01&M-02&M-03) Material Appro 6 19-Jul-15 26-Jul-15 T.B 13
M110001084 Plaza Walkway Filling (M-04) Material Approval 6 19-Jul-15 26-Jul-15 T.B 61
M110001086 Plaza Driveway Filling (M-05 & M-06) Material Approval 6 19-Jul-15 26-Jul-15 T.B 64
M110001088 Fountain Area M-07 Material Approval 6 19-Jul-15 26-Jul-15 T.B 54
M110001090 Plaza Borders B-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
29-Jul-15, Irrigation System
26-Jul-15, Fountains and Water Fall
20-Oct-15, Materials
28-Jul-15, Structural Materials
21-Jun-15, Structural Material Submittal
28-Jun-15, Structural Material Approval
05-Jul-15, Structural Material P.O
28-Jul-15, Structural Material Delivery
13-Oct-15, Finishing Mat
11-Aug-15, Finishing Material Submitta
18-Aug-15, Finishing Material Appro
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 3 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 4. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M110001092 Building Borders B-02 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64
M110001094 Drive Borders B-03 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64
M110001096 Planters Copping (C-01 & C-02 & C-03) Material Approval 6 19-Jul-15 26-Jul-15 T.B 64
M110001098 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Appr 6 19-Jul-15 26-Jul-15 T.B 70
M1100010100 Loose Gravel GR-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 72
M1100010102 Pre-Cast Concrete Curb CB-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 65
M1100010104 Soft Scape Material Approval 6 12-Aug-15 18-Aug-15 T.B 35
Finishing Material PFinishing Material P.O 46 27-Jul-15 17-Sep-15 35
M1100010106 Plaza Flooring Filling (M-01&M-02&M-03) Material P.O 3 27-Jul-15 29-Jul-15 N/A 13
M1100010108 Plaza Walkaway Filling (M-04) Material P.O 3 27-Jul-15 29-Jul-15 N/A 61
M11000101010 Plaza Driveway Filling (M-05 & M-06) Material P.O 3 27-Jul-15 29-Jul-15 N/A 64
M11000101012 Fountain Area M-07 Material P.O 3 27-Jul-15 29-Jul-15 N/A 54
M11000101014 Plaza Borders B-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64
M11000101016 Building Borders B-02 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64
M11000101018 Drive Borders B-03 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64
M11000101020 Planters Copping (C-01 & C-02 & C-03) Material P.O 3 27-Jul-15 29-Jul-15 N/A 64
M11000101022 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material P.O 3 27-Jul-15 29-Jul-15 N/A 70
M11000101024 Loose Gravel GR-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 72
M11000101026 Pre-Cast Concrete Curb CB-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 65
M11000101028 Soft Scape Material P.O 26 19-Aug-15 17-Sep-15 MIAC 35
Finishing Material DFinishing Material Delivery 61 30-Jul-15 13-Oct-15 37
M11000101030 Plaza Walkaway Filling (M-04) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 61
M11000101032 Plaza Driveway Filling (M-05 & M-06) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64
M11000101034 Fountain Area M-07 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 54
M11000101036 Plaza Borders B-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64
M11000101038 Building Borders B-02 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64
M11000101040 Drive Borders B-03 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64
M11000101042 Planters Copping (C-01 & C-02 & C-03) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64
M11000101044 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Deliv 26 30-Jul-15 29-Aug-15 N/A 70
M11000101046 Loose Gravel GR-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 72
M11000101048 Pre-Cast Concrete Curb CB-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 65
M11000101050 Plaza Flooring Filling (M-01&M-02&M-03) Material Deliver 52 30-Jul-15 01-Oct-15 N/A 13
M11000101052 Soft Scape Material Delivery 18 19-Sep-15 13-Oct-15 MIAC 35
MEP MaterialsMEP Materials 103 15-Jun-15 20-Oct-15 34
Material SubmittalMaterial Submittal 52 15-Jun-15 16-Aug-15 55
Electrical Material SElectrical Material Submittal 52 15-Jun-15 16-Aug-15 55
M11000101054 PVC Conduit Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 50
M11000101056 Wires for Power and Lighting Material Submittal 10 19-Jul-15 30-Jul-15 Ofoq 69
M11000101058 External & Facade Lighting Fixture Material Submittal 12 19-Jul-15 02-Aug-15 N/A 46
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
17-Sep-15, Finishing Material
13-Oct-15, Finishing Mat
20-Oct-15, MEP Materi
16-Aug-15, Material Submittal
16-Aug-15, Electrical Material Submit
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 4 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 5. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M11000101060 Structured Cable for Data System Material Submittal 18 19-Jul-15 09-Aug-15 Ofoq 49
M11000101062 Distribution Board DB1, DB4 Material Submittal 18 19-Jul-15 09-Aug-15 Ofoq 46
M11000101064 CCTV Cameras Material Submittal 18 19-Jul-15 09-Aug-15 N/A 30
M11000101066 Floor Box Submittal 18 27-Jul-15 16-Aug-15 Ofoq 40
M11000101068 Public Address Loud Speaker Material Submittal 18 27-Jul-15 16-Aug-15 N/A 36
Mechanical MateriaMechanical Material Submittal 12 19-Jul-15 02-Aug-15 32
M11000101070 FD,AD, PD Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 1
M11000101072 Fire Hydrant Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 38
M11000101074 Siamese Connection Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 35
M11000101076 Fountains and Water Fall Accessories Material Submittal 6 27-Jul-15 02-Aug-15 N/A 32
Material ApprovalMaterial Approval 55 18-Jun-15 23-Aug-15 55
Electrical Material AElectrical Material Approval 55 18-Jun-15 23-Aug-15 55
M11000101078 PVC Conduit Material Approval 6 18-Jun-15 24-Jun-15 SCG 50
M11000101080 Wires for Power and Lighting Material Approval 6 01-Aug-15 06-Aug-15 SCG 69
M11000101082 External & Facade Lighting Fixture Material Approval 6 03-Aug-15 09-Aug-15 SCG 46
M11000101084 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 49
M11000101086 Distribution Board DB1, DB4 Material Approval 6 10-Aug-15 16-Aug-15 SCG 46
M11000101088 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 30
M11000101090 Floor Box Material Approval 6 17-Aug-15 23-Aug-15 SCG 40
M11000101092 Public Address Loud Speaker Material Approval 6 17-Aug-15 23-Aug-15 SCG 36
Mechanical MateriaMechanical Material Approval 12 27-Jul-15 09-Aug-15 32
M11000101094 FD,AD, PD Material Approval 6 27-Jul-15 02-Aug-15 SCG 1
M11000101096 Fire Hydrant Material Approval 6 27-Jul-15 02-Aug-15 SCG 38
M11000101098 Siamese Connection Material Approval 6 27-Jul-15 02-Aug-15 SCG 35
M11000101100 Fountains and Water Fall Accessories Material Approval 6 03-Aug-15 09-Aug-15 SCG 32
Material P.OMaterial P.O 52 25-Jun-15 26-Aug-15 55
Electrical MaterialElectrical Material P.O 52 25-Jun-15 26-Aug-15 55
M110001010102 PVC Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 50
M110001010104 Wires for Power and Lighting Material P.O 3 08-Aug-15 10-Aug-15 Ofoq 69
M110001010106 External & Facade Lighting Fixture Material P.O 3 10-Aug-15 12-Aug-15 N/A 46
M110001010108 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 49
M110001010110 Distribution Board DB1, DB4 Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 46
M110001010112 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 30
M110001010114 Floor Box Material P.O 3 24-Aug-15 26-Aug-15 Ofoq 40
M110001010116 Public Address Loud Speaker Material P.O 3 24-Aug-15 26-Aug-15 N/A 36
Mechanical MateriaMechanical Material P.O 12 03-Aug-15 16-Aug-15 32
M110001010118 FD,AD, PD Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 1
M110001010120 Fire Hydrant Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 38
M110001010122 Siamese Connection Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 35
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
02-Aug-15, Mechanical Material Submitta
23-Aug-15, Material Approval
23-Aug-15, Electrical Material Appr
09-Aug-15, Mechanical Material Appr
26-Aug-15, Material P.O
26-Aug-15, Electrical Material P.O
16-Aug-15, Mechanical Material P.O
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 5 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 6. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M110001010124 Fountains and Water Accessories Fall Material P.O 6 10-Aug-15 16-Aug-15 N/A 32
Material DeliveryMaterial Delivery 91 29-Jun-15 20-Oct-15 34
Electrical MaterialElectrical Material Delivery 91 29-Jun-15 20-Oct-15 34
M110001010126 PVC Conduit Material Delivery 3 29-Jun-15 01-Jul-15 Ofoq 50
M110001010128 Wires for Power and Lighting Material Delivery 12 11-Aug-15 24-Aug-15 Ofoq 69
M110001010130 Structured Cable for Data System Material Delivery 26 20-Aug-15 19-Sep-15 Ofoq 49
M110001010132 External & Facade Lighting Fixture Material Delivery 36 13-Aug-15 27-Sep-15 N/A 46
M110001010134 Distribution Board DB1, DB4 Material Delivery 36 20-Aug-15 04-Oct-15 Ofoq 46
M110001010136 Floor Box Material Delivery 36 27-Aug-15 12-Oct-15 Ofoq 40
M110001010138 Public Address Loud Speaker Material Delivery 36 27-Aug-15 12-Oct-15 N/A 36
M110001010140 CCTV Cameras Material Delivery 48 20-Aug-15 20-Oct-15 N/A 30
Mechanical MateriaMechanical Material Delivery 52 10-Aug-15 13-Oct-15 38
M110001010144 FD,AD, PD Material Delivery 20 10-Aug-15 01-Sep-15 Ofoq 1
M110001010142 Fountains and Water Fall Accessories Material Delivery 45 17-Aug-15 12-Oct-15 N/A 32
M110001010146 Fire Hydrant Material Delivery 52 10-Aug-15 13-Oct-15 Ofoq 38
M110001010148 Siamese Connection Material Delivery 52 10-Aug-15 13-Oct-15 Ofoq 35
ConstructionConstruction 112 15-Jul-15 30-Nov-15 1
M1P1000 Removal of Temporary offices 6 22-Aug-15 27-Aug-15 HW ECIP 3
Structural WorkStructural Work 36 15-Jul-15 27-Aug-15 65
M110001010150 Existing Planters to be demolished 6 01-Aug-15 06-Aug-15 HW ECIP 21
M110001010350 Gas Room Ready to Receive Gas Facility 18 15-Jul-15 06-Aug-15 HW ECIP 83
M110001010152 Stair form Upper Basement to Plaza Level to be demolished 12 01-Aug-15 13-Aug-15 HW ECIP 3
M110001010154 Planters to be added above existing stair 12 01-Aug-15 13-Aug-15 HW ECIP 15
M110001010156 Slab to be removed 12 01-Aug-15 13-Aug-15 HW ECIP 3
M110001010158 New Planters to be added 12 01-Aug-15 13-Aug-15 HW ECIP 12
M110001010160 Existing Slab to be opened 3 15-Aug-15 17-Aug-15 HW ECIP 12
M110001010270 Expansion Joints 18 29-Jul-15 18-Aug-15 HW ECIP 12
M110001010162 New Slab to be added 18 01-Aug-15 20-Aug-15 HW ECIP 9
M110001010164 Two opening has been canceled and to be closed 18 01-Aug-15 20-Aug-15 HW ECIP 9
M110001010166 Concrete slab to be added instead of demolished stair 12 15-Aug-15 27-Aug-15 HW ECIP 3
M110001010168 Two New Stairs with a Ramp To Be Added 12 15-Aug-15 27-Aug-15 HW ECIP 3
MEP WorkMEP Work 87 30-Jul-15 14-Nov-15 15
Electrical WorksElectrical Works 62 29-Aug-15 14-Nov-15 15
M110001010170 PVC conduits Raceway for Electrical Power outlets 6 29-Aug-15 03-Sep-15 SCG Ofoq 3
M110001010174 PVC conduits Raceway for Data System 6 29-Aug-15 03-Sep-15 SCG Ofoq 3
M110001010172 PVC conduits Raceway for External Lighting Fixture 6 29-Aug-15 03-Sep-15 SCG Ofoq 5
M110001010176 PVC conduits Raceway for Public Address System (Sound
System)
6 29-Aug-15 03-Sep-15 SCG Ofoq 5
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
20-Oct-15, Material De
20-Oct-15, Electrical Ma
13-Oct-15, Mechanical M
30-Nov-15, Co
27-Aug-15, Structural Work
14-Nov-15, MEP W
14-Nov-15, Electri
