This weekly progress report covers the period from 31 October to 6 November 2022 for the Kusan Baru Infrastructure Development Project. Key highlights include:
- 26 workers were inducted and 24 were fit to work, with permits and licenses in order.
- Total man-hours for the week were 3,745 with staff and workers on site.
- Procurement status and deliveries are on track.
- Project progress was at 21.03% against the planned 20.19%, with works ongoing across site preparations, utilities installation, and civil works.
- Site photos documented ongoing activities across different areas.
Navigating the Health Insurance Market_ Understanding Trends and Options.pdfEnterprise Wired
From navigating policy options to staying informed about industry trends, this comprehensive guide explores everything you need to know about the health insurance market.
Defecation
Normal defecation begins with movement in the left colon, moving stool toward the anus. When stool reaches the rectum, the distention causes relaxation of the internal sphincter and an awareness of the need to defecate. At the time of defecation, the external sphincter relaxes, and abdominal muscles contract, increasing intrarectal pressure and forcing the stool out
The Valsalva maneuver exerts pressure to expel faeces through a voluntary contraction of the abdominal muscles while maintaining forced expiration against a closed airway. Patients with cardiovascular disease, glaucoma, increased intracranial pressure, or a new surgical wound are at greater risk for cardiac dysrhythmias and elevated blood pressure with the Valsalva maneuver and need to avoid straining to pass the stool.
Normal defecation is painless, resulting in passage of soft, formed stool
CONSTIPATION
Constipation is a symptom, not a disease. Improper diet, reduced fluid intake, lack of exercise, and certain medications can cause constipation. For example, patients receiving opiates for pain after surgery often require a stool softener or laxative to prevent constipation. The signs of constipation include infrequent bowel movements (less than every 3 days), difficulty passing stools, excessive straining, inability to defecate at will, and hard feaces
IMPACTION
Fecal impaction results from unrelieved constipation. It is a collection of hardened feces wedged in the rectum that a person cannot expel. In cases of severe impaction the mass extends up into the sigmoid colon.
DIARRHEA
Diarrhea is an increase in the number of stools and the passage of liquid, unformed feces. It is associated with disorders affecting digestion, absorption, and secretion in the GI tract. Intestinal contents pass through the small and large intestine too quickly to allow for the usual absorption of fluid and nutrients. Irritation within the colon results in increased mucus secretion. As a result, feces become watery, and the patient is unable to control the urge to defecate. Normally an anal bag is safe and effective in long-term treatment of patients with fecal incontinence at home, in hospice, or in the hospital. Fecal incontinence is expensive and a potentially dangerous condition in terms of contamination and risk of skin ulceration
HEMORRHOIDS
Hemorrhoids are dilated, engorged veins in the lining of the rectum. They are either external or internal.
FLATULENCE
As gas accumulates in the lumen of the intestines, the bowel wall stretches and distends (flatulence). It is a common cause of abdominal fullness, pain, and cramping. Normally intestinal gas escapes through the mouth (belching) or the anus (passing of flatus)
FECAL INCONTINENCE
Fecal incontinence is the inability to control passage of feces and gas from the anus. Incontinence harms a patient’s body image
PREPARATION AND GIVING OF LAXATIVESACCORDING TO POTTER AND PERRY,
An enema is the instillation of a solution into the rectum and sig
Welcome to Secret Tantric, London’s finest VIP Massage agency. Since we first opened our doors, we have provided the ultimate erotic massage experience to innumerable clients, each one searching for the very best sensual massage in London. We come by this reputation honestly with a dynamic team of the city’s most beautiful masseuses.
QA Paediatric dentistry department, Hospital Melaka 2020Azreen Aj
QA study - To improve the 6th monthly recall rate post-comprehensive dental treatment under general anaesthesia in paediatric dentistry department, Hospital Melaka
Navigating the Health Insurance Market_ Understanding Trends and Options.pdfEnterprise Wired
From navigating policy options to staying informed about industry trends, this comprehensive guide explores everything you need to know about the health insurance market.
