Total No of Observation(s): 03
Date – 26-12-2022
1
EHS Observations Tour Report
4
Safety Statistics Report for FY 2022-23
Indicators FY 2021-22 MTD YTD Variation
Near Miss report (Nos) 2 15 -15.00
Safe Man Hours (Million) 47632 372944 -372944.00
Safety Observations 37 291 -291.00
EHS On Job Training (Nos) 1 4 -4.00
EHS Class Room Training (Nos) 1 5 -5.00
EHS Training Man Hours (Hrs) 51 232 -232.00
ESH Awareness Program (Nos) 0 2 -2.00
EHS Event (Nos) 0 3 -3.00
First Aid Injury 1 7 -7
Reportable Incident (Lost Time
Injury / Fatal)
0 0 0
Fire Incident report 0 0 0
Safety Lead Indicator
Safety Lagging Indicator
5
Safety Statistics Report for FY 2022-23
Issued Closed Issued Closed Open Closed Open Closed
Process 98 92 47 47 23 7 40 15
Mechanical 207 188 41 10 46 45 37 39
Electrical 66 45 64 62 13 11 13 8
Instrument 20 12 5 5 1 1 2 0
Civil 33 29 1 1 2 1 1 0
S&D
Store 0 0 0 0
Automobile
Estate office
HR & Admin 0 0 0 0
Project (WHR) 0 0 0 0
Unsafe
Conditions
(Nos)
Department
Work Permit
(Nos)
LOTOTO Permit
(Nos)
Unsafe Acts
(Nos)
6
Safety Statistics Report till today (December 2022)
Issued Closed Issued Closed Open Closed Open Closed
Process 10 4 0 0 2 0 4 1
Mechanical 12 5 5 3 4 2 8 0
Electrical 2 0 0 0 1 1 3 1
Instrument 0 0 0 0 0 0 2 0
Civil 1 0 0 0 0 0 0 0
S&D
Store
Automobile
Estate office
HR & Admin
Project (WHR)
TOTAL 25 9 5 3 7 3 17 2
Unsafe
(Nos)
Department
Work Permit
(Nos)
LOTOTO
(Nos)
Unsafe Acts
(Nos)
7
Fire Statistics Report for FY 2022-23
FIRE PROTECTION
Types of Fire
Extinguishers
Total Fire
Extinguishers
(Nos)
Inspected as on
date
(Nos)
Extinguishers
used
(Nos)
Extinguishers
under
maintenance
(Nos)
Extinguishers
Rejected
(Nos)
New
Installation
(Nos)
ABC
BC
CO2
Foam
D Type
K Type
PAINTING SECTION
Type of work FY 2021-22 MTD YTD
Painting (Sq. Feet)
Sticker work (Sq. Feet)
New installation (Nos)
Decoration work (Sq. Feet)
Observation No. -01
8
Unit: MPL Location: Furnace floor Sub Location:
BEFORE AFTER
Observation(s): Unsafe condition was
observed due to non insulation of fuel feeding
system.
Preventive Action: All fuel-feeding system
components must be insulated to prevent fire.
Responsibility: Status: Open Target Date:00/00/2022
Responsibility: Status: Target Date: 00/00/2022
Responsibility: Status: Target Date: 00/00/2022
Observation No. -02
9
Unit: MPL Location: Feeding floor Sub Location:
BEFORE AFTER
Observation(s): Non-availability of fire fighting
equipments in 8 MW boiler.
Preventive Action: Required minimum fire
extinguisher on each floor where possibility of
catch of fire.
Responsibility: Status: Closed Target Date:00/00/2022
Responsibility: Status: Target Date: 00/00/2022
Responsibility: Status: Target Date: 00/00/2022
Observation No. -03
10
Unit: MPL Location: Feeding floor Sub Location:
BEFORE AFTER
Observation(s): Required additional fire
fighting system on 8MW furnace and feeding
floor’s.
Preventive Action: Water sprinkle system or
water tapping required on each floor.
Responsibility: Status: Open Target Date:00/00/2022
Responsibility: Status: Target Date: 00/00/2022
Responsibility: Status: Target Date: 00/00/2022
11

More Related Content

What's hot

Weekly HSE Report25.pptx
Weekly HSE Report25.pptxWeekly HSE Report25.pptx
Weekly HSE Report25.pptxsufiyanssk
 