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 6 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 7. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M110001010178 PVC conduits Raceway for CCTV System 6 29-Aug-15 03-Sep-15 SCG Ofoq 5
M110001010180 Back Box for Floor Box 2 05-Sep-15 06-Sep-15 SCG Ofoq 3
M110001010182 Wires for External Lighting Fixture 3 05-Sep-15 07-Sep-15 SCG Ofoq 60
M110001010184 Wires for Electrical Power outlets 3 07-Sep-15 09-Sep-15 SCG Ofoq 64
M110001010186 Structured Cable for Data System 3 20-Sep-15 26-Sep-15 SCG Ofoq 49
M110001010192 Facade Lighting Fixtures Erection 6 29-Sep-15 05-Oct-15 SCG Ofoq 47
M110001010188 Floor Box erection 2 05-Nov-15 07-Nov-15 SCG Ofoq 21
M110001010190 External Lighting Fixture Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 15
M110001010194 Public Address (Sound System) Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 17
M110001010196 CCTV Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 17
M110001010198 Distribution Board DB1, DB4 Erection 2 12-Nov-15 14-Nov-15 SCG Ofoq 15
Mechanical WorksMechanical Works 86 30-Jul-15 12-Nov-15 16
M110001010200 Builder Work And Core Drill for Drainage 6 30-Jul-15 05-Aug-15 SCG Ofoq 24
M110001010260 Gas Facility Network 12 08-Aug-15 20-Aug-15 SCG Gas 83
M110001010202 Floor Drains first fix 6 02-Sep-15 08-Sep-15 SCG Ofoq 1
M110001010204 Floor Drains second fix 3 04-Oct-15 07-Oct-15 SCG Ofoq 44
M110001010208 Fire Hydrant 3 19-Oct-15 21-Oct-15 SCG Ofoq 35
M110001010210 Siamese Connection 6 15-Oct-15 21-Oct-15 SCG Ofoq 35
M110001010206 Floor Drains final fix 2 05-Nov-15 07-Nov-15 SCG Ofoq 21
M110001010212 Irrigation for Main Road Island landscape 2 11-Nov-15 12-Nov-15 SCG Ofoq 12
Finishing WorkFinishing Work 76 29-Aug-15 30-Nov-15 1
M110001010214 Boundary wall (Travco Side) 18 29-Aug-15 17-Sep-15 HW ECIP 59
M110001010216 Temporary Fence 10 05-Nov-15 16-Nov-15 T.B N/A 13
Hard scapeHard scape 66 09-Sep-15 30-Nov-15 1
M110001010218 Insulation work for Plaza 18 09-Sep-15 03-Oct-15 HW ECIP 1
M110001010300 Remove Facade Cladding for Facade Lighting Fixture Erec 7 28-Sep-15 05-Oct-15 T.B Kemet 47
M110001010224 Walkways Filling Interlock 12 03-Oct-15 18-Oct-15 T.B N/A 35
M110001010232 Driveway Filling Interlock & Bazalt Tiles 12 03-Oct-15 18-Oct-15 T.B N/A 38
M110001010234 Driveway Boarders Bazalt tiles 12 03-Oct-15 18-Oct-15 T.B N/A 38
M110001010220 Screed over Insulation 12 04-Oct-15 19-Oct-15 HW ECIP 1
M110001010222 Flooring Filling Engineered Stone / Porcelain / Granite 15 19-Oct-15 04-Nov-15 T.B N/A 1
M110001010238 Main Road Island hardscape 5 05-Nov-15 10-Nov-15 T.B N/A 12
M110001010240 Planter Copping 6 05-Nov-15 11-Nov-15 T.B N/A 11
M110001010242 Stairs Covering 6 05-Nov-15 11-Nov-15 T.B N/A 17
M110001010228 Building Boarders Granite 12 05-Nov-15 18-Nov-15 T.B N/A 11
M110001010230 Plaza Boarders Granite 12 05-Nov-15 18-Nov-15 T.B N/A 11
M110001010226 Granite for Fountains 12 05-Nov-15 18-Nov-15 T.B N/A 1
M110001010236 Fountains and Water Fall Accessories Erection 10 19-Nov-15 30-Nov-15 T.B N/A 1
Soft scapeSoft scape 6 12-Nov-15 18-Nov-15 11
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
12-Nov-15, Mecha
30-Nov-15, Fin
30-Nov-15, Ha
18-Nov-15, Soft s
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 7 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 8. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M110001010246 Main Road Island softscape 4 14-Nov-15 17-Nov-15 T.B MIAC 12
M110001010244 Plaza softscape 6 12-Nov-15 18-Nov-15 T.B MIAC 11
Upper BasementUpper Basement 164 15-Jun-15 31-Dec-15 0
GeneralGeneral 0 07-Jul-15 07-Jul-15 15
M1P2760 Client Clear Vision about Security Issues as (CCTV, Access
Control...)
0 07-Jul-15 Client 6
M1P2770 Client Clear Vision about Data Issues as (Central, IT
requirements...)
0 07-Jul-15 Client 15
DesignDesign 78 15-Jun-15 15-Sep-15 17
Architectural DesArchitectural Design 24 15-Jun-15 12-Jul-15 0
M1P1020 Final Architectural Dimensional Plan for Upper Basement 6 15-Jun-15 21-Jun-15 T.B 0
M1P1010 Final Parking Layout for Upper Basement 0 28-Jun-15 Client 0
M1P1030 Final Architectural Package for Upper Basement 12 29-Jun-15 12-Jul-15 HW 0
Structural DesignStructural Design 6 09-Sep-15 15-Sep-15 17
M1P2750 Structural Design for Equipment Foundation (Child Pump ,
Supply and Exhaust Fans........)
6 09-Sep-15 15-Sep-15 HW 17
MEP DesignMEP Design 30 22-Jun-15 28-Jul-15 6
Electrical SystemsElectrical Systems 24 29-Jun-15 28-Jul-15 6
Power SystemPower System 6 29-Jun-15 05-Jul-15 4
M1P1060 Updated Design for Power System 6 29-Jun-15 05-Jul-15 SCG 4
Lighting SystemLighting System 6 29-Jun-15 05-Jul-15 4
M1P1070 Updated Design for Lighting System 6 29-Jun-15 05-Jul-15 SCG 4
Fire Alarm SystemFire Alarm System 6 13-Jul-15 20-Jul-15 0
M1P1680 Updated Design for Fire Alarm System 6 13-Jul-15 20-Jul-15 C/SCG 0
Parking SystemParking System 18 29-Jun-15 20-Jul-15 0
M1P1450 Updated Design for Parking System 18 29-Jun-15 20-Jul-15 C/SCG 0
CCTV SystemCCTV System 6 13-Jul-15 20-Jul-15 2
M1P1040 Updated Design for CCTV System 6 13-Jul-15 20-Jul-15 C/SCG 2
Data SystemData System 6 13-Jul-15 20-Jul-15 11
M1P1050 Updated Design for Data System 6 13-Jul-15 20-Jul-15 C/SCG 11
BMS SystemBMS System 6 21-Jul-15 28-Jul-15 6
M1P2000 Updated Design for BMS System 6 21-Jul-15 28-Jul-15 SCG 6
Mechanical SystemsMechanical Systems 24 22-Jun-15 20-Jul-15 12
HVAC SystemHVAC System 6 13-Jul-15 20-Jul-15 0
M1P1080 HVAC Updated Design for Upper Basement 6 13-Jul-15 20-Jul-15 SCG 0
Fire Fighting SysteFire Fighting System 6 22-Jun-15 28-Jun-15 19
M1P1130 Fire Fighting Updated Design for Upper Basement 6 22-Jun-15 28-Jun-15 SCG 19
Plumbing SystemPlumbing System 6 27-Jun-15 02-Jul-15 26
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
31-Dec-
07-Jul-15, General
15-Sep-15, Design
12-Jul-15, Architectural Design
15-Sep-15, Structural Design
28-Jul-15, MEP Design
28-Jul-15, Electrical Systems
05-Jul-15, Power System
05-Jul-15, Lighting System
20-Jul-15, Fire Alarm System
20-Jul-15, Parking System
20-Jul-15, CCTV System
20-Jul-15, Data System
28-Jul-15, BMS System
20-Jul-15, Mechanical Systems
20-Jul-15, HVAC System
28-Jun-15, Fire Fighting System
02-Jul-15, Plumbing System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 8 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 9. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
Drainage SystemDrainage System 6 27-Jun-15 02-Jul-15 20
M1P1090 Final Update for Upper Basement Drainage System 6 27-Jun-15 02-Jul-15 SCG 20
Irrigation SystemIrrigation System 6 27-Jun-15 02-Jul-15 26
M1P1100 Final Update for Plaza Irrigation System 6 27-Jun-15 02-Jul-15 SCG 26
Fountains and WateFountains and Water Fall 6 27-Jun-15 02-Jul-15 26
M1P1110 Fountains Design 6 27-Jun-15 02-Jul-15 SCG 26
M1P1120 Water Fall Design 6 27-Jun-15 02-Jul-15 SCG 26
Shop DrawingsShop Drawings 84 22-Jun-15 03-Oct-15 17
Architectural ShoArchitectural Shop Drawing 12 13-Jul-15 28-Jul-15 0
M1P1140 Upper Basement Architectural Shop Drawing Submittal 6 13-Jul-15 20-Jul-15 ECIP 0
M1P1150 Upper Basement Architectural Shop Drawing Approval 6 21-Jul-15 28-Jul-15 HW 0
Structural Shop DStructural Shop Drawing 68 11-Jul-15 03-Oct-15 17
M1P1160 Upper Basement Construction , Expansion Joints Details
Shop Drawing Submittal
6 11-Jul-15 16-Jul-15 ECIP 60
M1P1170 Upper Basement Construction , Expansion Joints Details
Shop Drawing Approval
6 19-Jul-15 26-Jul-15 HW 60
M1P2780 Upper Basement Equipment Foundations shop drawings
Submittal
6 16-Sep-15 26-Sep-15 ECIP 17
M1P2790 Upper Basement Equipment Foundations shop drawings
Approval
6 27-Sep-15 03-Oct-15 HW 17
Electrical SystemsElectrical Systems 36 06-Jul-15 18-Aug-15 0
Power SystemPower System 12 06-Jul-15 20-Jul-15 4
M1P1180 Upper Basement Power System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 4
M1P1190 Upper Basement Power System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 4
Lighting SystemLighting System 12 06-Jul-15 20-Jul-15 4
M1P1200 Upper Basement Lighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 4
M1P1210 Upper Basement Lighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 4
Fire Alarm SystemFire Alarm System 12 21-Jul-15 04-Aug-15 12
M1P1690 Upper Basement Fire Alarm System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 12
M1P1700 Upper Basement Fire Alarm System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 12
Parking SystemParking System 12 21-Jul-15 04-Aug-15 0
M1P1430 Upper Basement Parking System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0
M1P1440 Upper Basement Parking System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0
CCTV SystemCCTV System 12 21-Jul-15 04-Aug-15 2
M1P1220 Upper Basement CCTV System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 2
M1P1230 Upper Basement CCTV System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 2
Data SystemData System 12 21-Jul-15 04-Aug-15 11
M1P1240 Upper Basement Data System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11
M1P1250 Upper Basement Data System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
02-Jul-15, Drainage System
02-Jul-15, Irrigation System
02-Jul-15, Fountains and Water Fall
03-Oct-15, Shop Drawings
28-Jul-15, Architectural Shop Drawing
03-Oct-15, Structural Shop
18-Aug-15, Electrical Systems
20-Jul-15, Power System
20-Jul-15, Lighting System
04-Aug-15, Fire Alarm System
04-Aug-15, Parking System
04-Aug-15, CCTV System
04-Aug-15, Data System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 9 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 10. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
BMS SystemBMS System 12 05-Aug-15 18-Aug-15 0
M1P2010 Upper Basement BMS System Layout Submittal 6 05-Aug-15 11-Aug-15 Ofoq 0
M1P2020 Upper Basement BMS System Layout Approval 6 12-Aug-15 18-Aug-15 SCG 0
Mechanical SysteMechanical Systems 66 22-Jun-15 08-Sep-15 17
HVAC SystemHVAC System 66 22-Jun-15 08-Sep-15 17
M1P2210 HVAC Static Calculations for Child Water Pump Submittal 6 22-Jun-15 28-Jun-15 Ofoq 0
M1P2230 Fans Static Pressure Calculations Submittal 6 22-Jun-15 28-Jun-15 Ofoq 28
M1P2220 HVAC Static Calculations for Child Water Pump Approval 6 29-Jun-15 05-Jul-15 SCG 0
M1P2240 Fans Static Pressure Calculations Approval 6 29-Jun-15 05-Jul-15 SCG 28
M1P3560 Builder Work for Shaft Opening Layout Submittal 3 06-Jul-15 08-Jul-15 Ofoq 28
M1P3570 Builder Work for Shaft Opening Layout Approval 6 09-Jul-15 15-Jul-15 HW 28
M1P1260 Upper Basement HVAC System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0
M1P1270 Upper Basement HVAC System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0
M1P2730 Upper Basement Fan Room Details Submittal 6 29-Jul-15 04-Aug-15 Ofoq 41
M1P2740 Upper Basement Fan Room Details Approval 6 05-Aug-15 11-Aug-15 SCG 41
M1P2190 Upper Basement Plant Room Details Submittal 6 26-Aug-15 01-Sep-15 Ofoq 17
M1P2200 Upper Basement Plant Room Details Approval 6 02-Sep-15 08-Sep-15 SCG 17
Fire Fighting SystemFire Fighting System 12 29-Jun-15 12-Jul-15 19
M1P1280 Upper Basement Fire Fighting System Layout Submittal 6 29-Jun-15 05-Jul-15 Ofoq 19
M1P1290 Upper Basement Fire Fighting System Layout Approval 6 06-Jul-15 12-Jul-15 SCG 19
Plumbing SystemPlumbing System 12 04-Jul-15 16-Jul-15 26
Drainage SystemDrainage System 12 04-Jul-15 16-Jul-15 26
M1P1300 Upper Basement Drainage System Layout Submittal 6 04-Jul-15 09-Jul-15 Ofoq 26
M1P1310 Upper Basement Drainage System Layout Approval 6 11-Jul-15 16-Jul-15 SCG 26