Defecation
Normal defecation begins with movement in the left colon, moving stool toward the anus. When stool reaches the rectum, the distention causes relaxation of the internal sphincter and an awareness of the need to defecate. At the time of defecation, the external sphincter relaxes, and abdominal muscles contract, increasing intrarectal pressure and forcing the stool out
The Valsalva maneuver exerts pressure to expel faeces through a voluntary contraction of the abdominal muscles while maintaining forced expiration against a closed airway. Patients with cardiovascular disease, glaucoma, increased intracranial pressure, or a new surgical wound are at greater risk for cardiac dysrhythmias and elevated blood pressure with the Valsalva maneuver and need to avoid straining to pass the stool.
Normal defecation is painless, resulting in passage of soft, formed stool
CONSTIPATION
Constipation is a symptom, not a disease. Improper diet, reduced fluid intake, lack of exercise, and certain medications can cause constipation. For example, patients receiving opiates for pain after surgery often require a stool softener or laxative to prevent constipation. The signs of constipation include infrequent bowel movements (less than every 3 days), difficulty passing stools, excessive straining, inability to defecate at will, and hard feaces
IMPACTION
Fecal impaction results from unrelieved constipation. It is a collection of hardened feces wedged in the rectum that a person cannot expel. In cases of severe impaction the mass extends up into the sigmoid colon.
DIARRHEA
Diarrhea is an increase in the number of stools and the passage of liquid, unformed feces. It is associated with disorders affecting digestion, absorption, and secretion in the GI tract. Intestinal contents pass through the small and large intestine too quickly to allow for the usual absorption of fluid and nutrients. Irritation within the colon results in increased mucus secretion. As a result, feces become watery, and the patient is unable to control the urge to defecate. Normally an anal bag is safe and effective in long-term treatment of patients with fecal incontinence at home, in hospice, or in the hospital. Fecal incontinence is expensive and a potentially dangerous condition in terms of contamination and risk of skin ulceration
HEMORRHOIDS
Hemorrhoids are dilated, engorged veins in the lining of the rectum. They are either external or internal.
FLATULENCE
As gas accumulates in the lumen of the intestines, the bowel wall stretches and distends (flatulence). It is a common cause of abdominal fullness, pain, and cramping. Normally intestinal gas escapes through the mouth (belching) or the anus (passing of flatus)
FECAL INCONTINENCE
Fecal incontinence is the inability to control passage of feces and gas from the anus. Incontinence harms a patient’s body image
PREPARATION AND GIVING OF LAXATIVESACCORDING TO POTTER AND PERRY,
An enema is the instillation of a solution into the rectum and sig
Welcome to Secret Tantric, London’s finest VIP Massage agency. Since we first opened our doors, we have provided the ultimate erotic massage experience to innumerable clients, each one searching for the very best sensual massage in London. We come by this reputation honestly with a dynamic team of the city’s most beautiful masseuses.
QA Paediatric dentistry department, Hospital Melaka 2020Azreen Aj
QA study - To improve the 6th monthly recall rate post-comprehensive dental treatment under general anaesthesia in paediatric dentistry department, Hospital Melaka
R3 Stem Cells and Kidney Repair A New Horizon in Nephrology.pptxR3 Stem Cell
R3 Stem Cells and Kidney Repair: A New Horizon in Nephrology" explores groundbreaking advancements in the use of R3 stem cells for kidney disease treatment. This insightful piece delves into the potential of these cells to regenerate damaged kidney tissue, offering new hope for patients and reshaping the future of nephrology.
One of the most developed cities of India, the city of Chennai is the capital of Tamilnadu and many people from different parts of India come here to earn their bread and butter. Being a metropolitan, the city is filled with towering building and beaches but the sad part as with almost every Indian city
Medical Technology Tackles New Health Care Demand - Research Report - March 2...pchutichetpong
M Capital Group (“MCG”) predicts that with, against, despite, and even without the global pandemic, the medical technology (MedTech) industry shows signs of continuous healthy growth, driven by smaller, faster, and cheaper devices, growing demand for home-based applications, technological innovation, strategic acquisitions, investments, and SPAC listings. MCG predicts that this should reflects itself in annual growth of over 6%, well beyond 2028.
According to Chris Mouchabhani, Managing Partner at M Capital Group, “Despite all economic scenarios that one may consider, beyond overall economic shocks, medical technology should remain one of the most promising and robust sectors over the short to medium term and well beyond 2028.”