Safety committees duties 1
Safety committees duties 1Safety committees duties 1
Safety committees duties 1Roger Maxson
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdfjnanamaya Basu
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
Work permit system
Work permit systemWork permit system
Work permit systemsmithgeigle
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptBimal Chandra Das
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015Fitri Ifony
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 

What's hot (20)

HSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.pptHSE REPORT 2013-2014.ppt
HSE REPORT 2013-2014.ppt
 
Internal EHS Audit check sheet
Internal EHS Audit check sheetInternal EHS Audit check sheet
Internal EHS Audit check sheet
 
Weekly HSE Report25.pptx
Weekly HSE Report25.pptxWeekly HSE Report25.pptx
Weekly HSE Report25.pptx
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Safety committees duties 1
Safety committees duties 1Safety committees duties 1
Safety committees duties 1
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdf
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.ppt
 
HSE PRESENTATION
HSE PRESENTATIONHSE PRESENTATION
HSE PRESENTATION
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 

Similar to EHS-Safety Report

MRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMoolRaj3
 
Weekly slide - Wo-015 - 15 May to 22 May.pptx
Weekly slide - Wo-015 - 15 May  to 22 May.pptxWeekly slide - Wo-015 - 15 May  to 22 May.pptx
Weekly slide - Wo-015 - 15 May to 22 May.pptxSalmanKhan189856
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15Ptpg Stuc
 
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report  JUNE-2023 (1).pptxFM Partners Monthly OHS & E Report  JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptxRAPID187OXAGON
 
EHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxEHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxMoolRaj3
 
Rolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN finalRolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN finalRolinec Marek
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)thomas victor
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEGestore dei Servizi Energetici
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONcyberyogi07
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxMohHElkomy
 
ICCC2023 Statistics Report, has Common Criteria reached its peak?
ICCC2023 Statistics Report, has Common Criteria reached its peak?ICCC2023 Statistics Report, has Common Criteria reached its peak?
ICCC2023 Statistics Report, has Common Criteria reached its peak?Javier Tallón
 
Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...Gerald R. (Jerry) Genge
 

Similar to EHS-Safety Report (20)

MRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptx
 
Weekly slide - Wo-015 - 15 May to 22 May.pptx
Weekly slide - Wo-015 - 15 May  to 22 May.pptxWeekly slide - Wo-015 - 15 May  to 22 May.pptx
Weekly slide - Wo-015 - 15 May to 22 May.pptx
 
KAU transcript
KAU transcriptKAU transcript
KAU transcript
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15
 
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report  JUNE-2023 (1).pptxFM Partners Monthly OHS & E Report  JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
 
MAR,23.pptx
MAR,23.pptxMAR,23.pptx
MAR,23.pptx
 
EHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxEHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptx
 
Project HSE Progress .pptx
Project HSE  Progress  .pptxProject HSE  Progress  .pptx
Project HSE Progress .pptx
 
Rolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN finalRolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN final
 
Monthly report march, 2020(word)
Monthly report march, 2020(word)Monthly report march, 2020(word)
Monthly report march, 2020(word)
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
Monthly Progress Report No.05 - June-2012
Monthly Progress Report No.05 - June-2012Monthly Progress Report No.05 - June-2012
Monthly Progress Report No.05 - June-2012
 
total report
total reporttotal report
total report
 
Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptx
 
ICCC2023 Statistics Report, has Common Criteria reached its peak?
ICCC2023 Statistics Report, has Common Criteria reached its peak?ICCC2023 Statistics Report, has Common Criteria reached its peak?
ICCC2023 Statistics Report, has Common Criteria reached its peak?
 
Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...
 