Irrigation SystemIrrigation System 12 04-Jul-15 16-Jul-15 26
M1P1320 Upper Basement Irrigation System for Plaza Layout Submit 6 04-Jul-15 09-Jul-15 Ofoq 26
M1P1330 Upper Basement Irrigation System for Plaza Layout Appro 6 11-Jul-15 16-Jul-15 SCG 26
Fountains and WateFountains and Water Fall 12 04-Jul-15 16-Jul-15 26
M1P1340 Upper Basement Fountains and Water Fall System Layout
Submittal
6 04-Jul-15 09-Jul-15 Ofoq 26
M1P1350 Upper Basement Fountains and Water Fall System Layout
Approval
6 11-Jul-15 16-Jul-15 SCG 26
Composite DrawiComposite Drawing 12 19-Aug-15 01-Sep-15 0
M1P1360 Upper Basement MEP Composite Drawing Submittal 6 19-Aug-15 25-Aug-15 Ofoq 0
M1P1370 Upper Basement MEP Composite Drawing Approval 6 26-Aug-15 01-Sep-15 SCG 0
MaterialsMaterials 146 15-Jun-15 09-Dec-15 6
Finishing MateriaFinishing Materials 35 27-Jul-15 05-Sep-15 58
Material SubmittalMaterial Submittal 20 27-Jul-15 18-Aug-15 58
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
18-Aug-15, BMS System
08-Sep-15, Mechanical Systems
08-Sep-15, HVAC System
12-Jul-15, Fire Fighting System
16-Jul-15, Plumbing System
16-Jul-15, Drainage System
16-Jul-15, Irrigation System
16-Jul-15, Fountains and Water Fall
01-Sep-15, Composite Drawing
09-Dec-15, M
05-Sep-15, Finishing Materials
18-Aug-15, Material Submittal
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 10 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 11. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M110001206 Expansion Joints Submittal 6 27-Jul-15 02-Aug-15 ECIP 60
M1P1380 False Ceiling Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 17
M1P1390 Flooring Tiles Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 41
M1P1400 Paint Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 29
M1P1410 Curb Stone Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 46
M1P1420 Interlock Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 58
M1P3920 Doors Submittal 18 29-Jul-15 18-Aug-15 ECIP 58
M1P3930 Raised Floor Submittal (Expected in IT & Main IT Room) 18 29-Jul-15 18-Aug-15 ECIP 47
Material ApprovalMaterial Approval 20 03-Aug-15 25-Aug-15 58
M110001216 Expansion Joints Approval 6 03-Aug-15 09-Aug-15 HW 60
M1P1460 False Ceiling Material Approval 6 19-Aug-15 25-Aug-15 HW 17
M1P1470 Flooring Tiles Material Approval 6 19-Aug-15 25-Aug-15 HW 41
M1P1480 Paint Material Approval 6 19-Aug-15 25-Aug-15 HW 29
M1P1490 Curb Stone Material Approval 6 19-Aug-15 25-Aug-15 HW 46
M1P1500 Interlock Material Approval 6 19-Aug-15 25-Aug-15 HW 58
M1P3940 Doors Approval 6 19-Aug-15 25-Aug-15 HW 58
M1P3950 Raised Floor Approval (Expected in IT & Main IT Room) 6 19-Aug-15 25-Aug-15 HW 47
Material P.OMaterial P.O 17 10-Aug-15 29-Aug-15 58
M110001226 Expansion Joints P.O 3 10-Aug-15 12-Aug-15 ECIP 60
M1P1510 False Ceiling Material P.O 3 26-Aug-15 29-Aug-15 ECIP 17
M1P1520 Flooring Tiles Material P.O 3 26-Aug-15 29-Aug-15 ECIP 41
M1P1530 Paint Material P.O 3 26-Aug-15 29-Aug-15 ECIP 29
M1P1540 Curb Stone Material P.O 3 26-Aug-15 29-Aug-15 ECIP 46
M1P1550 Interlock Material P.O 3 26-Aug-15 29-Aug-15 ECIP 58
M1P3960 Doors P.O 3 26-Aug-15 29-Aug-15 ECIP 58
M1P3970 Raised Floor P.O (Expected in IT & Main IT Room) 3 26-Aug-15 29-Aug-15 ECIP 47
Material DeliveryMaterial Delivery 20 13-Aug-15 05-Sep-15 58
M110001236 Expansion Joints Delivery 6 13-Aug-15 19-Aug-15 ECIP 60
M1P1560 False Ceiling Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 17
M1P1570 Flooring Tiles Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 41
M1P1580 Paint Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 29
M1P1590 Curb Stone Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 46
M1P1600 Interlock Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 58
M1P3980 Doors Delivery 6 30-Aug-15 05-Sep-15 ECIP 58
M1P3990 Raised Floor Delivery (Expected in IT & Main IT Room) 6 30-Aug-15 05-Sep-15 ECIP 47
MEP MaterialsMEP Materials 146 15-Jun-15 09-Dec-15 6
Material SubmittalMaterial Submittal 72 15-Jun-15 08-Sep-15 46
Electrical Material SElectrical Material Submittal 72 15-Jun-15 08-Sep-15 20
M10 PVC , EMT Conduit with Accessories Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 48
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
25-Aug-15, Material Approval
29-Aug-15, Material P.O
05-Sep-15, Material Delivery
09-Dec-15, M
08-Sep-15, Material Submittal
08-Sep-15, Electrical Material Su
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 11 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 12. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M100 Cable Trays Submittal 6 15-Jun-15 21-Jun-15 Ofoq 86
M20 Wires for Power and Lighting Material Submittal 6 21-Jul-15 28-Jul-15 Ofoq 52
M30 Lighting Fixture Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 40
M90 Wiring Devices Submittal 12 21-Jul-15 04-Aug-15 Ofoq 15
M110 Fire Alarm Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 0
M40 Structured Cable for Data System Material Submittal 4 05-Aug-15 09-Aug-15 Ofoq 11
M50 Distribution Board Material Submittal 16 21-Jul-15 09-Aug-15 Ofoq 4
M60 CCTV Cameras Material Submittal 4 05-Aug-15 09-Aug-15 N/A 2
M80 Parking System Material Submittal 18 05-Aug-15 25-Aug-15 N/A 0
M420 LV Cables Submittal 6 02-Sep-15 08-Sep-15 Ofoq 12
M450 BMS Submittal 18 19-Aug-15 08-Sep-15 Ofoq 1
Electrical EquipmentElectrical Equipment 54 15-Jun-15 18-Aug-15 10
M1P1620 R.M.U Submittal 18 15-Jun-15 05-Jul-15 Ofoq 34
M1P1630 MVSG Submittal 18 15-Jun-15 05-Jul-15 Ofoq 34
M1P1710 UPS Submittal 26 15-Jun-15 14-Jul-15 Ofoq 12
M1P1610 Generator Submittal 18 29-Jun-15 20-Jul-15 Ofoq 2
M1P1640 Transformer Submittal 18 29-Jun-15 20-Jul-15 Ofoq 22
M1P1650 MDB Submittal 18 21-Jul-15 11-Aug-15 Ofoq 4
M1P1660 EMDB Submittal 18 21-Jul-15 11-Aug-15 Ofoq 4
M1P1720 MCC Submittal 18 21-Jul-15 11-Aug-15 Ofoq 10
M1P1670 ATS Submittal 6 12-Aug-15 18-Aug-15 Ofoq 10
Mechanical MateriaMechanical Material Submittal 72 15-Jun-15 08-Sep-15 46
HVAC System SubmHVAC System Submittal 54 15-Jun-15 18-Aug-15 58
M1P2030 Galvanized Duct Submittal 6 15-Jun-15 21-Jun-15 Ofoq 46
M1P2070 Child Water Pipes Submittal 6 15-Jun-15 21-Jun-15 Ofoq 76
M1P2080 Child Water Insulation Submittal 6 15-Jun-15 21-Jun-15 Ofoq 106
M1P2040 Volume Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10
M1P2050 Fire Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10
M1P2060 Fire Smoke Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10
M1P2090 Supply Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46
M1P2100 Exhaust Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System Submittal 48 13-Jul-15 08-Sep-15 3
M1P2800 Seamless Black Steel Pipes Submittal 3 13-Jul-15 15-Jul-15 Ofoq 26
M1P2810 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Submittal
6 13-Jul-15 20-Jul-15 Ofoq 29
M1P2820 Sprinklers Submittal 6 13-Jul-15 20-Jul-15 Ofoq 20
M1P2850 Fire Hose Stations Submittal 6 13-Jul-15 20-Jul-15 Ofoq 28
M1P2860 Fire Hose Real Stations Submittal 6 13-Jul-15 20-Jul-15 Ofoq 28
M1P2870 Fire Extinguishers Submittal 6 13-Jul-15 20-Jul-15 Ofoq 19
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
18-Aug-15, Electrical Equipment
08-Sep-15, Mechanical Material S
18-Aug-15, HVAC System Submittal
08-Sep-15, Fire Fighting System S
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 12 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 13. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P2830 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV
Room, IT&Main IT Room)Submittal
12 19-Aug-15 01-Sep-15 Ofoq 4
M1P2840 Foam Fire System for (Generator Room, Feul Tank Room)
Submittal
12 26-Aug-15 08-Sep-15 Ofoq 3
Plumbing System SPlumbing System Submittal 18 19-Jul-15 09-Aug-15 72
M1P3150 PPR Domestic Water Pipes Submittal 6 19-Jul-15 26-Jul-15 Ofoq 54
M1P3170 UPVC for Drainage System Submittal 6 19-Jul-15 26-Jul-15 Ofoq 48
M1P3180 PVC for Forced Main Line Submittal 6 19-Jul-15 26-Jul-15 Ofoq 66
M1P3190 Irrigation System PVC Submittal 6 19-Jul-15 26-Jul-15 Ofoq 66
M1P3200 Valves Submittal 6 19-Jul-15 26-Jul-15 Ofoq 72
M1P3210 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Submittal 6 19-Jul-15 26-Jul-15 Ofoq 36
M1P3220 Hose Bibbs Submittal 6 19-Jul-15 26-Jul-15 Ofoq 84
M1P3140 HDPE Domestic Water Pipes Submittal 12 19-Jul-15 02-Aug-15 Ofoq 72
M1P3160 HDPE for Drainage , Waste , Vent, Storm Systems Submitta 12 19-Jul-15 02-Aug-15 Ofoq 72
M1P3120 Fountains Tank Submittal 18 19-Jul-15 09-Aug-15 N/A 40
M1P3130 Water Fall Tank Submittal 18 19-Jul-15 09-Aug-15 N/A 40
Mechanical EquipmMechanical Equipment Submittal 36 06-Jul-15 18-Aug-15 60
HVAC EquipmentHVAC Equipment Submittal 36 06-Jul-15 18-Aug-15 60
M1P2150 Child Water Pumps Submittal 12 06-Jul-15 20-Jul-15 Ofoq 0
M1P2160 Exhaust Fans Submittal 12 06-Jul-15 20-Jul-15 Ofoq 41
M1P2170 Supply Fans Submittal 12 06-Jul-15 20-Jul-15 Ofoq 41
M1P2110 Fuel Oil Storage Tank Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2
M1P2120 AC DX Split Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 60
M1P2130 Heat Exchangers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2
M1P2140 Expansion and Compression Tanks Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2
M1P2180 Fan Coil Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 17
Material ApprovalMaterial Approval 87 18-Jun-15 03-Oct-15 34
Electrical Material AElectrical Material Approval 87 18-Jun-15 03-Oct-15 8
M70 PVC , EMT Conduit with Accessories Conduit Material
Approval
6 18-Jun-15 24-Jun-15 SCG 48
M120 Cable Trays Approval 6 22-Jun-15 28-Jun-15 SCG 86
M130 Wires for Power and Lighting Material Approval 6 29-Jul-15 04-Aug-15 SCG 52
M140 Lighting Fixture Material Approval 6 05-Aug-15 11-Aug-15 SCG 40
M150 Wiring Devices Approval 6 05-Aug-15 11-Aug-15 SCG 15
M160 Fire Alarm Material Approval 6 05-Aug-15 11-Aug-15 SCG 0
M170 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 11
M180 Distribution Board Material Approval 6 10-Aug-15 16-Aug-15 SCG 24
M190 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 2
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
09-Aug-15, Plumbing System Submittal
18-Aug-15, Mechanical Equipment Su
18-Aug-15, HVAC Equipment Submi
03-Oct-15, Material Appro
03-Oct-15, Electrical Mater
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 13 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 14. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M200 Parking System Material Approval 6 26-Aug-15 01-Sep-15 SCG 0
M410 LV Cables Approval 6 09-Sep-15 15-Sep-15 SCG 12
M460 BMS Approval 18 09-Sep-15 03-Oct-15 SCG 1
Electrical EquipmentElectrical Equipment 42 06-Jul-15 25-Aug-15 10
M1P1740 R.M.U Approval 6 06-Jul-15 12-Jul-15 SCG 34
M1P1750 MVSG Approval 6 06-Jul-15 12-Jul-15 SCG 34
M1P1800 UPS Approval 6 15-Jul-15 22-Jul-15 SCG 12
M1P1730 Generator Approval 6 21-Jul-15 28-Jul-15 SCG 2
M1P1760 Transformer Approval 6 21-Jul-15 28-Jul-15 SCG 22
M1P1770 MDB Approval 6 12-Aug-15 18-Aug-15 SCG 4
M1P1780 EMDB Approval 6 12-Aug-15 18-Aug-15 SCG 4
M1P1810 MCC Approval 6 12-Aug-15 18-Aug-15 SCG 16
M1P1790 ATS Approval 6 19-Aug-15 25-Aug-15 SCG 10
Mechanical MateriaMechanical Material Approval 72 22-Jun-15 15-Sep-15 46
HVAC System ApproHVAC System Approval 54 22-Jun-15 25-Aug-15 58
M1P2250 Galvanized Duct Approval 6 22-Jun-15 28-Jun-15 SCG 46
M1P2290 Child Water Pipes Approval 6 22-Jun-15 28-Jun-15 SCG 76
M1P2300 Child Water Insulation Approval 6 22-Jun-15 28-Jun-15 SCG 106
M1P2260 Volume Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10
M1P2270 Fire Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10