There is a movement towards home-based care for the elderly, next generation scanning and MRI devices, wearable technology, artificial intelligence incorporation, and online connectivity. Experts also see a focus on predictive, preventive, personalized, participatory, and precision medicine, with rising levels of integration of home care and technological innovation.
The average cost of treatment has been rising across the board, creating additional financial burdens to governments, healthcare providers and insurance companies. According to MCG, cost-per-inpatient-stay in the United States alone rose on average annually by over 13% between 2014 to 2021, leading MedTech to focus research efforts on optimized medical equipment at lower price points, whilst emphasizing portability and ease of use. Namely, 46% of the 1,008 medical technology companies in the 2021 MedTech Innovator (“MTI”) database are focusing on prevention, wellness, detection, or diagnosis, signaling a clear push for preventive care to also tackle costs.
In addition, there has also been a lasting impact on consumer and medical demand for home care, supported by the pandemic. Lockdowns, closure of care facilities, and healthcare systems subjected to capacity pressure, accelerated demand away from traditional inpatient care. Now, outpatient care solutions are driving industry production, with nearly 70% of recent diagnostics start-up companies producing products in areas such as ambulatory clinics, at-home care, and self-administered diagnostics.
CRISPR-Cas9, a revolutionary gene-editing tool, holds immense potential to reshape medicine, agriculture, and our understanding of life. But like any powerful tool, it comes with ethical considerations.
Unveiling CRISPR: This naturally occurring bacterial defense system (crRNA & Cas9 protein) fights viruses. Scientists repurposed it for precise gene editing (correction, deletion, insertion) by targeting specific DNA sequences.
The Promise: CRISPR offers exciting possibilities:
Gene Therapy: Correcting genetic diseases like cystic fibrosis.
Agriculture: Engineering crops resistant to pests and harsh environments.
Research: Studying gene function to unlock new knowledge.
The Peril: Ethical concerns demand attention:
Off-target Effects: Unintended DNA edits can have unforeseen consequences.
Eugenics: Misusing CRISPR for designer babies raises social and ethical questions.
Equity: High costs could limit access to this potentially life-saving technology.
The Path Forward: Responsible development is crucial:
International Collaboration: Clear guidelines are needed for research and human trials.
Public Education: Open discussions ensure informed decisions about CRISPR.
Prioritize Safety and Ethics: Safety and ethical principles must be paramount.
CRISPR offers a powerful tool for a better future, but responsible development and addressing ethical concerns are essential. By prioritizing safety, fostering open dialogue, and ensuring equitable access, we can harness CRISPR's power for the benefit of all. (2998 characters)
Contact Now 89011**83002 Dehradun ℂall Girls By Full Service ℂall Girl In De...