Manish Engineering Works
Manish Engineering WorksManish Engineering Works
Manish Engineering Works
 

Recently uploaded

如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一ypfy7p5ld
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaMalviyaNagarCallGirl
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样umasea
 
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxDineshKumar4165
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERunosafeads
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company PresentationMihajloManjak
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样whjjkkk
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technologyquickpartslimitlessm
 
VDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive IndustriesVDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive IndustriesKannanDN
 
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...kexey39068
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHot Call Girls In Sector 58 (Noida)
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsMihajloManjak
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证jjrehjwj11gg
 
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 HybridHyundai Motor Group
 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualExcavator
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一ga6c6bdl
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一mjyguplun
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 

Recently uploaded (20)

如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company Presentation
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technology
 
VDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive IndustriesVDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive Industries
 
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and Qualifications
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
 
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 

EHS-Safety Report

  • 1. Total No of Observation(s): 03 Date – 26-12-2022 1 EHS Observations Tour Report
  • 2. 4 Safety Statistics Report for FY 2022-23 Indicators FY 2021-22 MTD YTD Variation Near Miss report (Nos) 2 15 -15.00 Safe Man Hours (Million) 47632 372944 -372944.00 Safety Observations 37 291 -291.00 EHS On Job Training (Nos) 1 4 -4.00 EHS Class Room Training (Nos) 1 5 -5.00 EHS Training Man Hours (Hrs) 51 232 -232.00 ESH Awareness Program (Nos) 0 2 -2.00 EHS Event (Nos) 0 3 -3.00 First Aid Injury 1 7 -7 Reportable Incident (Lost Time Injury / Fatal) 0 0 0 Fire Incident report 0 0 0 Safety Lead Indicator Safety Lagging Indicator
  • 3. 5 Safety Statistics Report for FY 2022-23 Issued Closed Issued Closed Open Closed Open Closed Process 98 92 47 47 23 7 40 15 Mechanical 207 188 41 10 46 45 37 39 Electrical 66 45 64 62 13 11 13 8 Instrument 20 12 5 5 1 1 2 0 Civil 33 29 1 1 2 1 1 0 S&D Store 0 0 0 0 Automobile Estate office HR & Admin 0 0 0 0 Project (WHR) 0 0 0 0 Unsafe Conditions (Nos) Department Work Permit (Nos) LOTOTO Permit (Nos) Unsafe Acts (Nos)
  • 4. 6 Safety Statistics Report till today (December 2022) Issued Closed Issued Closed Open Closed Open Closed Process 10 4 0 0 2 0 4 1 Mechanical 12 5 5 3 4 2 8 0 Electrical 2 0 0 0 1 1 3 1 Instrument 0 0 0 0 0 0 2 0 Civil 1 0 0 0 0 0 0 0 S&D Store Automobile Estate office HR & Admin Project (WHR) TOTAL 25 9 5 3 7 3 17 2 Unsafe (Nos) Department Work Permit (Nos) LOTOTO (Nos) Unsafe Acts (Nos)
  • 5. 7 Fire Statistics Report for FY 2022-23 FIRE PROTECTION Types of Fire Extinguishers Total Fire Extinguishers (Nos) Inspected as on date (Nos) Extinguishers used (Nos) Extinguishers under maintenance (Nos) Extinguishers Rejected (Nos) New Installation (Nos) ABC BC CO2 Foam D Type K Type PAINTING SECTION Type of work FY 2021-22 MTD YTD Painting (Sq. Feet) Sticker work (Sq. Feet) New installation (Nos) Decoration work (Sq. Feet)
  • 6. Observation No. -01 8 Unit: MPL Location: Furnace floor Sub Location: BEFORE AFTER Observation(s): Unsafe condition was observed due to non insulation of fuel feeding system. Preventive Action: All fuel-feeding system components must be insulated to prevent fire. Responsibility: Status: Open Target Date:00/00/2022 Responsibility: Status: Target Date: 00/00/2022 Responsibility: Status: Target Date: 00/00/2022
  • 7. Observation No. -02 9 Unit: MPL Location: Feeding floor Sub Location: BEFORE AFTER Observation(s): Non-availability of fire fighting equipments in 8 MW boiler. Preventive Action: Required minimum fire extinguisher on each floor where possibility of catch of fire. Responsibility: Status: Closed Target Date:00/00/2022 Responsibility: Status: Target Date: 00/00/2022 Responsibility: Status: Target Date: 00/00/2022
  • 8. Observation No. -03 10 Unit: MPL Location: Feeding floor Sub Location: BEFORE AFTER Observation(s): Required additional fire fighting system on 8MW furnace and feeding floor’s. Preventive Action: Water sprinkle system or water tapping required on each floor. Responsibility: Status: Open Target Date:00/00/2022 Responsibility: Status: Target Date: 00/00/2022 Responsibility: Status: Target Date: 00/00/2022
  • 9. 11