M1P2280 Fire Smoke Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10
M1P2310 Supply Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46
M1P2320 Exhaust Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46
Fire Fighting SystemFire Fighting System Approval 51 16-Jul-15 15-Sep-15 3
M1P2880 Seamless Black Steel Pipes Approval 6 16-Jul-15 25-Jul-15 SCG 26
M1P2890 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Approval
6 21-Jul-15 28-Jul-15 SCG 29
M1P2900 Sprinklers Approval 6 21-Jul-15 28-Jul-15 SCG 20
M1P2910 Fire Hose Stations Approval 6 21-Jul-15 28-Jul-15 SCG 28
M1P2920 Fire Hose Real Stations Approval 6 21-Jul-15 28-Jul-15 SCG 28
M1P2930 Fire Extinguishers Approval 6 21-Jul-15 28-Jul-15 SCG 19
M1P2940 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV
Room, IT&Main IT Room)Approval
6 02-Sep-15 08-Sep-15 SCG 4
M1P2950 Foam Fire System for (Generator Room, Feul Tank Room)
Approval
6 09-Sep-15 15-Sep-15 SCG 3
Plumbing System APlumbing System Approval 18 27-Jul-15 16-Aug-15 72
M1P3230 PPR Domestic Water Pipes Approval 6 27-Jul-15 02-Aug-15 SCG 54
M1P3240 UPVC for Drainage System Approval 6 27-Jul-15 02-Aug-15 SCG 48
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
25-Aug-15, Electrical Equipment
15-Sep-15, Mechanical Materia
25-Aug-15, HVAC System Approval
15-Sep-15, Fire Fighting System
16-Aug-15, Plumbing System Approva
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 14 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 15. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P3250 PVC for Forced Main Line Approval 6 27-Jul-15 02-Aug-15 SCG 66
M1P3260 Irrigation System PVC Approval 6 27-Jul-15 02-Aug-15 SCG 66
M1P3270 Valves Approval 6 27-Jul-15 02-Aug-15 SCG 72
M1P3280 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Approval 6 27-Jul-15 02-Aug-15 SCG 36
M1P3290 Hose Bibbs Approval 6 27-Jul-15 02-Aug-15 SCG 84
M1P3300 HDPE Domestic Water Pipes Approval 6 03-Aug-15 09-Aug-15 SCG 72
M1P3310 HDPE for Drainage , Waste , Vent, Storm Systems Approval 6 03-Aug-15 09-Aug-15 SCG 72
M1P3320 Fountains Tank Approval 6 10-Aug-15 16-Aug-15 SCG 40
M1P3330 Water Fall Tank Approval 6 10-Aug-15 16-Aug-15 SCG 40
Mechanical EquipmMechanical Equipment Approval 30 21-Jul-15 25-Aug-15 60
HVAC EquipmentHVAC Equipment Approval 30 21-Jul-15 25-Aug-15 60
M1P2370 Child Water Pumps Approval 6 21-Jul-15 28-Jul-15 SCG 0
M1P2380 Exhaust Fans Approval 6 21-Jul-15 28-Jul-15 SCG 41
M1P2390 Supply Fans Approval 6 21-Jul-15 28-Jul-15 SCG 41
M1P2330 Fuel Oil Storage Tank Approval 6 19-Aug-15 25-Aug-15 SCG 2
M1P2340 AC DX Split Units Approval 6 19-Aug-15 25-Aug-15 SCG 60
M1P2350 Heat Exchangers Approval 6 19-Aug-15 25-Aug-15 SCG 2
M1P2360 Expansion and Compression Tanks Approval 6 19-Aug-15 25-Aug-15 SCG 2
M1P2400 Fan Coil Units Approval 6 19-Aug-15 25-Aug-15 SCG 17
Material P.OMaterial P.O 84 25-Jun-15 07-Oct-15 34
Electrical MaterialElectrical Material P.O 84 25-Jun-15 07-Oct-15 12
M210 PVC , EMT Conduit with Accessories Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 48
M220 Cable Trays P.O 3 29-Jun-15 01-Jul-15 Ofoq 86
M230 Wires for Power and Lighting Material P.O 3 05-Aug-15 08-Aug-15 Ofoq 52
M240 Lighting Fixture Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 40
M250 Wiring Devices P.O 3 12-Aug-15 15-Aug-15 Ofoq 15
M260 Fire Alarm Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 0
M270 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 11
M280 Distribution Board Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 24
M290 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 2
M300 Parking System Material P.O 3 02-Sep-15 05-Sep-15 N/A 0
M430 LV Cables P.O 3 16-Sep-15 19-Sep-15 Ofoq 12
M470 BMS P.O 3 04-Oct-15 07-Oct-15 Ofoq 1
Electrical EquipmentElectrical Equipment 39 13-Jul-15 29-Aug-15 42
M1P1830 R.M.U P.O 3 13-Jul-15 15-Jul-15 Ofoq 78
M1P1840 MVSG P.O 3 13-Jul-15 15-Jul-15 Ofoq 40
M1P1890 UPS P.O 3 25-Jul-15 27-Jul-15 Ofoq 12
M1P1820 Generator P.O 3 29-Jul-15 01-Aug-15 Ofoq 2
M1P1850 Transformer P.O 3 29-Jul-15 01-Aug-15 Ofoq 60
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
25-Aug-15, Mechanical Equipment A
25-Aug-15, HVAC Equipment Appr
07-Oct-15, Material P.O
07-Oct-15, Electrical Mater
29-Aug-15, Electrical Equipment
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 15 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 16. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P1860 MDB P.O 3 19-Aug-15 22-Aug-15 Ofoq 10
M1P1870 EMDB P.O 3 19-Aug-15 22-Aug-15 Ofoq 16
M1P1900 MCC P.O 3 19-Aug-15 22-Aug-15 Ofoq 16
M1P1880 ATS P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
Mechanical MateriaMechanical Material P.O 69 29-Jun-15 19-Sep-15 46
HVAC System P.OHVAC System P.O 51 29-Jun-15 29-Aug-15 58
M1P2410 Galvanized Duct P.O 3 29-Jun-15 01-Jul-15 Ofoq 46
M1P2450 Child Water Pipes P.O 3 29-Jun-15 01-Jul-15 Ofoq 76
M1P2460 Child Water Insulation P.O 3 29-Jun-15 01-Jul-15 Ofoq 106
M1P2420 Volume Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
M1P2430 Fire Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
M1P2440 Fire Smoke Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
M1P2470 Supply Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46
M1P2480 Exhaust Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System P.O 48 26-Jul-15 19-Sep-15 3
M1P2960 Seamless Black Steel Pipes P.O 3 26-Jul-15 28-Jul-15 Ofoq 26
M1P2970 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) P.O
3 29-Jul-15 01-Aug-15 Ofoq 29
M1P2980 Sprinklers P.O 3 29-Jul-15 01-Aug-15 Ofoq 20
M1P2990 Fire Hose Stations P.O 3 29-Jul-15 01-Aug-15 Ofoq 28
M1P3000 Fire Hose Real Stations P.O 3 29-Jul-15 01-Aug-15 Ofoq 28
M1P3010 Fire Extinguishers P.O 3 29-Jul-15 01-Aug-15 Ofoq 19
M1P3020 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV
Room, IT&Main IT Room)P.O
3 09-Sep-15 12-Sep-15 Ofoq 4
M1P3030 Foam Fire System for (Generator Room, Feul Tank Room) P 3 16-Sep-15 19-Sep-15 Ofoq 3
Plumbing System PPlumbing System P.O 15 03-Aug-15 19-Aug-15 72
M1P3340 PPR Domestic Water Pipes P.O 3 03-Aug-15 05-Aug-15 Ofoq 54
M1P3350 UPVC for Drainage System P.O 3 03-Aug-15 05-Aug-15 Ofoq 48
M1P3360 PVC for Forced Main Line P.O 3 03-Aug-15 05-Aug-15 Ofoq 66
M1P3370 Irrigation System PVC P.O 3 03-Aug-15 05-Aug-15 Ofoq 66
M1P3380 Valves P.O 3 03-Aug-15 05-Aug-15 Ofoq 72
M1P3390 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D P.O 3 03-Aug-15 05-Aug-15 Ofoq 36
M1P3400 Hose Bibbs P.O 3 03-Aug-15 05-Aug-15 Ofoq 84
M1P3410 HDPE Domestic Water Pipes P.O 3 10-Aug-15 12-Aug-15 Ofoq 72
M1P3420 HDPE for Drainage , Waste , Vent, Storm Systems P.O 3 10-Aug-15 12-Aug-15 Ofoq 72
M1P3430 Fountains Tank P.O 3 17-Aug-15 19-Aug-15 N/A 40
M1P3440 Water Fall Tank P.O 3 17-Aug-15 19-Aug-15 N/A 40
Mechanical EquipmMechanical Equipment P.O 30 29-Jul-15 01-Sep-15 60
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
19-Sep-15, Mechanical Materi
29-Aug-15, HVAC System P.O
19-Sep-15, Fire Fighting System
19-Aug-15, Plumbing System P.O
01-Sep-15, Mechanical Equipment
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 16 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 17. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
HVAC EquipmentHVAC Equipment P.O 30 29-Jul-15 01-Sep-15 60
M1P2530 Child Water Pumps P.O 6 29-Jul-15 04-Aug-15 Ofoq 0
M1P2540 Exhaust Fans P.O 6 29-Jul-15 04-Aug-15 Ofoq 52
M1P2550 Supply Fans P.O 6 29-Jul-15 04-Aug-15 Ofoq 52
M1P2490 Fuel Oil Storage Tank P.O 6 26-Aug-15 01-Sep-15 Ofoq 2
M1P2500 AC DX Split Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 60
M1P2510 Heat Exchangers P.O 6 26-Aug-15 01-Sep-15 Ofoq 2
M1P2520 Expansion and Compression Tanks P.O 6 26-Aug-15 01-Sep-15 Ofoq 2
M1P2560 Fan Coil Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 17
Material DeliveryMaterial Delivery 134 29-Jun-15 09-Dec-15 6
Electrical MaterialElectrical Material Delivery 121 29-Jun-15 24-Nov-15 1
M310 PVC , EMT Conduit with Accessories Conduit Material
Delivery
6 29-Jun-15 05-Jul-15 Ofoq 48
M320 Cable Trays Delivery 6 02-Jul-15 08-Jul-15 Ofoq 86
M330 Wires for Power and Lighting Material Delivery 6 09-Aug-15 15-Aug-15 Ofoq 52
M340 Lighting Fixture Material Delivery 18 16-Aug-15 05-Sep-15 N/A 40
M370 Structured Cable for Data System Material Delivery 18 20-Aug-15 09-Sep-15 Ofoq 11
M350 Wiring Devices Delivery 36 16-Aug-15 29-Sep-15 Ofoq 15
M390 CCTV Cameras Material Delivery 45 20-Aug-15 17-Oct-15 N/A 2
M360 Fire Alarm Material Delivery 52 16-Aug-15 20-Oct-15 Ofoq 0
M380 Distribution Board Material Delivery 52 20-Aug-15 25-Oct-15 Ofoq 24
M440 LV Cables Delivery 26 20-Sep-15 25-Oct-15 Ofoq 12
M400 Parking System Material Delivery 45 06-Sep-15 02-Nov-15 N/A 0
M480 BMS Delivery 40 08-Oct-15 24-Nov-15 Ofoq 1
Electrical EquipmentElectrical Equipment 90 16-Jul-15 05-Nov-15 14
M1P1920 R.M.U Delivery 26 16-Jul-15 17-Aug-15 Ofoq 78
M1P1940 Transformer Delivery 26 02-Aug-15 31-Aug-15 Ofoq 60
M1P1930 MVSG Delivery 52 16-Jul-15 16-Sep-15 Ofoq 40
M1P1950 MDB Delivery 52 23-Aug-15 27-Oct-15 Ofoq 10
M1P1960 EMDB Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16
M1P1990 MCC Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16
M1P1980 UPS Delivery 78 28-Jul-15 01-Nov-15 Ofoq 12
M1P1970 ATS Delivery 52 30-Aug-15 03-Nov-15 Ofoq 10
M1P1910 Generator Delivery 78 02-Aug-15 05-Nov-15 Ofoq 2
Mechanical MateriaMechanical Material Delivery 131 02-Jul-15 09-Dec-15 6
HVAC System DelivHVAC System Delivery 60 02-Jul-15 12-Sep-15 52
M1P2570 Galvanized Duct Delivery 6 02-Jul-15 08-Jul-15 Ofoq 46
M1P2610 Child Water Pipes Delivery 6 02-Jul-15 08-Jul-15 Ofoq 76
M1P2620 Child Water Insulation Delivery 6 02-Jul-15 08-Jul-15 Ofoq 106
M1P2580 Volume Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
01-Sep-15, HVAC Equipment P.O
09-Dec-15, M
24-Nov-15, Elec
05-Nov-15, Electrica
09-Dec-15, M
12-Sep-15, HVAC System Delive
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 17 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 18. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P2590 Fire Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
M1P2600 Fire Smoke Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
M1P2630 Supply Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46
M1P2640 Exhaust Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46
Fire Fighting SystemFire Fighting System Delivery 85 29-Jul-15 10-Nov-15 15
M1P3040 Seamless Black Steel Pipes Delivery 6 29-Jul-15 04-Aug-15 Ofoq 26
M1P3050 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Delivery
18 02-Aug-15 22-Aug-15 Ofoq 29
M1P3070 Fire Hose Stations Delivery 36 02-Aug-15 12-Sep-15 Ofoq 28
M1P3080 Fire Hose Real Stations Delivery 36 02-Aug-15 12-Sep-15 Ofoq 28
M1P3060 Sprinklers Delivery 45 02-Aug-15 26-Sep-15 Ofoq 20
M1P3090 Fire Extinguishers Delivery 78 02-Aug-15 05-Nov-15 Ofoq 19
M1P3100 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV
Room, IT&Main IT Room)Delivery
45 13-Sep-15 09-Nov-15 Ofoq 4
M1P3110 Foam Fire System for (Generator Room, Feul Tank Room)
Delivery
40 20-Sep-15 10-Nov-15 Ofoq 3
Plumbing System DPlumbing System Delivery 30 06-Aug-15 09-Sep-15 60
M1P3450 PPR Domestic Water Pipes Delivery 6 06-Aug-15 12-Aug-15 Ofoq 54
M1P3460 UPVC for Drainage System Delivery 6 06-Aug-15 12-Aug-15 Ofoq 48
M1P3470 PVC for Forced Main Line Delivery 6 06-Aug-15 12-Aug-15 Ofoq 66
M1P3480 Irrigation System PVC Delivery 6 06-Aug-15 12-Aug-15 Ofoq 66
M1P3490 Valves Delivery 6 06-Aug-15 12-Aug-15 Ofoq 72
M1P3500 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Delivery 6 06-Aug-15 12-Aug-15 Ofoq 36