ccl-weekly report week8.pptx
1. WEEKLY PROGRESS REPORT (week 8)
PERIOD 31th Oct – 06th Nov, 2022
• PROYEK PEMBANGUNAN
INFRASTRUKTUR KUSAN BARU
2. Content
1. Issue Register
2. Man Hour
3. HSE performance
4. Procurement Status
5. Progress
6. Site Activity & Photos
7. Varian Order/ Add Work
3. No Minutes Date Raised ActionBy Due date Status
1 Pengajuan Comm sarana triton 04 Okt 2022 GGL 08 Oktober 2022 Closed
2 Pengajuan mine permit 04 Okt 2022 GGL 08 Oktober 2022 Closed
3 Ditambahkan Due date shop
drawing
04 Okt 2022 GGL 05 Okt 2022 Closed
4 Submit hit analisa strutur WS
servis
11 Okt 2022 GGL Closed
5 Submit Drawing struktur WS
servis
11 Okt 2022 GGL Closed
6. Lahan Rumah Genset ada
perubahan koordinat
17 Okt 2022 SIS Open
7. Lahan Washing perlu material
keras
17 Okt 2022 SIS Closed
4. 11/8/2022
Progress MCU
MCU 26
Follow up 0
Unfit 0
Review 2
FIT to WORK 24
Sudah FIT to WORK
Sdh Induksi 26
Blm Induksi 0
Status Permit Active
Standby 0
waskat 4
Mine permit 22
Total MP 26
0 0 2
24
Follow up Unfit Review FIT to WORK
MCU Progress Manpower
0
4
22
Standby waskat Mine permit
Status Permit Active
Man Hours
Name Jabatan Last Week these week total
Staff 742 224 966
Tukang 1281 343 2779
3745
5. INCIDENT CATEGORY LAST WEEK THESE WEEK TOTAL CASES
Fatality
Sub-contractor
Lost Time Injury (LTI)
Restricted Work Injury (RWI)
Medical Treatment Injury (MTI)
First Aid Injury (FAI)
Properti Damaged Incident (PDI)
Envronmental Incident (EI)
Nea Miss (NM)
TOTAL - - - -
8. MANPOWER DETAILS
15-18 19-25 26-30 01-09 10-16 17-23 24-30 31-06
W1 W2 W3 W4 W5 W6 W7 W8
Indirect
1 Site Manager/PJO 1 Orang plan 1 1 1 1 1 1 1 1
1 Orang actual 1 1 1 1 1 1
2 Project Control 1 Orang plan 1 1 1 1
actual
3 Safety Officer 1 Orang plan 1 1 1 1 1 1 1 1
1 Orang actual 1 1 1 1 1 1 1 1
4 Safety Man 1 Orang plan 1 1 1 1
actual
5 Civil Supervisor 2 Orang plan 1 1 1 1
actual 1
6 Steel Structure Supervisor 1 Orang plan
actual
7 Mech & Elect Plumbing Supervisor 1 Orang plan
actual
8 Surveyor 1 Orang plan 1 1 1 1 1
actual 2 2
9 Logistik 1 Orang plan 1 1 1 1
actual 1
10 Mechanic 1 Orang plan 1 1 1 1
actual
Jumlah Indirect 11 Orang 2 Orang 2 2 2 3 8 8 8 8
Direct MP
1 Pekerja Sipil
Foreman 4 Orang plan 1 1 1 1 1
1 Orang actual 1 1 1 1 1 1 1
Tukang kayu/besi 20 Orang plan 8 10 10 10 10
6 Orang actual 6 6 6 6 6 6 6
Tukan batu 50 Orang plan 10 10 10
actual 5 5 5 5
Helper 20 Orang plan 5 5 10 10 10
actual 5 5 5 5
4 Driver/Operator 2 Orang 1 plan 1 1 1 2 2
actual 1 2 2 2 2
Jumlah Direct 144 Orang 8 Orang Orang - - - 15 17 32 33 33
Plan 155 Orang 2 2 2 18 25 40 41 41
Actual 9 Orang 1 9 9 10 21 21 23 24
Deviation (1) 7 7 (8) (4) (19) (18) (17)
REMARK
PLANNED
No. POSITION
Schedule
ONSITE
(STANDBY)
ONISTE
(WORK)
QUANTITIES
SEPTEMBER 2022 OKTOBER 2022 NOVEMBER 2022 REMARK
1 2 3
9. EQUIPMENT DETAILS
15-18 19-25 26-30 01-09 10-16 17-23 24-30 31-06 07-13 14-20 21-27
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11
A Heavy Equipment
A.1 Excavator (by SIS) 1 Unit Plan 1 1 1 1
Actual
A.2 Greader Unit Plan
Actual
A.3 Vibro Roller Unit Plan
Actual
A.4 Crane (by SIS) Unit Plan 1 1 1
Actual
A.5 Sarana Elf 1 Unit Plan 1 1 1 1 1 1 1
Actual 1 1 1 1 1 1
A.6 Sarana Triton 2 Unit Plan 1 1 2 2 2 2 2
Actual 1 1 1 1 1
B Civil Tools
B.1 Bar cutter (gunting besi) 4 Unit Plan 1 1 1 2 2 4 4
Actual 1 1
B.2 Bar bending (bending manual) 4 Unit Plan 1 1 1 1 2 4 4
Actual 1 1
B.3 Pompa air celup 3" 3 Unit Plan 1 1 1 1 2 2 2
Actual 1 1
B.3 Stamper 4 Unit Plan 1 1 1 1 2 4 4
Actual 1 1
B.4 Concrete vibrator 4 Unit Plan 1 1 1 1 2 4 4
Actual 1 1
B.5 Mesin gerinda portable 4 Unit Plan 1 1 1 1 4 4 4
Actual 1 1
B.6 Mesin potong keramik 4 Unit Plan 1 1 1 1 4 4 4
Actual
B.7 Mesin bor portable 4 Unit Plan 1 1 1 1 4 4 4
Actual
B.10 Pesawat theodolite complit tripot Unit Plan 1 1 1 1 1 1 1
Actual 1 1
B.11 Pesawat waterpass complit tripot Unit Plan 1 1 1 1 1 1 1
Actual 1 1
B.8 Mesin molen cap / electric start 4 Unit Plan 1 1 2 2 3 3 3
1 1
B.9 Panel Listrik 2 unit Plan 1 1 1 1 1 2 2 2
Actual 1 1 1 1 1
C Steel Tools
D Mechanical dan Electrical Tools
E Perancah
No Jabatan
Schedule
REMARK
PLANNED
ONSITE
(STAND
BY)
ONISTE
(WORK)
1
QUANTITIES
SEPTEMBER 2022 OKTOBER 2022 NOVEMBER 2022
2 3
10. MATERIAL NAME PURPOSE DELIVERY QUANTITIES REMARKS
Pancang Ws servis 60 batang
Besi Beton dadn wiremesh TPS B3 5,5 ton
11. 20.19 %
21.03 %
0.84 %
progress (%) progress (%) progress (%)
PERSIAPAN
1 Pengurusan HIRA - JSA 1 ls 0.58 100.00% 0.58 - 100.00% 0.58 0.58 - 0.58
-
2 Pengukuran dan Bouwplank 1.00 ls 2.50 36.36% 0.91 9.09% 0.23 45.45% 1.14 1.14 - 1.36
-
3 Direksi Keet, Kantor Lapangan, Barak kerja dan Gudang 1.00 ls 2.73 105.00% 2.86 25.00% 0.68 130.00% 3.55 2.73 0.82 2.73
-
4 Penyediaan listrik kerja ( power by owner ) 1.00 ls 0.58 45.45% 0.26 18.18% 0.11 63.64% 0.37 0.32 0.05 0.37
-
5 Penyediaan air Kerja ( suplly by owner )+Alat penampungan dari DSS 1.00 ls 0.47 13.79% 0.06 3.45% 0.02 17.24% 0.08 0.08 - 0.10
-
6 Laporan & photo proyek 1.00 ls 0.14 24.14% 0.03 3.45% 0.00 27.59% 0.04 0.04 - 0.04
-
7 Papan nama Proyek 1.00 ls 0.03 100.00% 0.03 0.00% - 100.00% 0.03 0.03 - 0.03
-
8 K-3 / Safety / MCU/PROKES COVID 19 1.00 ls 10.96 13.79% 1.51 3.45% 0.38 17.24% 1.89 1.89 - 2.27
-
9 Mobilisasi dan Demobilisasi 1.00 ls 28.95 13.79% 3.99 3.45% 1.00 17.24% 4.99 4.99 - 5.99
-
10 Fee design 1.00 ls 2.06 45.00% 0.92 6.67% 0.14 51.67% 1.06 1.10 (0.03) 1.23
11 Biaya Security & CSR -
a. 8.00 Bln 0.60 13.79% 0.08 3.45% 0.02 17.24% 0.10 0.10 - 0.12
-
12 Site Management 1.00 Bln 50.42 10.71% 5.40 3.57% 1.80 14.29% 7.20 7.20 - 9.00
100.00
- 20.19 23.83
16.66 4.37 21.03
0.84
NO Description Unit Quantity
Value
(%)
Plan
Actual
Deviation
PROGESS RENCANA
plan
PROGRESS
KET
DEVIASI
Plan Next
period
(week 8)
Deviation
PROGESS RENCANA KOMULATIF
PROGESS AKTUAL
PROGESS AKTUAL KOMULATIF
Last Period This Period Cumulative
21. PROSES REVIEW REVISI APPROVED
SUBMIT RECEIVED SUBMIT RECEIVED SUBMIT RECEIVED SUBMIT RECEIVED SUBMIT RECEIVED
1 WORKSHOP SERVICE 1 DRAWING ARSITEKTUR 10/20/2022 REVIEW 02-Nov-22
2 DRAWING STRUKTUR 10/20/2022 REVIEW 12-Oct-22
2.1 DRAWING STRUKTUR BAJA 9/24/2022 9/30/2022 10/18/2022 REVIEW 19-Oct-22
3 DRAWING MECHANICAL & PLUMBING PROSES 22-Dec-22
4 DRAWING ELECTRICAL PROSES 22-Dec-22
2 TPS B3
1 DRAWING ARSITEKTUR 9/12/2022 9/21/2022 9/26/2022 9/30/2022 10/6/2022 10/13/2022 10/19/2022 10/20/2022 REVIEW 16-Nov-22