M1P3510 Hose Bibbs Delivery 6 06-Aug-15 12-Aug-15 Ofoq 84
M1P3520 HDPE Domestic Water Pipes Delivery 12 13-Aug-15 26-Aug-15 Ofoq 72
M1P3530 HDPE for Drainage , Waste , Vent, Storm Systems Delivery 12 13-Aug-15 26-Aug-15 Ofoq 72
M1P3540 Fountains Tank Delivery 18 20-Aug-15 09-Sep-15 N/A 40
M1P3550 Water Fall Tank Delivery 18 20-Aug-15 09-Sep-15 N/A 40
Mechanical EquipmMechanical Equipment Delivery 104 05-Aug-15 09-Dec-15 6
HVAC EquipmentHVAC Equipment Delivery 104 05-Aug-15 09-Dec-15 6
M1P2660 AC DX Split Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 60
M1P2720 Fan Coil Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 17
M1P2700 Exhaust Fans Delivery 52 05-Aug-15 08-Oct-15 Ofoq 52
M1P2710 Supply Fans Delivery 52 05-Aug-15 08-Oct-15 Ofoq 52
M1P2650 Fuel Oil Storage Tank Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2
M1P2670 Heat Exchangers Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2
M1P2680 Expansion and Compression Tanks Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2
M1P2690 Child Water Pumps Delivery 104 05-Aug-15 09-Dec-15 Ofoq 0
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
10-Nov-15, Fire Fig
09-Sep-15, Plumbing System Del
09-Dec-15, M
09-Dec-15, H
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 18 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 19. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
ConstructionConstruction 137 16-Jul-15 31-Dec-15 0
Structural WorkStructural Work 112 16-Jul-15 01-Dec-15 0
M1P3580 Openings for Duct Shafts 12 16-Jul-15 01-Aug-15 HW ECIP 28
M1P3590 Completion of All demolishing and remodeling in Plaza Leve 0 27-Aug-15 HW ECIP 53
M1P3600 Expansion Joints 12 29-Aug-15 10-Sep-15 HW ECIP 53
M1P3890 Equipments Concrete Foundations 12 04-Oct-15 19-Oct-15 HW ECIP 17
M1P4000 Upper Basement Screed 12 18-Nov-15 01-Dec-15 HW ECIP 0
MEP WorkMEP Work 98 02-Sep-15 31-Dec-15 0
Electrical WorksElectrical Works 98 02-Sep-15 31-Dec-15 0
Power SystemPower System 71 02-Sep-15 29-Nov-15 2
M1P3610 Upper Basement PVC Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41
M1P3620 Upper Basement EMT Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41
M1P3630 Upper Basement Cable Trays for LV Cables 12 02-Sep-15 15-Sep-15 SCG Ofoq 41
M1P3640 Wires for Upper Basement Power Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 41
M1P3660 Laying Upper Basement DB Panels 2 26-Oct-15 27-Oct-15 SCG Ofoq 24
M1P3650 Laying Upper Basement LV Cables 6 26-Oct-15 01-Nov-15 SCG Ofoq 12
M1P3790 Wiring Devices Erection and termination 12 02-Nov-15 15-Nov-15 SCG Ofoq 12
M1P3670 Termination Upper Basement DB Panels 6 11-Nov-15 17-Nov-15 SCG Ofoq 12
Power EquipmentPower Equipment 35 20-Oct-15 29-Nov-15 2
M1P3700 Laying Upper Basement Transformer 2 20-Oct-15 21-Oct-15 SCG Ofoq 23
M1P3720 Laying R.M.U 2 20-Oct-15 21-Oct-15 SCG Ofoq 29
M1P3740 Laying MVSG 2 20-Oct-15 21-Oct-15 SCG Ofoq 17
M1P3730 Termination R.M.U 6 22-Oct-15 28-Oct-15 SCG Ofoq 29
M1P3680 Laying Upper Basement MCC's 2 28-Oct-15 29-Oct-15 SCG Ofoq 16
M1P3830 Laying EMDB 2 28-Oct-15 29-Oct-15 SCG Ofoq 16
M1P3900 Laying MDB 2 28-Oct-15 29-Oct-15 SCG Ofoq 10
M1P3860 Laying UPS 2 02-Nov-15 03-Nov-15 SCG Ofoq 12
M1P3710 Termination Upper Basement Transformer 12 22-Oct-15 04-Nov-15 SCG Ofoq 23
M1P3850 Laying ATS 2 04-Nov-15 05-Nov-15 SCG Ofoq 10
M1P3760 Laying Generator Package 2 07-Nov-15 08-Nov-15 SCG Ofoq 2
M1P3750 Termination MVSG 18 22-Oct-15 11-Nov-15 SCG Ofoq 17
M1P3690 Termination Upper Basement MCC's 12 31-Oct-15 12-Nov-15 SCG Ofoq 16
M1P3840 Termination EMDB 12 31-Oct-15 12-Nov-15 SCG Ofoq 16
M1P3880 Termination UPS 12 04-Nov-15 17-Nov-15 SCG Ofoq 12
M1P3870 Termination ATS 12 07-Nov-15 19-Nov-15 SCG Ofoq 10
M1P3910 Termination MDB 18 31-Oct-15 19-Nov-15 SCG Ofoq 10
M1P3770 Termination of Generator 18 09-Nov-15 29-Nov-15 SCG Ofoq 2
Lighting SystemLighting System 36 02-Sep-15 19-Oct-15 25
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
31-Dec-
01-Dec-15, Str
31-Dec-
31-Dec-
29-Nov-15, Pow
29-Nov-15, Pow
19-Oct-15, Lighting Sys
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 19 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 20. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P3800 Upper Basement PVC Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 25
M1P3810 Upper Basement EMT Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 25
M1P3820 Wires for Upper Basement Lighting Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 25
M1P3780 Lighting Fixture Erection and termination 18 27-Sep-15 19-Oct-15 SCG Ofoq 25
Low Current SysteLow Current Systems 98 02-Sep-15 31-Dec-15 0
Fire Alarm SystemFire Alarm System 98 02-Sep-15 31-Dec-15 0
M1P4010 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 19
M1P4020 Fire Alarm Cable 18 21-Oct-15 10-Nov-15 SCG Ofoq 0
M1P4030 Fire Alarm Devices 18 11-Nov-15 01-Dec-15 SCG Ofoq 0
M1P4040 Testing And Precommissioning 25 02-Dec-15 31-Dec-15 SCG Ofoq 0
Data SystemData System 98 02-Sep-15 31-Dec-15 0
M1P4050 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0
M1P4060 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0
M1P4070 Face Plates Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0
M1P4080 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0
CCTV SystemCCTV System 98 02-Sep-15 31-Dec-15 0
M1P4090 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0
M1P4100 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0
M1P4110 Cameras Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0
M1P4120 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0
BMS SystemBMS System 97 02-Sep-15 30-Dec-15 1
M1P4130 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 32
M1P4140 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 32
M1P4150 BMS System with FACP Termination 12 25-Nov-15 08-Dec-15 SCG Ofoq 1
M1P4160 Testing And Precommissioning 18 09-Dec-15 30-Dec-15 SCG Ofoq 1
Parking SystemParking System 98 02-Sep-15 31-Dec-15 0
M1P4170 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 12
M1P4180 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 12
M1P4190 Parking System 20 03-Nov-15 25-Nov-15 SCG Ofoq 0
M1P4200 Testing And Precommissioning 30 26-Nov-15 31-Dec-15 SCG Ofoq 0
Mechanical WorksMechanical Works 98 02-Sep-15 31-Dec-15 0
HVAC SystemHVAC System 98 02-Sep-15 31-Dec-15 0
M1P4210 Galvanized Duct Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 1
M1P4230 Child Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 31
M1P4220 Volume Dampers , Fire Dampers and Fire Smoke Dampers
Erection
12 27-Sep-15 11-Oct-15 SCG Ofoq 1
M1P4250 Child Water Pipes Test and Flushing 12 27-Sep-15 11-Oct-15 SCG Ofoq 31
M1P4290 Fan Coil Unit Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 17
M1P4240 Duct Smoke Test 12 12-Oct-15 26-Oct-15 SCG Ofoq 1
M1P4270 Child Water Pipes Insulation 12 12-Oct-15 26-Oct-15 SCG Ofoq 31
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
31-Dec-
31-Dec-
31-Dec-
31-Dec-
30-Dec-
31-Dec-
31-Dec-
31-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 20 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 21. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P4260 Duct Insulation 12 27-Oct-15 09-Nov-15 SCG Ofoq 1
M1P4280 Air Grill Supply and Exhaust 18 10-Nov-15 30-Nov-15 SCG Ofoq 1
HVAC EquipmentHVAC Equipment 72 07-Oct-15 31-Dec-15 0
M1P4300 AC DX Split Units Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 60
M1P4310 Exhaust Fans Erection 18 10-Oct-15 31-Oct-15 SCG Ofoq 52
M1P4320 Supply Fans Erection 18 10-Oct-15 31-Oct-15 SCG Ofoq 52
M1P4330 Fuel Oil Storage Tank Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2
M1P4340 Heat Exchangers Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2
M1P4350 Expansion and Compression Tanks Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2
M1P4360 Child Water Pumps Erection 18 10-Dec-15 31-Dec-15 SCG Ofoq 0
Fire Fighting SysteFire Fighting System 95 02-Sep-15 28-Dec-15 3
M1P4370 Seamless Black Steel Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 2
M1P4380 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Erection
6 27-Sep-15 03-Oct-15 SCG Ofoq 2
M1P4450 Pipe Testing and Flushing 12 04-Oct-15 19-Oct-15 SCG Ofoq 2
M1P4390 Fire Hose Stations Erection 36 13-Sep-15 29-Oct-15 SCG Ofoq 28
M1P4400 Fire Hose Real Stations Erection 36 13-Sep-15 29-Oct-15 SCG Ofoq 28
M1P4420 Fire Extinguishers 3 07-Nov-15 09-Nov-15 SCG Ofoq 19
M1P4410 Sprinklers Erection 45 20-Oct-15 10-Dec-15 SCG Ofoq 2
M1P4430 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV
Room, IT&Main IT Room)
40 10-Nov-15 27-Dec-15 SCG Ofoq 4
M1P4440 Foam Fire System for (Generator Room, Feul Tank Room)
Erection
40 11-Nov-15 28-Dec-15 SCG Ofoq 3
Plumbing SystemPlumbing System 54 02-Sep-15 09-Nov-15 19
M1P4510 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Erection 12 02-Sep-15 15-Sep-15 SCG Ofoq 19
M1P4460 PPR Domestic Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 37
M1P4490 Irrigation System PVC Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 49
M1P4500 Valves Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 37
M1P4520 Hose Bibbs Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 49
M1P4470 UPVC for Drainage System Erection 18 16-Sep-15 11-Oct-15 SCG Ofoq 19
M1P4570 Testing Domestic Network 6 04-Oct-15 11-Oct-15 SCG Ofoq 37
M1P4550 Fountains Tank Erection 26 10-Sep-15 15-Oct-15 SCG N/A 40
M1P4560 Water Fall Tank Erection 26 10-Sep-15 15-Oct-15 SCG N/A 40
M1P4530 HDPE Domestic Water Pipes Erection 6 12-Oct-15 19-Oct-15 SCG Ofoq 37
M1P4480 PVC for Forced Main Line Erection 12 12-Oct-15 26-Oct-15 SCG Ofoq 19
M1P4580 Testing for Drainage Network 6 27-Oct-15 02-Nov-15 SCG Ofoq 19
M1P4540 HDPE for Drainage , Waste , Vent, Storm Systems Erection 6 03-Nov-15 09-Nov-15 SCG Ofoq 19
Finishing WorkFinishing Work 126 29-Jul-15 29-Dec-15 2
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
31-Dec-
28-Dec-
09-Nov-15, Plumbi
29-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 21 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 22. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P4660 Block Work Completion for Equipments / Service / Stores
Rooms
12 29-Jul-15 11-Aug-15 HW ECIP 0
M1P4670 Plaster Work Applied for Equipments / Service / Stores Roo 12 12-Aug-15 25-Aug-15 HW ECIP 0
M1P4620 Curb Stone Material Erection 12 06-Sep-15 19-Sep-15 HW ECIP 46
M1P4680 MEP 1st Fix for Equipments / Service / Stores Rooms 26 26-Aug-15 28-Sep-15 SCG Ofoq 0
M1P4630 Interlock Material Erection 12 20-Sep-15 07-Oct-15 HW ECIP 46
M1P8420 Paint 1st and 2nd Coat for Ceiling and Walls in Upper
Basement
26 06-Sep-15 10-Oct-15 HW ECIP 54
M1P4590 False Ceiling Erection for Equipments / Service / Stores
Rooms
12 29-Sep-15 13-Oct-15 HW ECIP 0
M1P4610 Paint Applied for Equipments / Service / Stores Rooms 12 15-Oct-15 28-Oct-15 HW ECIP 0
M1P4650 Raised Floor Erection (Expected in IT & Main IT Room) 6 29-Oct-15 04-Nov-15 HW ECIP 6
M1P4600 Flooring Tiles Applied for Equipments / Service / Stores Roo 12 29-Oct-15 11-Nov-15 HW ECIP 0
M1P4640 Doors Erection for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 HW ECIP 5
M1P4690 MEP Final Fix for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 SCG Ofoq 0
M1P8430 Final Coat of Paint for Walls and Ceiling 12 12-Dec-15 26-Dec-15 HW 2
M1P8440 Epoxi Paint for Flooring 12 15-Dec-15 29-Dec-15 HW 2
Lower BasementLower Basement 164 15-Jun-15 31-Dec-15 0
GeneralGeneral 0 07-Jul-15 07-Jul-15 15
M1P6450 Client Clear Vision about Secuirty Issues as (CCTV, Access
Control...)