2 DRAWING STRUKTUR 9/12/2022 9/21/2022 9/26/2022 9/30/2022 10/6/2022 10/13/2022 10/19/2022 10/20/2022 REVIEW 12-Oct-22
2.1 DRAWING STRUKTUR BAJA 10/6/2022 10/13/2022 10/20/2022 REVIEW 16-Nov-22
3 DRAWING ELECTRICAL PROSES 07-Dec-22
4 DRAWING MECHANICAL & PLUMBING PROSES 07-Dec-22
3 WASHING BAYS
1 DRAWING ARSITEKTUR PROSES 02-Nov-22
2 DRAWING STRUKTUR 9/5/2022 10/12/2022 10/28/2022 REVIEW 12-Oct-22
3 DRAWING ELECTRICAL PROSES 02-Nov-22
4 DRAWING MECHANICAL & PLUMBING PROSES 02-Nov-22
4 RUMAH GENSET
1 DRAWING ARSITEKTUR 10/8/2022 9/30/2022 10/7/2022 10/17/2022 10/20/2022 REVIEW 09-Nov-22
2 DRAWING STRUKTUR 10/8/2022 9/30/2022 10/7/2022 10/17/2022 10/20/2022 REVIEW 12-Oct-22
2.1 DRAWING STRUKTUR BAJA 10/6/2022 10/17/2022 10/21/2022 REVIEW
3 DRAWING ELECTRICAL PROSES 09-Nov-22
4 DRAWING MECHANICAL & PLUMBING PROSES 09-Nov-22
REMARKS
NAMA GAMBAR R4
No. NAMA BANGUNAN STATUS
SUBMIT
PLAN BY
GGL
SUBMIT
R0 R1 R2 R3
DRAWING APPROVAL
SIS JOBSITE BORO
Sumbitted by : PT. Gelar Gatra Laras
Project : MIA KUSAN
22. SUBMIT RECEIVED
Review Approved Review Approved Review Approved Review Approved Review Approved Review Approved Review Approved Review Approved Review Approved Review Approved Review Approved
1 001/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL BESI BETON & WIREMESH 9/9/2022 9/14/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
2 002/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL BAJA 10/5/2022 10/17/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
3 003/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL CAT BAJA 9/9/2022 9/14/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
4 004/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL CAT DEMARKASI 9/18/2022 9/19/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
5 005/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL ATAP ZINCALUME & WALL CLADING 9/9/2022 9/14/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
6 006/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL RANGKA ATAP 9/9/2022 9/14/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
7 007/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL INSULATION ATAP 10/5/2022 REVIEW x x x x 1 - x x x x x x 1 - x x x x 1 - 1 -
8 008/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL TALANG DATAR 9/9/2022 9/14/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
9 009/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL PLAFOND GYPSUM, PLAFON GRC, RANGKA HOLLOW ZINCALUM 9/9/2022 9/14/2022 APPROVED x x x x x x x x x x x x - 1 x x x x x x - 1
10 010/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL CAT PLAFOND, CAT INTERIOR & EXTERIOR 9/24/2022 9/27/2022 APPROVED x x x x - 1 - 1 x x x x - 1 - 1 - 1 - 1 - 1
11 011/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL KUSEN PINTU, JENDELA & DAUN JENDELA 9/18/2022 9/19/2022 APPROVED x x x x x x x x x x x x - 1 x x x x - 1 - 1
12 012/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL KERAMIK 9/28/2022 10/5/2022 APPROVED x x x x x x x x x x x x x x x x x x - 1 - 1
13 013/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL PAGAR BRC 9/24/2022 9/27/2022 APPROVED x x x x - 1 x x x x x x x x x x x x x x -