0 07-Jul-15 Client 6
M1P6460 Client Clear Vision about Data Issues as (Central, IT
requirements...)
0 07-Jul-15 Client 15
DesignDesign 60 15-Jun-15 25-Aug-15 41
Architectural DesArchitectural Design 24 15-Jun-15 12-Jul-15 0
M1P4700 Final Parking Layout for Lower Basement 0 28-Jun-15 Client 0
M1P4710 Final Architectural Dimensional Plan for Lower Basement 12 15-Jun-15 28-Jun-15 T.B 0
M1P4720 Final Architectural Package for Lower Basement 12 29-Jun-15 12-Jul-15 HW 0
Structural DesignStructural Design 6 19-Aug-15 25-Aug-15 41
M1P6440 Structural Design for Equipment Foundation (Fire Pump ,
Supply and Exhaust Fans........)
6 19-Aug-15 25-Aug-15 HW 41
MEP DesignMEP Design 24 29-Jun-15 28-Jul-15 6
Electrical SystemsElectrical Systems 24 29-Jun-15 28-Jul-15 6
Power SystemPower System 6 29-Jun-15 05-Jul-15 15
M1P4750 Updated Design for Power System 6 29-Jun-15 05-Jul-15 SCG 15
Lighting SystemLighting System 6 29-Jun-15 05-Jul-15 15
M1P4760 Updated Design for Lighting System 6 29-Jun-15 05-Jul-15 SCG 15
Fire Alarm SystemFire Alarm System 6 13-Jul-15 20-Jul-15 0
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
31-Dec-
07-Jul-15, General
25-Aug-15, Design
12-Jul-15, Architectural Design
25-Aug-15, Structural Design
28-Jul-15, MEP Design
28-Jul-15, Electrical Systems
05-Jul-15, Power System
05-Jul-15, Lighting System
20-Jul-15, Fire Alarm System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 22 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 23. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P5370 Updated Design for Fire Alarm System 6 13-Jul-15 20-Jul-15 C/SCG 0
Parking SystemParking System 18 29-Jun-15 20-Jul-15 0
M1P5140 Updated Design for Parking System 18 29-Jun-15 20-Jul-15 C/SCG 0
CCTV SystemCCTV System 6 13-Jul-15 20-Jul-15 2
M1P4730 Updated Design for CCTV System 6 13-Jul-15 20-Jul-15 C/SCG 2
Data SystemData System 6 13-Jul-15 20-Jul-15 11
M1P4740 Updated Design for Data System 6 13-Jul-15 20-Jul-15 C/SCG 11
BMS SystemBMS System 6 21-Jul-15 28-Jul-15 6
M1P5690 Updated Design for BMS System 6 21-Jul-15 28-Jul-15 SCG 6
Mechanical SystemsMechanical Systems 18 29-Jun-15 20-Jul-15 6
HVAC SystemHVAC System 6 13-Jul-15 20-Jul-15 0
M1P4770 HVAC Updated Design for Lower Basement 6 13-Jul-15 20-Jul-15 SCG 0
Fire Fighting SysteFire Fighting System 6 29-Jun-15 05-Jul-15 3
M1P4820 Fire Fighting Updated Design for Lower Basement 6 29-Jun-15 05-Jul-15 SCG 3
Plumbing SystemPlumbing System 6 13-Jul-15 20-Jul-15 6
Drainage SystemDrainage System 6 13-Jul-15 20-Jul-15 6
M1P4780 Final Update for Lower Basement Drainage System 6 13-Jul-15 20-Jul-15 SCG 6
Shop DrawingsShop Drawings 60 29-Jun-15 08-Sep-15 41
Architectural ShoArchitectural Shop Drawing 12 13-Jul-15 28-Jul-15 4
M1P4830 Lower Basement Architectural Shop Drawing Submittal 6 13-Jul-15 20-Jul-15 ECIP 4
M1P4840 Lower Basement Architectural Shop Drawing Approval 6 21-Jul-15 28-Jul-15 HW 4
Structural Shop DStructural Shop Drawing 50 11-Jul-15 08-Sep-15 41
M1P4850 Lower Basement Construction , Expansion Joints Details
Shop Drawing Submittal
6 11-Jul-15 16-Jul-15 ECIP 64
M1P4860 Lower Basement Construction , Expansion Joints Details
Shop Drawing Approval
6 19-Jul-15 26-Jul-15 HW 64
M1P6470 Lower Basement Equipments Foundations shop drawings
Submittal
6 26-Aug-15 01-Sep-15 ECIP 41
M1P6480 Lower Basement Equipments Foundations shop drawings
Approval
6 02-Sep-15 08-Sep-15 HW 41
Electrical SystemsElectrical Systems 36 06-Jul-15 18-Aug-15 0
Power SystemPower System 12 06-Jul-15 20-Jul-15 15
M1P4870 Lower Basement Power System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 15
M1P4880 Lower Basement Power System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 15
Lighting SystemLighting System 12 06-Jul-15 20-Jul-15 15
M1P4890 Lower Basement Lighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 15
M1P4900 Lower Basement Lighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 15
Fire Alarm SystemFire Alarm System 12 21-Jul-15 04-Aug-15 12
M1P5380 Lower Basement Fire Alarm System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 12
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
20-Jul-15, Parking System
20-Jul-15, CCTV System
20-Jul-15, Data System
28-Jul-15, BMS System
20-Jul-15, Mechanical Systems
20-Jul-15, HVAC System
05-Jul-15, Fire Fighting System
20-Jul-15, Plumbing System
20-Jul-15, Drainage System
08-Sep-15, Shop Drawings
28-Jul-15, Architectural Shop Drawing
08-Sep-15, Structural Shop Draw
18-Aug-15, Electrical Systems
20-Jul-15, Power System
20-Jul-15, Lighting System
04-Aug-15, Fire Alarm System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 23 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 24. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P5390 Lower Basement Fire Alarm System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 12
Parking SystemParking System 12 21-Jul-15 04-Aug-15 0
M1P5120 Lower Basement Parking System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0
M1P5130 Lower Basement Parking System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0
CCTV SystemCCTV System 12 21-Jul-15 04-Aug-15 2
M1P4910 Lower Basement CCTV System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 2
M1P4920 Lower Basement CCTV System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 2
Data SystemData System 12 21-Jul-15 04-Aug-15 11
M1P4930 Lower Basement Data System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11
M1P4940 Lower Basement Data System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11
BMS SystemBMS System 12 05-Aug-15 18-Aug-15 0
M1P5700 Lower Basement BMS System Layout Submittal 6 05-Aug-15 11-Aug-15 Ofoq 0
M1P5710 Lower Basement BMS System Layout Approval 6 12-Aug-15 18-Aug-15 SCG 0
Mechanical SysteMechanical Systems 42 29-Jun-15 18-Aug-15 41
HVAC SystemHVAC System 42 29-Jun-15 18-Aug-15 41
M1P5920 Fans Static Pressure Calculations Submittal 6 29-Jun-15 05-Jul-15 Ofoq 21
M1P5930 Fans Static Pressure Calculations Approval 6 06-Jul-15 12-Jul-15 SCG 21
M1P7250 Builder Work for Shaft Opening Layout Submittal 3 13-Jul-15 15-Jul-15 Ofoq 22
M1P7260 Builder Work for Shaft Opening Layout Approval 6 16-Jul-15 25-Jul-15 HW 22
M1P4950 Lower Basement HVAC System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0
M1P4960 Lower Basement HVAC System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0
M1P6420 Lower Basement Fan Room Details Submittal 6 05-Aug-15 11-Aug-15 Ofoq 41
M1P6430 Lower Basement Fan Room Details Approval 6 12-Aug-15 18-Aug-15 SCG 41
Fire Fighting SystemFire Fighting System 12 06-Jul-15 20-Jul-15 3
M1P4970 Lower Basement Fire Fighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 3
M1P4980 Lower Basement Fire Fighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 3
Plumbing SystemPlumbing System 12 21-Jul-15 04-Aug-15 11
Drainage SystemDrainage System 12 21-Jul-15 04-Aug-15 11
M1P4990 Lower Basement Drainage System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11
M1P5000 Lower Basement Drainage System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11
Composite DrawiComposite Drawing 12 19-Aug-15 01-Sep-15 0
M1P5050 Lower Basement MEP Composite Drawing Submittal 6 19-Aug-15 25-Aug-15 Ofoq 0
M1P5060 Lower Basement MEP Composite Drawing Approval 6 26-Aug-15 01-Sep-15 SCG 0
MaterialsMaterials 149 15-Jun-15 13-Dec-15 3
Finishing MateriaFinishing Materials 35 27-Jul-15 05-Sep-15 58
Material SubmittalMaterial Submittal 20 27-Jul-15 18-Aug-15 58
M110001246 Expansion Joints Submittal 6 27-Jul-15 02-Aug-15 ECIP 64
M1P5070 False Ceiling Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 21
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
04-Aug-15, Parking System
04-Aug-15, CCTV System
04-Aug-15, Data System
18-Aug-15, BMS System
18-Aug-15, Mechanical Systems
18-Aug-15, HVAC System
20-Jul-15, Fire Fighting System
04-Aug-15, Plumbing System
04-Aug-15, Drainage System
01-Sep-15, Composite Drawing
13-Dec-15,
05-Sep-15, Finishing Materials
18-Aug-15, Material Submittal
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 24 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 25. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P5080 Flooring Tiles Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 45
M1P5090 Paint Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 33
M1P5100 Curb Stone Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 46
M1P5110 Interlock Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 58
M1P7610 Doors Submittal 18 29-Jul-15 18-Aug-15 ECIP 58
Material ApprovalMaterial Approval 20 03-Aug-15 25-Aug-15 58
M110001256 Expansion Joints Approval 6 03-Aug-15 09-Aug-15 HW 64
M1P5150 False Ceiling Material Approval 6 19-Aug-15 25-Aug-15 HW 21
M1P5160 Flooring Tiles Material Approval 6 19-Aug-15 25-Aug-15 HW 45
M1P5170 Paint Material Approval 6 19-Aug-15 25-Aug-15 HW 33
M1P5180 Curb Stone Material Approval 6 19-Aug-15 25-Aug-15 HW 46
M1P5190 Interlock Material Approval 6 19-Aug-15 25-Aug-15 HW 58
M1P7630 Doors Approval 6 19-Aug-15 25-Aug-15 HW 58
Material P.OMaterial P.O 17 10-Aug-15 29-Aug-15 58
M110001266 Expansion Joints P.O 3 10-Aug-15 12-Aug-15 ECIP 64
M1P5200 False Ceiling Material P.O 3 26-Aug-15 29-Aug-15 ECIP 21
M1P5210 Flooring Tiles Material P.O 3 26-Aug-15 29-Aug-15 ECIP 45
M1P5220 Paint Material P.O 3 26-Aug-15 29-Aug-15 ECIP 33
M1P5230 Curb Stone Material P.O 3 26-Aug-15 29-Aug-15 ECIP 46
M1P5240 Interlock Material P.O 3 26-Aug-15 29-Aug-15 ECIP 58
M1P7650 Doors P.O 3 26-Aug-15 29-Aug-15 ECIP 58
Material DeliveryMaterial Delivery 20 13-Aug-15 05-Sep-15 58
M110001276 Expansion Joints Delivery 6 13-Aug-15 19-Aug-15 ECIP 64
M1P5250 False Ceiling Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 21
M1P5260 Flooring Tiles Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 45
M1P5270 Paint Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 33
M1P5280 Curb Stone Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 46