14 014/GGL-STR-SIS/VII/2022 MATERIAL APPROVAL SANITARY 9/18/2022 9/19/2022 APPROVED x x x x x x x x x x x x x x x x x x - 1 - 1
15 015/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL LAMPU 10/5/2022 10/11/2022 APPROVED - 1 x x x x - 1 - 1 - 1 - 1 x x x x x x -
16 016/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL KABEL 9/18/2022 9/10/2022 APPROVED - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
17 017/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL PANEL
18 018/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL PIPA PVC 9/24/2022 10/3/2022 APPROVED x x x x x x x x x x x x - 1 x x x x - 1 - 1
19 019/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL BOOSTER PUMP 9/18/2022 10/3/2022 APPROVED - 1 x x x x x x - 1 - 1 x x x x x x x x -
20 020/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL KOMPRESSOR (GIP MED) 9/18/2022 10/11/2022 APPROVED - 1 x x x x x x - 1 - 1 x x x x x x x x -
21 021/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL BALL VALVE 10/7/2022 10/11/2022 APPROVED - 1 x x x x x x - 1 - 1 x x x x x x x x -
22 022/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL CABLE LADDER 9/24/2022 10/3/2022 APPROVED - 1 x x x x x x - 1 1 - 1 x x x x 1 -
23 023/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL PIPA OLI 10/5/2022 REVISI 1 - x x x x x x 1 - 1 - x x x x x x x x -
24 024/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL GATE VALVE 10/7/2022 10/11/2022 APPROVED x x x x - 1 x x x x x x x x x x x x x x -
25 025/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL PENANGKAL PETIR 10/5/2022 10/11/2022 APPROVED - 1 x x - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
26 026/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL TATA UDARA AC 9/24/2022 10/3/2022 APPROVED x x x x x x x x x x x x x x x x x x - 1 - 1
27 027/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL STOP KONTAK 10/6/2022 10/11/2022 APPROVED - 1 x x - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1
28 028/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL WATER TANK 10/6/2022 10/11/2022 APPROVED x x x x x x x x x x x x - 1 x x x x - 1 - 1
29 029/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL SEPTIC TANK 10/5/2022 10/11/2022 APPROVED x x x x x x x x x x x x - 1 x x x x - 1 - 1
30 030/GGL-MEP-SIS/VII/2022 MATERIAL APPROVAL PANEL SENDWITCH 10/6/2022 10/17/2022 APPROVED x x x x x x x x x x x x - 1 x x x x - 1 - 1
31 031/GGL-STR-SIS/X/2022 MATERIAL APPROVAL TIANG PANCANG 10/21/2022 10/25/2022 APPROVED - 1 x x x x x x x x x x x x x x x x x x x x
1 16 0 8 1 13 0 12 1 15 1 15 1 19 0 11 0 11 1 20 1 20
5.9% 94.1% 0.0% 100.0% 7.1% 92.9% 0.0% 100.0% 6.3% 93.8% 6.3% 93.8% 5.0% 95.0% 0.0% 100.0% 0.0% 100.0% 4.8% 95.2% 4.8% 95.2%
GUDANG
OLI
MAIN
OFFICE
MASJID
TPS
B3
WORKSHOP
TYRE
WORKSHOP
FABRIKASI
WARE
HOUSE
GUDANG
KOMP
FORM UPDATE MATERIAL APPROVAL
PROYEK PEKERJAAN WORKSHOP MODULAR
SIS BORO KUSAN ATAS-KALIMANTAN SELATAN
SUBMIT
R0
No. Nomor Dokumen Nama Dokumen STATUS
WS
SERVICE
WASHING
BAY
RUMAH
GENSET
23. Fabrikasi begesting
TPS B3
Pek Galian pondasi PC1 Mapping pek pancang
Pek pelurusan besi D19 Pek Pancang as B Fabrikasi besi PC 1