M1P5290 Interlock Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 58
M1P7670 Doors Delivery 6 30-Aug-15 05-Sep-15 ECIP 58
MEP MaterialsMEP Materials 149 15-Jun-15 13-Dec-15 3
Material SubmittalMaterial Submittal 72 15-Jun-15 08-Sep-15 40
Electrical Material SElectrical Material Submittal 72 15-Jun-15 08-Sep-15 20
M490 PVC , EMT Conduit with Accessories Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 48
M570 Cable Trays Submittal 6 15-Jun-15 21-Jun-15 Ofoq 86
M530 Wires for Power and Lighting Material Submittal 6 21-Jul-15 28-Jul-15 Ofoq 56
M520 Lighting Fixture Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 44
M560 Wiring Devices Submittal 12 21-Jul-15 04-Aug-15 Ofoq 15
M580 Fire Alarm Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 0
M500 Structured Cable for Data System Material Submittal 4 05-Aug-15 09-Aug-15 Ofoq 11
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
25-Aug-15, Material Approval
29-Aug-15, Material P.O
05-Sep-15, Material Delivery
13-Dec-15,
08-Sep-15, Material Submittal
08-Sep-15, Electrical Material Su
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 25 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 26. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M510 Distribution Board Material Submittal 16 21-Jul-15 09-Aug-15 Ofoq 24
M540 CCTV Cameras Material Submittal 4 05-Aug-15 09-Aug-15 N/A 2
M550 Parking System Material Submittal 18 05-Aug-15 25-Aug-15 N/A 0
M900 LV Cables Submittal 6 02-Sep-15 08-Sep-15 Ofoq 12
M930 BMS Submittal 18 19-Aug-15 08-Sep-15 Ofoq 1
Electrical EquipmentElectrical Equipment 18 21-Jul-15 11-Aug-15 16
M1P5410 MCC Submittal 18 21-Jul-15 11-Aug-15 Ofoq 16
Mechanical MateriaMechanical Material Submittal 30 13-Jul-15 18-Aug-15 58
HVAC System SubmHVAC System Submittal 12 05-Aug-15 18-Aug-15 58
M1P5720 Galvanized Duct Submittal 6 05-Aug-15 11-Aug-15 Ofoq 4
M1P5760 Child Water Pipes Submittal 6 05-Aug-15 11-Aug-15 Ofoq 34
M1P5770 Child Water Insulation Submittal 6 05-Aug-15 11-Aug-15 Ofoq 64
M1P5730 Volume Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10
M1P5740 Fire Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10
M1P5750 Fire Smoke Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10
M1P5780 Supply Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46
M1P5790 Exhaust Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System Submittal 6 21-Jul-15 28-Jul-15 23
M1P6490 Seamless Black Steel Pipes Submittal 3 21-Jul-15 25-Jul-15 Ofoq 20
M1P6500 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Submittal
6 21-Jul-15 28-Jul-15 Ofoq 23
M1P6510 Sprinklers Submittal 6 21-Jul-15 28-Jul-15 Ofoq 14
M1P6540 Fire Hose Stations Submittal 6 21-Jul-15 28-Jul-15 Ofoq 22
M1P6550 Fire Hose Real Stations Submittal 6 21-Jul-15 28-Jul-15 Ofoq 22
M1P6560 Fire Extinguishers Submittal 6 21-Jul-15 28-Jul-15 Ofoq 13
Plumbing System SPlumbing System Submittal 6 05-Aug-15 11-Aug-15 64
M1P6840 PPR Domestic Water Pipes Submittal 6 05-Aug-15 11-Aug-15 Ofoq 46
M1P6860 UPVC for Drainage System Submittal 6 05-Aug-15 11-Aug-15 Ofoq 40
M1P6870 PVC for Forced Main Line Submittal 6 05-Aug-15 11-Aug-15 Ofoq 58
M1P6890 Valves Submittal 6 05-Aug-15 11-Aug-15 Ofoq 64
M1P6900 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Submittal 6 05-Aug-15 11-Aug-15 Ofoq 28
Mechanical EquipmMechanical Equipment Submittal 30 13-Jul-15 18-Aug-15 35
HVAC EquipmentHVAC Equipment Submittal 30 13-Jul-15 18-Aug-15 35
M1P5850 Exhaust Fans Submittal 12 13-Jul-15 28-Jul-15 Ofoq 21
M1P5860 Supply Fans Submittal 12 13-Jul-15 28-Jul-15 Ofoq 21
M1P5810 AC DX Split Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 35
M1P5870 Fan Coil Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 17
Fire Fighting EquFire Fighting Equipment Submittal 6 21-Jul-15 28-Jul-15 3
M1P8450 Fire Pumps Submittal 6 21-Jul-15 28-Jul-15 Ofoq 3
Plumbing EquipmPlumbing Equipment Submittal 6 05-Aug-15 11-Aug-15 11
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
11-Aug-15, Electrical Equipment
18-Aug-15, Mechanical Material Subm
18-Aug-15, HVAC System Submittal
28-Jul-15, Fire Fighting System Submittal
11-Aug-15, Plumbing System Submittal
18-Aug-15, Mechanical Equipment Su
18-Aug-15, HVAC Equipment Submi
28-Jul-15, Fire Fighting Equipment Submi
11-Aug-15, Plumbing Equipment Subm
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 26 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 27. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P8460 Domestic Water Pump Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11
M1P8470 Irrigation Pump Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11
M1P8480 Waste Water Submersible Pumps Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11
M1P8490 Sewage Water Submersible Pumps Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11
Material ApprovalMaterial Approval 87 18-Jun-15 03-Oct-15 28
Electrical Material AElectrical Material Approval 87 18-Jun-15 03-Oct-15 8
M590 PVC , EMT Conduit with Accessories Conduit Material
Approval
6 18-Jun-15 24-Jun-15 SCG 48
M670 Cable Trays Approval 6 22-Jun-15 28-Jun-15 SCG 86
M630 Wires for Power and Lighting Material Approval 6 29-Jul-15 04-Aug-15 SCG 56
M620 Lighting Fixture Material Approval 6 05-Aug-15 11-Aug-15 SCG 44
M660 Wiring Devices Approval 6 05-Aug-15 11-Aug-15 SCG 15
M680 Fire Alarm Material Approval 6 05-Aug-15 11-Aug-15 SCG 0
M600 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 11
M610 Distribution Board Material Approval 6 10-Aug-15 16-Aug-15 SCG 24
M640 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 2
M650 Parking System Material Approval 6 26-Aug-15 01-Sep-15 SCG 0
M890 LV Cables Approval 6 09-Sep-15 15-Sep-15 SCG 12
M940 BMS Approval 18 09-Sep-15 03-Oct-15 SCG 1
Electrical EquipmentElectrical Equipment 6 12-Aug-15 18-Aug-15 16
M1P5500 MCC Approval 6 12-Aug-15 18-Aug-15 SCG 16
Mechanical MateriaMechanical Material Approval 27 26-Jul-15 25-Aug-15 58
HVAC System ApproHVAC System Approval 12 12-Aug-15 25-Aug-15 58
M1P5940 Galvanized Duct Approval 6 12-Aug-15 18-Aug-15 SCG 4
M1P5980 Child Water Pipes Approval 6 12-Aug-15 18-Aug-15 SCG 34
M1P5990 Child Water Insulation Approval 6 12-Aug-15 18-Aug-15 SCG 64
M1P5950 Volume Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10
M1P5960 Fire Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10
M1P5970 Fire Smoke Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10
M1P6000 Supply Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46
M1P6010 Exhaust Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46
Fire Fighting SystemFire Fighting System Approval 9 26-Jul-15 04-Aug-15 23
M1P6570 Seamless Black Steel Pipes Approval 6 26-Jul-15 01-Aug-15 SCG 20
M1P6580 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Approval
6 29-Jul-15 04-Aug-15 SCG 23
M1P6590 Sprinklers Approval 6 29-Jul-15 04-Aug-15 SCG 14
M1P6620 Fire Hose Stations Approval 6 29-Jul-15 04-Aug-15 SCG 22
M1P6630 Fire Hose Real Stations Approval 6 29-Jul-15 04-Aug-15 SCG 22
M1P6640 Fire Extinguishers Approval 6 29-Jul-15 04-Aug-15 SCG 13
Plumbing System APlumbing System Approval 6 12-Aug-15 18-Aug-15 64
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
03-Oct-15, Material Appro
03-Oct-15, Electrical Mater
18-Aug-15, Electrical Equipment
25-Aug-15, Mechanical Material Ap
25-Aug-15, HVAC System Approval
04-Aug-15, Fire Fighting System Approv
18-Aug-15, Plumbing System Approv
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 27 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 28. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P6950 PPR Domestic Water Pipes Approval 6 12-Aug-15 18-Aug-15 SCG 46
M1P6970 UPVC for Drainage System Approval 6 12-Aug-15 18-Aug-15 SCG 40
M1P6980 PVC for Forced Main Line Approval 6 12-Aug-15 18-Aug-15 SCG 58
M1P7000 Valves Approval 6 12-Aug-15 18-Aug-15 SCG 64
M1P7010 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Approval 6 12-Aug-15 18-Aug-15 SCG 28
Mechanical EquipmMechanical Equipment Approval 24 29-Jul-15 25-Aug-15 35
HVAC EquipmentHVAC Equipment Approval 24 29-Jul-15 25-Aug-15 35
M1P6070 Exhaust Fans Approval 6 29-Jul-15 04-Aug-15 SCG 21
M1P6080 Supply Fans Approval 6 29-Jul-15 04-Aug-15 SCG 21
M1P6030 AC DX Split Units Approval 6 19-Aug-15 25-Aug-15 SCG 35
M1P6090 Fan Coil Units Approval 6 19-Aug-15 25-Aug-15 SCG 17
Fire Fighting EquFire Fighting Equipment Approval 6 29-Jul-15 04-Aug-15 3
M1P8500 Fire Pumps Approval 6 29-Jul-15 04-Aug-15 SCG 3
Plumbing EquipmPlumbing Equipment Approval 6 12-Aug-15 18-Aug-15 11
M1P8540 Domestic Water Pump Approval 6 12-Aug-15 18-Aug-15 SCG 11
M1P8550 Irrigation Pump Approval 6 12-Aug-15 18-Aug-15 SCG 11
M1P8560 Waste Water Submersible Pumps Approval 6 12-Aug-15 18-Aug-15 SCG 11
M1P8570 Sewage Water Submersible Pumps Approval 6 12-Aug-15 18-Aug-15 SCG 11
Material P.OMaterial P.O 84 25-Jun-15 07-Oct-15 28
Electrical MaterialElectrical Material P.O 84 25-Jun-15 07-Oct-15 8
M690 PVC , EMT Conduit with Accessories Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 48
M770 Cable Trays P.O 3 29-Jun-15 01-Jul-15 Ofoq 86
M730 Wires for Power and Lighting Material P.O 3 05-Aug-15 08-Aug-15 Ofoq 56
M720 Lighting Fixture Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 44
M760 Wiring Devices P.O 3 12-Aug-15 15-Aug-15 Ofoq 15
M780 Fire Alarm Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 0
M700 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 11
M710 Distribution Board Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 24
M740 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 2
M750 Parking System Material P.O 3 02-Sep-15 05-Sep-15 N/A 0
M910 LV Cables P.O 3 16-Sep-15 19-Sep-15 Ofoq 12
M950 BMS P.O 3 04-Oct-15 07-Oct-15 Ofoq 1
Electrical EquipmentElectrical Equipment 3 19-Aug-15 22-Aug-15 16
M1P5590 MCC P.O 3 19-Aug-15 22-Aug-15 Ofoq 16
Mechanical MateriaMechanical Material P.O 27 02-Aug-15 01-Sep-15 55
HVAC System P.OHVAC System P.O 9 19-Aug-15 29-Aug-15 58
M1P6100 Galvanized Duct P.O 3 19-Aug-15 22-Aug-15 Ofoq 4
M1P6140 Child Water Pipes P.O 3 19-Aug-15 22-Aug-15 Ofoq 34
M1P6150 Child Water Insulation P.O 3 19-Aug-15 22-Aug-15 Ofoq 64
M1P6110 Volume Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
25-Aug-15, Mechanical Equipment A
25-Aug-15, HVAC Equipment Appr
04-Aug-15, Fire Fighting Equipment App
18-Aug-15, Plumbing Equipment App
07-Oct-15, Material P.O
07-Oct-15, Electrical Mater
22-Aug-15, Electrical Equipment
01-Sep-15, Mechanical Material P
29-Aug-15, HVAC System P.O
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 28 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 29. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M1P6120 Fire Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
M1P6130 Fire Smoke Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
M1P6160 Supply Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46
M1P6170 Exhaust Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System P.O 6 02-Aug-15 08-Aug-15 23
M1P6650 Seamless Black Steel Pipes P.O 3 02-Aug-15 04-Aug-15 Ofoq 20
M1P6660 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) P.O
3 05-Aug-15 08-Aug-15 Ofoq 23
M1P6670 Sprinklers P.O 3 05-Aug-15 08-Aug-15 Ofoq 14
M1P6700 Fire Hose Stations P.O 3 05-Aug-15 08-Aug-15 Ofoq 22
M1P6710 Fire Hose Real Stations P.O 3 05-Aug-15 08-Aug-15 Ofoq 22
M1P6720 Fire Extinguishers P.O 3 05-Aug-15 08-Aug-15 Ofoq 13
Plumbing System PPlumbing System P.O 3 19-Aug-15 22-Aug-15 64
M1P7060 PPR Domestic Water Pipes P.O 3 19-Aug-15 22-Aug-15 Ofoq 46
M1P7080 UPVC for Drainage System P.O 3 19-Aug-15 22-Aug-15 Ofoq 40
M1P7090 PVC for Forced Main Line P.O 3 19-Aug-15 22-Aug-15 Ofoq 58
M1P7110 Valves P.O 3 19-Aug-15 22-Aug-15 Ofoq 64
M1P7120 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D P.O 3 19-Aug-15 22-Aug-15 Ofoq 28
Mechanical EquipmMechanical Equipment P.O 24 05-Aug-15 01-Sep-15 35
HVAC EquipmentHVAC Equipment P.O 24 05-Aug-15 01-Sep-15 35
M1P6230 Exhaust Fans P.O 6 05-Aug-15 11-Aug-15 Ofoq 21
M1P6240 Supply Fans P.O 6 05-Aug-15 11-Aug-15 Ofoq 21
M1P6190 AC DX Split Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 35
M1P6250 Fan Coil Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 17
Fire Fighting EquFire Fighting Equipment P.O 3 05-Aug-15 08-Aug-15 3
M1P8510 Fire Pumps P.O 3 05-Aug-15 08-Aug-15 Ofoq 3
Plumbing EquipmPlumbing Equipment P.O 3 19-Aug-15 22-Aug-15 11
M1P8580 Domestic Water Pump P.O 3 19-Aug-15 22-Aug-15 Ofoq 11
M1P8590 Irrigation Pump P.O 3 19-Aug-15 22-Aug-15 Ofoq 11
M1P8600 Waste Water Submersible Pumps P.O 3 19-Aug-15 22-Aug-15 Ofoq 11
M1P8610 Sewage Water Submersible Pumps P.O 3 19-Aug-15 22-Aug-15 Ofoq 11
Material DeliveryMaterial Delivery 137 29-Jun-15 13-Dec-15 3
Electrical MaterialElectrical Material Delivery 121 29-Jun-15 24-Nov-15 1
M790 PVC , EMT Conduit with Accessories Conduit Material
Delivery
6 29-Jun-15 05-Jul-15 Ofoq 48
M870 Cable Trays Delivery 6 02-Jul-15 08-Jul-15 Ofoq 86
M830 Wires for Power and Lighting Material Delivery 6 09-Aug-15 15-Aug-15 Ofoq 56
M820 Lighting Fixture Material Delivery 18 16-Aug-15 05-Sep-15 N/A 44
M800 Structured Cable for Data System Material Delivery 18 20-Aug-15 09-Sep-15 Ofoq 11
M860 Wiring Devices Delivery 36 16-Aug-15 29-Sep-15 Ofoq 15
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
08-Aug-15, Fire Fighting System P.O
22-Aug-15, Plumbing System P.O
01-Sep-15, Mechanical Equipment
01-Sep-15, HVAC Equipment P.O
08-Aug-15, Fire Fighting Equipment P.O
22-Aug-15, Plumbing Equipment P.O
13-Dec-15,
24-Nov-15, Elec
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 29 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 30. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
M840 CCTV Cameras Material Delivery 45 20-Aug-15 17-Oct-15 N/A 2
M880 Fire Alarm Material Delivery 52 16-Aug-15 20-Oct-15 Ofoq 0
M810 Distribution Board Material Delivery 52 20-Aug-15 25-Oct-15 Ofoq 24
M920 LV Cables Delivery 26 20-Sep-15 25-Oct-15 Ofoq 12
M850 Parking System Material Delivery 45 06-Sep-15 02-Nov-15 N/A 0
M960 BMS Delivery 40 08-Oct-15 24-Nov-15 Ofoq 1
Electrical EquipmentElectrical Equipment 52 23-Aug-15 27-Oct-15 16
M1P5680 MCC Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16
Mechanical MateriaMechanical Material Delivery 107 05-Aug-15 13-Dec-15 3
HVAC System DelivHVAC System Delivery 18 23-Aug-15 12-Sep-15 52
M1P6260 Galvanized Duct Delivery 6 23-Aug-15 29-Aug-15 Ofoq 4
M1P6300 Child Water Pipes Delivery 6 23-Aug-15 29-Aug-15 Ofoq 34
M1P6310 Child Water Insulation Delivery 6 23-Aug-15 29-Aug-15 Ofoq 64
M1P6270 Volume Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
M1P6280 Fire Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
M1P6290 Fire Smoke Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
M1P6320 Supply Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46
M1P6330 Exhaust Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46
Fire Fighting SystemFire Fighting System Delivery 81 05-Aug-15 12-Nov-15 13
M1P6730 Seamless Black Steel Pipes Delivery 6 05-Aug-15 11-Aug-15 Ofoq 20
M1P6740 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Delivery
18 09-Aug-15 29-Aug-15 Ofoq 23
M1P6780 Fire Hose Stations Delivery 36 09-Aug-15 19-Sep-15 Ofoq 22
M1P6790 Fire Hose Real Stations Delivery 36 09-Aug-15 19-Sep-15 Ofoq 22
M1P6750 Sprinklers Delivery 45 09-Aug-15 03-Oct-15 Ofoq 14
M1P6800 Fire Extinguishers Delivery 78 09-Aug-15 12-Nov-15 Ofoq 13
Plumbing System DPlumbing System Delivery 6 23-Aug-15 29-Aug-15 64
M1P7170 PPR Domestic Water Pipes Delivery 6 23-Aug-15 29-Aug-15 Ofoq 46
M1P7190 UPVC for Drainage System Delivery 6 23-Aug-15 29-Aug-15 Ofoq 40
M1P7200 PVC for Forced Main Line Delivery 6 23-Aug-15 29-Aug-15 Ofoq 58
M1P7220 Valves Delivery 6 23-Aug-15 29-Aug-15 Ofoq 64
M1P7230 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Delivery 6 23-Aug-15 29-Aug-15 Ofoq 28
Mechanical EquipmMechanical Equipment Delivery 104 09-Aug-15 13-Dec-15 3
HVAC EquipmentHVAC Equipment Delivery 52 12-Aug-15 17-Oct-15 27
M1P6350 AC DX Split Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 35
M1P6410 Fan Coil Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 17
M1P6390 Exhaust Fans Delivery 52 12-Aug-15 17-Oct-15 Ofoq 21
M1P6400 Supply Fans Delivery 52 12-Aug-15 17-Oct-15 Ofoq 21
Fire Fighting EquFire Fighting Equipment Delivery 104 09-Aug-15 13-Dec-15 3
M1P8520 Fire Pumps Delivery 104 09-Aug-15 13-Dec-15 Ofoq 3
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
27-Oct-15, Electrical E
13-Dec-15,
12-Sep-15, HVAC System Delive
12-Nov-15, Fire Fi
29-Aug-15, Plumbing System Delive
13-Dec-15,
17-Oct-15, HVAC Equip
13-Dec-15,
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 30 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
- 31. Activity ID Activity Name Original
Duration
Start Finish Consultant Contractor Total
Float
Plumbing EquipmPlumbing Equipment Delivery 78 23-Aug-15 26-Nov-15 11
M1P8620 Domestic Water Pump Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11
M1P8630 Irrigation Pump Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11
M1P8640 Waste Water Submersible Pumps Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11
M1P8650 Sewage Water Submersible Pumps Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11
ConstructionConstruction 138 15-Jul-15 31-Dec-15 0
Structural WorkStructural Work 119 15-Jul-15 08-Dec-15 4
M1P8340 Lower Basement PC Slab On Grade 18 15-Jul-15 06-Aug-15 HW ECIP 71
M1P7270 Openings for Duct Shafts 12 26-Jul-15 08-Aug-15 HW ECIP 22
M1P7290 Expansion Joints 12 20-Aug-15 02-Sep-15 HW ECIP 64
M1P7580 Equipments Concrete Foundations 12 09-Sep-15 26-Sep-15 HW ECIP 41
M1P7690 Lower Basement RC Slab On Grade 18 18-Nov-15 08-Dec-15 HW ECIP 4
MEP WorkMEP Work 98 02-Sep-15 31-Dec-15 0
Electrical WorksElectrical Works 98 02-Sep-15 31-Dec-15 0
Power SystemPower System 61 02-Sep-15 17-Nov-15 12
M1P7300 Lower Basement PVC Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41
M1P7310 Lower Basement EMT Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41
M1P7320 Lower Basement Cable Trays for LV Cables 12 02-Sep-15 15-Sep-15 SCG Ofoq 41
M1P7330 Wires for Lower Basement Power Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 41
M1P7350 Laying Lower Basement DB Panels 2 26-Oct-15 27-Oct-15 SCG Ofoq 24
M1P7340 Laying Lower Basement LV Cables 6 26-Oct-15 01-Nov-15 SCG Ofoq 12
M1P7480 Wiring Devices Erection and termination 12 02-Nov-15 15-Nov-15 SCG Ofoq 12
M1P7360 Termination Lower Basement DB Panels 6 11-Nov-15 17-Nov-15 SCG Ofoq 12
Power EquipmentPower Equipment 14 28-Oct-15 12-Nov-15 16
M1P7370 Laying Lower Basement MCC's 2 28-Oct-15 29-Oct-15 SCG Ofoq 16
M1P7380 Termination Lower Basement MCC's 12 31-Oct-15 12-Nov-15 SCG Ofoq 16
Lighting SystemLighting System 36 02-Sep-15 19-Oct-15 29
M1P7490 Lower Basement PVC Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 29
M1P7500 Lower Basement EMT Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 29
M1P7510 Wires for Lower Basement Lighting Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 29
M1P7470 Lighting Fixture Erection and termination 18 27-Sep-15 19-Oct-15 SCG Ofoq 29
Low Current SysteLow Current Systems 98 02-Sep-15 31-Dec-15 0
Fire Alarm SystemFire Alarm System 98 02-Sep-15 31-Dec-15 0
M1P7700 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 19
M1P7710 Fire Alarm Cable 18 21-Oct-15 10-Nov-15 SCG Ofoq 0
M1P7720 Fire Alarm Devices 18 11-Nov-15 01-Dec-15 SCG Ofoq 0
M1P7730 Testing And Precommissioning 25 02-Dec-15 31-Dec-15 SCG Ofoq 0
Data SystemData System 98 02-Sep-15 31-Dec-15 0
M1P7740 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0
Jun Jul Aug Sep Oct Nov Dec Jan eb
2015 2016
26-Nov-15, Plum
31-Dec-
08-Dec-15, S
31-Dec-
31-Dec-
17-Nov-15, Power
12-Nov-15, Power
19-Oct-15, Lighting Sys
31-Dec-
31-Dec-
31-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary Page 31 of 39 TASK filter: All Activities
© Primavera Systems, Inc.